1. JUMLAH OUTLET
HITUNG JUMLAH OUTLET, NAMA RUANGAN DAN JUMLAH TEMPAT TIDUR
2. JUMLAH KAPASITAS FLOW
HITUNG KEBUTUHAN FLOW MASING-MASING TEMPAT TIDUR DAN
RUANGAN DENGAN MEMPERHITUNGKAN DIVERSITY FAKTOR.
RUANG PERAWATAN, RUANG KRITIKAL DAN RUANG OPERASI
MEMPUNYAI KEBUTUHAN FLOW DAN DIVERSITI YANG BERBEDA.
3. TIPE MEDICAL GAS OUTLET
SECARA UMUM ADA 2 TIPE YAITU : QUICK CONNECT ATAU SCREW
CONNECT.
DAN DI MASING-MASING TIPE JUGA DIBEDAKAN LAGI TIPENYA :
CHEMETRON, DISS, FRENCH, GERMAN, JAPANESE, OHMEDA, BRITISH
DESIGN KEY
NO NAMA RUANG JUMLAH JUMLAH MEICAL GAS OUTLET
RUANG BED/RUANG O N A V
1 Ruang Isolasi ICU 10 1 20 - 10 10
2 Ruang Isolasi Pediatric 4 2 18 - 8 8
3 Ruang Neonatal 1 4 4 - 4 4
4 Ruang Penerimaan 1 2 2 - - 2
5 Ruang Recovery 1 1 1 - 1 1
6 Ruang Operasi 1 1 2 1 1 1
JUMLAH 47 1 24 26
MODEL CONTOH RUANG ISOLASI
JUMLAH OUTLET
NAMA RUANG FAKTOR
DIVERSITY
FLOW - LPM
RUANG RAWAT
1 – 8 OUTLET 100% 10 lpm/ outlet
9 – 12 OUTLET 60% 10 lpm/ outlet
RUANG ISOLASI ICU 100% 30 lpm/ outlet
RUANG OPERASI 100% 50 lpm/ outlet
OKSIGEN
NAMA RUANG FAKTOR DIVERSITY FLOW - SCFM
RUANG RAWAT 25% 2 scfm / room
RUANG ISOLASI ICU 50% 2 scfm / outlet
RUANG NEONATAL ICU 75% 1,5 scfm / outlet
RUANG OPERASI 100% 2 scfm / room
UDARA TEKAN MEDIK
NAMA RUANG FAKTOR DIVERSITY FLOW - SCFM
RUANG RAWAT 10% 1 scfm / room
RUANG ISOLASI ICU 75% 2 scfm / outlet
RUANG NEONATAL ICU 25% 1 scfm / outlet
RUANG OPERASI 100% 3,5 scfm / room
VAKUM MEDIK
TOTAL KAPASITAS FLOW OKSIGEN DENGAN 47 TITIK
= FLOW X JUMLAH TITIK X DIVERSITY
= ( 30 lpm x 20 titik x 100%) + ( 10 lpm x 25 titik x 100% ) + (50 lpm x 2 titik x 100% )
= 600 + 250 + 100
= 950 lpm
FT = 0,3048 M
FT^3 = 0,028317 M^3
1 FT^3 = 28,32 LTR/MIN
TOTAL KAPASITAS FLOW UDARA TEKAN MEDIK DENGAN 26 TITIK
= FLOW X JUMLAH TITIK X DIVERSITY
= ( 2 SCFMx18 titikx50%) + ( 1,5 SCFMx4 titikx75% ) + ( 2 SCFMx1x100% ) + ( 2 SCFMX1X25% )
= 509,70 lpm + 127,43 lpm + 14,16 lpm + 14,16 lpm
= 665,45 lpm
TOTAL KAPASITAS FLOW VAKUM MEDIK DENGAN 26 TITIK
= FLOW X JUMLAH TITIK X DIVERSITY
= ( 2 SCFMx18 titikx75%) + ( 1 SCFMx4 titikx25% ) + ( 1 SCFMx3x10% ) + ( 3,5 SCFMX1X100% )
= 764,55 lpm + 28,32 lpm + 8,50 lpm + 99,11 lpm
