SlideShare a Scribd company logo
1 of 17
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
CAI MEP INTERNATIONAL CONTAINER TERMINAL 
METHOD STATEMENT OF INSTALLATION ROOF FAN AND NATURAL 
VENTILATOR FOR BUILDING WORK 
Page 1
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
TABLE OF CONTENS 
1. Introduction Page 3 
2. References Page 3 
3. Work Flow Chart Page 4 
4. Work Procedure Page 5 
4.1 Preparation work Page 5 
4.2 Survey fan location Page 5 
4.3 Installation work Page 5 
4.4 Manpower & Equipment Plan Page 9 
4.5 QA/QC Procedures Page 10 
4.6 Site supervision and Process control Page 10 
5. Safety process Page 10 
6. Environment Protection Page 11 
7. Organization chart Page 12 
8. Appendix Page 12 
1. Work schedule 
2. Inspection & Testing Plan (ITP) 
3. Inspection form 
4. Check list 
5. Test report 
Page 2
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
1. INTRODUCTION: 
This Method Statement is prepared to ensure that installation of Roof fan and Natural 
ventilator for Mechanical work on this project shall comply on specifications, approved shop 
drawing, and all relevant standard and code requirements in the execution of different work 
activities to be performed in the installation of Roof fan and Natural ventilator. In addition, 
this will serve as a tool to guide all technical personnel and layman execute proper installation 
procedures complied with the quality and safety plans for the project. 
2. REFERENCE TECHNICAL SPECIFICATION: 
Page 3
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
1. WORK FLOW CHART: 
. 
Submission of Shop drawing; 
Not Approved 
get approval 
Preparation work 
Survey work 
Installation work 
Testing & 
Inspection 
with JPC-NK 
Approved 
Page 4 
Rectification 
of Work 
Cleaning & Touch-up paint 
Completion Work
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
3. WORK PROCEDURE: 
The work procedure is described as follows: 
4.1 PREPARATION WORK: 
Before carrying out any work, check the followings as listed below: 
- Checks all approved shop drawings and confirm latest drawings are used. 
- Confirm all materials procured against material approval list. 
- Ensure that approved installation details methods are fully comprehended by the 
workers. 
- Clear area under installation location and install warning tape for forbidding non-authorized 
person to enter. 
- Support for fan shall be prepared prior to installation work. 
- Check dimension of fan’s support to ensure enough space for installation fan. 
- The coordinates and level shall be followed approved shop drawing and confirmed with 
Engineer prior to the commencement of construction works. 
- Roof fan , Natural ventilator shall be approved and accepted for using by Engineer. 
4.2 SURVEY FAN LOCATION: 
After determining the coordinates and elevation level, location and level of Fan shall be 
determined following approved shop drawing with Engineer’s representative. The support of fan 
shall be fabricated basing on approved shop drawing in accordance with instruction by the 
Engineer (if any). 
4.3 INSTALLATION WORK: 
4.3.1. Support Installation: 
- Support shall be fabricated to follow approved drawing of Engineer and installed on the 
steel structure of building. 
- Support shall be painted with approved color prior to installation work. 
- The survey work shall be done to confirm the location of support and to be checked by 
Engineer. 
- Installation work shall be carried out carefully because of high level. Workers shall 
observe safety patrol for working at high level. 
- Supports shall be fixed to steel structure by bolt and nut with washers after that checking 
its stable by visual and shaking by hand. 
Page 5
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Page 6
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
4.3.2 Fan installation: 
Fan shall be installed on the steel support or concrete base. The dimension of both kind have to 
follow the manufacture specification. 
Fan shall be fixed to support by screws or bolts with quantity and size basing on approved shop 
drawing and instruction of Engineer. 
The rubber isolator with 10mm thickness shall also be installed between fan’s base and support. 
Page 7
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
The balance and level of fan shall be check carefully prior to fixing work. 
Screw or bolt for fixed fan to support do not over-tighten to prevent distortion of fan base (in 
case fan case made by GPR, fiberglass) and rubber isolator. 
Water proof work shall be carried out carefully to ensure non-leakage when it rain. Every gap, 
joint shall be sealed by suitable caulking material which is approved by Engineer. 
4.3.3 Testing work: 
Air flow rate of fan (except Natural ventilator) shall be tested basing on the specification. 
Electrical power (voltage, ampere) shall be also check to ensure the operation of fan with 
correctly condition. 
4.3.4 Completion work: 
At the end of Mechanical work, all equipment and redundant material shall be removed and 
transported to another place. Clean up the working place for next work team to start. 
Touch-up paint to damage position on support before finishing work. 
4.3.5 Electrical work: 
Electrical work(power supply) shall be executed to follow the approved drawing by skill 
electrical worker after Mechanical work finished. 
Page 8
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
4.4 MANPOWER AND EQUIPMENT: 
4.4.1 Manpower List : 
No. Designation Unit Quantity 
1 M&E Manager (Japanese) Person 1 
2 Chief Engineer (Japanese) Person 1 
3 Site Engineer (Local) Person 2 
4 QA/QC & Safety Engineer Person 1 
5 Skilled worker Person 2 
