Project Highlights:
• A good example of the use of post-tensioning to improve crack control
for an exposed slab, which reduces the penetration of water and other
liquid chemicals.
• The use of post-tensioning also eliminated control joints that could
curl or crack over time.
Emergency Vehicle Operator Course
Project Overview:
The Emergency Vehicle Operator Course (EVOC) is a unique post-
tensioned concrete slab-on-ground constructed for the Minnesota
Department of Military Affairs at Camp Ripley. EVOC is a 60,000 ft 2
“skid pan” that is made slippery so that vehicle drivers can practice
controlling skids. EVOC consists of a 12.5 in. thick concrete slab with 20
in. grade beams around the perimeter. The post-tensioned slab used
6000 psi shrinkage-compensating concrete that was laid on top of two
layers of 6 mil thick polyethylene sheet and a 14 in. base course.
Additionally, it was separated from an asphaltic “transition” slab by a
perimeter expansion joint.
Emergency Vehicle Operator Course
Project Overview Continued:
Unlike most post-tensioned concrete slabs of similar square footage,
EVOC had two pours of 30,000 ft 2 pours each, which were poured on
consecutive days. Initial stressing was done at 0.4 Fpu (or 16.5 kip) when
the concrete in Pour #2 reached 1500 psi. Final stressing was done at 0.8
Fpu (or 33 kip) when the concrete reached 3000 psi in both pours. Each
0.5 in. diameter 270 ksi tendon was stressed from both ends to increase
the final average force in the tendon. In total, EVOC has 190 bundles of
two unbonded tendons spaced at 1 to 7 in. on center in the short 200 ft
direction and 150 bundles of two unbonded tendons spaced at 16 in. on
center in the long 300 ft direction.
Because the concrete slab would be exposed to aggressive environments
from inclement Minnesota weather and test chemicals, the project
documents required an encapsulated post-tensioning system of PTI
specifications. This should help increase the durability of the concrete
and improve life-cycle costs.
Emergency Vehicle Operator Course
Emergency Vehicle Operator Course (EVOC)

More Related Content

What's hot

The Trump International Hotel & Tower
The Trump International Hotel & TowerThe Trump International Hotel & Tower
The Trump International Hotel & Tower
PostTensioningInstitute
 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
PostTensioningInstitute
 
2201 Westlake/Enso
2201 Westlake/Enso2201 Westlake/Enso
2201 Westlake/Enso
PostTensioningInstitute
 
Glacier Skywalk
Glacier SkywalkGlacier Skywalk
Glacier Skywalk
PostTensioningInstitute
 
McKinney Place Garage
McKinney Place GarageMcKinney Place Garage
McKinney Place Garage
PostTensioningInstitute
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
PostTensioningInstitute
 
Green Screen Parking Structure
Green Screen Parking StructureGreen Screen Parking Structure
Green Screen Parking Structure
PostTensioningInstitute
 
Trump Tower Chicago
Trump Tower ChicagoTrump Tower Chicago
Trump Tower Chicago
Hamza Khan Afridi
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure
PostTensioningInstitute
 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
PostTensioningInstitute
 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
PostTensioningInstitute
 
The Memorial Wall at Ground Zero
The Memorial Wall at Ground ZeroThe Memorial Wall at Ground Zero
The Memorial Wall at Ground Zero
PostTensioningInstitute
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
Kumar Snehansu
 
Washinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior ProjectWashinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior Project
WSUME_2013_A-TEAM
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
Mayur Waghulde
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotelYo Ksen
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
Vishakha Thole
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
Nayan Rao
 
2010 Marina Bay Sands
2010 Marina Bay Sands2010 Marina Bay Sands
2010 Marina Bay Sands
Natare Corp
 

What's hot (20)

The Trump International Hotel & Tower
The Trump International Hotel & TowerThe Trump International Hotel & Tower
The Trump International Hotel & Tower
 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
 
2201 Westlake/Enso
2201 Westlake/Enso2201 Westlake/Enso
2201 Westlake/Enso
 
Glacier Skywalk
Glacier SkywalkGlacier Skywalk
Glacier Skywalk
 
McKinney Place Garage
McKinney Place GarageMcKinney Place Garage
McKinney Place Garage
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
 
Green Screen Parking Structure
Green Screen Parking StructureGreen Screen Parking Structure
Green Screen Parking Structure
 
Trump Tower Chicago
Trump Tower ChicagoTrump Tower Chicago
Trump Tower Chicago
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure
 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
 
The Memorial Wall at Ground Zero
The Memorial Wall at Ground ZeroThe Memorial Wall at Ground Zero
The Memorial Wall at Ground Zero
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
 
Washinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior ProjectWashinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior Project
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
BDE80_p10
BDE80_p10BDE80_p10
BDE80_p10
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
2010 Marina Bay Sands
2010 Marina Bay Sands2010 Marina Bay Sands
2010 Marina Bay Sands
 

Viewers also liked

EVOC review
EVOC reviewEVOC review
EVOC review
Andy Mihans
 
EVOC Training with OneBeacon Government Risks
EVOC Training with OneBeacon Government RisksEVOC Training with OneBeacon Government Risks
EVOC Training with OneBeacon Government Risks
OneBeacon Government Risks
 
Presentation on vechile operator safety
Presentation on vechile operator safetyPresentation on vechile operator safety
Presentation on vechile operator safety
Shivam Sharma
 
