This document provides an overview of building a risk-based testing strategy for SAP applications. It discusses the need for such a strategy due to the constant changes in SAP systems and digital technologies. It then introduces Worksoft Certify Impact, a solution that helps identify business process tests impacted by SAP transports and automatically executes those tests. The solution analyzes change impacts, locates related tests, and executes them to validate changes. This allows teams to focus testing on only the areas affected by changes.
Worksoft certify online training basic demo tutorialITJobZone.biz
Worksoft Certify Basic Tutorials on Layout, Process, Variables, Recordset and More. Learn Worksoft Certify from the best trainers in the industry. http://www.itjobzone.biz/Worksoft-certify-training-automation-testing.html
Moving from SAP HCM to SAP SuccessFactors Employee Central: Evaluating Your R...Rizing HCM
Are you an on-premise SAP HCM customer wondering if you are ready to move to SAP SuccessFactors Employee Central in the cloud before SAP ends mainstream maintenance on legacy systems? This webcast helps you assess your readiness to make the switch, so you will know how much risk, how much customization, and how much effort the project will entail.
Attendees will receive guidance on how to better prepare for the move to HR in the cloud, including:
- Identifying significant roadblocks
- Moving to self-service
- Data extraction and migration
- Integration requirements and tools
- Assessing your current system and what you need in the future
- Evaluating HCM process and organizational structures
- Change management and training
Watch the full webinar: go.rizing.com/WBN-EC-Readiness-OnDemand.html
Worksoft certify online training basic demo tutorialITJobZone.biz
Worksoft Certify Basic Tutorials on Layout, Process, Variables, Recordset and More. Learn Worksoft Certify from the best trainers in the industry. http://www.itjobzone.biz/Worksoft-certify-training-automation-testing.html
Moving from SAP HCM to SAP SuccessFactors Employee Central: Evaluating Your R...Rizing HCM
Are you an on-premise SAP HCM customer wondering if you are ready to move to SAP SuccessFactors Employee Central in the cloud before SAP ends mainstream maintenance on legacy systems? This webcast helps you assess your readiness to make the switch, so you will know how much risk, how much customization, and how much effort the project will entail.
Attendees will receive guidance on how to better prepare for the move to HR in the cloud, including:
- Identifying significant roadblocks
- Moving to self-service
- Data extraction and migration
- Integration requirements and tools
- Assessing your current system and what you need in the future
- Evaluating HCM process and organizational structures
- Change management and training
Watch the full webinar: go.rizing.com/WBN-EC-Readiness-OnDemand.html
Change Request Management (ChaRM) tool in SAP Solution Manager addresses the challenges described in the previous slide.
It enables to manage and control changes within system landscape from a central SAP Solution Manager system.
It integrates SAP CRM business transaction functionality for managing request for change and allows you to process your projects universally from change management and project planning, through resource management and cost control, to the physical transport of the changes from the development environment into the production environment.
Abacus Consulting is one of the oldest and leading SAP implementation and education service provider.
We have received best e-Academy for 2012, 2014 and 2015,
We will help you become a Global Resource!!
The new SAP Cloud Platform Integration L2 Deck provides the product overview on SAP Cloud Platform Integration services and wide variety of customer use cases.
Four pillars of DevOps - John Shaw - Agile Cambridge 2014johnfcshaw
Slides presented at Agile Cambridge 2014 http://agilecambridge.net/ac2014/sessions/index.php?session=57
Session Description:
The emerging practice of DevOps is a natural extension to established Agile methods. The choice of tooling to support the practices is important and will influence heavily how rapid, repeatable and reliable live deployments might be.
Three of the four pillars are concerned with automation through tooling but, arguably, the fourth pillar is more important than the other three together. The fourth pillar is at the heart of the Agile Manifesto: people.
The "Gold Rush" for DevOps is dominated by vendors and the push to sell their wares. But it is people who use the tools, people who define, develop and assure the software, and people who manage the services after they have gone live. One of the cornerstones of DevOps is breaking down the walls between development teams and operations; too much tool specialisation will lead to further separation and even the introduction of yet another silo.
This talk will cover four pillars to DevOps: Environments, Deployment, Testing and People. The insights brought together in this talk were gained under commercial engagements with government clients, on development of financial systems responsible for management of funding in the adult education sector.
Agile Testing Framework - The Art of Automated TestingDimitri Ponomareff
Once your organization has successfully implemented Agile methodologies, there are two major areas that will require improvements: Continuous Integration and Automated Testing.
