Essay On Shooting An Elephant
Writing an essay on the topic "Shooting an Elephant" can present a unique set of challenges.
George Orwell's essay delves into complex themes, including the struggle between personal
conscience and societal expectations, the abuse of power, and the impact of imperialism.
Capturing the essence of these ideas requires a careful analysis of Orwell's narrative, an
understanding of the historical context in which the essay is set, and the ability to articulate one's
own interpretation and insights.
One difficulty lies in interpreting Orwell's internal conflict as he grapples with the expectations
of the crowd, the oppressive nature of imperialism, and his own ethical considerations. Crafting
a coherent and insightful analysis requires a deep exploration of Orwell's language choices,
narrative techniques, and the symbolism employed in the text.
Moreover, the essay demands a nuanced understanding of the historical context of British
imperialism in Burma, as well as an awareness of the broader socio-political issues addressed by
Orwell. This contextualization is crucial for providing a comprehensive analysis and
demonstrating a mastery of the subject matter.
Expressing one's own perspective and response to Orwell's narrative adds another layer of
complexity. The writer must navigate through the intricacies of personal interpretation while
maintaining a connection to the central themes of the essay. Developing a well-structured
argument that combines personal insights with a solid foundation in literary analysis is essential.
In conclusion, crafting an essay on "Shooting an Elephant" requires a multi-faceted approach
involving literary analysis, historical contextualization, and personal reflection. Meeting these
challenges necessitates careful reading, critical thinking, and effective communication skills.
While demanding, successfully navigating through these complexities can result in a thought-
provoking and engaging essay.
For assistance with similar essays or other academic writing needs, various resources are
available, including online platforms like HelpWriting.net, where professional writers can
provide support and guidance in tackling complex topics.
Essay On Shooting An Elephant Essay On Shooting An Elephant
Love In The Great Gatsby
The greatest thing you ll ever learn is just to love and be loved in return . The scene
where Satine and Christian are going behind the back of the duke and having the
time of their life. Luhrmann uses the slow motion effect to create slow tension and
make the audience think the outcome is going to be bad. This compares directly
with the Gatsby and Daisy scene where he is throwing his shirts down like they are
nothing. The concept of loveis shown in extremities, they are willing to give up
everything for their love. Satine is throwing away her career for her to be with
Christian rather than the duke.
The fast pace is also a key theme in The Great Gatsby.
2 close ups of cigarette being twisted into ash tray with force by Tom.
A lot ... Show more content on Helpwriting.net ...
The greatest thing you ll ever learn is just to love and be loved in return . Satine is
willing to No care for the duke who holds the deeds to the moulin rouge. Some of the
film techniques Luhrmann uses is close ups to show the true emotions of characters
and a fast pace with a lot of quick cutting between shots, fast cutting is used for
various reasons, it can be used to get a lot of information to the audience quickly,
dialogue between characters and the reason that Luhrmann uses fast cutting is to
show the energy and or chaos that is present. Luhrmann can also slow the pace
down slowing it down a several times during the extract. The way he uses his pace
to set the mood and the ideas of each particular scene is one of his better attributes.
An example of slowing it down is when Christian is narrating and also when the
Duke is about to witness Christian and Satine together, he uses the slow motion
effect in this situation and it adds a lot of tension to the scene and we all breathe a
sigh of relief once its over. To dramatise scenes Luhrmann uses background music to
suit the mood and the tension that the characters create. In this time and era it seems
like it is the normal thing to be having an
Tanner Glass s Role In Professional Sports
In most recent New York Rangers news. Ice hockey winger Tanner Glass has been
pulling his weight around the team for some time now. But he also made his status
in the National Hockey League by occasionally tossing the gloves and getting in
other opponents faces, but he s done well to stay on the right side of the rules.
Glass has only met with the NHL s Department of Player Safety once in his career,
occurring late in the 2014 2015 season for an end thrown on the Boston Bruins
defenseman Adam McQuaid. Since that incident the hockey veteran hasn t been in
trouble with the league. That may change as soon as Wednesday. In the final
minutes of the first period on Tuesday night, Glass lined up and shook up Tampa
Bay Lightning s center, Vladislav Namestnikov long after the 23 year old had already
moved the puck.... Show more content on Helpwriting.net ...
Glass violent hit earned him a major interference and a misconduct, while
Namestnikov remained on the ice for a couple of moments before heading to the
Lightning s back room. Thankfully for the Lightnings, who are dealing with an
unfortunate number of injuries, Namestnikov was able to return to the contest in
the second quarter of the game. The angles available of Glass check make it
difficult to tell where exactly the initial contact of the puck is made. But, from
what can be seen on the Madison Square Garden feeds, it appears as though Glass
smashes into Namestnikov shoulder to shoulder. There s a chance for an
interference play to earn a suspension, and there s a chance Glass becomes the fifth
Rangers player this season suspended for interference. If the league does decide to
suspend, Namestnikov s health and Glass history will be taken into account. Both of
those should fall in favor of Glass, who has no suspension history, as Namestnikov
returned and remained in the
Transition Of Art And Architecture From The Gilded Age
Transition of art and architecture from the gilded Age to the era of Ashcan artists
Introduction
Art is the expression of creative skills and imagination, through a visual medium such
as painting or sculptures. Architectural is the art of designing and constriction of an
object or a building. During Gilded Age the newly wealth citizens of America traced
their ancestry and cultural heritage to the greater civilization and aristocracies of
Europe. People spend months collecting and moving art and architecture from Europe
to United States. During the Gilded Age, American architects created a different
blending of style to their great houses which were initially influenced by European
design. As a result of revolution, Ashcan schoolwas introduced by a group of artists
who were inspired by Robert henry. The artists believed in worthiness of immigrants
and the working class life as artistic subject matter in art.
1.A Ride for Liberty
The theme of this art is liberty. It was designed by Eastman Johnson on 2nd march,
1962. It is located at Brooklyn museum. This art demonstrate the journey of America
to freedom. Americans love for freedom was represented by the liberty poles. The art
shows the idea of Americans attempting to occupy a more prominent place in public
and private discourse in the United States (Walker,... Show more content on
Helpwriting.net ...
It was designed by Thomas Eakins in 1875. It is located at Philadelphia Museum of
Art. The gross clinic art showed the society how surgical operation was done in the
19th century. Frock coats worn by the surgeons represent hygienic surgical
environment and helped people to understand prevention of infections. Frock coats
depict a cleaner and brighter surgical theater (Aldrich, 1969, p.111). It demonstrates
the evolution of health care in America in the 19th century. The Gross Clinic Art is a
representative of the Gilded Age since people had not adopted proper
Evaluation Of A Project On Project Management
Name Avi Mohan Sharma Student ID 11613141
Ans 1. Methodology:
Methodology is a collection of strategic methods that focus on how to plan, perform
and complete certain projects. It has a conductive approach which depends on the
conditions of different projects(Marchewka, 2003).
Role of the Methodologies in Project Management:
It suggests variations, tools and techniques, analyzation to accomplish the
projects(Marchewka, 2003). It designs a plan to fulfill the project and product life
cycles(Marchewka, 2003). Methodologies enable the sponsors, team members and
stakeholders to communicate in a specific business terms(Marchewka, 2003).
According to Marchewka(2003), methodology should be capable to accept the
necessities of the organizations.
The different project methodologies are Waterfall(common), Agile, SCRUM, SDLC,
PMBOK, PRINCE2, RAD etc(Marchewka, 2003).
According to Marchewka(2003), project methodologies utilize the design approach to
explain the project in a cyclic process.
Ans 2. Comparing PRINCE2 PMBOK:
PRINCE2 is originated in UK while PMBOK is originated in US.(PRINCE2 VS
PMP, n. d.).
PRINCE2 is more rigid than PMBOK as it is performance based methodology while
PMBOK is based on the facts and Knowledge areas.(PRINCE2 VS PMP, n. d.).
PRINCE2 defines the whole process(what, when, how, whom) to implement a project
. On the other hand, PMBOK
Youth Violence Memo
Thank you for participating in our recent Special Results Minneapolis roundtable
conversation on youth violence prevention. A roundtable meeting presents a unique
opportunity for City staff, leadership, elected officials, and stakeholders from outside
agencies and organizations to engage in robust discussions.
The YouthViolence Prevention Special Report presented by the Minneapolis Health
Department focused their data driven approach on identifying trends and
opportunities to reduce youth violence. From the discussion, three interrelated
themes emerged. To reduce youth violence, it requires actions taken with youth,
families, and the greater Minneapolis community. The following memo details these
themes, and suggests ways to reduce youth ... Show more content on Helpwriting.net
...
Therefore, to reduce youth violence, it is necessary to make wraparound services
available to youth also available to families. Without supporting families, efforts to
curtail youth violence cannot be as effective.
Theme: The Greater Minneapolis Community Has the Resources to Reduce Youth
Violence.
A consistent theme that at risk youth raise in discussions with community social
workers is the desire to have a job. Minneapolis has done a great deal of work in
connecting youth to employers through program such as Step up and Pathways .
These programs give any adolescence, at risk or not, a unique opportunity to build
purpose and nurture relationships with potential future employers. These programs
help to create positive life trajectories for youth.
The Minneapolis Public Schools (MPS) has operated a highly successful afterschool
program for years. Over the last 15 years, the funding for the program has declined
precipitously. Limited funds have made it challenging for MPS to keep the program
staffed with teachers, relying on an inconsistent flow of volunteers instead. The
afterschool program is an invaluable resource in the effort to reduce youth violence.
Instead of unsupervised and unstructured time, the program keeps youth focused on
completing homework, developing skills, exposes them to mentors, and allows
parents to rest assured that their children are safe while they are still at
Doping Testing And Doping Tests
Doping dates back to ancient Greek where athletes took special diets to make
themselves stronger. In the 19th Century, substances such as caffeine, alcohol and
cocaine were used to enhance performance among long distance athletes. In 1904,
for example, Thomas Hicks won the marathon by taking raw eggs, doses of brandy
administered during the race and injections of strychnine. By the year 1920s, people
realized that restrictions had to be created regarding the use of drugs in sports. In
1928, IAAF was the first sports federation to ban doping fir the use of stimulating
substances. In 1930, the problem became worse because of the introduction of
synthetic hormones, and the IAAF lacked the proper equipment to detect doping of
such kinds. By 1960, doping was a big issue because of the death of an athlete Knud
Jensen during the Olympics games in Mexico. An autopsy revealed the presence of
amphetamine a performance enhancement drug.
In 1966, FIFA and Cycling were the first sports to introduce doping tests in their
world championships. The International Olympics Committee followed suit the
following year, and it tested athletes in the 1968 Olympic Games. By the year 1999,
the IOC convened the first World Conference on Doping in Sports, which lead to the
formation of the World Anti Doping Agency(WADA) on November of the same year.
