Trust Technologies – Mentor, Ohio
Sept 8 – 10, 2009
Trust Technologies, Inc – Mentor, Ohio
Waste Reduction Workshop
F119 Cell Pt # 524P235-01
Trust Technologies – Mentor, Ohio
The TEAM
2
Trust Technologies – Mentor, Ohio
Agenda – Hoshin Workshop
• Day One 8am to 4pm
• 20 Principles & 7 concepts of Lean –John Petak
• 8 Forms of “TIM WOOD “ Waste – John Petak
• 6 Rules of Quality – drive Quality First concept – John Petak
• Defined 17 process steps VA 41% NVA 59% - Team
• Defining the Current State VSM – Team (High Level Map) -Team
• Calculate Takt Time for 4 part references TT = 114 minutes or 6857 sec - Team
Trust Technologies – Mentor, Ohio
Agenda Hoshin Workshop
• Day Two
• Review day one findings / lessons learned
• Gather inventory data on all 17 process steps ( 85.7 days) Lead time
• Kaizen Process overview with A3 Report out , Business case establish
• Build current state metrics ( Distance part travels, inventory, manpower, cycle time,
changeover time and first time yield or FTQ).
• Construct future state map and U shaped cell
Trust Technologies – Mentor, Ohio
Agenda Hoshin Workshop
• Day Three
• Review the past two days
• Prepare new layout without “Tim Wood” waste
• Build Plan, Do, Check and Act worksheet
• Finalize A3 Report out
• Measure equipment footprint to construct new layout
• Management Report Out
Trust Technologies – Mentor, Ohio
Trust Technologies – Mentor, Ohio
7
Trust Technologies – Mentor, Ohio
General Observations
 1. Excessive walk time from incoming receiving to shipping department (968’ or 324 yds)
 2. Downtime not tracked and recorded daily to drive uptime in cell
 3. Visual management with daily information need to run production ( KAN BAN Pull system,
super markets)
 4. Quality Defects or FIRST time Yield needs to be implemented
 5.Train all associates to QMM standards
 6. Point of use , real time of VA work.
Trust Technologies – Mentor, Ohio
Flow Oriented Layout
• Definition
• Designing physical work space that supports a logical flow of all materials in the
production area.
Opr #20
Inspection &
Shipping ,
500 & 600
VALUE ADD
Trust Technologies – Mentor, Ohio
Trust Technologies – Mentor, Ohio
Future State Map – F119 524P235 - 01
11
Trust Technologies – Mentor, Ohio
Trust Technologies – Mentor, Ohio New Layout
Trust Technologies – Mentor, Ohio
14
Work Station (Front View) Rev. A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Work Station (Left Side View) Rev. A
15
16
17
18
Work Station (Back View) Rev. A
19
21
20
New work stations designed by TEAM
Trust Technologies – Mentor, Ohio
10/5/201615
This letter is my personal recommendation for Exercise Lean. As a Project Manager, I was faced with the task of
turning a non-profitable work cell into a cell that would provide 20% profit margins. Current profit margins were in
the red, losing $50 for every part we had shipped to our customer was unacceptable business practice; our delivery
of 30 units a week was costing the Kilroy Co. $1500 weekly.
Our work culture needed to change otherwise we would be faced with the difficult decision to lay off more
employees and move backwards from our goal of “growing the business”. That change was quite simple, a
company from Simpsonville, South Carolina known as: Exercise Lean headed north to Mentor, Ohio to take on the
challenge to prove that the Kilroy Co. can still compete globally in manufacturing, and provide profitable results in
less than 6 months.
President John F. Petak led the charge by coordinating a “Hoshin Process” and implementing and teaching
continuous cost saving methods such as: 5 why problem solving techniques, kanban style super market pull
systems, 5s, hour by hour production boards, progressing and monitoring timelines by using a plan do check act
spreadsheet focusing on action items with assigned owners and implemented expenses with return on investment
factored in.
I am pleased to announce that in less than 6 months, we experienced a record sales month in April of 2010 due to
the fact that we are now successfully shipping 100 units a week to our customer, and producing a part complete
every 60’ (the initial goal was to make a part every 75’ to obtain a 20% profit margin).
The 5s work shop was instrumental in making the project a success. Exercise Lean measured the old process using
video cameras and stopwatches “real time” to determine where the waste essentially existed. Once the waste was
identified the operators and cell leader placed a red tag on all items deemed not useful and were then placed in the
red tag holding area implemented by Exercise Lean.
Employees moral has also improved due to the adopted 5s culture. All hand tools, measuring devices and work
instructions were placed on work stations designed by Exercise Lean, and built by the employees at the Kilroy Co.
during the Hoshin Process. The workstations eliminated time spent walking or searching for items or tools needed
to perform the job due to the fact that “all” needed items were in place ready to use and identified with a name,
location and border therefore giving the operator or auditor instant view if an item was missing.
Ergonomics were also vital in employee satisfaction, the old process traveled the length of three football fields, our
current process travels less than 100 ft. Employee absenteeism has dropped by 11% over the last four months due
to the new cell layout.
As of today we have taken many of the principles and methods taught to us by Exercise Lean, and have
implemented them throughout the entire shop floor, to better provide: quality, delivery, response, customer
satisfaction and safety.
I highly recommend Exercise Lean, for their services provided are nothing less than first class, they can provide
value added methods to any company and have the devotion and services that are not commonly found amongst
most practices today.
Thank you,
Brian McGill
Project Manager
Trust Technologies, a Kilroy Co.
Trust Technologies – Mentor, Ohio
Prepared by John F Petak