This presentation illustrates why it's important to invest in an Automated Testing Framework (ATF) to reduce technical debt, increase quality and accelerate time to market.
Learn more at www.agiletestingframework.com.
At SQA Solution the objectives of SAP System Testing are to verify that the installed system, which includes the SAP software, custom code and manual procedures, perform per business requirements:
Executes as specified and without error.
Validates with the users and management that the delivered system performs in accordance with the stated system requirements.
Ensures that the system works with other existing systems, including but not limited to interfaces, conversions, and reports.
The SAP solutions for Enterprise Information Management (EIM) Overview presentation provides a comprehensive overview on the portfolio of EIM solutions.
Accelerate Your Test Automation Journey with Process Mining for SAPWorksoft
You’ve made the commitment to accelerate your business with automation, but then handicap that effort by manually capturing and documenting your current business processes. Why limit your discovery initiatives to time intensive SME interviews and motion studies? Accelerate and expand the scope of discovery efforts by using every historical transaction performed by every user to rapidly build a robust library of test cases automatically with Process Mining for SAP.
YETI Cooler's Guide to Pulling off a Rock Solid SAP S/4HANA Software Implemen...Worksoft
Learn how YETI built a comprehensive plan for its company-wide SAP S/4HANA software deployment by utilizing intelligent automation to document and validate business processes and support adoption.
Change Request Management (ChaRM) tool in SAP Solution Manager addresses the challenges described in the previous slide.
It enables to manage and control changes within system landscape from a central SAP Solution Manager system.
It integrates SAP CRM business transaction functionality for managing request for change and allows you to process your projects universally from change management and project planning, through resource management and cost control, to the physical transport of the changes from the development environment into the production environment.
Abacus Consulting is one of the oldest and leading SAP implementation and education service provider.
We have received best e-Academy for 2012, 2014 and 2015,
We will help you become a Global Resource!!
The new SAP Cloud Platform Integration L2 Deck provides the product overview on SAP Cloud Platform Integration services and wide variety of customer use cases.
Four pillars of DevOps - John Shaw - Agile Cambridge 2014johnfcshaw
Slides presented at Agile Cambridge 2014 http://agilecambridge.net/ac2014/sessions/index.php?session=57
Session Description:
The emerging practice of DevOps is a natural extension to established Agile methods. The choice of tooling to support the practices is important and will influence heavily how rapid, repeatable and reliable live deployments might be.
Three of the four pillars are concerned with automation through tooling but, arguably, the fourth pillar is more important than the other three together. The fourth pillar is at the heart of the Agile Manifesto: people.
The "Gold Rush" for DevOps is dominated by vendors and the push to sell their wares. But it is people who use the tools, people who define, develop and assure the software, and people who manage the services after they have gone live. One of the cornerstones of DevOps is breaking down the walls between development teams and operations; too much tool specialisation will lead to further separation and even the introduction of yet another silo.
This talk will cover four pillars to DevOps: Environments, Deployment, Testing and People. The insights brought together in this talk were gained under commercial engagements with government clients, on development of financial systems responsible for management of funding in the adult education sector.
Agile Testing Framework - The Art of Automated TestingDimitri Ponomareff
Once your organization has successfully implemented Agile methodologies, there are two major areas that will require improvements: Continuous Integration and Automated Testing.
This presentation illustrates why it's important to invest in an Automated Testing Framework (ATF) to reduce technical debt, increase quality and accelerate time to market.
Learn more at www.agiletestingframework.com.
At SQA Solution the objectives of SAP System Testing are to verify that the installed system, which includes the SAP software, custom code and manual procedures, perform per business requirements:
Executes as specified and without error.
Validates with the users and management that the delivered system performs in accordance with the stated system requirements.
Ensures that the system works with other existing systems, including but not limited to interfaces, conversions, and reports.
The SAP solutions for Enterprise Information Management (EIM) Overview presentation provides a comprehensive overview on the portfolio of EIM solutions.
Accelerate Your Test Automation Journey with Process Mining for SAPWorksoft
You’ve made the commitment to accelerate your business with automation, but then handicap that effort by manually capturing and documenting your current business processes. Why limit your discovery initiatives to time intensive SME interviews and motion studies? Accelerate and expand the scope of discovery efforts by using every historical transaction performed by every user to rapidly build a robust library of test cases automatically with Process Mining for SAP.
YETI Cooler's Guide to Pulling off a Rock Solid SAP S/4HANA Software Implemen...Worksoft
Learn how YETI built a comprehensive plan for its company-wide SAP S/4HANA software deployment by utilizing intelligent automation to document and validate business processes and support adoption.
