The FPA 2008 Training for DG ECHO experts and partners Bangkok, June 2008 Version 27.05.08
Training programme Preparing Implementing Closing Launching
Training programme Preparing Implementing Closing Launching
Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
Amendments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What cannot be changed: ”The untouchables” ,[object Object],[object Object],[object Object],[object Object]
What cannot be changed: ”The untouchables” ,[object Object],[object Object],[object Object],[object Object]
Special case: the confirmation reply ,[object Object],[object Object],[object Object],[object Object],[object Object]
Amendment methods ,[object Object],[object Object],[object Object],[object Object],[object Object]
Unilateral modifications – what? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Unilateral modifications – what? ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Unilateral modifications – how?
Exchange of letters – what? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Exchange of letters – how? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Supplementary Agreement  - What? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Supplementary Agreement – How? ,[object Object],[object Object],[object Object],[object Object],[object Object]
Something went wrong… ,[object Object],[object Object],[object Object],[object Object],[object Object]
What about the Single Form? ,[object Object],[object Object],[object Object],[object Object]
Post mortem… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Amendment request in final report? ,[object Object],[object Object],[object Object]
Who signs what? Supplementary agreement Subdelegated Authorising Officer (= same person as person who signed original agreement) + Visa B2 Exchange of letters ( ex tempore ) Head of Unit Exchange of letters ( during implementation period ) Desk Confirmation reply Who signs What
Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
What is  force majeure ? ,[object Object],[object Object],[object Object],[object Object]
Consequences of  force majeure ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What is suspension? ,[object Object],[object Object],[object Object],[object Object],[object Object]
Suspension by the partner ,[object Object],[object Object],[object Object],[object Object],[object Object]
Start suspension by partner (1) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Start suspension by partner (2) ,[object Object],[object Object],[object Object],[object Object]
End suspension by partner ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],Suspension by DG ECHO
Start suspension by DG ECHO ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
End suspension by DG ECHO ,[object Object],[object Object]
To suspend or not to suspend ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Duration suspension period(s) ,[object Object],[object Object]
Example of a suspension timeline Partner  informs ECHO asap of suspension Partner  informs ECHO about reasons, costs, duration  Reply ECHO: acceptance suspension  Partner  informs ECHO: wishes to extend suspension > 1/3 Reply ECHO:   acceptance extension  Resumption Partner  informs ECHO asap of resumption and changes Agreement ECHO  issues supplementary Agreement Suspension period 1/3 of duration action
Continuing the implementation after suspension ,[object Object],[object Object]
 
Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
Objectives of the intermediate report ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
How to appraise  the intermediate report? ,[object Object],[object Object],[object Object],[object Object],[object Object]
The (action assessment) Matrix Did the partner respect the procedures (e.g. in the area of procurement)? Which costs are eligible? Were the used means and costs necessary and reasonable to achieve the results?  Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Which results were actually achieved? What was the added value of DG ECHO's intervention? Lessons learned for programming other actions? Final reporting Respect of financial procedures? Respect procedures for A-control mechanisms? Is there any need to revise the means and costs? Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Where does the partner stand now? What must still be done to achieve the results? Is there a need to change? Lessons learned for programming other actions? Intermediate reporting Respect of financial procedures? Respect of DG ECHO's mandate and financing decision? Are the intended means and costs necessary and reasonable to achieve the results?  What are the intended results? What will be the added value of DG ECHO's intervention? Respect of DG ECHO's mandate and financing decision? Proposal Formalism and  procedures Economy and  efficiency Results and  effectiveness
NEW: special attention for A control mechanisms ,[object Object],[object Object],[object Object]
Reporting requirements ,[object Object],[object Object],[object Object],[object Object],[object Object]
A couple of technicalities (1) ,[object Object],[object Object],[object Object],[object Object],[object Object]
A couple of technicalities (2) ,[object Object],[object Object],[object Object],[object Object]
If no submission of intermediate report … ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Need for 2 nd  pre-financing? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
Language ,[object Object],[object Object]
NEW: Transmission of documents  by partner ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
NEW: Transmission of documents  by DG ECHO ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Date of receipt ,[object Object]
NEW: Contact persons ,[object Object],[object Object]
Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
Oops ,[object Object],[object Object]
It’s all in the Memo ,[object Object],[object Object]
Training programme Preparing Implementing Closing Launching
Closing the Action ,[object Object],[object Object],[object Object],[object Object]
Closing the Action ,[object Object],[object Object],[object Object],[object Object]
Remaining supplies… ,[object Object],[object Object],[object Object]
…  must be donated to… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
…  but never to ,[object Object],[object Object],[object Object],[object Object]
NEW: How to donate? ,[object Object],[object Object],[object Object]
No donation obligation if (1) ,[object Object],[object Object],[object Object],[object Object],[object Object]
No donation obligation if (2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Exception:  transfer to another project (1) ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],Exception:  transfer to another project (2)
[object Object],[object Object],Other exceptions
Reporting on end use (1) ,[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Reporting on end use (2)
Closing the Action ,[object Object],[object Object],[object Object],[object Object]
Eligibility Principles (1) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eligibility Principles (2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Not eligible ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
In more details: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. Equipment Purchase ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. Equipment NEW: DG ECHO depreciation rates No donation obligation at end action (see earlier) 33% per year (36 months) > € 2.000 and  ≤  € 10.000 25% per year (48 months) > € 10.000 and  ≤  € 30.000 20% per year (60 months) > € 30.000 50% per year (24 months) ≤ €  2.000 Depreciation rate Purchase value
1. Equipment NEW: Partner’s depreciation policy ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2. Stocks Eligibility of stocks ,[object Object],[object Object],[object Object],[object Object]
2. Stocks Constituted stocks (1) ,[object Object],[object Object],[object Object],[object Object]
2. Stocks Constituted stocks (2) ,[object Object],[object Object],[object Object],[object Object]
2. Stocks Stockpiling: creation and sustainability ,[object Object],[object Object],[object Object],[object Object]
2. Stocks Stockpiling: use ,[object Object],[object Object],[object Object],[object Object],[object Object]
3. NEW: Cost allocation systems  ,[object Object],[object Object],[object Object],[object Object]
4. Cash payments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
4. Cash payments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
4. Cash payments ,[object Object],[object Object],[object Object],[object Object],[object Object]
4. Cash payments ,[object Object],[object Object],[object Object],[object Object],[object Object]
4. Cash payments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
5. VAT  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
6. Financial fees ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
7. Exchange rates: the problem PARTNER Implementation in the field Prefinancing € € $ £ Financial reporting system of the partner Financial transactions in the field Liquidation € €  / £/  $ How to report on this correctly? Җ ش ۼ ﭷ ش Timeline of the project
7. Exchange rates: the solution PARTNER Implementation in the field Prefinancing € € $ ¥ Financial transactions in the field Liquidation € €  / £/  $ It is a question of reporting… : a default rate from which a derogation may be made in the Agreement Timeline of the project Financial reporting system of the partner
8. Liabilities and insurance ,[object Object],[object Object],[object Object],[object Object],[object Object]
8. Liabilities and insurance ,[object Object],[object Object],[object Object],[object Object],[object Object]
8. Liabilities and insurance ,[object Object],[object Object],[object Object],[object Object],[object Object]
9. Contributions in kind ,[object Object],[object Object],[object Object],[object Object]
10. Other eligible costs (1) ,[object Object],[object Object],[object Object],[object Object],[object Object]
10. Other eligible costs (2) ,[object Object],[object Object],[object Object],[object Object]
Closing the Action ,[object Object],[object Object],[object Object],[object Object]
Objectives ,[object Object],[object Object],[object Object],[object Object]
Two final reports ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The (action assessment) Matrix Did the partner respect the procedures (e.g. in the area of procurement)? Which costs are eligible? Were the used means and costs necessary and reasonable to achieve the results?  Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Which results were actually achieved? What was the added value of DG ECHO's intervention? Lessons learned for programming other actions? Final reporting Respect of financial procedures? Respect procedures for A-control mechanisms? Is there any need to revise the means and costs? Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Where does the partner stand now? What must still be done to achieve the results? Is there a need to change? Lessons learned for programming other actions? Intermediate reporting Respect of financial procedures? Respect of DG ECHO's mandate and financing decision? Are the intended means and costs necessary and reasonable to achieve the results?  What are the intended results? What will be the added value of DG ECHO's intervention? Respect of DG ECHO's mandate and financing decision? Proposal Formalism and  procedures Economy and  efficiency Results and  effectiveness
How to appraise  the final reports? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],5. Formalism and Procedures How to appraise  the final reports?
Reporting requirements ,[object Object],[object Object],[object Object]
A couple of technicalities (1) ,[object Object],[object Object],[object Object],[object Object]
A couple of technicalities (2) ,[object Object],[object Object],[object Object],[object Object]
A couple of technicalities (3) ,[object Object],[object Object],[object Object],[object Object]
If no submission of final report ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Final payment in two phases ,[object Object],[object Object],[object Object],[object Object]
First phase: acceptance of the reports ,[object Object],[object Object]
First phase: acceptance of the reports ,[object Object],[object Object],[object Object],[object Object]
Second phase: validation payment request ,[object Object],[object Object],[object Object],[object Object],[object Object]
Second phase: validation payment request ,[object Object],[object Object],[object Object]
Final payment: schematic overview 45 days Geo unit X days (delay Partner) 45 days Unit B2 Acceptance reports Verification payment request “ Stop the clock” if DG ECHO requests additional info If no reply within 30 days: Refuse reports Continue on basis of available info Continue “stop clock” Inform partner Interests payable as from 90 + X days + suspended periods, if > 200 Euro Extra 45 days +  suspended periods for verification  payment request DG ECHO receives additional info after liquidation
Possible problematic situations ,[object Object],[object Object],[object Object],[object Object]
Practical advice (1) ,[object Object],[object Object],[object Object],[object Object]
Practical advice (2) ,[object Object],[object Object],[object Object]
Interests ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
Closing the Action ,[object Object],[object Object],[object Object],[object Object]
Guarantees ,[object Object],[object Object]
Insurance ,[object Object],[object Object],[object Object]
VAT ,[object Object],[object Object],[object Object]
De-mining ,[object Object],[object Object]
Main novelties in a nutshell So what was new?
Main novelties (1) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Main novelties (2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Main novelties (3) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Main novelties (4) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Main novelties (5) ,[object Object],[object Object],[object Object],[object Object],[object Object]
Check out our website: link to “new FPA 2008”
Please do not forget the evaluation form Thank you