More Related Content

What's hot

Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
Upendra K
 
Lean Presentation
Lean PresentationLean Presentation
Lean Presentation
Pam Watkins
 
New Employee Lean Orientation
New Employee Lean OrientationNew Employee Lean Orientation
New Employee Lean Orientation
flevko
 
Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting Class
Sam Bishop
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
ahmad bassiouny
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
Adrian Pask
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
Ankit Sharma
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
Adrian Pask
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments
TKMG, Inc.
 
SBS - Basics of Lean
SBS - Basics of LeanSBS - Basics of Lean
SBS - Basics of Lean
Chris Cummins
 
Lean innovation - Basic principles of Lean
Lean innovation - Basic principles of LeanLean innovation - Basic principles of Lean
Lean innovation - Basic principles of Lean
Joeri Vercammen, PhD
 
Lean Management
Lean ManagementLean Management
Lean Management
Andreas Hägglund
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
TKMG, Inc.
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
Jagriti Prasad
 
Kaizen Blitz multicoat loading area April 2005
Kaizen Blitz multicoat loading area April 2005Kaizen Blitz multicoat loading area April 2005
Kaizen Blitz multicoat loading area April 2005
D9 Process Improvement
 
What is Lean manufacturing?
What is Lean manufacturing?What is Lean manufacturing?
What is Lean manufacturing?
Lean Six Sigma Belgium & France
 
5 s presentation-converted
5 s presentation-converted5 s presentation-converted
5 s presentation-converted
Siddharth Pal
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
Sumon Kumar Kundu
 
Basics of lean
Basics of leanBasics of lean
Basics of lean
Lizeth Moreno
 

What's hot (20)

Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 
Lean Presentation
Lean PresentationLean Presentation
Lean Presentation
 
New Employee Lean Orientation
New Employee Lean OrientationNew Employee Lean Orientation
New Employee Lean Orientation
 
Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting Class
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments
 
SBS - Basics of Lean
SBS - Basics of LeanSBS - Basics of Lean
SBS - Basics of Lean
 
Lean innovation - Basic principles of Lean
Lean innovation - Basic principles of LeanLean innovation - Basic principles of Lean
Lean innovation - Basic principles of Lean
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Kaizen Blitz multicoat loading area April 2005
Kaizen Blitz multicoat loading area April 2005Kaizen Blitz multicoat loading area April 2005
Kaizen Blitz multicoat loading area April 2005
 
What is Lean manufacturing?
What is Lean manufacturing?What is Lean manufacturing?
What is Lean manufacturing?
 
5 s presentation-converted
5 s presentation-converted5 s presentation-converted
5 s presentation-converted
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
Basics of lean
Basics of leanBasics of lean
Basics of lean
 

Similar to F119 Team_Report_out_Sept 10, 2009

Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report OutTrust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
ExerciseLeanLLC
 
Recomendation Letter Trust Tech June 16 2010
Recomendation Letter Trust   Tech June 16 2010Recomendation Letter Trust   Tech June 16 2010
Recomendation Letter Trust Tech June 16 2010
ExerciseLeanLLC
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
Marico Ltd.
 