See what is new with Worksoft Certify. This presentation covers the new features in Certify 10.0.01 including automated exploratory testing, process compare, and how to find and replace values and variables easily. It also explains how to test APIs via SoapUI.
Creating business blueprints in Solution Manager has traditionally been such a time consuming task that most organizations have given up on the idea. But what if you could automatically create and update blueprints? During this webinar we discussed how the latest technology makes it possible.
Digital Testing Strategy: Replace Manual Testing with Intelligent AutomationWorksoft
Keeping pace with change is the key to your company’s future success, but reliability is vital for day-to-day operations. So how can you create a robust automation platform to ensure business process quality, and reduce the risks of manual testing? Find out how the world’s top companies have solved this challenge by replacing manual QA and legacy script-based tools with intelligent test automation.
This presentation is for those who are very new to Powerpoints and want to learn the art of making effective PPT's. Also the idea behind making a module, per say, is important and this PPT describes the parameters on which a Basic Training Module can be built. These parameters will help the new comers to get an Idea of how to prepare Training Modules
Critical steps in Determining Your Value Stream Management SolutionDevOps.com
In order to increase your delivery velocity, you must find, identify and solve the bottlenecks of delivery. Value Stream management solutions capture metrics and processes helping guide your digital transformation journey.
Join Marc Hornbeek, Principal Consultant and Jeff Keyes from Plutora where they will discuss a methodology determining a value stream management solution for your organization. It will consist of critical steps including a Review of VSM Assessments, Future-State Value Stream Mapping, Road-Mapping VSM Transformation, and more. Following these steps provide a logical and comprehensive approach to determine a value stream management solution that fits for your organization’s requirements.
What will be learned:
WHY – is following steps for determining a VSM solution important?
HOW – are VSM solutions determined?
WHAT – is the expected outcome of a Value Stream Management solution recommendation?
The move to a SaaS-based solution like SAP SuccessFactors that is updated frequently requires teams to work together in an agile fashion. This requires new levels of collaboration, automation and the ability for teams to work in parallel.
Learn how Worksoft enables the adoption of Agile-plus-DevOps testing for SAP SuccessFactors. For more information visit: www.worksoft.com.
Value stream management is essential for dev ops v4DevOps.com
Join us for a live webinar on December 13th to learn why you can’t have effective DevOps without Value Stream Management.
While DevOps provides capabilities that improve a business value stream through the implementation of culture, toolchains, orchestration and automation, DevOps alone without Value Stream Management is not sufficient to realize business benefits.
Don’t spend the time and money on DevOps alone and NOT get to reap the rewards for the business!
Attend this webinar to hear Marc Hornbeek of Trace3, and Jeff Keyes of Plutora discuss how you can leverage all of the data from your DevOps tools chains to provide real-time analytics, and codify policies that must be orchestrated to realize benefits of a business value stream.
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...Bernhard Luecke
For enterprises , Time to Value is what most counts in the more and more rapidly changing world. As a software provider, SAP needs to ensure the quality of the configured and extended product, integrated as part of the solution landscape of the customer. This is achieved through the SAP Control Center Concept delivered within the SAP MaxAttention or Active Embedded engagement by SAP Active Global Support.
Presentation held at "II Jornadas de Calidad del Producto" in Madrid ( http://calidaddelproductosoftware.com/2014/programa/ )
These slides and embedded webinar covers how to:
Proactively understand the impact of transports on target systems
-Mitigate risk by pinpointing relevant test assets and identifying gaps in coverage
-Rapidly create and update appropriate test sets and data
-Efficiently validate the test assets that changed before it goes into production
Remote resources adhere to service level agreements, leveraging other customer insights, supporting required SAP modules at a fraction of your internal cost. Full time employees are not always required, remote application resources can be spread across many disciplines and are used to support many modules with expert hands on demand.
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksIBM UrbanCode Products
Inefficient software delivery impacts the entire business, from line of business units, to operations, to development and test, and the variety of suppliers.
Wastes in your processes are causing bottlenecks.
Join Eric Minick, IBM DevOps Evangelist (and UrbanCode guy), as he explores how ‘Lean Thinking’ techniques can be leveraged to help identify ‘bottlenecks’ in your delivery pipeline that can be addressed by adopting DevOps.
Reducing the complexity of your Enterprise Packaged Application Automation Te...YASH Technologies
Automated testing creates new efficiencies that accelerate the testing cycle and promote software quality. By automating
regression tests and other repetitive tasks, means increased test coverage, better utilization QA resources.