More Related Content

Similar to Fpa training bangkok day 2

Contract admn ajit philip
Contract admn ajit philipContract admn ajit philip
Contract admn ajit philip
Farhan Moosa
 
H2020 mga-gga-multi en
H2020 mga-gga-multi enH2020 mga-gga-multi en
H2020 mga-gga-multi en
Carina Rodrigues
 
4. Stay on track- communication and amendments updated april 2014
4. Stay on track- communication and amendments updated april 20144. Stay on track- communication and amendments updated april 2014
4. Stay on track- communication and amendments updated april 2014
Raffaella Battella
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
Lin Hui
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
GLC
 
Europeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial ReportingEuropeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial Reporting
Europeana
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
SHAZEBALIKHAN1
 
Best practices on PPPs contracts
Best practices on PPPs contracts  Best practices on PPPs contracts
Best practices on PPPs contracts
Mauricio Portugal Ribeiro
 
Offset obligations in Brazil.ppt
Offset obligations in Brazil.pptOffset obligations in Brazil.ppt
Offset obligations in Brazil.ppt
SonnyIskandar1
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
Yee Len Wan
 
dokumen.tips_fidic-power-point-presentation.pdf
dokumen.tips_fidic-power-point-presentation.pdfdokumen.tips_fidic-power-point-presentation.pdf
dokumen.tips_fidic-power-point-presentation.pdf
afadlalla
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
Assen Antov
 
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
MMS presentation firm
 
2 claims under new fidic
2 claims under new fidic2 claims under new fidic
2 claims under new fidic
AhmetArslan47
 
Newsletter august
Newsletter augustNewsletter august
Newsletter august
Cerasela Angelescu
 
BDO Transfer Pricing Services
BDO Transfer Pricing ServicesBDO Transfer Pricing Services
BDO Transfer Pricing Services
BDO Indonesia
 
3. IMI Financial workshop 18 November 2014_Reporting requirements
3. IMI Financial workshop 18 November 2014_Reporting requirements3. IMI Financial workshop 18 November 2014_Reporting requirements
3. IMI Financial workshop 18 November 2014_Reporting requirements
Georges Divaris
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & Associates
Cerasela Angelescu
 