Rapid Prototyping (Mechanical)
Rapid Prototyping (Mechanical)Rapid Prototyping (Mechanical)
Rapid Prototyping (Mechanical)
Shubham Thakur
 
Six stroke engine akhil dont delte
Six stroke engine akhil dont delteSix stroke engine akhil dont delte
Six stroke engine akhil dont delte
Akhil Das
 
CCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab Brochure
CCL Concrete
 
Gear
GearGear
Classical vs. Modern
Classical vs. Modern�Classical vs. Modern�
Classical vs. Modern
Zohreh Daemi, MBA, DBA
 
Cook Islands
Cook IslandsCook Islands
Cook Islands
Akaroa Area School
 

Viewers also liked (9)

EVOC review
EVOC reviewEVOC review
EVOC review
 
EVOC Training with OneBeacon Government Risks
EVOC Training with OneBeacon Government RisksEVOC Training with OneBeacon Government Risks
EVOC Training with OneBeacon Government Risks
 
Presentation on vechile operator safety
Presentation on vechile operator safetyPresentation on vechile operator safety
Presentation on vechile operator safety
 
Rapid Prototyping (Mechanical)
Rapid Prototyping (Mechanical)Rapid Prototyping (Mechanical)
Rapid Prototyping (Mechanical)
 
Six stroke engine akhil dont delte
Six stroke engine akhil dont delteSix stroke engine akhil dont delte
Six stroke engine akhil dont delte
 
CCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab Brochure
 
Gear
GearGear
Gear
 
Classical vs. Modern
Classical vs. Modern�Classical vs. Modern�
Classical vs. Modern
 
Cook Islands
Cook IslandsCook Islands
Cook Islands
 

Similar to Emergency Vehicle Operator Course (EVOC)

Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
Kamesh Tripathi
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
Rajesh Prasad
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
Raghavendra Raghu
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
Vicky Matwan
 
A012510113
A012510113A012510113
A012510113
IOSR Journals
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
Abhishek Paul
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
Google
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
Amir Amdani
 
Self Compacting Concrete
Self Compacting ConcreteSelf Compacting Concrete
Self Compacting Concrete
Ahsan Rabbani
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
SUNILPRASAD68
 
Concrete cloth
Concrete clothConcrete cloth
Concrete cloth
aryan922
 
Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...
Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...
Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...
IOSR Journals
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPTCherylwitmer
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
PRANTIKSINHA2
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
inventionjournals
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
SayedaAmrin
 
May17
May17May17

Similar to Emergency Vehicle Operator Course (EVOC) (20)

Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Final thesis presentation.
Final thesis presentation.Final thesis presentation.
Final thesis presentation.
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
A012510113
A012510113A012510113
A012510113
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
 
Presentation1
Presentation1Presentation1
Presentation1
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
Self Compacting Concrete
Self Compacting ConcreteSelf Compacting Concrete
Self Compacting Concrete
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
 
Concrete cloth
Concrete clothConcrete cloth
Concrete cloth
 
Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...
Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...
Ultimate Behavior of Lightweight High Strength Concrete Filled Steel Tube (LW...
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
 
May17
May17May17
May17
 

Recently uploaded

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

Emergency Vehicle Operator Course (EVOC)

  • 2. Location: Camp Ripley at Little Falls, MN Submitted by: AMSYSCO, Inc. Owner: U.S. Army Architect(s): URS Engineer(s): URS Contractor: Donlar Construction PT Supplier: AMSYSCO, Inc. Other Contributors: Pawan Gupta; High Strength Cement- Ed Rice, CTS Cement Emergency Vehicle Operator Course
  • 3. Project Highlights: • A good example of the use of post-tensioning to improve crack control for an exposed slab, which reduces the penetration of water and other liquid chemicals. • The use of post-tensioning also eliminated control joints that could curl or crack over time. Emergency Vehicle Operator Course
  • 4. Project Overview: The Emergency Vehicle Operator Course (EVOC) is a unique post- tensioned concrete slab-on-ground constructed for the Minnesota Department of Military Affairs at Camp Ripley. EVOC is a 60,000 ft 2 “skid pan” that is made slippery so that vehicle drivers can practice controlling skids. EVOC consists of a 12.5 in. thick concrete slab with 20 in. grade beams around the perimeter. The post-tensioned slab used 6000 psi shrinkage-compensating concrete that was laid on top of two layers of 6 mil thick polyethylene sheet and a 14 in. base course. Additionally, it was separated from an asphaltic “transition” slab by a perimeter expansion joint. Emergency Vehicle Operator Course
  • 5. Project Overview Continued: Unlike most post-tensioned concrete slabs of similar square footage, EVOC had two pours of 30,000 ft 2 pours each, which were poured on consecutive days. Initial stressing was done at 0.4 Fpu (or 16.5 kip) when the concrete in Pour #2 reached 1500 psi. Final stressing was done at 0.8 Fpu (or 33 kip) when the concrete reached 3000 psi in both pours. Each 0.5 in. diameter 270 ksi tendon was stressed from both ends to increase the final average force in the tendon. In total, EVOC has 190 bundles of two unbonded tendons spaced at 1 to 7 in. on center in the short 200 ft direction and 150 bundles of two unbonded tendons spaced at 16 in. on center in the long 300 ft direction. Because the concrete slab would be exposed to aggressive environments from inclement Minnesota weather and test chemicals, the project documents required an encapsulated post-tensioning system of PTI specifications. This should help increase the durability of the concrete and improve life-cycle costs. Emergency Vehicle Operator Course