Digitize your repetitive development processes to gain additional productivity and improve quality and costs.
Your Challenge
IT is increasingly under pressure to release applications quickly, reduce development, operations, and maintenance costs, while remaining relevant to business objectives.
Using a purely manual software development process can be useful when starting out and processes are not yet concrete. At a certain point, you will hit scalability limits around traceability and throughput. This will affect overall product quality.
Tests will increase over time as applications become larger and more complex, causing testing capacities to reach an upper bound slowing testing throughout. The urgency of release to market means a product may not be fully tested.
Our Advice
Critical Insight
Focus on instrumentation and integration when implementing your automated application development (AAD) tools to reduce maintenance costs, increase product quality, and improve project productivity. Instrumentation focuses on your tool’s execution, and integration refers to the movement and acceptance of development artifacts.
Don't try to automate if you don't have a good foundation based on quality and traceability first. Otherwise automation will make matters worse by amplifying gaps in your foundation. Assess your current development process for people, process, and technology gaps before deciding to implement AAD.
Impact and Result
Realize significant savings over time by reducing repetitive effort devoted to developing, testing, deploying, and maintaining applications.
Free up time to proactively optimize processes and tools or to take on innovation projects to help boost business initiatives. Innovation, a historically nice-to-have, can now be an integrated part of IT directives and mantras.
IT and the business can accurately measure the success of the development, testing, and deployment of the application to determine the need for future optimization projects to further reduce costs and improve productivity.
Using Lean Thinking to identify and address Delivery Pipeline bottlenecksSanjeev Sharma
Using Lean Thinking to identify and address Delivery Pipeline bottlenecks: This session explores 'Lean Thinking' techniques to help identify 'bottlenecks' in your delivery pipeline that can be addressed by adopting DevOps
Case Study: SunTrust’s Next Gen QA and Release Services Transformation JourneyCA Technologies
Sun Trust’s journey from challenge identification, charter definition, execution practices and key metrics and results in their transformation of traditional QA and Release functions into a more cohesive, collaborative and “continuous” model.
For more information, please visit http://cainc.to/Nv2VOe
How Applied Materials Deploys Faster SAP® Projects and Boosts Quality with Wo...Worksoft
How Applied Materials Deploys Faster SAP® Projects and Boosts Quality with Worksoft Test Automation
https://www.worksoft.com/events/how-applied-materials-deploys-faster-sap-projects-and-boosts-quality-with-test-automation
Do you have to learn code to create test automation? The answer is no. The latest technology enables business and QA teams to ensure enterprise application quality using easy to maintain, plain English tests. Powerful automated business process discovery, risk based analysis and lights-out regression tests can then be used to extend automation and create additional value – all without code!
Best Practices for a Repeatable Shift-Left CommitmentApplause
Applause testing experts discuss the challenges of shifting left and innovative new ways to enable teams to eliminate the impact of manually validating new functionality immediately after a new feature is coded.
Similar to Everything You Need to Build a Risk-Based Testing Strategy for SAP (20)
Continuous Integration is a more modern approach to development. It delivers clear value around managing code changes and has been quickly and widely adopted by teams building custom applications. Learn the core principles of Continuous Integration and how they apply to running end-to-end regression tests for SAP.
Agile-plus-DevOps Testing for Packaged ApplicationsWorksoft
Guest presenter Forrester VP and Principal Analyst Diego Lo Giudice joined Worksoft Agile expert Chris Kraus for an exploration of the state of adoption of Agile, DevOps and test automation in the enterprise packaged application space. Learn why it is important to include testing of packaged apps and mainframe as part of an Agile-plus-DevOps strategy and how the adoption of Agile and DevOps varies for packaged vs. custom-built applications. View the recorded event at: https://www.worksoft.com/downloads/worksoft-forrester-webinar-agile-plus-devops-testing-for-packaged-applications.
In the world of digital transformation and Agile methodologies, change is the only constant. And with change comes risk. That's why adopting a test automation strategy is key to accelerating critical app projects - dramatically reducing risk. During this webinar we discussed how you can get started.
Running automated, unattended, end-to-end tests in parallel at scale is challenging. Fortunately, Lights Out Testing makes it possible to test any business process on demand. During this webinar we discuss how you can get started with automated test execution.
Packaged enterprise apps are different from custom apps, and that means testing has to be different too. During this webinar we discussed these differences and provided strategies for supporting every aspect of implementing, testing, and running large enterprise applications.