Lean Methodology July Monthly
Lean Methodology July MonthlyLean Methodology July Monthly
Lean Methodology July Monthly
Joe Kalchbrenner
 
Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017
Victor Javier Marranzini
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement Simulation
Bisher Yousfi
 
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies PresentationCity of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina
 
Training and employee engagement 5-6th july 2012 kl v 2
Training and employee engagement  5-6th july 2012 kl v 2Training and employee engagement  5-6th july 2012 kl v 2
Training and employee engagement 5-6th july 2012 kl v 2
Laurence Yap M.A. (UM) CHRM
 
Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"
greendot management solution
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
Malcolm Sanders
 
Joe Crews Resume
Joe Crews Resume Joe Crews Resume
Lean Leader Presentation Lauren Larsen 2017
Lean Leader Presentation Lauren Larsen 2017Lean Leader Presentation Lauren Larsen 2017
Lean Leader Presentation Lauren Larsen 2017
LAUREN LARSEN
 
Why take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiionWhy take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiion
Nish Mahanty
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study
Yash Shah
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
Julian Kalac P.Eng
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
Sean Hougham
 
aLean Manufacturingeddy
aLean ManufacturingeddyaLean Manufacturingeddy
aLean Manufacturingeddy
Yeow Chiang San
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
LCI1998
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
Seta Wicaksana
 
BCS-Presentations.pptx
BCS-Presentations.pptxBCS-Presentations.pptx
BCS-Presentations.pptx
Alien231
 

Similar to F119 Team_Report_out_Sept 10, 2009 (20)

Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report OutTrust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
Trust Tech F119 Rapid Assessment & Hoshin Workshop Report Out
 
Recomendation Letter Trust Tech June 16 2010
Recomendation Letter Trust   Tech June 16 2010Recomendation Letter Trust   Tech June 16 2010
Recomendation Letter Trust Tech June 16 2010
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean Methodology July Monthly
Lean Methodology July MonthlyLean Methodology July Monthly
Lean Methodology July Monthly
 
Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement Simulation
 
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies PresentationCity of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
 
Training and employee engagement 5-6th july 2012 kl v 2
Training and employee engagement  5-6th july 2012 kl v 2Training and employee engagement  5-6th july 2012 kl v 2
Training and employee engagement 5-6th july 2012 kl v 2
 
Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
 
Joe Crews Resume
Joe Crews Resume Joe Crews Resume
Joe Crews Resume
 
Lean Leader Presentation Lauren Larsen 2017
Lean Leader Presentation Lauren Larsen 2017Lean Leader Presentation Lauren Larsen 2017
Lean Leader Presentation Lauren Larsen 2017
 
Why take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiionWhy take a Continuous Delivery approach in your organisatiion
Why take a Continuous Delivery approach in your organisatiion
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
 
aLean Manufacturingeddy
aLean ManufacturingeddyaLean Manufacturingeddy
aLean Manufacturingeddy
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
BCS-Presentations.pptx
BCS-Presentations.pptxBCS-Presentations.pptx
BCS-Presentations.pptx
 

More from exerciselean

Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011exerciselean
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
exerciselean
 
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
exerciselean
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
exerciselean
 
Kaizen System Diagnosis(1)
Kaizen  System Diagnosis(1)Kaizen  System Diagnosis(1)
Kaizen System Diagnosis(1)
exerciselean
 
8 Wastes - getting LEAN
8 Wastes - getting LEAN8 Wastes - getting LEAN
8 Wastes - getting LEAN
exerciselean
 
Setup Reduction Workshop
Setup Reduction WorkshopSetup Reduction Workshop
Setup Reduction Workshop
exerciselean
 
A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009
exerciselean
 
Standardized Work
Standardized WorkStandardized Work
Standardized Work
exerciselean
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]
exerciselean
 

More from exerciselean (10)

Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
 
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
 
Kaizen System Diagnosis(1)
Kaizen  System Diagnosis(1)Kaizen  System Diagnosis(1)
Kaizen System Diagnosis(1)
 
8 Wastes - getting LEAN
8 Wastes - getting LEAN8 Wastes - getting LEAN
8 Wastes - getting LEAN
 
Setup Reduction Workshop
Setup Reduction WorkshopSetup Reduction Workshop
Setup Reduction Workshop
 
A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009
 
Standardized Work
Standardized WorkStandardized Work
Standardized Work
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]
 