= 900,47 lpm
NO JENIS GAS TOTAL KAPASITAS FLOW
1 OKSIGEN 950 lpm
2 UDARA TEKAN MEDIK 665 lpm
3 VAKUM MEDIK 901 lpm
FLOW
=UKURAN JUMLAH UDARA/GAS DALAM SATUAN VOLUME PER WAKTU ( misalnya : LPM =
Liter Per Menit )
VELOCITY
=UKURAN CEPAT UDARA/GAS DALAM SATUAN WAKTU ( misalnya : meter per detik )
PRESSURE
= UKURAN GAYA PADA SATUAN LUASAN (misalnya : pound per inchi persegi / psi )
V = 1,273 Q / D2
Dimana :
V = velocity ( mtr/ dtk
Q = volume flow ( m3/dtk)
D = pipe inside diameter ( mtr )
Q = A X V
V = Q / A
= Q / ( (phi x D^2/4))
= q / ( 0,785 X D^2 )
= 1,273 q / D^2
PIPA DIAMETER BERAPA ?
YANG DIPAKAI UNTUK INSTALASI
The equation of the impingement velocity curve in Figure 2 is defined as follows:
– If 0.3 MPa abs (45 psia) < P < 1.5 MPa (225 psia) then V(m/s) = 30 m/s (100 ft/s)
– If 1.5 MPa (225 psia) < P < 10 Mpa (1500 psia) then P.V = 45 Mpa.m/s (22500 psia.ft/s)
– If 10 MPa (1500 psia) < P < 20 MPa (3000 psia) then V(m/s) = 4.5 m/s (15 ft/s)
ASUMSI KECEPATAN FLOW GAS OXYGEN < 30 mtr/dtk
TEKANAN KERJA GAS MEDIK OKSIGEN = 0,45 MPa
DITENTUKAN V = 20 mtr/dtk
= SQRT ( ( 1,273 X Q ) / V )
= SQRT ( ( 1,273 X 950 ltr/min ) / 20 mtr/dtk )
= SQRT ( ( 1,273 x 0,015833 m3/dtk ) / 20 mtr/dtk )
= 0,031746 mtr
= 31,75 mm
= 1,25 inchi
D = DIAMETER
DITENTUKAN V = 30 mtr/dtk
= SQRT ( ( 1,273 X Q ) / V )
= SQRT ( ( 1,273 X 950 ltr/min ) / 30 mtr/dtk )
= SQRT ( ( 1,273 x 0,015833 m3/dtk ) / 30 mtr/dtk )
= 0,02592 mtr
= 25,92 mm
= 1 inchi
D = DIAMETER
P+ ½ ρV2 + ρgh = constant
P1 + ½ ρV1
2 + ρgh1 = P2 + ½ ρV2
2 + ρgh2
G = constant dan h1 – h2 = 0
P1 – P2 = ½ ρgh ( V2
2 – V1
2 )
A1V1 = A2V2
Jadi : A2 < A1 , V2 > V1
V2 > V1 , P2 < P1
PERSAMAAN BERNOULLI :
menyatakan secara matematis bahwa jika suatu fluida mengalir
melalui sebuah tabung dan diameter tabungnya mengecil, maka
kecepatan fluida tersebut bertambah, tekanannya berkurang,
dan aliran massa (=aliran volumetrik) tetap konstan selama
massa jenis udara tetap konstan. Prinsip ini berlaku untuk gas
selama gas tersebut bergerak jauh di bawah kecepatan suara
dan tidak bervariasi suhunya (karena ini akan menyebabkan
peningkatan volume).
TERIMA KASIH
-
DONY TRI LAKSONO
08113604879
081938467129