Citrix Systems Inc. has an IT landscape consisting of diversified technologies that include SAP, SAP Ariba, Concur, and Workday solutions. Learn how Citrix put in place a test automation strategy to achieve end-to-end quality and validation of complex business processes that span multiple SAP technology solutions. Citrix HR, procurement, and travel and expenses business processes, which require integration between a hosted SAP solution and cloud-based Workday, SAP Ariba, and Concur platforms, will be explained.
Tired of spending countless hours updating and maintaining HP UFT test scripts? You’re not alone! Now you can escape the complexity and high cost of HP UFT test maintenance without losing your existing SAP GUI test cases.
The HP UFT Replacement Program makes it easy to eliminate duplicate tests and improve business process coverage while reducing test cases by 70% or more.
Stop manual testing: Take your weekends back! Worksoft
Manual testing takes time and manually validating data is error prone. It means doing the same repetitive task over and over and for many people it's not their day job. Discover your business processes, find the real end-to-end workflow and ensure that every business process works as planned with Worksoft Automation.
Accenture and Worksoft Explain Why Businesses Need a Digital Testing StrategyWorksoft
Originally presented February 11th by Matthias Rasking, Principal Director and Testing Platform Lead at Accenture, and Shoeb Javed, Chief Technology Officer at Worksoft.
Based on research with Pierre Audoin Consultants (PAC) in Europe
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...Shahin Sheidaei
Games are powerful teaching tools, fostering hands-on engagement and fun. But they require careful consideration to succeed. Join me to explore factors in running and selecting games, ensuring they serve as effective teaching tools. Learn to maintain focus on learning objectives while playing, and how to measure the ROI of gaming in education. Discover strategies for pitching gaming to leadership. This session offers insights, tips, and examples for coaches, team leads, and enterprise leaders seeking to teach from simple to complex concepts.
Developing Distributed High-performance Computing Capabilities of an Open Sci...Globus
COVID-19 had an unprecedented impact on scientific collaboration. The pandemic and its broad response from the scientific community has forged new relationships among public health practitioners, mathematical modelers, and scientific computing specialists, while revealing critical gaps in exploiting advanced computing systems to support urgent decision making. Informed by our team’s work in applying high-performance computing in support of public health decision makers during the COVID-19 pandemic, we present how Globus technologies are enabling the development of an open science platform for robust epidemic analysis, with the goal of collaborative, secure, distributed, on-demand, and fast time-to-solution analyses to support public health.
Understanding Globus Data Transfers with NetSageGlobus
NetSage is an open privacy-aware network measurement, analysis, and visualization service designed to help end-users visualize and reason about large data transfers. NetSage traditionally has used a combination of passive measurements, including SNMP and flow data, as well as active measurements, mainly perfSONAR, to provide longitudinal network performance data visualization. It has been deployed by dozens of networks world wide, and is supported domestically by the Engagement and Performance Operations Center (EPOC), NSF #2328479. We have recently expanded the NetSage data sources to include logs for Globus data transfers, following the same privacy-preserving approach as for Flow data. Using the logs for the Texas Advanced Computing Center (TACC) as an example, this talk will walk through several different example use cases that NetSage can answer, including: Who is using Globus to share data with my institution, and what kind of performance are they able to achieve? How many transfers has Globus supported for us? Which sites are we sharing the most data with, and how is that changing over time? How is my site using Globus to move data internally, and what kind of performance do we see for those transfers? What percentage of data transfers at my institution used Globus, and how did the overall data transfer performance compare to the Globus users?
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoamtakuyayamamoto1800
In this slide, we show the simulation example and the way to compile this solver.
In this solver, the Helmholtz equation can be solved by helmholtzFoam. Also, the Helmholtz equation with uniformly dispersed bubbles can be simulated by helmholtzBubbleFoam.
Experience our free, in-depth three-part Tendenci Platform Corporate Membership Management workshop series! In Session 1 on May 14th, 2024, we began with an Introduction and Setup, mastering the configuration of your Corporate Membership Module settings to establish membership types, applications, and more. Then, on May 16th, 2024, in Session 2, we focused on binding individual members to a Corporate Membership and Corporate Reps, teaching you how to add individual members and assign Corporate Representatives to manage dues, renewals, and associated members. Finally, on May 28th, 2024, in Session 3, we covered questions and concerns, addressing any queries or issues you may have.