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9  - task 9.2, overview on the finacial guidelines by GraphitechSlope wp9  - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
SLOPE Project
 
Cl compilation
Cl compilationCl compilation
Cl compilation
Jessyca Than
 

Similar to Fpa training bangkok day 2 (20)

Contract admn ajit philip
Contract admn ajit philipContract admn ajit philip
Contract admn ajit philip
 
H2020 mga-gga-multi en
H2020 mga-gga-multi enH2020 mga-gga-multi en
H2020 mga-gga-multi en
 
4. Stay on track- communication and amendments updated april 2014
4. Stay on track- communication and amendments updated april 20144. Stay on track- communication and amendments updated april 2014
4. Stay on track- communication and amendments updated april 2014
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
 
Europeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial ReportingEuropeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial Reporting
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
 
Best practices on PPPs contracts
Best practices on PPPs contracts  Best practices on PPPs contracts
Best practices on PPPs contracts
 
Offset obligations in Brazil.ppt
Offset obligations in Brazil.pptOffset obligations in Brazil.ppt
Offset obligations in Brazil.ppt
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
 
dokumen.tips_fidic-power-point-presentation.pdf
dokumen.tips_fidic-power-point-presentation.pdfdokumen.tips_fidic-power-point-presentation.pdf
dokumen.tips_fidic-power-point-presentation.pdf
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
 
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
 
2 claims under new fidic
2 claims under new fidic2 claims under new fidic
2 claims under new fidic
 
Newsletter august
Newsletter augustNewsletter august
Newsletter august
 
BDO Transfer Pricing Services
BDO Transfer Pricing ServicesBDO Transfer Pricing Services
BDO Transfer Pricing Services
 
3. IMI Financial workshop 18 November 2014_Reporting requirements
3. IMI Financial workshop 18 November 2014_Reporting requirements3. IMI Financial workshop 18 November 2014_Reporting requirements
3. IMI Financial workshop 18 November 2014_Reporting requirements
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & Associates
 
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9  - task 9.2, overview on the finacial guidelines by GraphitechSlope wp9  - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
 
Cl compilation
Cl compilationCl compilation
Cl compilation
 

More from DIPECHO Nepal

0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011
DIPECHO Nepal
 
0.0 dev and drr
0.0 dev and drr0.0 dev and drr
0.0 dev and drr
DIPECHO Nepal
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on cca
DIPECHO Nepal
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepali
DIPECHO Nepal
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programme
DIPECHO Nepal
 
School renovation
School renovationSchool renovation
School renovation
DIPECHO Nepal
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
DIPECHO Nepal
 
Rambati case
Rambati caseRambati case
Rambati case
DIPECHO Nepal
 
Early warning system
Early warning systemEarly warning system
Early warning systemDIPECHO Nepal
 
Communication channel
Communication channelCommunication channel
Communication channelDIPECHO Nepal
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upca
DIPECHO Nepal
 
Biodyke
BiodykeBiodyke
Biodyke
DIPECHO Nepal
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 english
DIPECHO Nepal
 
Mason ort report
Mason ort reportMason ort report
Mason ort report
DIPECHO Nepal
 
Inee nepal
Inee nepalInee nepal
Inee nepal
DIPECHO Nepal
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_study
DIPECHO Nepal
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010
DIPECHO Nepal
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practice
DIPECHO Nepal
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52
DIPECHO Nepal
 
Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion report
DIPECHO Nepal
 

More from DIPECHO Nepal (20)

0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011
 
0.0 dev and drr
0.0 dev and drr0.0 dev and drr
0.0 dev and drr
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on cca
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepali
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programme
 
School renovation
School renovationSchool renovation
School renovation
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
 
Rambati case
Rambati caseRambati case
Rambati case
 
Early warning system
Early warning systemEarly warning system
Early warning system
 
Communication channel
Communication channelCommunication channel
Communication channel
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upca
 
Biodyke
BiodykeBiodyke
Biodyke
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 english
 
Mason ort report
Mason ort reportMason ort report
Mason ort report
 
Inee nepal
Inee nepalInee nepal
Inee nepal
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_study
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practice
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52
 
Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion report
 

Recently uploaded

NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Denish Jangid
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
S. Raj Kumar
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 