6 Unskilled labor Person 8 
7 Foremen Person 1 
8 Welder Person 1 
TOTAL Persons 17 
4.4.2 Equipment List : 
No. Designation Unit Quantity 
1 Cutter Set 1 
2 Drilling machine Set 1 
3 Marking instrument Set 1 
4 Scale Set 1 
5 Bubble level Set 1 
6 
Hand tools(Screw driver, basin 
wrench, pliers, adjustable wrench, 
etc.) 
lot 1 
7 Extension Socket for power supply lot 1 
8 Electric welding machine Set 1 
4.5 QA/QC PROCEDURES: 
4.5.1 General 
The Contractor shall submit the name, shop drawing and appropriate details of any 
independent testing organization to the Engineer for approval before any construction work 
for fan installation commences. 
Page 9
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
4.5.2 Materials Testing 
Materials testing are to be carried out before delivery of materials into the site and quality 
certificate shall be submitted. 
The Contractor should be submitted to the Engineer the related documents for approval 
before delivery to site or start the construction. 
The inspection report or specification of Fan shall be received before arrival of Fan on site. 
Upon arrival on site, Fan shall be inspected as to dimensions, quantity, and physical 
condition and reported to the Engineer. 
4.6 SITE SUPERVISION AND PROCESS CONTROL: 
Approved for materials shall be carried out prior to delivery to the project site. Constructions 
shall be followed approved shop drawing by Engineer. 
The Ventilation Fan, support, & accessories shall be checked and inspected for defects to 
ensure that all material is good quality prior to install. 
The work shall be supervised by qualified and experienced staff and executed by highly 
skilled , experienced operators and workers. 
5. SAFETY PROCESS: 
The project Safety Plan is established for the Construction of CAI MEP INTERNATIONAL 
CONTAINER TERMINAL in Vietnam based on Occupational Health and Safety and 
Rehabilitation Management Manual of TTJV. 
The safety control of works shall be maintained and ensure its compliance through-out the 
completion period so that works can be executed smoothly without unnecessary interruption. 
Importance shall be placed on the prevention of any accident such as personal injury , 
damage to structures and work itself. 
In general, safety rules and regulations stipulated by the governing authorities of Vietnam as 
well as by the client shall be observed. 
6. ENVIROMENT PROTECTION: 
The Project Environmental Management Plan (EMP) addresses the requirements for 
Environmental Management, outlining how the scope, as described by the Conditions of 
Contract , will be implemented to achieve the key objectives for CAI MEP 
Page 10
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
INTERNATIONAL CONTAINER TERMINAL PROJECT , and has been designed to 
comply with the intent of OHSAS 18001 and ISO 14001. 
Built into this operating system will be CAI MEP INTERNATIONAL CONTAINER 
TERMINAL PROJECT Specification requirements ,as defined in the contract. This 
Environmental Management Plan will incorporate work method statements, inspections, test 
plans , and check sheets are developed to cover the particular requirements of this project. 
This Plan is established based on the Environmental Management Manual of TTJV. 
All materials will be stacked safely and with clear means of access. Scrap, rubbish and debris 
frequently and regularly will be removed from the site. 
Combustible waste materials and rubbish will not be allowed accumulating within the project 
site or in its immediate vicinity. A waste bin will be placed. 
Welding and cutting are prohibited near the places of combustible materials, or to the area 
where flammable dust, gas or vapor, which are likely to be present or given off. 
Regular disposal of rubbish will be maintained as soon as practicable. 
Proper maintenance and operation of engines will be controlled emission from gas or diesel 
engines. 
No person will permit to drive a vehicle without an appropriate license to drive. 
All workers must wear proper personal protective equipment. 
All field staffs and workers including subcontractor are given a counseling and training to 
apprise the HSE requirements. 
All related tools and equipment should regularly maintain and check for safe working 
condition. 
An emergency contact network is a source to avoid negative events such as an accident. 
Working area will regularly be inspected for cleanliness (Housekeeping) and safe working 
environment. 
Regular daily toolbox meeting will be held before start working. 
7. ORGANIZATION CHART : 
TOA-TOYO 
(MAIN CONTRACTOR) 
Mr. Fukushima 
Project Manager 
Page 11
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
YURTEC 
(SUBCONTRACTOR) 
8. APPENDIX : 
Mr. Asai 
Building Manager 
(TTJV) 
Mr. Sato 
M&E Deputy 
Manager 
1. Work schedule 
2. Inspection & Testing plan (ITP) 
3. Inspection form 
4. Check list 
5. Test Report 
Page 12 
TTJV Mechanical 
Engineer 
TTJV Electrical 
Engineer 
Surveyor 
Mr. Rolly 
Bldg QS/QC Chief 
Engineer 
Mr. Quan 
HSE Manager 
Bldg M&E Chief 
Engineer 
Mr. Bao Anh 
Mr. Chau 
Mechanical Engineer 
Mr. Quang 
Electrical Engineer 
Mr. Satoh 
M&E Manager
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Appendix - 1 
Work schedule 
Page 13
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Appendix - 2 
Inspection and Test Plan 
Page 14
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Appendix - 3 
Inspection form 
Page 15
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Appendix - 4 
Check list 
Page 16
Doc. Title Method Statement of installation 
Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Appendix - 5 
Test Report 
Page 17