F119 Team_Report_out_Sept 10, 2009

  • 1. Trust Technologies – Mentor, Ohio Sept 8 – 10, 2009 Trust Technologies, Inc – Mentor, Ohio Waste Reduction Workshop F119 Cell Pt # 524P235-01
  • 2. Trust Technologies – Mentor, Ohio The TEAM 2
  • 3. Trust Technologies – Mentor, Ohio Agenda – Hoshin Workshop • Day One 8am to 4pm • 20 Principles & 7 concepts of Lean –John Petak • 8 Forms of “TIM WOOD “ Waste – John Petak • 6 Rules of Quality – drive Quality First concept – John Petak • Defined 17 process steps VA 41% NVA 59% - Team • Defining the Current State VSM – Team (High Level Map) -Team • Calculate Takt Time for 4 part references TT = 114 minutes or 6857 sec - Team
  • 4. Trust Technologies – Mentor, Ohio Agenda Hoshin Workshop • Day Two • Review day one findings / lessons learned • Gather inventory data on all 17 process steps ( 85.7 days) Lead time • Kaizen Process overview with A3 Report out , Business case establish • Build current state metrics ( Distance part travels, inventory, manpower, cycle time, changeover time and first time yield or FTQ). • Construct future state map and U shaped cell
  • 5. Trust Technologies – Mentor, Ohio Agenda Hoshin Workshop • Day Three • Review the past two days • Prepare new layout without “Tim Wood” waste • Build Plan, Do, Check and Act worksheet • Finalize A3 Report out • Measure equipment footprint to construct new layout • Management Report Out
  • 6. Trust Technologies – Mentor, Ohio
  • 7. Trust Technologies – Mentor, Ohio 7
  • 8. Trust Technologies – Mentor, Ohio General Observations  1. Excessive walk time from incoming receiving to shipping department (968’ or 324 yds)  2. Downtime not tracked and recorded daily to drive uptime in cell  3. Visual management with daily information need to run production ( KAN BAN Pull system, super markets)  4. Quality Defects or FIRST time Yield needs to be implemented  5.Train all associates to QMM standards  6. Point of use , real time of VA work.
  • 9. Trust Technologies – Mentor, Ohio Flow Oriented Layout • Definition • Designing physical work space that supports a logical flow of all materials in the production area. Opr #20 Inspection & Shipping , 500 & 600 VALUE ADD
  • 10. Trust Technologies – Mentor, Ohio
  • 11. Trust Technologies – Mentor, Ohio Future State Map – F119 524P235 - 01 11
  • 12. Trust Technologies – Mentor, Ohio
  • 13. Trust Technologies – Mentor, Ohio New Layout
  • 14. Trust Technologies – Mentor, Ohio 14 Work Station (Front View) Rev. A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Work Station (Left Side View) Rev. A 15 16 17 18 Work Station (Back View) Rev. A 19 21 20 New work stations designed by TEAM
  • 15. Trust Technologies – Mentor, Ohio 10/5/201615 This letter is my personal recommendation for Exercise Lean. As a Project Manager, I was faced with the task of turning a non-profitable work cell into a cell that would provide 20% profit margins. Current profit margins were in the red, losing $50 for every part we had shipped to our customer was unacceptable business practice; our delivery of 30 units a week was costing the Kilroy Co. $1500 weekly. Our work culture needed to change otherwise we would be faced with the difficult decision to lay off more employees and move backwards from our goal of “growing the business”. That change was quite simple, a company from Simpsonville, South Carolina known as: Exercise Lean headed north to Mentor, Ohio to take on the challenge to prove that the Kilroy Co. can still compete globally in manufacturing, and provide profitable results in less than 6 months. President John F. Petak led the charge by coordinating a “Hoshin Process” and implementing and teaching continuous cost saving methods such as: 5 why problem solving techniques, kanban style super market pull systems, 5s, hour by hour production boards, progressing and monitoring timelines by using a plan do check act spreadsheet focusing on action items with assigned owners and implemented expenses with return on investment factored in. I am pleased to announce that in less than 6 months, we experienced a record sales month in April of 2010 due to the fact that we are now successfully shipping 100 units a week to our customer, and producing a part complete every 60’ (the initial goal was to make a part every 75’ to obtain a 20% profit margin). The 5s work shop was instrumental in making the project a success. Exercise Lean measured the old process using video cameras and stopwatches “real time” to determine where the waste essentially existed. Once the waste was identified the operators and cell leader placed a red tag on all items deemed not useful and were then placed in the red tag holding area implemented by Exercise Lean. Employees moral has also improved due to the adopted 5s culture. All hand tools, measuring devices and work instructions were placed on work stations designed by Exercise Lean, and built by the employees at the Kilroy Co. during the Hoshin Process. The workstations eliminated time spent walking or searching for items or tools needed to perform the job due to the fact that “all” needed items were in place ready to use and identified with a name, location and border therefore giving the operator or auditor instant view if an item was missing. Ergonomics were also vital in employee satisfaction, the old process traveled the length of three football fields, our current process travels less than 100 ft. Employee absenteeism has dropped by 11% over the last four months due to the new cell layout. As of today we have taken many of the principles and methods taught to us by Exercise Lean, and have implemented them throughout the entire shop floor, to better provide: quality, delivery, response, customer satisfaction and safety. I highly recommend Exercise Lean, for their services provided are nothing less than first class, they can provide value added methods to any company and have the devotion and services that are not commonly found amongst most practices today. Thank you, Brian McGill Project Manager Trust Technologies, a Kilroy Co.
  • 16. Trust Technologies – Mentor, Ohio Prepared by John F Petak