More Related Content

What's hot

Sop pkm b dekontaminasi alat medis
Sop pkm b dekontaminasi alat medisSop pkm b dekontaminasi alat medis
Sop pkm b dekontaminasi alat medisYadiSupriyadi20
 
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat KerjaSNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat KerjaMuhamad Imam Khairy
 
7.1.1 SK tentang kebijakan pelayanan klinis.docx
7.1.1 SK tentang kebijakan pelayanan klinis.docx7.1.1 SK tentang kebijakan pelayanan klinis.docx
7.1.1 SK tentang kebijakan pelayanan klinis.docxIlhamWahyudi90
 
Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...
Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...
Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...Rizki Darmawan
 
Sop pelayanan resep rawat inap
Sop pelayanan resep rawat inapSop pelayanan resep rawat inap
Sop pelayanan resep rawat inapxgtsvz
 
Materi pelatihan hydrant 1
Materi pelatihan hydrant 1Materi pelatihan hydrant 1
Materi pelatihan hydrant 1Eko Kiswanto
 
Audit Kebersihan Tangan KKT.pptx
Audit Kebersihan Tangan KKT.pptxAudit Kebersihan Tangan KKT.pptx
Audit Kebersihan Tangan KKT.pptxRiaSilviani1
 
SNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat Kerja
SNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat KerjaSNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat Kerja
SNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat KerjaMuhamad Imam Khairy
 
Pengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur Gali
Pengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur GaliPengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur Gali
Pengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur GaliHesty Kartika Dewi
 
SOP Kalibrasi Alat.docx
SOP Kalibrasi Alat.docxSOP Kalibrasi Alat.docx
SOP Kalibrasi Alat.docxfahmiroza
 
Sop pengelolaan limbah B3
Sop pengelolaan limbah B3Sop pengelolaan limbah B3
Sop pengelolaan limbah B3Sidik Darmanto
 
Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)
Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)
Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)Joy Irman
 
Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...
Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...
Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...Kanaidi ken
 
Pengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekanPengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekanAl Marson
 
Sni 19 0232-2005-nab kimia
Sni 19 0232-2005-nab kimiaSni 19 0232-2005-nab kimia
Sni 19 0232-2005-nab kimiaWinarso Arso
 
materi presentasi orientasi umum
materi presentasi orientasi umummateri presentasi orientasi umum
materi presentasi orientasi umumabdul rochman
 
Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...
Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...
Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...Penataan Ruang
 

What's hot (20)

Sop pkm b dekontaminasi alat medis
Sop pkm b dekontaminasi alat medisSop pkm b dekontaminasi alat medis
Sop pkm b dekontaminasi alat medis
 
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat KerjaSNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
 
7.1.1 SK tentang kebijakan pelayanan klinis.docx
7.1.1 SK tentang kebijakan pelayanan klinis.docx7.1.1 SK tentang kebijakan pelayanan klinis.docx
7.1.1 SK tentang kebijakan pelayanan klinis.docx
 
Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...
Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...
Permen lhk no. 56 2015 ttg tatacara dan persyaratan teknis pengelolaan lb3 fa...
 
Sop pelayanan resep rawat inap
Sop pelayanan resep rawat inapSop pelayanan resep rawat inap
Sop pelayanan resep rawat inap
 
Sosialisasi bahan dan limbah b3
Sosialisasi bahan dan limbah b3Sosialisasi bahan dan limbah b3
Sosialisasi bahan dan limbah b3
 
Materi pelatihan hydrant 1
Materi pelatihan hydrant 1Materi pelatihan hydrant 1
Materi pelatihan hydrant 1
 
Audit Kebersihan Tangan KKT.pptx
Audit Kebersihan Tangan KKT.pptxAudit Kebersihan Tangan KKT.pptx
Audit Kebersihan Tangan KKT.pptx
 
SNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat Kerja
SNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat KerjaSNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat Kerja
SNI 16-7058-2004 tentang Pengukuran Kadar Debu Total di Udara Tempat Kerja
 
Pengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur Gali
Pengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur GaliPengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur Gali
Pengambilan Sampel dan Pemeriksaan Kekeruhan Air Sumur Gali
 
SOP Kalibrasi Alat.docx
SOP Kalibrasi Alat.docxSOP Kalibrasi Alat.docx
SOP Kalibrasi Alat.docx
 
Sop pengelolaan limbah B3
Sop pengelolaan limbah B3Sop pengelolaan limbah B3
Sop pengelolaan limbah B3
 
Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)
Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)
Jenis jenis Instalasi Pengolahan Air Limbah Domestik (IPAL)
 
Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...
Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...
Manajemen Fasilitas dan Keselamatan (MFK) _BimTek "Standar AKREDITASI RUMAH S...
 
Pengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekanPengawasan K3 pesawat uap dan bejana tekan
Pengawasan K3 pesawat uap dan bejana tekan
 
Sni 19 0232-2005-nab kimia
Sni 19 0232-2005-nab kimiaSni 19 0232-2005-nab kimia
Sni 19 0232-2005-nab kimia
 
materi presentasi orientasi umum
materi presentasi orientasi umummateri presentasi orientasi umum
materi presentasi orientasi umum
 
Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...
Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...
Peraturan Pemerintah No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Kes...
 