More Related Content

What's hot

Safety interview question & answer
Safety interview question & answerSafety interview question & answer
Safety interview question & answerSalim Solanki
 
Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)Devinder Chawla
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templatesDwarika Bhushan Sharma
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...Ahmad Nazib
 
Erection method statement
Erection method statementErection method statement
Erection method statementkanalbiru
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.maqsood1459
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler houseAnatoliZ
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Abirami V Veeramani
 
Method statement painting
Method statement painting Method statement painting
Method statement painting Daniel SLSA CLA
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docxTOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docxDwarika Bhushan Sharma
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templatesDwarika Bhushan Sharma
 
4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan4.6 working at heights and fall protection plan
4.6 working at heights and fall protection planDwarika Bhushan Sharma
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CVSony Mani
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templatesDwarika Bhushan Sharma
 
Method statement for civil works
Method statement for civil worksMethod statement for civil works
Method statement for civil worksMuhammad Shahid
 
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docxLIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docxDwarika Bhushan Sharma
 

What's hot (20)

Safety interview question & answer
Safety interview question & answerSafety interview question & answer
Safety interview question & answer
 
Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
My Resume
My ResumeMy Resume
My Resume
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
Erection method statement
Erection method statementErection method statement
Erection method statement
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
 
Method statement painting
Method statement painting Method statement painting
Method statement painting
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docxTOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 
Full report (Petronas Prai)
Full report (Petronas Prai)Full report (Petronas Prai)
Full report (Petronas Prai)
 
4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
 
Method statement for civil works
Method statement for civil worksMethod statement for civil works
Method statement for civil works
 
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docxLIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
 
UBBL 2021.pdf
UBBL 2021.pdfUBBL 2021.pdf
UBBL 2021.pdf
 

Viewers also liked

Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 
03 jun 08 pile head
03 jun 08 pile head03 jun 08 pile head
03 jun 08 pile headMinh Bui Si
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structureMinh Bui Si
 
Static load test method statement cm - ms- bw - 003
Static load test method statement  cm - ms- bw - 003Static load test method statement  cm - ms- bw - 003
Static load test method statement cm - ms- bw - 003Minh Bui Si
 
Excavation method rectified 13-11-2010
Excavation method   rectified 13-11-2010Excavation method   rectified 13-11-2010
Excavation method rectified 13-11-2010Minh Bui Si
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concreteMinh Bui Si
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paintMinh Bui Si
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Minh Bui Si
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surfaceMinh Bui Si
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002Minh Bui Si
 