By 200, the fight against the use of EPO was ongoing and tests were undertaken
during the Sydney Olympics. Currently, more research is undertaken
Comparing Zefferelli s Film
Zefferelli vs. Baz Luhrmann Shirin Shahsavari 3/10/16 Although Zefferelli s film is
a better book to movie adaptation of Shakespeare s famous play, Romeo and Juliet ,
Baz Luhrmann s version is a lot more entertaining and comprehensible to most
teenagers because of its modern setting. Perhaps, one of the most substantial visible
contrasts between the two films is the setting. Zeffirelli s film takes place in a
classical setting, accurately representing the actual historic period in which the play
was written in. However, in Luhrmann s version the setting has been completely
transformed to make the film more modern and therefore easier for the audience to
understand and relate to. The modern setting makes the film more intriguing and
apprehensible
Franz Liszt was a Great Romantic Composer
According to De Portales, Liszt had a struggle in himself between the virtuoso and
the composer and he knew that he had to choose. He chose to go with the
composer and in 1847 his virtuoso career was over (De Portales 111 112). Another
reason he made the choice was that in 1847 Liszt once again fell in love upon
meeting a princess, named Carolyne Sayn Wittgenstein, in Kiev. She gave him a
large sum of money after a charity concert and he deeply desired to meet her to
thank her (De Pourtales 117). They met and fell in love. In 1848, after knowing
each other for a couple of months they went back to Weimar together, even though
she was married to another man (De Pourtales 121 122). Liszt accepted a job at the
Grand Duke of Weimar s court and became the Kapellmeister in Weimar and also
the conductor (Perenyi 238, Kamien 238). This even though it by the romantic era
was more normal for musicians to be independent ( Liszt, Franz ). His reason was
not because he needed money, he was the first pianist performer who could support
himself by doing what he did, he wanted to start composing (Franz Liszt). He stayed
at his position in Weimar from 1848 until 1861 ( Liszt, Franz ). His new orchestra
one of the first in Germany (De Portales (114). He managed to make the orchestra
bigger and to obtain more skilled players. He made sure to give them better pay and
better pensions. The orchestra had 45 members ( Liszt, Franz ), which was a normal
size for a romantic orchestra
Comparing Rene Descartes And Iacovos Vasiliou In The
Matrix
The movie the Matrix is full of philosophical relevancies and issues dealing with
morality. Rene Descartes and Iacovos Vasiliou are both great thinkers, and both of
them had great ideas that played a big part into forming the idea of the Matrix and
it s reality and whether or not it was real or not. In my paper, I will describe both
their sides and their opinions on the matter of the Matrix, and how Neo, the main
character, would feel in regards to all of it. I will also discuss how I believe both
Descartes and Vasiliou in their views.
In regards to Neo, how would he actually really know and believe that nothing in the
Matrix really exists? How does he know that when he left the Matrix program it was
real, and he is not still in it? One can take into account when Cypher speaks to Agent
Smith:
You know, I know this steak doesn t exist. I know that when I put it in my mouth,
The Matrix is telling my brain that it is juicy and delicious. After nine years, you
know what I realize? Ignorance is bliss (The Matrix Quotes ).
I believe that you can never necessarily know, and you can just choose to belief or
not when the information is presented to you. The entire point of the Matrix is that
we don t know what is necessarily real and what is a dream (Anderson). ... Show
more content on Helpwriting.net ...
The evil demon is paralleled in the Matrix as being the artificial intelligence that took
over earth and forced the virtual reality on the human population (Mo). Descartes
reasons that since he believes in what he sees and feels while he is dreaming, he
cannot trust his sense to tell him that he isn t still dreaming. His sense cannot aid him
with evidence that the Earth exists. He ends on the note that he cannot trust his
senses and that the world might be under control of an evil demon
Essay On A Grief Support Group
A Grief Support Group Observation
The Cokesbury United Methodist Church grief support group follows a thirteen
week curriculum from GriefShare, however, new members can join in at any time
as each week has a self contained lesson. The topic for the week I attendee focused
on the why of losing a loved one. Through following this curriculum, the group seeks
to equip members with essentials to recover from the hurt of grief and loss.
(GriefShare, n.d.) The group focuses on helping members rebuild their lives after
they experience tremendous loss and grief through facing the challenge together.
(GriefShare, n.d.)
Format of the Group
Psychoeducational groups emphasize, using education methods to acquire
information and develop related meaning and skills. (Brown, 1997, p.1) This grief
support group works as a psychoeducational group, through focusing on education and
knowledge for healing and growth. In this group, members value knowledge as it
further brings growth through their grief journey. The facilitator educates the group
with thirty minute videos made by grief experts to support the members in learning
proper coping skills and processing certain aspects of their grief. The group also
characterizes a psychoeducational group through providing emotional support with
discussion before and after each video. During this short discussion time the group
worked together, to help apply the skills to their lives and process topics discusses in
the video.
When reflecting
Specialties within Radiology
Modern medicine is capable of treating a tremendous range of human disease and
injuries, but the usefulness of all medical specialties depends on accurate diagnosis.
Virtually every conceivable medical specialty relies on radiological technologies to
provide formal diagnoses, making radiology one of the most important of all medical
specialties. Radiologists enjoy some of the best working conditions in modern
medicineand typically experience very positive employment conditions. Consequently,
their services are generally in very high demand, with many starting out with six
figure annual incomes immediately after completion of their professional training.
Within the field of radiology, there are: (1) radiologists who are physicians... Show
more content on Helpwriting.net ...
In the words of my Radiology professor, Warren Hejny, Radiology can take you
anywhere; it can be used as a starting block or stepping stone. Because of its
tremendously wide applications within modern medicine, radiology offers more than
a dozen distinct areas of even greater specialization within the field. Some of those
specialty areas involve direct medical intervention, such as in the case of radiation
oncology and interventional radiology. Others focus more on diagnostics rather than
on direct medical treatment.
In that regard, breast imaging involves diagnosing diseases of the breast through
mammography, ultrasound, magnetic resonance imaging (MRI), and tissue biopsies.
Cardiovascular radiology is the radiology specialty that uses X rays, computer axial
tomography (CAT scans), MRIs, and ultrasound to diagnose problems with the heart
and circulatory system. Chest radiology employs many of the same technologies and
tools to diagnose and treat medical conditions of the heart and lungs. Other radiology
specialty practice areas include: gastrointestinal radiology, emergency radiology, head
and neck radiology, musculoskeletal radiology, and reproductive radiology. Finally,
radiology specialties can also intersect directly with other specialty areas of interest
such as
The Pollution Of Air Pollution
Most people never stop to think about the sanitation of the air around them. The
only places that people ruminate over air quality are largely populated states and
cities. One of these places is California. Ominous clouds of smog and polluted air
constantly hover over the citizens. These people don t ever look up and worry,
because smogis a usual appearance. This issue destroys not only the earth and its
atmosphere, but the very center of our lives: our bodies health. Particulate pollutants
are like the retroviruses of the world: well rounded and dangerous. Air pollutionis the
largest ecological issue of our time because the contaminated air lingers all over the
world constantly being augmented to, and further threatening the world and those
who lives in it. As a state that is car centric, California has been harassed by air
pollutionfor decades. Even one of California s most famous cities, Los Angeles, is
known for the cloud of smog. National Geographic even comments on the daily
emissions from factories and automobiles in the city saying, In the past 150 years,
such activities have pumped enough carbon dioxide into the atmosphere to raise its
levels higher than they have been for hundreds of thousands of years. ( Air Pollution
Facts, Air Pollution Effects, Air Pollution Solutions, Air Pollution Causes National
Geographic. ) California s air pollution levels are at an all time high and needs to be
redressed. Ozone is one of the most dangerous main types of air
Business Intelligence And Marketing Analytics Essay
Blogs / job portals / special interest groups take on BI and BA
Business intelligence and business analytics... aren t they the same thing?Or are they
describing opposite processes?There are a lot of big words that get thrown around in
the world of BI, and it s easy to get lost in a whirlwind of interpretation.The diversity
of opinion reflects the fluidity of how we understand the defining language of the
field.It also demonstrates that in business intelligence, one term can mean different
things to different people, depending on their business focus and their
perspective.Though it is commonly called the BI field, the number of Google
searches for business analytics have risen sharply in the past 10 years vs. a mild
decline for business intelligence (google).
I went through various blogs and special interest groups that are formed around these
two terms i.e. business intelligence and business analytics. One common thing that I
found is that most of them consider business intelligence and analytics as distinct but
connected tools. They described business intelligence as a tool that provides a way of
amassing data to find information primarily through asking questions, reporting, and
online analytical processes. On the other hand, business analytics take advantage of
statistical and quantitative data for explanatory and predictive modeling. Analytics
focuses on solutions oriented capabilities which create value and convert information
into knowledge. Moreover, both business
Humanitarian Aid Be Banned
Humanitarian Aid s main purpose is to provide aid to those who suffer from natural
or man made disaster . Some of the humanitarian aid organizations include American
Red Cross, Doctors without Borders, and the Mercy Corps. The number of
humanitarian aid in countries is increasing to around 1 2 million organizations in
India and 277,000 organizations in Russia. Some of the rescue missions that
humanitarian aid attends to are disasters such as Hurricane Havrey or Hurricane
Katrina. Although some look at humanitarian aid as a good and positive outlook,
there have been many incidents where humanitarian aid has been selfish and has
been done wrong. Humanitarian aid should be banned because ...humanitarian aid
did as much or even more harm than good (Gourevitch) by prolonging war, creating
reasons to call for aid, and taking advantage of the profits and donations given to
those companies. Although many say humanitarian aid is civilizing war by
withdrawing injured on the battlefield and removing them from hostilities.
Personally, humanitarian aid does not only help very little during the war, but they
prolong the war to get more money and benefits that they claim to need for the sake
of the people s lives. When the Nigerian civil war began in 1967, humanitarian aids
were there to help, but they did more harm during the war then they ever did good.
The organizations were the reason behind the year and a half extension of this civil
war causing tens of thousands dead, many more
Nt1330 Unit 1 Exercise 2 Reaction Paper
Hi Marcos, Thank you for your help in working through this issue. I wanted to try
a different approach since you are running lmutils instead of lmadmin. First. I
wanted to confirm that you have the most recent version of the lmgrd.exe in
addition to the freeflyr.exe. A newer lmgrd can be used with an older vendor
daemon, but a newer vendor daemon might not work properly with an older
lmgrd. When upgrading FreeFlyer to a newer version, you want to be sure to use
the newest version of lmgrd and freeflyr. Were you able to download and unzip the
entire Network Licensing zip file, including the License Administration Tools,
lmadmin, and lmgrd folders? If not we d be happy to find a way to allow you to
access and download the folder. If so, then I have included two methods to configure
the License Server, one from a clean install and one using the current LMTools. The
instructions are below:... Show more content on Helpwriting.net ...
2) Launch lmtools.exe 3) Navigate to the Config Services tab and fill in the
Service Name (e.g. FF_LicenseServer), and the paths to the lmgrd.exe and license
files. 4) In the Path to the debug log file text box, enter or browse to the debug log
file that this license server writes. Prepending the debug log file name with the +
character appends logging entries. The default location for the debug log file is
the c:WindowsSystem32 folder. To specify a different location, make sure you
specify a fully qualified path. 5) Once you have set up these paths, select Save
Service . 6) Navigate to the Start/Stop/Reread tab, and select Start Server . 7) The
FreeFlyer License Server is now running and ready for a client machine to
Pernol Essay
Is living in pain destroying your normal lifestyle? Arthritis and Joint Pain are a
debilitative disease which cause misery and frustration to your every day life. Pernol
is described as The arthritis miracle from the sea , that will eliminate joint pain, aid
joint lubrication and ease your suffering, to enable you to regain your mobility and
quality of life once more. So what is it? The main active ingredient is a patented,
highly purified 99% stabilised pharmaceutical grade oil, extracted from the Green
Lipped Mussels (Perna canaliculus) which are exclusive to the New Zealand coastline
along the South Island. It is a unique chronic joint pain and inflammation product new
which completely alleviates inflammation, eliminating swelling, pain,... Show more
content on Helpwriting.net ...