For more Tendenci AMS events, check out www.tendenci.com/events
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Mind IT Systems
Healthcare providers often struggle with the complexities of chronic conditions and remote patient monitoring, as each patient requires personalized care and ongoing monitoring. Off-the-shelf solutions may not meet these diverse needs, leading to inefficiencies and gaps in care. It’s here, custom healthcare software offers a tailored solution, ensuring improved care and effectiveness.
How Recreation Management Software Can Streamline Your Operations.pptxwottaspaceseo
Recreation management software streamlines operations by automating key tasks such as scheduling, registration, and payment processing, reducing manual workload and errors. It provides centralized management of facilities, classes, and events, ensuring efficient resource allocation and facility usage. The software offers user-friendly online portals for easy access to bookings and program information, enhancing customer experience. Real-time reporting and data analytics deliver insights into attendance and preferences, aiding in strategic decision-making. Additionally, effective communication tools keep participants and staff informed with timely updates. Overall, recreation management software enhances efficiency, improves service delivery, and boosts customer satisfaction.
Enhancing Research Orchestration Capabilities at ORNL.pdfGlobus
Cross-facility research orchestration comes with ever-changing constraints regarding the availability and suitability of various compute and data resources. In short, a flexible data and processing fabric is needed to enable the dynamic redirection of data and compute tasks throughout the lifecycle of an experiment. In this talk, we illustrate how we easily leveraged Globus services to instrument the ACE research testbed at the Oak Ridge Leadership Computing Facility with flexible data and task orchestration capabilities.
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Anthony Dahanne
Les Buildpacks existent depuis plus de 10 ans ! D’abord, ils étaient utilisés pour détecter et construire une application avant de la déployer sur certains PaaS. Ensuite, nous avons pu créer des images Docker (OCI) avec leur dernière génération, les Cloud Native Buildpacks (CNCF en incubation). Sont-ils une bonne alternative au Dockerfile ? Que sont les buildpacks Paketo ? Quelles communautés les soutiennent et comment ?
Venez le découvrir lors de cette session ignite
A Comprehensive Look at Generative AI in Retail App Testing.pdfkalichargn70th171
Traditional software testing methods are being challenged in retail, where customer expectations and technological advancements continually shape the landscape. Enter generative AI—a transformative subset of artificial intelligence technologies poised to revolutionize software testing.
top nidhi software solution freedownloadvrstrong314
This presentation emphasizes the importance of data security and legal compliance for Nidhi companies in India. It highlights how online Nidhi software solutions, like Vector Nidhi Software, offer advanced features tailored to these needs. Key aspects include encryption, access controls, and audit trails to ensure data security. The software complies with regulatory guidelines from the MCA and RBI and adheres to Nidhi Rules, 2014. With customizable, user-friendly interfaces and real-time features, these Nidhi software solutions enhance efficiency, support growth, and provide exceptional member services. The presentation concludes with contact information for further inquiries.
In software engineering, the right architecture is essential for robust, scalable platforms. Wix has undergone a pivotal shift from event sourcing to a CRUD-based model for its microservices. This talk will chart the course of this pivotal journey.
Event sourcing, which records state changes as immutable events, provided robust auditing and "time travel" debugging for Wix Stores' microservices. Despite its benefits, the complexity it introduced in state management slowed development. Wix responded by adopting a simpler, unified CRUD model. This talk will explore the challenges of event sourcing and the advantages of Wix's new "CRUD on steroids" approach, which streamlines API integration and domain event management while preserving data integrity and system resilience.
Participants will gain valuable insights into Wix's strategies for ensuring atomicity in database updates and event production, as well as caching, materialization, and performance optimization techniques within a distributed system.
Join us to discover how Wix has mastered the art of balancing simplicity and extensibility, and learn how the re-adoption of the modest CRUD has turbocharged their development velocity, resilience, and scalability in a high-growth environment.
Check out the webinar slides to learn more about how XfilesPro transforms Salesforce document management by leveraging its world-class applications. For more details, please connect with sales@xfilespro.com
If you want to watch the on-demand webinar, please click here: https://www.xfilespro.com/webinars/salesforce-document-management-2-0-smarter-faster-better/
Large Language Models and the End of ProgrammingMatt Welsh
Talk by Matt Welsh at Craft Conference 2024 on the impact that Large Language Models will have on the future of software development. In this talk, I discuss the ways in which LLMs will impact the software industry, from replacing human software developers with AI, to replacing conventional software with models that perform reasoning, computation, and problem-solving.
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTier1 app
Even though at surface level ‘java.lang.OutOfMemoryError’ appears as one single error; underlyingly there are 9 types of OutOfMemoryError. Each type of OutOfMemoryError has different causes, diagnosis approaches and solutions. This session equips you with the knowledge, tools, and techniques needed to troubleshoot and conquer OutOfMemoryError in all its forms, ensuring smoother, more efficient Java applications.