X ref auto cad 2007+r4
X ref auto cad 2007+r4X ref auto cad 2007+r4
X ref auto cad 2007+r4HaGun Gunawan
 
Scs leakage prevention practices
Scs leakage prevention practicesScs leakage prevention practices
Scs leakage prevention practicesTran Khanh
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture worksMohd Nizam Mohd Zan
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement worksMohd Nizam Mohd Zan
 
Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test observation and calculation Plate load test image (usefulsear...Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test observation and calculation Plate load test image (usefulsear...Make Mannan
 
Supervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeSupervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeTong Seng Chua
 
Lab safety ppt
Lab safety pptLab safety ppt
Lab safety pptclemesg
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTmustafa hussain
 

Viewers also liked (20)

Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 
03 jun 08 pile head
03 jun 08 pile head03 jun 08 pile head
03 jun 08 pile head
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Static load test method statement cm - ms- bw - 003
Static load test method statement  cm - ms- bw - 003Static load test method statement  cm - ms- bw - 003
Static load test method statement cm - ms- bw - 003
 
Excavation method rectified 13-11-2010
Excavation method   rectified 13-11-2010Excavation method   rectified 13-11-2010
Excavation method rectified 13-11-2010
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concrete
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surface
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
 
X ref auto cad 2007+r4
X ref auto cad 2007+r4X ref auto cad 2007+r4
X ref auto cad 2007+r4
 
Scs leakage prevention practices
Scs leakage prevention practicesScs leakage prevention practices
Scs leakage prevention practices
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture works
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test observation and calculation Plate load test image (usefulsear...Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test observation and calculation Plate load test image (usefulsear...
 
Lab safety good ppt
Lab safety   good pptLab safety   good ppt
Lab safety good ppt
 
Supervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeSupervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, Singapore
 
Lab safety ppt
Lab safety pptLab safety ppt
Lab safety ppt
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 

Similar to 2 cm-ms-bld-012 - roof fan & natural ventilator

Lifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchLifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchHaGun Gunawan
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updatedPersonal Secret
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Iqbal Mohammad
 
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Krm Chari
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015HaGun Gunawan
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works Shaik Mohsin
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013leo040490
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfMDAbdullah621330
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
MFRH Erection & Commissioning Method.pdf
MFRH Erection & Commissioning Method.pdfMFRH Erection & Commissioning Method.pdf
MFRH Erection & Commissioning Method.pdfssuseref23d3
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi AhmadAhmad Hadi
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 

Similar to 2 cm-ms-bld-012 - roof fan & natural ventilator (20)

Lifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchLifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winch
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)
 
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
Spe
SpeSpe
Spe
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
MFRH Erection & Commissioning Method.pdf
MFRH Erection & Commissioning Method.pdfMFRH Erection & Commissioning Method.pdf
MFRH Erection & Commissioning Method.pdf
 
T.rajakumar.cv
T.rajakumar.cvT.rajakumar.cv
T.rajakumar.cv
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
CURRECULUM VITAE
CURRECULUM VITAECURRECULUM VITAE
CURRECULUM VITAE
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
03 Mohamed_fathi
03 Mohamed_fathi03 Mohamed_fathi
03 Mohamed_fathi
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 