The presence of this source of essential fatty acids provides the mussel with potent
anti inflammatory activity. This can be passed on to consumers when the mussel or
its concentrated pure oil is as the mussel acts as a unique filtration system extracting
crucial and essential nutrients that have shown to provide phenomenal pain relief, aid
joint lubrication and act as powerful anti inflammation agents. The main active
ingredient of Pernol is a patented, highly purified 99% stabilised pharmaceutical
grade oil, extracted from the Green Lipped Mussels ( Perna canaliculus ) which are
exclusive to the New Zealand coastline along Marlborough Sounds area of the South
Island. This unique chronic joint pain and inflammation formulation can alleviate
inflammation, eliminate swelling, pain, joint stiffness, lack of mobility, irritation and
the wearing down of cartilage. A key component in combating and relieving arthritis
pain and inflammation is the Concentrated Natural Oil Blend of Salmon Oil, Fish
Oil, Evening Primrose Oil, Lemon Oil and Celery Seed Oil. This blend, combines
with and aids the 99% Green Lipped Mussel Oil Extract, to provide the crucial natural
oil blend to ensure optimum joint lubrication and overall joint
Analysis Of The Blackbird Calls In Grief
Irish poetry is a special and distant literary genre. The many aspects of folklore and
tradition evident in the poetry create unmistakably Irish verse. This evident in
three poems from The New Oxford Book of Irish Verse: poem 67 referred to as
The blackbird calls in grief , poem 108 referred to as There are three , and All That
is Left... by Michael Hartnett. Death is the topic of numerous poems throughout
history, however, these poems address the taboo topic in an authentic and
unpredictable fashion. Through verse, death is given a new exploration without
clichГ©. This is accomplished using Irish voice, nature, and religion. The
blackbird calls in grief is an anonymously written poem from the twelfth century.
The narrator laments the death of loved ones. In the poem, the narrator begins by
lamenting to a blackbird. He mourns the passing of both the birds and his own
family. The bird is personified and the two share in their grief. The harm now
happened to him/ not long since happened to me (Kinsella 85). An analogy is
created equating the loss of the two families and the injustice of the loss. The bird
is removed from the poem after the sixth stanza, the grief is only the narrators to
bare. The seventh stanza questions God, O You who made the world, / Your bias is
hard to bear:/ friends all around me are spared, / their woman and young survive
(Kinsella 86). This poem is distinctive compared even to more modern poems. This is
perhaps why the author chose to remain
The Dwarves Research Paper
The land of Svartalhiem is a Dangerous one. The surface is plagued by a never
ending raging storms. Lighting and thunder roam the skies has high power winds
make it impossible for anything to take root. This causes the surface to develop into
a dyeing wasteland. However, life has survived on Svartalhiem, driven underground
by the winds. A labyrinth of caves, mines, rivers, and lakes have dug into the earth.
Plant life is very minimal in these damp caverns; however, the caves can grow
mushrooms of different varieties. These mushrooms would go on to support a lot of
the different life forms of the realm. Most importantly, the Dwarves.
The Dwarves are a race of humanoid creatures that look similar to humans, however
they are short in stature ... Show more content on Helpwriting.net ...
A harden warrior with a sol desire to conquer Svartalhiem. She is advised by a grand
mage, Alviss, a sliver tongued and wise Dark Elf. Together, Galari and Alviss, rule
over their city, Nidavellir.
Similar to the Dwarves, the Dark Elves pay respects to their paragons Sudri and
Vestri. These sisters lead their people into the safety of the darkness and founded
Nidavellir. They were also known for leading attacks on Svartalhiem.
There are other life forms living underground. Trolls are known for have small
roaming communities. These monstrous figures are known for attacking small
colonies of Dwarves and Dark Elves. There is also a numerus number of small
colonies of goblins that cause mischief. Dimwitted they are easily fooled however
they have a short temper. Then you have the spider queen and her children that haunt
the forgotten mines long left untouched. These giant spiders are known for their toxic
venom. Lastly, the rivers and lakes that make up the veins of the earth are home to
some dangerous serpents.
Dwarves and Dark Elves want weapons that can be used in battle and on the forge,
thus both sides favor hammers. However, they still produce and use swords, maces,
daggers, and
How Did Ancient Egypt s Relations With Foreign Power
To a great extent Egypt s relations changed with foreign powers from the eighteenth
to the nineteenth dynasties as Egyptian pharaohs adopted policies of diplomacy or
military conquest. During the reign of Amenhotep III Egypt s relations with foreign
powers continued to be focused on diplomacy rather than military conflict as
Amenhotep sort to maintain peace and prosperity throughout the region. With the
accession of Akhenatento the throne, Egypts relations with foreign powers and its
vassal s changed dramatically with the rise of the expansionist Hittites and the
decline of Mitanni. The nineteenth dynasty saw a shift in Egypt s foreign policy
with its neighbours, as Seti I sort to restore the glory of Egypt and embarked on a
campaign of expansionism... Show more content on Helpwriting.net ...
The battle of Kadesh was the climax of hostilities between Egypt and Hittite,
however, the battle served as the end of Egyptian expansionism in Syria Palestine. In
year twenty one of Ramesses reign peace was achieved between Egypt and Hittite as
evident from inscriptions at the Ramesseum, the Hypostyle Hall at Karnak and a
Hittite tablet at its capital, Hattusas. In contrast to the early part of Ramesses reign,
the quotation reflects the peace and prosperity experienced by both Egypt and Hittite
during this period and the stability that continued throughout the reign of Ramesses.
The treaty led to a formation of an alliance, a mutual defence pact and a promise of
no further aggression. Trading improved with the reopening of Phoenician ports and
removal of barriers to the Euphrates brought renewed trading opportunities.
Diplomacy and marriages where used to maintain friendly relations between the two
sides. Gifts were exchanged and Nefertari and the Hittite queen Pudukhapa
exchanged correspondence and gifts of jewels as evident from letters. Further evident
from letters is that in year thirty four of his reign Ramesses married a Hittite princess
to strengthen Egypt Hittite relations. This was followed by another marriage to
Artificial Venture Capital ( Vc ) Market And...
Artificial Venture Capital (VC) Market and Overregulation as Limitation of the Policy
7. (U) In addition to the limitations of the government led top down approaches to
building startup ecosystem, unwise policy measures to cultivate a good venture
capital (VC) investment environment is another limitation of the Creative Economy
policy that must be addressed. In a 2014 research paper published in the Korean
Journal of Financial Studies, Professor Song Chi seung of Wonkwang University
points out, while the government led venture capital investments did play a
considerable role in cultivating the VC investment environment in the ROK despite
the global downturn of VC funds after the 2008 Financial Crisis, they now act as an
impediment ... Show more content on Helpwriting.net ...
The strict regulations for foreign VCs such as a minimum required investment of
USD 1 million and the minimum number of employees to hire are the fixed costs to
the foreign VCs investment in Korean startups and SMEs, he said. Mr. Lim
contended that venture capital investment regulations must be eased not only to
attract foreign venture capitalists but also to provide startups and VCs a more
convenient platform for exits through initial public offerings (IPOs) or merge and
acquisitions (M As). Furthermore, Mr. Lim observed that excessive regulations in
other areas also prevent a robust growth of startup ecosystems. Specifically, the
government s positive list approach to regulations preventing new services such as
peer to peer (P2P) lending and Uber must be changed into a negative list approach.
Controversial Roles of Chaebols in Building the ROK s Startup Ecosystem
9. (U) Above all, the strongest criticism against the Park administration s Creative
Economy policy is the CCEIs dependence on chaebols for incubating startups and
SMEs. The structure of CCEIs under which startups and SMEs must rely on the
conglomerates for purchase of technologies, equity investment and marketing has
drawn criticisms from both academia and political circles. The critics argue that the
CCEIs have made startups and SMEs vulnerable to the conglomerates stealing of their
intellectual property (IP) and forced them
Advocate And Serve
Crutchfield and Grant identify six practices of high impact nonprofits: advocate and
serve, make markets work, inspire evangelists, nurture nonprofit networks, master
the art of adaptation, and share leadership. All of these practices proved to be
crucial in the success of the twelve featured nonprofits, however, there are two
practices that I find to be more intriguing than the rest. Advocate and serve and
inspire evangelists are the two practices that stand out. The practice of advocate and
serve was a new concept to me, which is, in part, why I found it particularly
interesting. The practice of inspiring evangelists, is a concept I am familiar with, but
I have never seen it articulated this well.
Advocate and serve is complex practice. ... Show more content on Helpwriting.net ...
This could be the answer to the issue addressed by Berger and Neuhaus in their essay
entitled, To Empower People: From State to Civil Society. They write about the
paradox of the public s desire for public services, coupled with their resistance to
government intervention. When nonprofits are successful in advocating within the
government sphere, they expand opportunities through means such as: increased
government funding, tax breaks, changes to tax codes, policy changes, raised
awareness, and, ultimately, changes to public behavior. These results allow
nonprofits the opportunity to maximize their impact, therefore fulfilling the public
need while keeping the government seemingly uninvolved.
Regardless of one s beliefs on integrating advocacy and service, it is difficult to
dispute that social aliments we face today stem from a deeper issue within the
infrastructure of our society. Direct service organizations offer temporary solutions,
a Band Aid, if you will, to buy time for change. Advocacy groups aim to resolve the
root problem that results in the need for the Band Aid. We need direct service
organizations. We need advocacy groups. Does it make sense for the two to be one
in the
A Brief Look at Aerospace Engineering
Discover Engineering: Aerospace Engineering
According to Dictionary.com, engineering is a branch of science and technology that
works with design and building. Also engineering is a career that focuses on solving
problems by using the design process.Engineers work on the following: they solve,
design, test and building things that humans use on a daily use.
The Engineering Profession
Chemical Engineering According to Wikipedia.com chemical engineering is solve
problems by using science, for example, creating new materials or try to make
energy by connecting two diamonds, or making things that don t damage the Earth
or humans. Civil Engineering According to Dictionary.com, civil engineering is a
career that deals with design problems, or design something that we see in our
regular day and we use. For example: roads, bridges, canals, and others builds that
the humans use. Electrical Engineering According to Wikipedia.com, electrical
engineering works and solve problems related to electricity and electronics.
Electrical engineering has started since the 19th century after the first telephone and
electric power. Mechanical Engineering According to Wikipedia.com, mechanical
engineering applies to math and physics to analysis a design or to solve a problem.
They products and operates machines and tools that a human use on a daily
basis.This field type of engineering also connects to electrical and civil engineering.
My Engineering Profession
The
Persuasive Essay On Social Justice
Eliezer Yudkowsky once said, You are personally responsible for becoming more
ethical than the society you grew up in. This exact quote represents the initiative I
plan on taking to promote social justice. Though I have yet to make a humongous
contribution to the progress of society, I am steadily working towards it. The need
for social justice is everywhere due to the acts of injustice that people, primarily
minorities, face everyday. This includes police brutality, racism, and discrimination.
That being said, action must be taken and I will do my part by starting in my own
community Atlanta,GA. On July 7th, 2016, Michael George Smith Jr. was found
hanging from a tree in Piedmont Park. Policeruled his death as a suicide, but of
course everyone, including myself, suspected foul play. In addition to Michael s
death, Alton Sterling and Philando Castile were both killed earlier that week. Both
whom were unarmed and not disturbing any peace, yet were still shot and killed by
the police. In response to all three of their deaths, protests erupted throughout
downtown Atlanta. The day of the protest, my grandma and I were both watching the
news, seeing everything that was happening. In the midst of us watching the news,
she mumbled damn, 50 years later and ain t none changed . It then began to dwell on
me that when it comes to police brutality, protesting has not changed anything. Even
back in 1992, when the LA riots occurred after the Rodney Kingbeating, all of
Literacy Task
Literacy Task
1PRODUCING BIODEGRADABLE PLASTIC JUST GOT CHEAPER AND
GREENER
The topic of this report is that producing biodegradable plastic just got cheaper and
greener. What this report is about and how it relates to the society, technology and the
environment will be discussed.
Biodegradable plastic is plastic that is capable to decompose through the action of
living organisms. It is originally from renewable resources and made from natural
materials such as corn starch. Biodegradable plastic is also an alternative source of
plastic. To produce it, First, lactic acid is fed into a reactor and converted into a
type of pre plastic under high temperature and in a vacuum , Professor Bert Sels
explains(2015). These are only the some of the ... Show more content on
Helpwriting.net ...