ICRA.doc
ICRA.docICRA.doc
ICRA.doc
 
ICRA HAIS.doc
ICRA HAIS.docICRA HAIS.doc
ICRA HAIS.doc
 

Similar to GAS MEDIK

SAINS 1-KUANTITI FIZIK & PENGUKURAN
SAINS 1-KUANTITI FIZIK & PENGUKURANSAINS 1-KUANTITI FIZIK & PENGUKURAN
SAINS 1-KUANTITI FIZIK & PENGUKURANMuhammad Amirul
 
Mekanika fluida 2 pertemuan 3 okk
Mekanika fluida 2 pertemuan 3 okkMekanika fluida 2 pertemuan 3 okk
Mekanika fluida 2 pertemuan 3 okkMarfizal Marfizal
 
MATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM Akamigas
MATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM AkamigasMATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM Akamigas
MATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM AkamigasYOHANIS SAHABAT
 
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...MuhammadAzkaBintangA
 
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Vempi Satriya
 
MATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdf
MATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdfMATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdf
MATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdfyusufrmath
 
DASAR PSIKROMETRIK
DASAR PSIKROMETRIKDASAR PSIKROMETRIK
DASAR PSIKROMETRIKKiki Amelia
 
FISIKA - GETARAN PEGAS
FISIKA - GETARAN PEGASFISIKA - GETARAN PEGAS
FISIKA - GETARAN PEGASPRAMITHA GALUH
 
Analisa vibrasi Turbine-Generator unit 1 PLTU AMURANG 2x25MW
Analisa vibrasi Turbine-Generator  unit 1 PLTU AMURANG 2x25MWAnalisa vibrasi Turbine-Generator  unit 1 PLTU AMURANG 2x25MW
Analisa vibrasi Turbine-Generator unit 1 PLTU AMURANG 2x25MWIdabagus Mahartana
 
Transport Fluida di Industri Pangan 2017.ppt
Transport Fluida di Industri Pangan 2017.pptTransport Fluida di Industri Pangan 2017.ppt
Transport Fluida di Industri Pangan 2017.pptssuser97aaa8
 
Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)
Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)
Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)gunawanzharfan
 
1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak
1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak
1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaakSafrizaAhmad2
 
Alat_Pembatas_dan_Pengukur.ppt
Alat_Pembatas_dan_Pengukur.pptAlat_Pembatas_dan_Pengukur.ppt
Alat_Pembatas_dan_Pengukur.pptvarikawicaksono
 
ITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanik
ITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanikITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanik
ITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanikFransiska Puteri
 

Similar to GAS MEDIK (20)

SAINS 1-KUANTITI FIZIK & PENGUKURAN
SAINS 1-KUANTITI FIZIK & PENGUKURANSAINS 1-KUANTITI FIZIK & PENGUKURAN
SAINS 1-KUANTITI FIZIK & PENGUKURAN
 
Materi 1 mekanika fluida 1
Materi 1 mekanika fluida 1Materi 1 mekanika fluida 1
Materi 1 mekanika fluida 1
 
Mekanika fluida 2 pertemuan 3 okk
Mekanika fluida 2 pertemuan 3 okkMekanika fluida 2 pertemuan 3 okk
Mekanika fluida 2 pertemuan 3 okk
 
FAN-TEST-STAND-33333
FAN-TEST-STAND-33333FAN-TEST-STAND-33333
FAN-TEST-STAND-33333
 
MATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM Akamigas
MATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM AkamigasMATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM Akamigas
MATERI 5 HIDROGEOLOGI (Manajemen Pertambangan & Energi) STEM Akamigas
 
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...
 
Uji Disolusi
Uji DisolusiUji Disolusi
Uji Disolusi
 
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...
 
MATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdf
MATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdfMATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdf
MATEMATIKA – TEKNIK ENERGI TERBARUKAN.pdf
 
DASAR PSIKROMETRIK
DASAR PSIKROMETRIKDASAR PSIKROMETRIK
DASAR PSIKROMETRIK
 
F18
F18F18
F18
 
FISIKA - GETARAN PEGAS
FISIKA - GETARAN PEGASFISIKA - GETARAN PEGAS
FISIKA - GETARAN PEGAS
 
Analisa vibrasi Turbine-Generator unit 1 PLTU AMURANG 2x25MW
Analisa vibrasi Turbine-Generator  unit 1 PLTU AMURANG 2x25MWAnalisa vibrasi Turbine-Generator  unit 1 PLTU AMURANG 2x25MW
Analisa vibrasi Turbine-Generator unit 1 PLTU AMURANG 2x25MW
 
Transport Fluida di Industri Pangan 2017.ppt
Transport Fluida di Industri Pangan 2017.pptTransport Fluida di Industri Pangan 2017.ppt
Transport Fluida di Industri Pangan 2017.ppt
 