2 cm-ms-bld-012 - roof fan & natural ventilator

  • 1. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal CAI MEP INTERNATIONAL CONTAINER TERMINAL METHOD STATEMENT OF INSTALLATION ROOF FAN AND NATURAL VENTILATOR FOR BUILDING WORK Page 1
  • 2. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal TABLE OF CONTENS 1. Introduction Page 3 2. References Page 3 3. Work Flow Chart Page 4 4. Work Procedure Page 5 4.1 Preparation work Page 5 4.2 Survey fan location Page 5 4.3 Installation work Page 5 4.4 Manpower & Equipment Plan Page 9 4.5 QA/QC Procedures Page 10 4.6 Site supervision and Process control Page 10 5. Safety process Page 10 6. Environment Protection Page 11 7. Organization chart Page 12 8. Appendix Page 12 1. Work schedule 2. Inspection & Testing Plan (ITP) 3. Inspection form 4. Check list 5. Test report Page 2
  • 3. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 1. INTRODUCTION: This Method Statement is prepared to ensure that installation of Roof fan and Natural ventilator for Mechanical work on this project shall comply on specifications, approved shop drawing, and all relevant standard and code requirements in the execution of different work activities to be performed in the installation of Roof fan and Natural ventilator. In addition, this will serve as a tool to guide all technical personnel and layman execute proper installation procedures complied with the quality and safety plans for the project. 2. REFERENCE TECHNICAL SPECIFICATION: Page 3
  • 4. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 1. WORK FLOW CHART: . Submission of Shop drawing; Not Approved get approval Preparation work Survey work Installation work Testing & Inspection with JPC-NK Approved Page 4 Rectification of Work Cleaning & Touch-up paint Completion Work
  • 5. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 3. WORK PROCEDURE: The work procedure is described as follows: 4.1 PREPARATION WORK: Before carrying out any work, check the followings as listed below: - Checks all approved shop drawings and confirm latest drawings are used. - Confirm all materials procured against material approval list. - Ensure that approved installation details methods are fully comprehended by the workers. - Clear area under installation location and install warning tape for forbidding non-authorized person to enter. - Support for fan shall be prepared prior to installation work. - Check dimension of fan’s support to ensure enough space for installation fan. - The coordinates and level shall be followed approved shop drawing and confirmed with Engineer prior to the commencement of construction works. - Roof fan , Natural ventilator shall be approved and accepted for using by Engineer. 4.2 SURVEY FAN LOCATION: After determining the coordinates and elevation level, location and level of Fan shall be determined following approved shop drawing with Engineer’s representative. The support of fan shall be fabricated basing on approved shop drawing in accordance with instruction by the Engineer (if any). 4.3 INSTALLATION WORK: 4.3.1. Support Installation: - Support shall be fabricated to follow approved drawing of Engineer and installed on the steel structure of building. - Support shall be painted with approved color prior to installation work. - The survey work shall be done to confirm the location of support and to be checked by Engineer. - Installation work shall be carried out carefully because of high level. Workers shall observe safety patrol for working at high level. - Supports shall be fixed to steel structure by bolt and nut with washers after that checking its stable by visual and shaking by hand. Page 5
  • 6. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Page 6
  • 7. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 4.3.2 Fan installation: Fan shall be installed on the steel support or concrete base. The dimension of both kind have to follow the manufacture specification. Fan shall be fixed to support by screws or bolts with quantity and size basing on approved shop drawing and instruction of Engineer. The rubber isolator with 10mm thickness shall also be installed between fan’s base and support. Page 7
  • 8. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal The balance and level of fan shall be check carefully prior to fixing work. Screw or bolt for fixed fan to support do not over-tighten to prevent distortion of fan base (in case fan case made by GPR, fiberglass) and rubber isolator. Water proof work shall be carried out carefully to ensure non-leakage when it rain. Every gap, joint shall be sealed by suitable caulking material which is approved by Engineer. 4.3.3 Testing work: Air flow rate of fan (except Natural ventilator) shall be tested basing on the specification. Electrical power (voltage, ampere) shall be also check to ensure the operation of fan with correctly condition. 4.3.4 Completion work: At the end of Mechanical work, all equipment and redundant material shall be removed and transported to another place. Clean up the working place for next work team to start. Touch-up paint to damage position on support before finishing work. 4.3.5 Electrical work: Electrical work(power supply) shall be executed to follow the approved drawing by skill electrical worker after Mechanical work finished. Page 8