It also leave harmful chemical remains on earth. As compared to normal plastic,
biodegradable plastic takes a shorter period of time to decompose. Normal plastic
has harmful impacts on the environment such as affecting natural habitats and
marine wildlife. In the final report for the department for the Environment
Australia, at least 77 species of marine fauna have been recorded as being impacted
by plastic debris in Australian waters over the last three decades (2009). The
constant rise in biodegradable plastics of global production capacities in figure 4
increases the chances of biodegradable plastic fully replacing plastic as an alternative
Tyson And Baffour Summary
Tyson and Baffour (2004) wanted to explore the types of arts based strengths
identified by adolescents and whether there was any relationship to psychiatric
diagnosis. Tyson and Baffour conducted a study involving 108 adolescents admitted
to an inpatient psychiatric unit. Results indicated that 71% of the adolescent s
interviews reported an art based activity or strength. These activities and strengths
included making art, listening to music, or writing, as their most frequently used
coping strategy. The study stated that 100% of the clients who listed artmaking as
their first coping strategy and 74% of those who identified writing as their primary
coping strategy suffered internalizing disorders, such as depression and anxiety.
(Tyson Baffour,
Taming Of The Shrew And 10 Things I Hate About You
Analysis
Have you ever had a relationship that has moved on because of change? Maybe he or
she was too different from when things started? The play Taming of the Shrew by
William Shakespeare and the movie 10 Things I Hate About You explore how the
relationship between Katherine and Petruchio have evolved throughout cultural
differences. Whether showing this through Petruchio, Katherine, and how their
relationship overall maneuver they act differently or stay the same because of
cultural influence. This dictates their views and behaviors in their relationship.
Petruchio and Katherine certainly have many differences from 16th century Italy to
early 2000s United States. Let s explore these differences now, starting with
Petruchio.
If you have seen 10 Things I Hate About You, you would definitely remember the
rebellious and sexy Patrick. Whether that be his black combat boots, long hair and
rugged appearance, or the fact that he ate a live duck, this certainly shows. On the
other hand, if you have read the play Taming of the Shrew you would see Petruchio
as a visitor to Padua. Petruchio states his intentions in the city plainly, ... Show more
content on Helpwriting.net ...
At the conclusion of Taming of the Shrew Katherine is a different person entirely
and is tamed by Petruchio. When asked by Petruchio to give a speech to the less
loving wives, she lectures, And place your hands below your husband s foot; In
token of which duty, if he please, My hand is ready, may it do him ease. (Act 5 Sc. 2
193 195) This explains that Katherine is telling the other ladies to do whatever their
husbands command and that you should do anything for him. This is quite a contrast
to the beginning of both the play and movie where both Katherine s are rebels and are
very independent. Together, though, Katherine and Petruchio s relationship also has
Case Study of Snow Band
Snow Brand Milk Products Crisis or Opportunity? Time for Corporate Revitalization
Hong Kong Baptist University 10 June 2010 Contents |1. |Executive Summary |1 | |2.
|Problem Identification |2 | |3. |Analysis |2 | |4. |Alternatives |4 | |5. |Recommendation
|5 | |6. |Implementation... Show more content on Helpwriting.net ...
Japan further imposed an indefinite ban on US beef in 2003 after the confirmed
appearance of Bovine Spongiform Encephalopathy (BSE) in North America. 3. A
new corporate governance structure, under which outside directors play important
roles in managerial decisions, was sanctioned by the revised commercial code in
April 2003. в†ђ Economic factors 1. Due to the BSE outbreak in Japan in 2001 and
the subsequent beef mislabeling issues, consumers became leery of beef products in
general and beef consumption declined as a result. 2. Japanese consumers reported
significant declines in their perception of domestic beef as safe and healthy. в†ђ
Social factors 1. SBM has significantly lost public trust and consumer confidence. 2.
Post war Japan had seen a rise in consumer activism and consumer groups
prominence. 3. Consumers became more aware of and concerned about food safety
issues. 4. Common practices of beef mislabeling had led to a renewed call for ethics
and integrity in Japanese businesses as well as a call for business to attend to risk
management. Internal Analysis: в†ђ Corporate culture and leadership: 1. Currently,
SBM had a traditional Japanese management style of uncertainty avoidance and
harmonization, thus losing focus on customers and quality. Staff worked with a
presupposition that a firm existed for the sake of its managers and employees, which
fostered
Analysis Of Ayn Rand s Anthem
Ayn Rand, a Russian American novelist, philosopher, and playwright wrote the
novella Anthem in 1937. During the time Rand was writing this novella, the
ruthless dictator Joseph Stalin mercilessly ruled over Russia. Also during this time,
the beginnings of World War II took place. These events more than likely inspired
the plot for Anthem, a dystopian fiction. Rand s projection of the totalitarianism of
Anthem s society is astounding, the book itself has feeling and meaning in
correlation to today s world. Anthem depicts a collectivism dictatorship world of
the future as in this world there is no I , these people are forced to follow a strict set
of rules, and they are born in bulk, learning and knowing only what their higher
powers want them to learn and know.... Show more content on Helpwriting.net ...
The characters of the story refer to themselves as we or us forcing them into a
bond of conventionality. In the novella, Rand expresses this fact by using we
several times in the first chapter alone, stating sentences such as We are alone here
under the earth...We are twenty one years old. We are six feet tall... We were born
with a curse . In addition, Rand projects the collectivism of this society by allowing
the reader to look into the minds of the main character Prometheus (formerly known
as Equality 7 2521). Rand does this by writing this character in a way that portrays
him as yearning to be an individual. This is proven throughout the novella as
Prometheus struggles to find himself and his ego. Through this evidence, it is clear
that Anthem shows a clear perspective on a collectivist dictatorship world of the
future by expressing that in said world, there is no
Essay on William Faulkner s Absalom, Absalom!
William Faulkner s Absalom, Absalom!
William Faulkner s novel entitled Absalom, Absalom! is a book which systematically
utilizes the concept of discovering the past in the present. Faulkner s use of the past
in the present is pertinent in both the construction of the plot of Absalom, Absalom!
as well as the extension of its interpreted meanings. Furthermore, Faulkner s writing
of Absalom, Absalom! appears to have been motivated by the great ills and conflicts
of the American South, which was most poignant during the American Civil War,
while the title, as well as its implications, was simultaneously conceived in Faulkner s
mind. The fact that the story of Absalom in the Old Testament and the plot of
Absalom, Absalom! are so ... Show more content on Helpwriting.net ...
The ability for Faulkner to obtain and convey the truth, or what one should do, does
not, however, hinge upon his telling of the story. Instead, Faulkner presents, through
his characters, similar inhibitions that existed in the story of Absalom in the Old
Testament with the belief that the past in the present will reveal, being compelled
separately and individually, truth for the benefit of the projected future.
Within the context of Absalom, Absalom!, the revival of the past into the present is
achieved by focusing on Thomas Sutpen s, or who is Colonel Sutpen s, deplorable
story and how it is incorporated into the lives of those related to or associated with
him. When Ms. Rosa Coldfield is relaying her interpretation of the past story of
Colonel Sutpen to his friend s grandson, Quentin, Quentin battles to disassociate
himself from the stigmas of the South, specifically the time period of the American
Civil war, with which his grandfather, General Compson, was imbued: Then hearing
would reconcile and he would seem to listen to two separate Quentins now the
Quentin Compson preparing for Harvard in the South, the deep South dead since
1865 and peopled with garrulous outraged baffled ghosts, listening, having to listen,
to one of the ghosts which had refused to lie still even longer than most had, telling
him about old
St. Tropez Tanning Techniques
Self tanners are an effective way to get a darker skin tone without harmful effects
from the sun. Applying self tanning mist using the St. Tropez Tanning Technique
takes several steps but will result in a deeper, darker and natural looking tan.
Clothing should be removed before beginning, as well as glasses, deodorant,
perfume, jewelery or make up. Only disposable underwear and St. Tropez Sticky
Feet should be worn, to protect the feet. The hair should also be protected with a
hairband. Moisturizer should then be applied to any dry areas including hands,
elbows, knees and feet. Eyes should be closed and a deep breath taken as the mist
is applied to the facial area. Beginning at the face, the mist should be applied by
holding the spray gun level. Vertical strokes should be used, and the mist should be
sprayed from the left to the right. Next the head should be turned to one side while
the mist is applied down the face to the shoulder and across the side of the neck.
The process should then be repeated on the opposite side of the neck. The gun
should then be held sideways and sprayed across the front of the neck and under the
chin, as the head is tilted up. Two to three additional strokes should then applied to
the shoulders.... Show more content on Helpwriting.net ...
Arms should then be held away from the body and the mist should be sprayed from
the shoulder to the wrist, working from the outer to the inner arm. Care should be
taken so that palms are not sprayed. Standing with legs hip width apart, arms held
away from their body, the self tan is next applied to the legs. Beginning at the hip,
the mist should be applied down to the ankle. The spray gun should be level and not
pointed down, as this can result in the feet becoming too
Key Elements Of A Contract
Contacts are something we come across in our day to day lives, most of the time
without even noticing it. Whether we are at a restaurant, buying a house or car, or
even having a day at the spa. A contract is a written or expressed agreement
between at least two parties to provide a service or product and can be legally
enforced if drawn up correctly. It is most common for a contract to be written and
signed by both parties, but there are other forms of contracts including expressed
contract and implied in fact contracts. In an express contract, all elements are clearly
stated either written or orally. Both parties must fully understand the terms and
conditions that they are agreeing to. The not so transparent of contracts would be an...
Show more content on Helpwriting.net ...
This exchange of money would bind both parties to the agreement. Consideration
is the next element of a contract. It is something of value that is exchanged
between the parties involved in the contract in the form of money or promise to do
something or perform. In order to qualify as consideration, it must be bargained for
and legally sufficient. In this case, Stan (promisor) offers Jim and Laura
(promisee) to hold the vehicle with a deposit of $100, Jim and Laura accepts, the
$100 is the consideration (value) for the hold of the vehicle (performance). The
consideration meets both qualifications because there is not a legal obligation
already in place for the offer and it was bargained for by the exchange of promise
and something of value. A contract must be for a legal purpose and not for any
purpose that may break any laws. A court will not back up and support a contract
that has any intention of breaking the law. Based on the information from the
scenario, neither Jim, Laura nor Stan Salesman appear to have any illegal intent
when entering the potential contract. Jim and Laura were legitimately looking to
replace their current vehicle that had been giving them mechanical problems and to
use it to travel from work and school. Being of legal age and of sound mind is the
capacity of the contract. Capacity means a person s legal ability to enter into a
contract. When looking at who can enter a contract a few
Pediatric Dentistry
Pediatric Clinic in Newark NJ is a service for pediatric dentistry. It is very important
for children to see the pediatric dentist because this sets the foundation for their adult
teeth. When visiting the Pediatric Clinic in Newark NJ, the dentist will clean teeth,
examine teeth, diagnose conditions and make recommendations to patients. A child
should visit the pediatric dentist six months after their first tooth has came in.
During this time, the dentist is able to examine the development of your child s
mouth and foresee any issues. Small children are susceptible to gum disease and
tooth decay just like adults. This is why it is extremely important for you to take
your child to the dentist. As soon as your baby s first tooth comes in,
Essay The Relationship Between Producers and Audiences
The relationship between producers and audiences
Audience research, producer response to research and audience targeting
A producer when beginning pre production or even before will most likely look at
some form of survey s which would include things like possible cast members for the
film and the amount of audience that would want to see possibly be interested in
the genre. They will then take this to the writers and director of the particular film
and they will make amendments to how the survey has come out. A producer will
also look at the success of recent films of the same type; this is visible in recent
times with the resurgence of vampire films following the success of twilight saga
this has lead to TV series and films ... Show more content on Helpwriting.net ...