Globus Connect Server Deep Dive - GlobusWorld 2024Globus
We explore the Globus Connect Server (GCS) architecture and experiment with advanced configuration options and use cases. This content is targeted at system administrators who are familiar with GCS and currently operate—or are planning to operate—broader deployments at their institution.
3. 3
“By 2020, 60% of digital businesses will
experience a major service failure because of
IT teams’ inability to “manage digital risk in
new technology and use cases.”
Gartner Projection
The Pace of Change Drives Digital Risk
4. 4
“This is probably good news for incumbents, since many of them
are carefully watching tech start-ups to identify the winning plays
and then imitating them at their own bigger scale. That approach,
to be sure, demands cutting-edge agility to excel on all the
operational and organizational aspects of digital maturity.”
4/12/2017
Source http://www.mckinsey.com/business-functions/digital-mckinsey/our-insights/the-case-for-digital-reinvention
Agility Has Never Been More Important!
5. 5
SAP… Change Is a Constant
• When a new process becomes available, how quickly can I integrate the process
into my business and begin realizing its benefits?
• How can I decrease the time required to implement system changes and events?
• How do I improve implementation performance, mitigate risks, leverage
accelerators, and measure adoption?
EFFORT
ONGOING
CHANGE
EVENTS
DISCRETE
CHANGE
EVENTS
…establish a quality platform to minimize time/cost of change event efforts
Consolid.
New
Implementation
Upgrades
New Processes
TIME
Custom
Dev.
Custom
Dev.
Custom
Dev.
Hot
Packs
Support Pack Support Pack
CHANGE EVENTS
Business drivers
Changed business processes, M&A
re-organizations & new products,
vendors…
Compliance drivers
Governance, risk management &
compliance
Technology drivers
New functionality & Upgrades
Transforming software change control into business change control –
company-wide, across SAP and non-SAP landscapes
6. 6
“Quality & Testing”
Biggest Pain Point Of Upgrades
0
10
20
30
40
50
60
70
80
90
83%
17%
% Members
IN THE
PROCESS OF
UPGRADING
NOT
UPGRADING
Major Cost and Time Factors during Upgrade or
Implementation, % Customers
QA & Testing
Change Mgmt.
Planning
Training & Doc.
Resource Mgmt.
Complexity
Project schedule
n=52
75%
30%
16%
12%
7%
5%
0%
Source: ASUG Test influence council member survey 2013
Testing and coverage is
the #1 stated pain point
for all customers
Over 86% of customers
are concerned about
risks due to lack of
comprehensive testing
Complexity and project
schedule are rated
much lower compared
to the rest
7. 7
The SAP systems are extremely
complex and getting more so at an
alarming pace!
• Many touch points with
other internal and external systems
increase risk-prone breakage areas
• Multi-component development
efforts greatly increase
wait/downtime
• Complexity of systems renders
duplication for Dev/QA extremely
costly if not altogether impossible
Top SAP Testing Pain Points
Number of interfaces
(counting point-to-point connections):
Source: Results of the global Survey 2016 for SAP Process
Integration (Part 1 of 2)
% of users
8. 8
Unclear poorly
defined
Requirement
Risks
Complexity
Technical
Risks
Failure to
address priority
conflicts
Schedule
Risks
What Are the Risks?
“Risk Based Testing is a method for prioritizing the tests based on the risk of their
failure because testers cannot test everything with available resources, usually it
starts early in the project cycle.”
Source: International Journal of Computer Applications (0975 – 8887), Volume 65– No.1, March 2013. Risk-based Testing
Techniques: A Perspective Study. Md. Mottahir Alam and Asif Irshad Khan.
10. 10www.worksoft.com
Quick Intro to Worksoft
Automation for End to End Business Process Testing
Global Organization
Offices in Dallas TX, London
UK & Munich Germany
Diverse Global 5000
customers across N. America,
Europe & Asia
Worldwide support and
services
Innovative Technology
First-to-market with business process
testing. First with process mining for
SAP.
Focus on Enterprise Apps: SAP,
Salesforce.com, Workday, Oracle
and many others
5 patents awarded, 2 in progress
Ranked #1 by Gartner in Test
Automation for Packaged Enterprise
Applications
Diverse Community
SAP Partner
Global partnerships with the
leading system integrators
Thriving practitioner
community with peer learning,
blogs & customer-generated
content
Worksoft University and
certification programs
12. 12
Advantages:
• Speed - Tests can then
be immediately run in
Worksoft Execution
Manager or HP QC
• Insights - Data can be
imported into Worksoft
Analyze and graphically
visualized
4/12/2017
How Do You Manage the Change?