BANGUN RUANG SISI LENGKUNG kls 9
BANGUN RUANG SISI LENGKUNG kls 9BANGUN RUANG SISI LENGKUNG kls 9
BANGUN RUANG SISI LENGKUNG kls 9
 
Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)
Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)
Hidrolik dan Elektro-Hidrolik (Hydraulic and Electrical-Hidraulic)
 
1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak
1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak
1LINGKUNGAN KERJA REVISIaalakakaaaaaaaaak
 
RAB PLTMH
RAB PLTMHRAB PLTMH
RAB PLTMH
 
Alat_Pembatas_dan_Pengukur.ppt
Alat_Pembatas_dan_Pengukur.pptAlat_Pembatas_dan_Pengukur.ppt
Alat_Pembatas_dan_Pengukur.ppt
 
ITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanik
ITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanikITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanik
ITP UNS Semester 3, Satuan Operasi 2: Pemisahan secara mekanik
 

Recently uploaded

2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptxAnnisaNurHasanah27
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studiossuser52d6bf
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaRenaYunita2
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxmuhammadrizky331164
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptxMuhararAhmad
 
05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.pptSonyGobang1
 

Recently uploaded (6)

2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
 
05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt
 

GAS MEDIK

  • 1. GAS MEDIK DAN VAKUM MEDIK (2)
  • 2. 1. JUMLAH OUTLET HITUNG JUMLAH OUTLET, NAMA RUANGAN DAN JUMLAH TEMPAT TIDUR 2. JUMLAH KAPASITAS FLOW HITUNG KEBUTUHAN FLOW MASING-MASING TEMPAT TIDUR DAN RUANGAN DENGAN MEMPERHITUNGKAN DIVERSITY FAKTOR. RUANG PERAWATAN, RUANG KRITIKAL DAN RUANG OPERASI MEMPUNYAI KEBUTUHAN FLOW DAN DIVERSITI YANG BERBEDA. 3. TIPE MEDICAL GAS OUTLET SECARA UMUM ADA 2 TIPE YAITU : QUICK CONNECT ATAU SCREW CONNECT. DAN DI MASING-MASING TIPE JUGA DIBEDAKAN LAGI TIPENYA : CHEMETRON, DISS, FRENCH, GERMAN, JAPANESE, OHMEDA, BRITISH DESIGN KEY
  • 3. NO NAMA RUANG JUMLAH JUMLAH MEICAL GAS OUTLET RUANG BED/RUANG O N A V 1 Ruang Isolasi ICU 10 1 20 - 10 10 2 Ruang Isolasi Pediatric 4 2 18 - 8 8 3 Ruang Neonatal 1 4 4 - 4 4 4 Ruang Penerimaan 1 2 2 - - 2 5 Ruang Recovery 1 1 1 - 1 1 6 Ruang Operasi 1 1 2 1 1 1 JUMLAH 47 1 24 26 MODEL CONTOH RUANG ISOLASI JUMLAH OUTLET
  • 4. NAMA RUANG FAKTOR DIVERSITY FLOW - LPM RUANG RAWAT 1 – 8 OUTLET 100% 10 lpm/ outlet 9 – 12 OUTLET 60% 10 lpm/ outlet RUANG ISOLASI ICU 100% 30 lpm/ outlet RUANG OPERASI 100% 50 lpm/ outlet OKSIGEN
  • 5. NAMA RUANG FAKTOR DIVERSITY FLOW - SCFM RUANG RAWAT 25% 2 scfm / room RUANG ISOLASI ICU 50% 2 scfm / outlet RUANG NEONATAL ICU 75% 1,5 scfm / outlet RUANG OPERASI 100% 2 scfm / room UDARA TEKAN MEDIK NAMA RUANG FAKTOR DIVERSITY FLOW - SCFM RUANG RAWAT 10% 1 scfm / room RUANG ISOLASI ICU 75% 2 scfm / outlet RUANG NEONATAL ICU 25% 1 scfm / outlet RUANG OPERASI 100% 3,5 scfm / room VAKUM MEDIK