A producer who knows that their film doesn t have a lot of money or publicity
would use a film festival to get both of these things. Also these films will most
likely be in art house cinemas but if one is particularly successful then this could
move to multiplex cinemas the troll hunter is one of those films that has crossed
the brigde from art house to multiplex and is now being shown in over 20 vue
cinemas in the UK, the producer did this by getting the film publicity from channel
4 s sister channel E4 and making a competition for a private screening this made
the film sort after which then lead to interest from multiplex cinemas. But for films
that won t need that sort of publicity will have a big Hollywood premiere that
would most likely have a segment on TV showing the premiere and would include
interviews with the cast, director and any other notable person involved with the
film. Celebrities from outside of the film will go also to show the films quality and
also so that they themselves can get publicity, films like this will almost always be
shown in multiplex cinemas this is the same for Cars 2 but will probably have this
kind of showing but because it s a childs film the TV shows and so on will most
probably be shown on kids TV most obviously the Disney
H.G. Wells The Time Machine Essay examples
When the time traveler thought of the future he made assumptions that would suggest
that the in the future, society would act in a progressive manner. He believed that
society would be free of disease, that the human species would be very advanced
compared to the humans in his time, and that the human beings in this society would
not know fear because of their advances in technology. These assumptions are soon
proven false early on when the time traveler thought he ...had built the time machine
in vain (21). The Sphinx puts pressure on a progressive time by suggesting that
society does not progress all the time but will eventually regress. When the time
traveler notices that the Sphinx, was greatly weather worn, and that imparted... Show
more content on Helpwriting.net ...
Relying on technology becomes associated with this utopian society, and certain
problems such as laziness can arise because of this. Laziness as a result of
dependency on technology proves to be fatal. An example of this would be when
one thinks about the Sphinx s riddle. At first, society finds the answer to the riddle
through one specific way of thinking and arriving at that answer, but because of
technology anything originally learned can then be referenced so that eliminates
the need to remember it. Now if someone who comes from a society that is
dependent on technology is asked this riddle, he will have no way of answering the
question because he would first need to look at technology for the answer. Wells
suggests that this shows that after arriving to a utopian state, a society dependent on
technology can have a reduced ability to think. When the time traveler first entered
this society in the future, the first thing he noticed was the Sphinx that had its wings
...spread so it seemed to hover (18). There are other instances in the story where an
idea is seen as just floating or hovering into the time traveler s mind. While he is
thinking about how the Eloi have become reacquainted with fear ... suddenly there
came into my head the memory of meat I had seen in the Underworld. It seemed odd
how it floated into my mind... (49). This suggests that the time traveler is
Into The Wild By John Krakauer
Into the Wild Analysis John Krakauer s depiction of the tragic life of Chris
McCandless in the award winning novel Into the Wild creates different schools of
thought that brew a perfect storm for debate. Krakauer s polarizing style is what
makes it so special, because no two people will feel the same way as they
experience the journey of McCandless. One of the highly discussed topics of the
novel relates to the idea that Chris journey of self discovery in his quest for
ultimate freedom is inherently selfish or nobel. McCandless quest is noble in
many ways. The first of which is his desire to leave behind the modern materialistic
world and isolate himself to find peace. He also has this deep seated desire to fill a
void, a missing... Show more content on Helpwriting.net ...
One hundred and twenty three dollars in legal tender was promptly reduced to ash
and smoke (pg.29). The act of burning all of his cash in this manner speaks to
McCandless mindset. He truly believes he doesn t need money to make him happy
and that he can survive without relying on riches to get him by. Relieving himself
of money takes place on a consistent bases in the novel because Chris doesn t want
the attachment to hold him back, or make his journey to easy. Another example of
the simplistic life Chris Alex Supertramp McCandless is attempting to live can be
obtained from the first interaction in the book. When Jim Gallien picks up Alex on
the side of the road and drives him to the start of the Alaskan Wilderness, it says
Alex admitted that the only food in his pack was a ten pound bag of rice. His gear
seemed exceedingly minimal for the harsh conditions of the interior, which in April
still lay buried under the winter snowpack...Alex insisted on giving Gallien his watch,
his comb, and what he said was all his money... (pg.5 7). Even with almost nothing on
him, Alex/Chris still attempts to rid himself of materialistic items like his watch, and
again, his money. He wants nothing to hold him back so he can achieve the true
reward of his journey, spiritual enlightenment. A big influence on Chris in the book is
his fascination with literary artists and philosophers. The main four that inspire
High School Vs. College Life
Mukesh Mehata
Professor: L Pierce
English 1301.41002
5th October 2017
High School Vs. College Life
As we go on in life we face many challenges and new situations that we deal with. A
new situation that most people deal with is on college and high school. School plays
one of the most significant stages in our lives. Many people spend more than 16
years to get an education in their life. Those years are different levels, some of them
are more entertaining than others. A student must pass through high schooland
college life in their student life. Even though people think that high school and
college level are same, there is an important difference between them. Although high
school and college life are divided among academic point of view, ... Show more
content on Helpwriting.net ...
The hours of credit classes are fixed by the administration in high school, without
any flexibility. Classes are distributed on annual basis. Students get many excuses
from missing classes, late submission of homework in high school whereas they
get to lose their grades in college life. In High School, teacher manages to take their
students to different educational excursion program, visit new places, parks, etc.,
whereas these are not done in college life. Parents can check for the grades of their
kids in high school, but in college life, it is considered as privacy. It is easy to make
friends in high school but in college life, it depends on common interest. These are
some of the experiences done by almost every individual in high school life.
College, on the other hand, is a choice if one wants to attend or not. An individual
who is attending college life usually pays for his own education. Since they pay for
their own education, they work hard enough to get success in their career. College
life has much freedom of time schedule. They are flexible to work and study as per
their need. This level prepares every individual to develop understanding and
maintain a good career in life. Therefore, an individual after finish college degree can
easily get a job. As soon as a person entered in college a sense of maturity comes to
him. They realize everything in college is materialistic and college level is very
practical. College life prepares
The Origin Of Life On Earth
According to astronomical research and geological evidence, scientist indicate the
universe is approximately thirteen thousand eight hundred and twenty billion
years old. The first link to humanity started with a primate group called
Ardipithecus. While our ancestors have been around for about six million years,
the modern form of humans only evolved about two hundred thousand years ago.
The age of the Earth is estimated about four point fifty four billion years because
that is the age of the oldest rocks with fossil evidence of life on earth. The oldest
rocks on Earth found to date are the Acasta Gneisses in northwestern Canada near
the Great Slave Lake, which are four point three billion years old. The study of the
origin of life on Earth, more specifically abiogenesis, is the natural process of life
arising from non living matter. Life on Earth is believed to have began from
organic compounds about three point eight to four billion years ago. Despite
several competing theories for how life arose on Earth scientist only know when
life first appeared on Earth and are still far from answering how it appeared. Since
it is hard to prove or disprove them, no fully accepted theories of the origin of life
exists. What is life? This is a difficult question to answer, largely because life itself is
not a simple concept. About four thousand five hundred million years ago the Earth
collided with a planetoid the size of Mars. At this time, fragments orbiting the Earth
formed the
Social Labor Values
Alice Paul once said There will never be a new world until women are a part it.
Alice Paul and Lucy Burns shaped the voting rights in America. Alice Paul and Lucy
Burns were suffragist who changed women s role during the twentieth century by
holding suffrage campaigns and forming organizations. Their campaign, reconciles
with the values of the social workprofession today. The values Alice Paul and Lucy
Burn reconcile with was social justice and dignity and worth of the individual. Alice
Paul and Lucy Burn understood the importance of empowering individuals and the
importance for women to vote. Women who votes have the chance to elect a
president who have their best interest and focus on their needs. However, before
women earned the right to vote, women just stayed home with their kids and did
housework. Women were considered weaker than men; they were not able to work.
For this reason, women were discriminated against jobs, education and their right to
vote. Like many social workers, Alice Paul and Lucy Burns understood gender
equality and fought against it. Moreover, Iron Jawed Angels film portrays Alice Paul
and Luck Burn passion for equality. Alice Paul and Lucy were committed to serving
their community. Due to their commitment, Burn and other protesters picketed at the
White House. Burn and other protesters went to the White House in an effort to let
their voices hear by President Woodrow Wilson, so he can support the 19th
amendment. The suffragists urged Wilson
Should Genetically Modified Flar-Svr Tomatoes Be
Available...
Investigation into Genetically Modified Flavr Savr Tomatoes, should they be
available for human consumption.
Technology has been advancing at an increasingly high rate; as a result scientists
have used this development to create genetically modified foods. Biotechnologies
used to genetically modify foods have contributed to the controversial statements,
whether or not genetically modified foods should be available for human
consumption. Genetic Modified plants and foods such as the Flavr Savr Tomato
enhanced through the use of biotechnologies have sparked arguments in favour and
against. Those in favour consider that they are advantageous for humans, those
against believe that it is detrimental for human consumption and altering the ... Show
more content on Helpwriting.net ...
Conversely, The Flavr Savour tomato possesses supressed activity of the enzyme
polygalacturonase. The suppression contributes to the fruits ability to stay harder
for longer allowing it to stay on the vine. This suppression allows the tomato to
develop its natural flavours and ripen as it stays on the vine for a longer time
period. This flavour saving process lead to the products name The Flavr Savr .
The Flavr Savr tomato is created through the use of antisense gene technologies to
decrease the polygalacturonase activity. The kan(r) is a gene from the bacteria
Escherichia coli, alongside with the gene from the Flavr Savr tomato they are
inserted into a plasmid that resembles a round ring of DNA. These plasmids are
further inserted into a group of normal tomato cells in a medium growth that
contains the kanamycin antibiotic Engel 7. This process produces the APH (3 ) II
substance that allows the cell to become resistant to the antibiotic. This process is
used to identify the genetically transformed genes. The gene of the Flavr Savr
initially coded for a strand of RNA, which was the reverse strand of RNA that
occurs in a natural tomato plant. The original RNA strand contains the enzyme
polygalacturonase degrading the cell wall, making the fruit soft. The RNA strand
made from the Flavr Savr gene binds to the polygalacturonase RNA in a process to
cancel each other out as demonstrated in figure 1.
The antisense gene is a
Mr. Douglas Murrow Case Paper
Mr. Douglas Murrow Based on the information presented in the case of 39 year old
Douglas Murrow, he has been charged with criminal infractions consisting of
breaking and entering his parent s home in the middle of the night, as well as
physically assaulting them. Murrow constantly theorizes about a conspiracy plot
against him and has consistently displayed episodes of paranoid, delusional behavior.
Murrow s erratic behavior is marked by the belief that his parents are conspiring with
his doctor to force him to take psychopharmaceuticals. The delusional ideation is
amplified by Murrow s insistence that his parents are entering into his apartment at
night to torture him while he is asleep (Laureate Education, Inc., 2017). Rationalizing
the Competency Evaluation... Show more content on Helpwriting.net ...