You Don’t Have to Test Everything. You Just Need to Test the Right Things.
Option 2 - Use Worksoft Certify and Impact
What Do
We Have?
What Are the
Risks?
What’s
Changing?
See the SAP
transactions,
programs and
objects that
are effected
Learn the risks by seeing
what is not covered and what
the STO3 associated risks are.
Overlay your existing
Certify processes that
test those Tcodes.
1
3
2
13. 13www.worksoft.com
Worksoft Solutions & Technology
From Continuous Delivery to Continuous Transformation
Discovery &
visualization
Process Mining for
SAP
Interactive & Passive
Capture
Advanced analytics
Business process testing
Certify Impact
Visual authoring
Out-of-the-box
optimizations for select
enterprise apps
Continuous execution
Lights-Out testing
Multi-tenant cloud
services
Massive, elastic VM
support
Worksoft Analyze® Worksoft Certify® Operations Suite
14. 14
Worksoft Certify Impact: Risk Based Testing for SAP
Developed for change management teams and non-technical users
Certify Impact Key Features:
• Automated change impact analysis for SAP
• Automated identification of changes made by transports in SAP
• Identification of appropriate tests to run in Worksoft Certify test
portfolio
• Integrates with SAP’s BPCA for a more detailed change analysis
• Works in real-time
Only execute the tests needed to
verify the change, not the entire
regression library!
Certify Impact minimizes the time required to test
changes as they are brought into the SAP landscape
WHAT IMPACT IS NOT GOOD FOR:
Conquering the Complexity of SAP Changes!
• Comparisons between two SAP systems
• Code analysis
• Reporting of object level changes.
BPCA can be used for this level of detail. We
help with BPPs and TBOMs.
15. 15
3. Execute Identified Business Process Tests
to Validate Changes in SAP System
2. Locate impacted objects
in Worksoft Certify Business
Process Tests
Provides an SAP-specific solution for ABAP-stack applications
Performs a deep and thorough analysis of selected SAP transports
Certify Impact – Approach
Certify Impact
SAP® Applications
ERP
SAP Applications Certify Database
Transports
Worksoft Certify®
Business
Process Tests
1. Inspect Transport for
Impacted Transactions and
Programs
Impacted Objects
16. 16
Example Of Certify Impact Object Analysis
Domain
Data Element
Fields
Tables
Structures
Function Module
Include Program
Calling Program
Transaction
IDOC_INPUT_ORDERS
D_AUART
RV45A
AUART
VBAK
VBAK-AUART
MV45AOAT
VA01
SAPMV45A
17. 17
• Analyze change for
• Identify major and minor projects
• Run and sustain
• Integrate with the testing platform
• Automatically identify test cases that match the
changes being made by the transports
• Automatically execute the test cases from the tool
• Identify testing gaps
• Verify where the gaps exist between current test
library and the changes being made
Impact in Action
19. 19
• Minimizes the time and resources required to test changes in SAP
• Focus resources specifically on what’s new and different
• Identify, recommend, and execute end-to-end business process tests based
on a set of proposed SAP application changes and their relationships to
critical business processes
• Increases quality in business process execution
• Provides a safeguard for identifying and testing changes before committing to
production
Certify Impact – Business Benefits
20. 20
IDC Validates the Value of Worksoft Certify
The Business Value of Worksoft Automated Business Process Validation Solutions
Source: The Business Value of Worksoft Automated Business Process Validation Solutions a commissioned August 2014 study conducted by IDC on behalf of Worksoft.
Method: IDC assessed the cost, benefits, and value associated with the use of Worksoft Certify by the 12 organizations interviewed for this white paper over a five-year period.
Worksoft Extends Automation and Drives Business Agility
ROI
273%
NPV
$11.46M
PAYBACK
11.9 mos.
INCREASED AUTOMATION
Automated business process
tests increased from 12% to
44%.
IMPROVED PRODUCTIVITY
Staff hours spent doing
regression testing reduced by
48%.
LOSSES FROM DEFECTS CUT
Productivity losses from
defects entering products cut
by 44%.
"We were looking for more seamless automation and fewer starts and stops for our regression
testing. Worksoft filled that gap. We went from having about 50% to 80% of our regression
processes automated."