  • 6. TOTAL KAPASITAS FLOW OKSIGEN DENGAN 47 TITIK = FLOW X JUMLAH TITIK X DIVERSITY = ( 30 lpm x 20 titik x 100%) + ( 10 lpm x 25 titik x 100% ) + (50 lpm x 2 titik x 100% ) = 600 + 250 + 100 = 950 lpm FT = 0,3048 M FT^3 = 0,028317 M^3 1 FT^3 = 28,32 LTR/MIN TOTAL KAPASITAS FLOW UDARA TEKAN MEDIK DENGAN 26 TITIK = FLOW X JUMLAH TITIK X DIVERSITY = ( 2 SCFMx18 titikx50%) + ( 1,5 SCFMx4 titikx75% ) + ( 2 SCFMx1x100% ) + ( 2 SCFMX1X25% ) = 509,70 lpm + 127,43 lpm + 14,16 lpm + 14,16 lpm = 665,45 lpm
  • 7. TOTAL KAPASITAS FLOW VAKUM MEDIK DENGAN 26 TITIK = FLOW X JUMLAH TITIK X DIVERSITY = ( 2 SCFMx18 titikx75%) + ( 1 SCFMx4 titikx25% ) + ( 1 SCFMx3x10% ) + ( 3,5 SCFMX1X100% ) = 764,55 lpm + 28,32 lpm + 8,50 lpm + 99,11 lpm = 900,47 lpm NO JENIS GAS TOTAL KAPASITAS FLOW 1 OKSIGEN 950 lpm 2 UDARA TEKAN MEDIK 665 lpm 3 VAKUM MEDIK 901 lpm
  • 8. FLOW =UKURAN JUMLAH UDARA/GAS DALAM SATUAN VOLUME PER WAKTU ( misalnya : LPM = Liter Per Menit ) VELOCITY =UKURAN CEPAT UDARA/GAS DALAM SATUAN WAKTU ( misalnya : meter per detik ) PRESSURE = UKURAN GAYA PADA SATUAN LUASAN (misalnya : pound per inchi persegi / psi )
  • 9. V = 1,273 Q / D2 Dimana : V = velocity ( mtr/ dtk Q = volume flow ( m3/dtk) D = pipe inside diameter ( mtr ) Q = A X V V = Q / A = Q / ( (phi x D^2/4)) = q / ( 0,785 X D^2 ) = 1,273 q / D^2
  • 10. PIPA DIAMETER BERAPA ? YANG DIPAKAI UNTUK INSTALASI
  • 11. The equation of the impingement velocity curve in Figure 2 is defined as follows: – If 0.3 MPa abs (45 psia) < P < 1.5 MPa (225 psia) then V(m/s) = 30 m/s (100 ft/s) – If 1.5 MPa (225 psia) < P < 10 Mpa (1500 psia) then P.V = 45 Mpa.m/s (22500 psia.ft/s) – If 10 MPa (1500 psia) < P < 20 MPa (3000 psia) then V(m/s) = 4.5 m/s (15 ft/s)
  • 12. ASUMSI KECEPATAN FLOW GAS OXYGEN < 30 mtr/dtk TEKANAN KERJA GAS MEDIK OKSIGEN = 0,45 MPa DITENTUKAN V = 20 mtr/dtk = SQRT ( ( 1,273 X Q ) / V ) = SQRT ( ( 1,273 X 950 ltr/min ) / 20 mtr/dtk ) = SQRT ( ( 1,273 x 0,015833 m3/dtk ) / 20 mtr/dtk ) = 0,031746 mtr = 31,75 mm = 1,25 inchi D = DIAMETER
  • 13. DITENTUKAN V = 30 mtr/dtk = SQRT ( ( 1,273 X Q ) / V ) = SQRT ( ( 1,273 X 950 ltr/min ) / 30 mtr/dtk ) = SQRT ( ( 1,273 x 0,015833 m3/dtk ) / 30 mtr/dtk ) = 0,02592 mtr = 25,92 mm = 1 inchi D = DIAMETER
  • 14. P+ ½ ρV2 + ρgh = constant P1 + ½ ρV1 2 + ρgh1 = P2 + ½ ρV2 2 + ρgh2 G = constant dan h1 – h2 = 0 P1 – P2 = ½ ρgh ( V2 2 – V1 2 ) A1V1 = A2V2 Jadi : A2 < A1 , V2 > V1 V2 > V1 , P2 < P1
  • 15. PERSAMAAN BERNOULLI : menyatakan secara matematis bahwa jika suatu fluida mengalir melalui sebuah tabung dan diameter tabungnya mengecil, maka kecepatan fluida tersebut bertambah, tekanannya berkurang, dan aliran massa (=aliran volumetrik) tetap konstan selama massa jenis udara tetap konstan. Prinsip ini berlaku untuk gas selama gas tersebut bergerak jauh di bawah kecepatan suara dan tidak bervariasi suhunya (karena ini akan menyebabkan peningkatan volume).
  • 16. TERIMA KASIH - DONY TRI LAKSONO 08113604879 081938467129