Murrow s eccentric fantasies persistently clouds his grasp of reality; creating a
substantial hindrance in the progress of the case and competency to decipher the
difference between right and wrong. Murrow s irrational actions and delusional
ideation places him in a position of danger to others, as well as himself, especially
if the case results in a prison sentence. As such, the competency assessment should
successfully yield a diagnosis for Paranoid Personality Disorder (PPD) since
Murrow meets all seven of the diagnostic criteria. Utilizing the Interdisciplinary
Fitness Interview (IFI), Murrow s delusions (e.g. tainted milk and juice and episodes
of torture by the hands of his parents) are likely to surface well after the assessment
is complete. The revised Fitness Interview Test (FIT R) should also prove Murrow
unfit to stand trial (Slobogin, Hafemeister, Mossman, Reisner, 2014; Greene
Heilbrun, 2014; Laureate Education, Inc.,
Glucocorticoids
Glucocorticoids are steroid hormones which are produced predominantly in the
adrenal gland in response to stress (1, 2, 8). The physiological effects of
glucocorticoids occurs when the hormone are bind to and mediated by the
glucocorticoid receptor (2, 4), and it play wide ranges of vital physiological roles that
are necessary for healthy implantation, and pregnancyprocesses (1). Glucocorticoids
not only play an important role in the regulation of the cardiovascular, metabolic,
immunological and other homoeostatic functions of the fetus (2, 5). It also inhibit the
growth and development of tissues and organ systems, which in term increase the
risk of developing various symptoms, and impaired brain function (2). This essay
will explore how... Show more content on Helpwriting.net ...
notably altering behaviour and cognition, as well as disease susceptibility in
adulthood (6). Stress hormones like glucocorticoids and CRH could interact with
their receptors in the foetal brain, which have an influence on neuronal
differentiation and function at different stages of development (9). During
pregnancy, maternal psychosocial stress threatens the CNS and shortens the
length of gestation (8). Low birth weight can also alter brain development and is
associated with behavioural and cognitive disorders in adulthood (1, 4, 5, 6, 7, 8,
9). The offspring of stressed mothers are more likely to have reduced head
circumferences (7), show emotional problems (7, 9), impaired memory (4, 5, 7) as
well as supress cognitive performances including schizophrenia (5, 6, 9), attention
deficit (5, 6, 9), antisocial behaviour (2, 6, 7), increased vulnerability to post
traumatic stress disorder (PTSD), learning difficulties (6, 9), anxiety disorders and
depression (4, 6, 8, 9), impaired intelligence and thus lower school grades (7,
Small and Medium Sized Enterprises
Chapter tow Literature review In most western economics Small and medium sized
enterprise (SME) development is considered as a key to economic growth,
innovations and market competition (Acs and Audretch, 1990). In transition
countries, the contribution of SMEs is important for the sustaining ideology of the
free market, generate income, innovation and creating jobs (Johnson and Loveman,
1995). So far, most of the transition countries still suffer from high unemployment
rates even after being on the transition path for over a decade. Since national
stabilization efforts and strong SME sectors could provide future employment
opportunity and contribute to economic growth. In general, to consider variation
between transition countries, in mature market economies, characteristics of private
business are not necessarily different, yet they are unique because they tend to take
on extreme proportions (Smallbone and Welter, 2001). In many cases, the transition
process environment for doing business, the weak institutions and poor governance
law and regulations made the growth of SMEs slow (Aidis, 2005). Corruption and
environmental changes In transition countries are much larger scale than in advanced
western countries. Most of studies in private businesses have identified the obstacles
which they are affecting business operations like formal barriers which associated
with the role of the government, such as high level of taxes (Bohata and Mladek,
1999; Hashi, 2001; Bartlett
The Beginnings of a National Literary Tradition Essay
The Beginnings of a National Literary Tradition
Canadians throughout their history have been concerned over the status of their
national literature. One of the major problems facing early Canadian writers was that
the language and poetic conventions that they had inherited from the Old World were
inadequate for the new scenery and conditions in which they now found themselves.
Writers such as Susanna Moodie, Samuel Hearne, and
Oliver Goldsmith were what I would consider Immigrant authors. Even though they
were writing in Canada about Canada their style and their audiences were primarily
England and Europe. These authors wrote from an Old World perspective and
therefore were not truly Canadian authors. It took a group of ... Show more content on
Helpwriting.net ...
Lampman signaled the move from the Immigrant authors like Moodie and her
counterparts toward a true and distinct Canadian literary movement. It is important to
note that in order to appreciate the quality of 19th Century Canadian literature, an
effort of sympathy and a leap of imagination are both needed because it is here in the
19th Century that our nations true poetic history begins. In early Canadian poetry the
most influential and universal poet is undoubtedly Archibald Lampman. While his
career, like his life, were short lived his poetry remains as a reminder to the origins
of Canadian literary thought. Lampman was one of our first major literary figures to
try and identify a national literature. He realized the importance of having a
specifically Canadian literary tradition. An important stepping point in
Lampman s career came after he read the work Orion by Charles G.D. Roberts.
Lampman describes his over powering emotion when as a youth he came across this
published work(in the quote on the title page). The importance of having this distinct
literary school was a driving inspiration in his art. Lampman is regarded as the most
talented of The Confederation Poets ( W.J. Keith 18). It is amazing that this
unspectacular man could have such a profound effect on the evolution of Canadian
literary tradition. His upbringing was in a very conservative environment as Lampman
American in the 1980 s Essay
The 1980 s is one of the most interesting decades that was experienced in the United
States. Dealing with the stock market, the coming up of new inventions, all the way
to the types of music people listened to. During the 1980s, the only thing that made
Americans be Americans was because of the things they were provided with. Many
Americans had fun throughout the 1980s with materialistic, glamorous, and
technological life styles; therefore there were different economical problems that
Americans faced.
During the 1980 s, many Americans were incredibly materialistic; they were only
concerned with the things in life, not with life as it was. In the musical world,
Madonna was becoming popular. One of her greatest hits, Material Girl, ... Show
more content on Helpwriting.net ...
There were many styles that people were able to work with. First off, one of the
most common styles was the retro style. Retro was, in a way, inspired by disco.
Americans would often wear flares, which were types of jeans where the legs got
bigger and flared out towards the bottom of the foot (CITATION, #). This proves
that retro was just one of the major fashion statements in the 1980s. Another style
that Americans tried out was the Glamour style. This fashion included top of the
line designers like CoCo Chanel, Versace, and Oscar de la Renta. These designers
made a significant impact on the glamorous lifestyle. Glamorous was over the top,
but in a fashionable or unique way that people like to dress (CITATION, #). People
would wear skirts with a huge puffball at the bottom of it, or switch it up to a nice
tight fitting pencil skirt. The economy was a huge factor. Obviously people wanted
the best of the best, but the economy was not doing that well (CITATION, #). There
were some bad things about the agriculture. Since the United States is just coming out
of a recession, they were working on rebuilding businesses in the city so they could
expand their business and try to earn back some of the money they lost. This proves
that at this point in the 80s, life was not so glamorous because people had to worry
about earning back the assets that they lost along with businesses. The farm economy
was
4230 Hw 3
1.Corporate malfeasance is defined as deceptive and/or fraudulent activities carried
out by corporate officers. Usually the CEO is held responsible for corporate
problems, but a firm s board is essential to preventing malfeasance and ensuring that
management acts with integrity. I would describe some of Messier s actions as
corporate malfeasance. For example, Messier repurchased a significant amount of
VivendiUniversal s stock (i.e., 6.4 billion Euros from 2001 2002) to fund employee
stock optiongrants. Because Messier was so focused on the firm s stock, his focus
was not on the firm s financial stability nor did he make the best use of excess cash.
Further, the accounting rules used were questionable, as Vivendi Universal used, and
... Show more content on Helpwriting.net ...
Messier was dedicated to Americanizing the firm, taking away from its French
heritage. When Messier decided to sell off Vivendi Environment, the parent
company s most profitable business, to finance a deal with USA Networks he
continued to transform the firm into a media first business neglecting the firm s
water supply roots. Now the parent company was left with debt and many
overvalued assets. Vivendi Universal would eventually have to write down
significant amounts due to excessive goodwill estimates from acquisitions.
Messier was stubborn. He declared that these loses were not reflective of the
company s sound operations and tried to blame Lescure, the decision maker for
Canal Plus, for the parent company s business failure, deeming Canal Plus as a
tumor for Vivendi Universal. All in all, Messier was adamant in keeping to the
story that his firm was in good financial position, and, because he had the support
of board members (who he had initially appointed), others believed this story as well.
His persistence in growing the business fogged his perception of reality he was
managing a failing business. It is clear that Messier did a poor job as CEO.
3.Messier was a victim of bad timing, however, his failure as a CEO should not only
be attributed to poor timing. Yes, the dot.com bubble burst during his tenure, which
may have caused him to over value some acquired firms. Other issues
The Atomic Bomb Of World War II
The atom bomb was no Great Decision. It was merely another powerful weapon in
the arsenal of righteousness said Harry S. Truman. The atomic bomb is considered
a weapon of mass destruction because of the insurmountable damage and
causalities such attack can cause. The United States resorted to the creation of
such incredible weapon as a means to annihilate or alter the Axis powers.
However, this all began due to the September 1, 1939, German attack to Poland
and the Pearl Harbor bombings by Japan. These actions by the Axis powers would
result in one of the deadliest global wars in human history. World War II involved
the vast majority of the world s nations. An estimated 50 million to 85 million died
in the events that occurred in World War II. The origin and development of the
atomic bomb during World War II changed forever the direction of the war and posed
the United States as a champion in military strategies; this endeavor also known as
the Manhattan Projectserved as catalyst in WWII. During this time, the world s most
intelligent scientists discovered that German physicists were learning to produce a
bomb that could cause immense destruction. The fear of such a bomb led scientists
Albert Einstein and Enrico Fermi to inform President Franklin D. Roosevelt of
Germany s plans. Renowned scientist, Albert Einstein had fled Nazi persecution and
was by then living in the United States; he delivered a letter to President Roosevelt
on October 11, 1939. In the letter,
Essay On Women In Antigone
The play Antigone by Sophocles perfectly demonstrates the values of a society can
alienate an individual for such thing as gender. Antigone, the protagonist,
demonstrates her strong personality throughout the play as she believes that women
have the right to express their opinions, rather than to listen to the society or to the
man with more power. However, with Antigonebeing a woman, everyone treated her
differently.
Antigone s character proves that women are not born as a second class, and they
have the right to express their beliefs. For example from the play, in the beginning,
Antigone asked her sister, Ismene, to bury her brother together with Antigone.
However, Ismene disagrees with her sister s opinion because Ismene is scared of
Creon since she was portrayed to be the type of girl that will follow the men s lead
in this play. Antigone said, To wreck itself; the worst that can befall/ Is but to die an
honorable death (Sophocles 95 96) and I would not welcome such a fellowship./ Go
thine own way; myself will bury him (Sophocles 69 70). From this, Antigone shows
that she is not afraid of danger or death and she will do whatever she feels is right for
her late brother. ... Show more content on Helpwriting.net ...
With that being said, because Antigone was born as a woman in that time period,
her actions were not approved by others. Everyone, including her sister Ismene,
believes that Antigone needs to listen and follow Creon s order if she doesn t want
to die. When Antigone asked her sister to bury their dead brother in secret, Ismene
said, Weak women, think of that,/ Not framed by nature to content with men
(Sophocles 60 61). In other words, Ismene believes that women are supposed to be
weak and need protection, rather than to fight against
Essay About Homeless People
Thomas crossed the road, looking both ways before he dashed across the cracked
pavement. Just because the crosswalk was blinking a little green man didn t mean
the early morning New York commuters wouldn t run him down if he took too
long. In his hand was a small brown package from the deli behind him that crinkled
as he moved. After crossing the street he stopped for a moment to catch his breath.
Despite being young, he was not in the best shape, and running was not something
he did often. As he pushed his sandy blond hair out of his face, and straightened his
tie, which has flipped over his shoulder. His brown eyes locked onto his motivation
for crossing the street. With his lungs need for oxygen satiated, he took a few hesitant
steps... Show more content on Helpwriting.net ...
The man opened the bag, and pulled out a sandwich. It was rather basic; turkey,
cheese, tomato and lettuce, slice in half and wrapped in brown paper. The type of
food you buy when you don t know what the other person likes to eat. I don t think I
can finish this all by myself, The man said as Thomas had started to walk away.
Would you care to join me? Thomas paused, looking the man over. The man smiled,
his straight white teeth peeking out from under his greying beard and mustache, I
don t bite.
Thomas checked his watch, 7:32 am. I suppose I have some time before I need to
be at work, he said, plopping down on the cold hard sidewalk. The man handed him
the half of the sandwich that was still wrapped, and took a bite of his own. Chewing
slowly he shut his eyes, savoring the taste.
It s been awhile since I ve had company for breakfast. The man chuckled at his own
joke and turned to look at Thomas. I m Ed, he said holding out his hand. Thomas
took his hand and shook it, surprised by the firmness of the handshake.