  • 9. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 4.4 MANPOWER AND EQUIPMENT: 4.4.1 Manpower List : No. Designation Unit Quantity 1 M&E Manager (Japanese) Person 1 2 Chief Engineer (Japanese) Person 1 3 Site Engineer (Local) Person 2 4 QA/QC & Safety Engineer Person 1 5 Skilled worker Person 2 6 Unskilled labor Person 8 7 Foremen Person 1 8 Welder Person 1 TOTAL Persons 17 4.4.2 Equipment List : No. Designation Unit Quantity 1 Cutter Set 1 2 Drilling machine Set 1 3 Marking instrument Set 1 4 Scale Set 1 5 Bubble level Set 1 6 Hand tools(Screw driver, basin wrench, pliers, adjustable wrench, etc.) lot 1 7 Extension Socket for power supply lot 1 8 Electric welding machine Set 1 4.5 QA/QC PROCEDURES: 4.5.1 General The Contractor shall submit the name, shop drawing and appropriate details of any independent testing organization to the Engineer for approval before any construction work for fan installation commences. Page 9
  • 10. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 4.5.2 Materials Testing Materials testing are to be carried out before delivery of materials into the site and quality certificate shall be submitted. The Contractor should be submitted to the Engineer the related documents for approval before delivery to site or start the construction. The inspection report or specification of Fan shall be received before arrival of Fan on site. Upon arrival on site, Fan shall be inspected as to dimensions, quantity, and physical condition and reported to the Engineer. 4.6 SITE SUPERVISION AND PROCESS CONTROL: Approved for materials shall be carried out prior to delivery to the project site. Constructions shall be followed approved shop drawing by Engineer. The Ventilation Fan, support, & accessories shall be checked and inspected for defects to ensure that all material is good quality prior to install. The work shall be supervised by qualified and experienced staff and executed by highly skilled , experienced operators and workers. 5. SAFETY PROCESS: The project Safety Plan is established for the Construction of CAI MEP INTERNATIONAL CONTAINER TERMINAL in Vietnam based on Occupational Health and Safety and Rehabilitation Management Manual of TTJV. The safety control of works shall be maintained and ensure its compliance through-out the completion period so that works can be executed smoothly without unnecessary interruption. Importance shall be placed on the prevention of any accident such as personal injury , damage to structures and work itself. In general, safety rules and regulations stipulated by the governing authorities of Vietnam as well as by the client shall be observed. 6. ENVIROMENT PROTECTION: The Project Environmental Management Plan (EMP) addresses the requirements for Environmental Management, outlining how the scope, as described by the Conditions of Contract , will be implemented to achieve the key objectives for CAI MEP Page 10
  • 11. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal INTERNATIONAL CONTAINER TERMINAL PROJECT , and has been designed to comply with the intent of OHSAS 18001 and ISO 14001. Built into this operating system will be CAI MEP INTERNATIONAL CONTAINER TERMINAL PROJECT Specification requirements ,as defined in the contract. This Environmental Management Plan will incorporate work method statements, inspections, test plans , and check sheets are developed to cover the particular requirements of this project. This Plan is established based on the Environmental Management Manual of TTJV. All materials will be stacked safely and with clear means of access. Scrap, rubbish and debris frequently and regularly will be removed from the site. Combustible waste materials and rubbish will not be allowed accumulating within the project site or in its immediate vicinity. A waste bin will be placed. Welding and cutting are prohibited near the places of combustible materials, or to the area where flammable dust, gas or vapor, which are likely to be present or given off. Regular disposal of rubbish will be maintained as soon as practicable. Proper maintenance and operation of engines will be controlled emission from gas or diesel engines. No person will permit to drive a vehicle without an appropriate license to drive. All workers must wear proper personal protective equipment. All field staffs and workers including subcontractor are given a counseling and training to apprise the HSE requirements. All related tools and equipment should regularly maintain and check for safe working condition. An emergency contact network is a source to avoid negative events such as an accident. Working area will regularly be inspected for cleanliness (Housekeeping) and safe working environment. Regular daily toolbox meeting will be held before start working. 7. ORGANIZATION CHART : TOA-TOYO (MAIN CONTRACTOR) Mr. Fukushima Project Manager Page 11
  • 12. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal YURTEC (SUBCONTRACTOR) 8. APPENDIX : Mr. Asai Building Manager (TTJV) Mr. Sato M&E Deputy Manager 1. Work schedule 2. Inspection & Testing plan (ITP) 3. Inspection form 4. Check list 5. Test Report Page 12 TTJV Mechanical Engineer TTJV Electrical Engineer Surveyor Mr. Rolly Bldg QS/QC Chief Engineer Mr. Quan HSE Manager Bldg M&E Chief Engineer Mr. Bao Anh Mr. Chau Mechanical Engineer Mr. Quang Electrical Engineer Mr. Satoh M&E Manager
  • 13. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Appendix - 1 Work schedule Page 13
  • 14. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Appendix - 2 Inspection and Test Plan Page 14
  • 15. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Appendix - 3 Inspection form Page 15
  • 16. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Appendix - 4 Check list Page 16
  • 17. Doc. Title Method Statement of installation Roof Fan & Natural Ventilator TOA-TOYO JOINT VENTURE Doc. No CM – MS – BLD - 013 Rev. No. 0 Date Mar. 31, 2011 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Appendix - 5 Test Report Page 17