Recently uploaded (20)

NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 

Fpa training bangkok day 2

  • 1. The FPA 2008 Training for DG ECHO experts and partners Bangkok, June 2008 Version 27.05.08
  • 2. Training programme Preparing Implementing Closing Launching
  • 3. Training programme Preparing Implementing Closing Launching
  • 4. Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
  • 5. Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. Who signs what? Supplementary agreement Subdelegated Authorising Officer (= same person as person who signed original agreement) + Visa B2 Exchange of letters ( ex tempore ) Head of Unit Exchange of letters ( during implementation period ) Desk Confirmation reply Who signs What
  • 23. Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36. Example of a suspension timeline Partner informs ECHO asap of suspension Partner informs ECHO about reasons, costs, duration Reply ECHO: acceptance suspension Partner informs ECHO: wishes to extend suspension > 1/3 Reply ECHO: acceptance extension Resumption Partner informs ECHO asap of resumption and changes Agreement ECHO issues supplementary Agreement Suspension period 1/3 of duration action
  • 37.
  • 38.  
  • 39. Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
  • 40.
  • 41.
  • 42. The (action assessment) Matrix Did the partner respect the procedures (e.g. in the area of procurement)? Which costs are eligible? Were the used means and costs necessary and reasonable to achieve the results? Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Which results were actually achieved? What was the added value of DG ECHO's intervention? Lessons learned for programming other actions? Final reporting Respect of financial procedures? Respect procedures for A-control mechanisms? Is there any need to revise the means and costs? Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Where does the partner stand now? What must still be done to achieve the results? Is there a need to change? Lessons learned for programming other actions? Intermediate reporting Respect of financial procedures? Respect of DG ECHO's mandate and financing decision? Are the intended means and costs necessary and reasonable to achieve the results? What are the intended results? What will be the added value of DG ECHO's intervention? Respect of DG ECHO's mandate and financing decision? Proposal Formalism and procedures Economy and efficiency Results and effectiveness
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49. Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55. Implementing the humanitarian action Amending the agreement Force majeure and suspension Intermediate reporting Transmission of documents between DG ECHO and the partner Exercises
  • 56.
  • 57.
  • 58. Training programme Preparing Implementing Closing Launching
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78. 1. Equipment NEW: DG ECHO depreciation rates No donation obligation at end action (see earlier) 33% per year (36 months) > € 2.000 and ≤ € 10.000 25% per year (48 months) > € 10.000 and ≤ € 30.000 20% per year (60 months) > € 30.000 50% per year (24 months) ≤ € 2.000 Depreciation rate Purchase value
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92.
  • 93. 7. Exchange rates: the problem PARTNER Implementation in the field Prefinancing € € $ £ Financial reporting system of the partner Financial transactions in the field Liquidation € € / £/ $ How to report on this correctly? Җ ش ۼ ﭷ ش Timeline of the project
  • 94. 7. Exchange rates: the solution PARTNER Implementation in the field Prefinancing € € $ ¥ Financial transactions in the field Liquidation € € / £/ $ It is a question of reporting… : a default rate from which a derogation may be made in the Agreement Timeline of the project Financial reporting system of the partner
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104. The (action assessment) Matrix Did the partner respect the procedures (e.g. in the area of procurement)? Which costs are eligible? Were the used means and costs necessary and reasonable to achieve the results? Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Which results were actually achieved? What was the added value of DG ECHO's intervention? Lessons learned for programming other actions? Final reporting Respect of financial procedures? Respect procedures for A-control mechanisms? Is there any need to revise the means and costs? Can we learn lessons in terms of economy and efficiency of the used means and costs for programming other actions? Where does the partner stand now? What must still be done to achieve the results? Is there a need to change? Lessons learned for programming other actions? Intermediate reporting Respect of financial procedures? Respect of DG ECHO's mandate and financing decision? Are the intended means and costs necessary and reasonable to achieve the results? What are the intended results? What will be the added value of DG ECHO's intervention? Respect of DG ECHO's mandate and financing decision? Proposal Formalism and procedures Economy and efficiency Results and effectiveness
  • 105.
  • 106.
  • 107.
  • 108.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113.
  • 114.
  • 115.
  • 116.
  • 117. Final payment: schematic overview 45 days Geo unit X days (delay Partner) 45 days Unit B2 Acceptance reports Verification payment request “ Stop the clock” if DG ECHO requests additional info If no reply within 30 days: Refuse reports Continue on basis of available info Continue “stop clock” Inform partner Interests payable as from 90 + X days + suspended periods, if > 200 Euro Extra 45 days + suspended periods for verification payment request DG ECHO receives additional info after liquidation
  • 118.
  • 119.
  • 120.
  • 121.
  • 122.  
  • 123.
  • 124.
  • 125.
  • 126.
  • 127.
  • 128. Main novelties in a nutshell So what was new?
  • 129.
  • 130.
  • 131.
  • 132.
  • 133.
  • 134. Check out our website: link to “new FPA 2008”
  • 135. Please do not forget the evaluation form Thank you