Nice to meet you Ed. I m Thomas. He released Ed s hand hand began to unwrap his
half of the sandwich.
Thomas is a business name, Joked Ed, as he swallowed down his third big bite. Do
your friends call ya Tom?
All My friends are business friends, said Thomas. So, they all call me Thomas. He
shrugged his shoulders. My Mom calls me Tommy. Ed chuckled, and looked at
Thomas from the
The Causes Of Work-Related Stress In The Workplace
Work related stress is a very serious problem that will end up costing companies
millions of dollars as a result of employee productivity declining. It always falls
back on the management team to find solutions to their employee s stress within the
means of the company. This problem needs to be addressed very rapidly because if
not dealt with the end results will be negative effects for both the employee and
employer. Employees that are stressed need to recognize the signs of stressbecause
they will be susceptible to mental health problems such as depression, which can
lead to a build up of chronic diseases if exposed to prolonged stress. This essay will
discuss the causes of work related stress and suggest some solutions.
In any organization one of the utmost crucial tasks is management. Management is
the act of dealing with or the act of controlling people or processes. For an
organization to run its activities it needs to have a very efficient management team.
To manage a group can also be said it is the step of making the choice concerning
people, systems, and objectives in an organization. It is not a science but an act which
necessitates human attendance and determination. The primary functions of any
management are planning, organizing, staffing, directing, coordinating, report and
budgeting (Nahavandi, Denhardt Aristigueta 2015). When it comes to planning,
management is involved in the planning of all their department activities which leads
to the production
Analyzing Blues Music
The Blues: Genre Analysis
The blues is a musical genre that originated among African Americans in the
Southern United States in the late 19th and early 20th centuries. From these humble
and provincial origins it has come to be appreciated all over the country and the
world, and has also spread its influence even more widely by way of its offspring, jazz
and rock. While the word genre is certainly appropriate, the blues can be defined more
specifically as a closely related set of melodies, harmonies, rhythmic patterns and
bar structures. Unlike many musical genres, the blues is very tightly focused in fact
it could be said without much fear of exaggeration that all blues songs are variations
on one song. Nevertheless, as time went on the blues lost some of its stereotyped or
formulaic aspect and loosened up its structure to encompass a variety of forms of
expression.
Basically, blues melodies are built around a major scale with fairly strong
pentatonic character. However, the third tone of the scale tends to be sung (or to
the extent possible, played) slightly flat (a blue third ), or to be bent from the
minor third up to the major third. Less often, the seventh and fifth tones of the scale
are given similar treatment. The harmony (provided by the guitar or piano in the
original solo format of blues performance) relies mainly on the I, IV, and V chords,
although some versions also make use of the VI and II. The typical progression
moves from the I chord to the IV, back
Coca Cola Struggles with Ethics
Case Study 4 The Coca Cola Company Struggles with Ethical Crises Case #11
January 5, 2014 1)The corporate role in any company builds the foundation of how a
company succeeds and, also, how the public views them. Their organizational
performance is based on how the company is run and what ethical structure they have
in place. Their social responsibility runs parallel with their organizational
performance. If a company is not successful within themselves they cannot be
successful within society. The first thing a stakeholder will assess is the culture of
the corporation. This involves identifying the mission, values and norms of the
company. This information can typically be found in corporate documents or on
company s... Show more content on Helpwriting.net ...
Any chance of losing a consumer s trust should be avoided at all costs. Once trust
is lost it is a long road back to regaining it. Coca Cola needs to learn from these past
mistakes and not let them happen again. Claims of discrimination have also
haunted them. In 1999 a large group of African American employees accused the
company of discriminating in areas of pay, promotion and performance evaluation.
Although they strongly denied the allegations, the lawsuit caused a lot of unrest
within the company. Out of this Coca Cola created a diversity council which is
something they should have had to begin with. It is always better for a company
to be proactive rather than reactive. Coca Cola has also been plagued with a
mixture of competition issues with claims of dirty marketing tactics as well as
non compliance with laws with other countries. They have had to deal with
accusation s of channel stuffing, a method used to get rid of surplus stock at the
end of a quarter to cause the appearance of increased sales. I think that Coca cola
has learned a lot from their ethical crisis but has a ways to go. To be proactive, they
have made local education and community improvement program a top priority.
They also offer grants to various colleges both local and abroad. Recycling has
become a priority to them also. Chair Neville Isdell received the
Role of Cost Accounting and Ethical Consideration
RUNNING HEADER: Role of Cost Accounting and Ethical Consideration
Role of Cost Accounting and Ethical Consideration
Introduction Cost accounting is used to help management understand how much it
cost to run a business. Understanding the role of cost accounting is important when
one is trying to put together a team of managers to help run the company. The CEO of
a merchandising organization needs to hire a CFO to run the accounting system, but
the CEO has little understanding of cost accounting. The CEO will hire a consultant
to help her understand the role of cost accounting, the role of ethics in cost
accounting, and compare and contrast the absorption and variable costing.
Role of Cost Accounting Cost accounting is the area ... Show more content on
Helpwriting.net ...
Ethical analysis needs to be instutionalized as an integral part of phases in decision
making process.
Compare and Contrast Absorption and Variable Cost
It is important for the CEO is the manufacturing organization to understand the
different between absorption cost and variable cost. One different between the two
are the way accounting treats fixed manufacturing overhead. Absorption cost is all
the manufacturing overhead costs applied to the manufactured goods (Hilton, 2003).
Variable cost is applied to work in process as product cost, and fixed overhead costs
are expensed as period cost. Other different is the timing of when fixed overhead
becomes an expense. Variable fixed cost is expense immediately, and absorption
fixed cost is inventoried until the goods are sold. Fixed cost is expense in both
accounting system. Both systems have advantages and it will be up to management
to decide which works best for their organization. Below is a list of each system
advantages:
Advantages of Absorption costing Fixed MOH is treated as the same as other
product costs, e.g. DM, DL Consistent with long run pricing decisions that must cover
full cost External reporting and income tax law require AC
Advantages of Variable

Essay On Shooting An Elephant.pdf

  • 1.
    Essay On ShootingAn Elephant Writing an essay on the topic "Shooting an Elephant" can present a unique set of challenges. George Orwell's essay delves into complex themes, including the struggle between personal conscience and societal expectations, the abuse of power, and the impact of imperialism. Capturing the essence of these ideas requires a careful analysis of Orwell's narrative, an understanding of the historical context in which the essay is set, and the ability to articulate one's own interpretation and insights. One difficulty lies in interpreting Orwell's internal conflict as he grapples with the expectations of the crowd, the oppressive nature of imperialism, and his own ethical considerations. Crafting a coherent and insightful analysis requires a deep exploration of Orwell's language choices, narrative techniques, and the symbolism employed in the text. Moreover, the essay demands a nuanced understanding of the historical context of British imperialism in Burma, as well as an awareness of the broader socio-political issues addressed by Orwell. This contextualization is crucial for providing a comprehensive analysis and demonstrating a mastery of the subject matter. Expressing one's own perspective and response to Orwell's narrative adds another layer of complexity. The writer must navigate through the intricacies of personal interpretation while maintaining a connection to the central themes of the essay. Developing a well-structured argument that combines personal insights with a solid foundation in literary analysis is essential. In conclusion, crafting an essay on "Shooting an Elephant" requires a multi-faceted approach involving literary analysis, historical contextualization, and personal reflection. Meeting these challenges necessitates careful reading, critical thinking, and effective communication skills. While demanding, successfully navigating through these complexities can result in a thought- provoking and engaging essay. For assistance with similar essays or other academic writing needs, various resources are available, including online platforms like HelpWriting.net, where professional writers can provide support and guidance in tackling complex topics. Essay On Shooting An Elephant Essay On Shooting An Elephant
  • 2.
    Love In TheGreat Gatsby The greatest thing you ll ever learn is just to love and be loved in return . The scene where Satine and Christian are going behind the back of the duke and having the time of their life. Luhrmann uses the slow motion effect to create slow tension and make the audience think the outcome is going to be bad. This compares directly with the Gatsby and Daisy scene where he is throwing his shirts down like they are nothing. The concept of loveis shown in extremities, they are willing to give up everything for their love. Satine is throwing away her career for her to be with Christian rather than the duke. The fast pace is also a key theme in The Great Gatsby. 2 close ups of cigarette being twisted into ash tray with force by Tom. A lot ... Show more content on Helpwriting.net ... The greatest thing you ll ever learn is just to love and be loved in return . Satine is willing to No care for the duke who holds the deeds to the moulin rouge. Some of the film techniques Luhrmann uses is close ups to show the true emotions of characters and a fast pace with a lot of quick cutting between shots, fast cutting is used for various reasons, it can be used to get a lot of information to the audience quickly, dialogue between characters and the reason that Luhrmann uses fast cutting is to show the energy and or chaos that is present. Luhrmann can also slow the pace down slowing it down a several times during the extract. The way he uses his pace to set the mood and the ideas of each particular scene is one of his better attributes. An example of slowing it down is when Christian is narrating and also when the Duke is about to witness Christian and Satine together, he uses the slow motion effect in this situation and it adds a lot of tension to the scene and we all breathe a sigh of relief once its over. To dramatise scenes Luhrmann uses background music to suit the mood and the tension that the characters create. In this time and era it seems like it is the normal thing to be having an
  • 3.
    Tanner Glass sRole In Professional Sports In most recent New York Rangers news. Ice hockey winger Tanner Glass has been pulling his weight around the team for some time now. But he also made his status in the National Hockey League by occasionally tossing the gloves and getting in other opponents faces, but he s done well to stay on the right side of the rules. Glass has only met with the NHL s Department of Player Safety once in his career, occurring late in the 2014 2015 season for an end thrown on the Boston Bruins defenseman Adam McQuaid. Since that incident the hockey veteran hasn t been in trouble with the league. That may change as soon as Wednesday. In the final minutes of the first period on Tuesday night, Glass lined up and shook up Tampa Bay Lightning s center, Vladislav Namestnikov long after the 23 year old had already moved the puck.... Show more content on Helpwriting.net ... Glass violent hit earned him a major interference and a misconduct, while Namestnikov remained on the ice for a couple of moments before heading to the Lightning s back room. Thankfully for the Lightnings, who are dealing with an unfortunate number of injuries, Namestnikov was able to return to the contest in the second quarter of the game. The angles available of Glass check make it difficult to tell where exactly the initial contact of the puck is made. But, from what can be seen on the Madison Square Garden feeds, it appears as though Glass smashes into Namestnikov shoulder to shoulder. There s a chance for an interference play to earn a suspension, and there s a chance Glass becomes the fifth Rangers player this season suspended for interference. If the league does decide to suspend, Namestnikov s health and Glass history will be taken into account. Both of those should fall in favor of Glass, who has no suspension history, as Namestnikov returned and remained in the
  • 4.
    Transition Of ArtAnd Architecture From The Gilded Age Transition of art and architecture from the gilded Age to the era of Ashcan artists Introduction Art is the expression of creative skills and imagination, through a visual medium such as painting or sculptures. Architectural is the art of designing and constriction of an object or a building. During Gilded Age the newly wealth citizens of America traced their ancestry and cultural heritage to the greater civilization and aristocracies of Europe. People spend months collecting and moving art and architecture from Europe to United States. During the Gilded Age, American architects created a different blending of style to their great houses which were initially influenced by European design. As a result of revolution, Ashcan schoolwas introduced by a group of artists who were inspired by Robert henry. The artists believed in worthiness of immigrants and the working class life as artistic subject matter in art. 1.A Ride for Liberty The theme of this art is liberty. It was designed by Eastman Johnson on 2nd march, 1962. It is located at Brooklyn museum. This art demonstrate the journey of America to freedom. Americans love for freedom was represented by the liberty poles. The art shows the idea of Americans attempting to occupy a more prominent place in public and private discourse in the United States (Walker,... Show more content on Helpwriting.net ... It was designed by Thomas Eakins in 1875. It is located at Philadelphia Museum of Art. The gross clinic art showed the society how surgical operation was done in the 19th century. Frock coats worn by the surgeons represent hygienic surgical environment and helped people to understand prevention of infections. Frock coats depict a cleaner and brighter surgical theater (Aldrich, 1969, p.111). It demonstrates the evolution of health care in America in the 19th century. The Gross Clinic Art is a representative of the Gilded Age since people had not adopted proper
  • 5.