Editor's Notes

  1. GC ART. 11.1
  2. GC ART. 11.1 GC ART. 11.1 AND GC ART. 11.2
  3. GC ART. 11.1
  4. IF POSSIBLE LINK FACT SHEET AMENDMENTS
  5. GC ART. 11.2, GC ART. 11.4, GC ART. 11.5
  6. GC ART. 11.2
  7. GC ART. 11.2
  8. GC ART. 11.2 FACT SHEET AMENDMENTS
  9. GC ART. 11.4
  10. GC ART. 11.4 FACT SHEET AMENDMENTS
  11. GC ART. 11.5 FACT SHEET AMENDMENTS
  12. GC ART. 11.5 FACT SHEET AMENDMENTS
  13. GC ART. 11.5 FACT SHEET AMENDMENTS
  14. FACT SHEET AMENDMENTS
  15. GC ART. 14
  16. GC ART. 15.1
  17. GC ART. 15.1 AND GC ART. 15.2
  18. GC ART. 15.1
  19. GC ART. 1.3
  20. GC ART. 1.3 GC ART. 11.5 GC ART. 15.3
  21. GC ART. 15.2
  22. GC ART. 1.3
  23. GC ART. 11.5
  24. GC ART. 15.3
  25. GC ART. 15.3 GC ART. 16.3
  26. GC ART. 15.3
  27. GC ART. 10.2
  28. GC ART. 10.2
  29. GC ART. 10.2
  30. GC ART. 10.2
  31. GC ART. 10.2
  32. GC ART. 10.2
  33. GC ART. 10.2
  34. GC ART. 12.1
  35. GC ART. 12.1
  36. GC ART. 12.1
  37. GC ART. 12.1
  38. GC ART. 12.2
  39. GC ART. 19.1
  40. GC ART. 19.1
  41. GC ART. 19.1 IF POSSIBLE, LINK TO FACT SHEET
  42. GC ART. 19.1 IF POSSIBLE, LINK TO FACT SHEET
  43. GC ASRT. 19.2
  44. GC ART. 19.2
  45. GC ART. 19.2
  46. GC ART. 19.3
  47. GC ART. 19.3 GC ART. 23.4
  48. GC ART. 18.1 (A), (B) AND (C)
  49. GC ART. 18.1 (D), (E) AND (F)
  50. GC ART. 18.6
  51. GC ART. 18.2 (I), (J)
  52. GC ART. 18.5
  53. GC ART. 18.6
  54. IF POSSIBLE, LINK TO FACT SHEET
  55. GC ART. 18.8
  56. GC ART. 18.2 (E), (F), (G), (H)
  57. GC ART. 18.2 (I), (J)
  58. GC ART. 10.2
  59. LINK TO SF LINK TO GUIDELINES ON SINGLE FORM AND ON FINANCIAL REPORTING
  60. GC ART. 10.3 AND GC ART. 10.4 SC ART. 4
  61. GC ART. 10.3 AND GC ART. 10.4 SC ART. 4
  62. GC ART. 10.3 AND GC ART. 10.4 SC ART. 4
  63. GC ART. 10.3 AND GC ART. 10.4 SC ART. 4
  64. GC ART. 10.2
  65. GC ART. 10.2
  66. GC ART. 21.2
  67. GC ART. 21.2
  68. GC ART. 22.5
  69. GC ART. 10.2
  70. GC ART. 21.4 GC ART. 22.6
  71. GC ART. 23.4
  72. GC ART. 23.4