    Evaluation Of AProject On Project Management Name Avi Mohan Sharma Student ID 11613141 Ans 1. Methodology: Methodology is a collection of strategic methods that focus on how to plan, perform and complete certain projects. It has a conductive approach which depends on the conditions of different projects(Marchewka, 2003). Role of the Methodologies in Project Management: It suggests variations, tools and techniques, analyzation to accomplish the projects(Marchewka, 2003). It designs a plan to fulfill the project and product life cycles(Marchewka, 2003). Methodologies enable the sponsors, team members and stakeholders to communicate in a specific business terms(Marchewka, 2003). According to Marchewka(2003), methodology should be capable to accept the necessities of the organizations. The different project methodologies are Waterfall(common), Agile, SCRUM, SDLC, PMBOK, PRINCE2, RAD etc(Marchewka, 2003). According to Marchewka(2003), project methodologies utilize the design approach to explain the project in a cyclic process. Ans 2. Comparing PRINCE2 PMBOK: PRINCE2 is originated in UK while PMBOK is originated in US.(PRINCE2 VS PMP, n. d.). PRINCE2 is more rigid than PMBOK as it is performance based methodology while PMBOK is based on the facts and Knowledge areas.(PRINCE2 VS PMP, n. d.). PRINCE2 defines the whole process(what, when, how, whom) to implement a project . On the other hand, PMBOK
  • 6.
    Youth Violence Memo Thankyou for participating in our recent Special Results Minneapolis roundtable conversation on youth violence prevention. A roundtable meeting presents a unique opportunity for City staff, leadership, elected officials, and stakeholders from outside agencies and organizations to engage in robust discussions. The YouthViolence Prevention Special Report presented by the Minneapolis Health Department focused their data driven approach on identifying trends and opportunities to reduce youth violence. From the discussion, three interrelated themes emerged. To reduce youth violence, it requires actions taken with youth, families, and the greater Minneapolis community. The following memo details these themes, and suggests ways to reduce youth ... Show more content on Helpwriting.net ... Therefore, to reduce youth violence, it is necessary to make wraparound services available to youth also available to families. Without supporting families, efforts to curtail youth violence cannot be as effective. Theme: The Greater Minneapolis Community Has the Resources to Reduce Youth Violence. A consistent theme that at risk youth raise in discussions with community social workers is the desire to have a job. Minneapolis has done a great deal of work in connecting youth to employers through program such as Step up and Pathways . These programs give any adolescence, at risk or not, a unique opportunity to build purpose and nurture relationships with potential future employers. These programs help to create positive life trajectories for youth. The Minneapolis Public Schools (MPS) has operated a highly successful afterschool program for years. Over the last 15 years, the funding for the program has declined precipitously. Limited funds have made it challenging for MPS to keep the program staffed with teachers, relying on an inconsistent flow of volunteers instead. The afterschool program is an invaluable resource in the effort to reduce youth violence. Instead of unsupervised and unstructured time, the program keeps youth focused on completing homework, developing skills, exposes them to mentors, and allows parents to rest assured that their children are safe while they are still at
  • 7.
    Doping Testing AndDoping Tests Doping dates back to ancient Greek where athletes took special diets to make themselves stronger. In the 19th Century, substances such as caffeine, alcohol and cocaine were used to enhance performance among long distance athletes. In 1904, for example, Thomas Hicks won the marathon by taking raw eggs, doses of brandy administered during the race and injections of strychnine. By the year 1920s, people realized that restrictions had to be created regarding the use of drugs in sports. In 1928, IAAF was the first sports federation to ban doping fir the use of stimulating substances. In 1930, the problem became worse because of the introduction of synthetic hormones, and the IAAF lacked the proper equipment to detect doping of such kinds. By 1960, doping was a big issue because of the death of an athlete Knud Jensen during the Olympics games in Mexico. An autopsy revealed the presence of amphetamine a performance enhancement drug. In 1966, FIFA and Cycling were the first sports to introduce doping tests in their world championships. The International Olympics Committee followed suit the following year, and it tested athletes in the 1968 Olympic Games. By the year 1999, the IOC convened the first World Conference on Doping in Sports, which lead to the formation of the World Anti Doping Agency(WADA) on November of the same year. By 200, the fight against the use of EPO was ongoing and tests were undertaken during the Sydney Olympics. Currently, more research is undertaken
  • 8.
    Comparing Zefferelli sFilm Zefferelli vs. Baz Luhrmann Shirin Shahsavari 3/10/16 Although Zefferelli s film is a better book to movie adaptation of Shakespeare s famous play, Romeo and Juliet , Baz Luhrmann s version is a lot more entertaining and comprehensible to most teenagers because of its modern setting. Perhaps, one of the most substantial visible contrasts between the two films is the setting. Zeffirelli s film takes place in a classical setting, accurately representing the actual historic period in which the play was written in. However, in Luhrmann s version the setting has been completely transformed to make the film more modern and therefore easier for the audience to understand and relate to. The modern setting makes the film more intriguing and apprehensible
  • 9.
    Franz Liszt wasa Great Romantic Composer According to De Portales, Liszt had a struggle in himself between the virtuoso and the composer and he knew that he had to choose. He chose to go with the composer and in 1847 his virtuoso career was over (De Portales 111 112). Another reason he made the choice was that in 1847 Liszt once again fell in love upon meeting a princess, named Carolyne Sayn Wittgenstein, in Kiev. She gave him a large sum of money after a charity concert and he deeply desired to meet her to thank her (De Pourtales 117). They met and fell in love. In 1848, after knowing each other for a couple of months they went back to Weimar together, even though she was married to another man (De Pourtales 121 122). Liszt accepted a job at the Grand Duke of Weimar s court and became the Kapellmeister in Weimar and also the conductor (Perenyi 238, Kamien 238). This even though it by the romantic era was more normal for musicians to be independent ( Liszt, Franz ). His reason was not because he needed money, he was the first pianist performer who could support himself by doing what he did, he wanted to start composing (Franz Liszt). He stayed at his position in Weimar from 1848 until 1861 ( Liszt, Franz ). His new orchestra one of the first in Germany (De Portales (114). He managed to make the orchestra bigger and to obtain more skilled players. He made sure to give them better pay and better pensions. The orchestra had 45 members ( Liszt, Franz ), which was a normal size for a romantic orchestra
  • 10.
    Comparing Rene DescartesAnd Iacovos Vasiliou In The Matrix The movie the Matrix is full of philosophical relevancies and issues dealing with morality. Rene Descartes and Iacovos Vasiliou are both great thinkers, and both of them had great ideas that played a big part into forming the idea of the Matrix and it s reality and whether or not it was real or not. In my paper, I will describe both their sides and their opinions on the matter of the Matrix, and how Neo, the main character, would feel in regards to all of it. I will also discuss how I believe both Descartes and Vasiliou in their views. In regards to Neo, how would he actually really know and believe that nothing in the Matrix really exists? How does he know that when he left the Matrix program it was real, and he is not still in it? One can take into account when Cypher speaks to Agent Smith: You know, I know this steak doesn t exist. I know that when I put it in my mouth, The Matrix is telling my brain that it is juicy and delicious. After nine years, you know what I realize? Ignorance is bliss (The Matrix Quotes ). I believe that you can never necessarily know, and you can just choose to belief or not when the information is presented to you. The entire point of the Matrix is that we don t know what is necessarily real and what is a dream (Anderson). ... Show more content on Helpwriting.net ... The evil demon is paralleled in the Matrix as being the artificial intelligence that took over earth and forced the virtual reality on the human population (Mo). Descartes reasons that since he believes in what he sees and feels while he is dreaming, he cannot trust his sense to tell him that he isn t still dreaming. His sense cannot aid him with evidence that the Earth exists. He ends on the note that he cannot trust his senses and that the world might be under control of an evil demon
  • 11.
    Essay On AGrief Support Group A Grief Support Group Observation The Cokesbury United Methodist Church grief support group follows a thirteen week curriculum from GriefShare, however, new members can join in at any time as each week has a self contained lesson. The topic for the week I attendee focused on the why of losing a loved one. Through following this curriculum, the group seeks to equip members with essentials to recover from the hurt of grief and loss. (GriefShare, n.d.) The group focuses on helping members rebuild their lives after they experience tremendous loss and grief through facing the challenge together. (GriefShare, n.d.) Format of the Group Psychoeducational groups emphasize, using education methods to acquire information and develop related meaning and skills. (Brown, 1997, p.1) This grief support group works as a psychoeducational group, through focusing on education and knowledge for healing and growth. In this group, members value knowledge as it further brings growth through their grief journey. The facilitator educates the group with thirty minute videos made by grief experts to support the members in learning proper coping skills and processing certain aspects of their grief. The group also characterizes a psychoeducational group through providing emotional support with discussion before and after each video. During this short discussion time the group worked together, to help apply the skills to their lives and process topics discusses in the video. When reflecting
  • 12.
    Specialties within Radiology Modernmedicine is capable of treating a tremendous range of human disease and injuries, but the usefulness of all medical specialties depends on accurate diagnosis. Virtually every conceivable medical specialty relies on radiological technologies to provide formal diagnoses, making radiology one of the most important of all medical specialties. Radiologists enjoy some of the best working conditions in modern medicineand typically experience very positive employment conditions. Consequently, their services are generally in very high demand, with many starting out with six figure annual incomes immediately after completion of their professional training. Within the field of radiology, there are: (1) radiologists who are physicians... Show more content on Helpwriting.net ... In the words of my Radiology professor, Warren Hejny, Radiology can take you anywhere; it can be used as a starting block or stepping stone. Because of its tremendously wide applications within modern medicine, radiology offers more than a dozen distinct areas of even greater specialization within the field. Some of those specialty areas involve direct medical intervention, such as in the case of radiation oncology and interventional radiology. Others focus more on diagnostics rather than on direct medical treatment. In that regard, breast imaging involves diagnosing diseases of the breast through mammography, ultrasound, magnetic resonance imaging (MRI), and tissue biopsies. Cardiovascular radiology is the radiology specialty that uses X rays, computer axial tomography (CAT scans), MRIs, and ultrasound to diagnose problems with the heart and circulatory system. Chest radiology employs many of the same technologies and tools to diagnose and treat medical conditions of the heart and lungs. Other radiology specialty practice areas include: gastrointestinal radiology, emergency radiology, head and neck radiology, musculoskeletal radiology, and reproductive radiology. Finally, radiology specialties can also intersect directly with other specialty areas of interest such as
  • 13.
    The Pollution OfAir Pollution Most people never stop to think about the sanitation of the air around them. The only places that people ruminate over air quality are largely populated states and cities. One of these places is California. Ominous clouds of smog and polluted air constantly hover over the citizens. These people don t ever look up and worry, because smogis a usual appearance. This issue destroys not only the earth and its atmosphere, but the very center of our lives: our bodies health. Particulate pollutants are like the retroviruses of the world: well rounded and dangerous. Air pollutionis the largest ecological issue of our time because the contaminated air lingers all over the world constantly being augmented to, and further threatening the world and those who lives in it. As a state that is car centric, California has been harassed by air pollutionfor decades. Even one of California s most famous cities, Los Angeles, is known for the cloud of smog. National Geographic even comments on the daily emissions from factories and automobiles in the city saying, In the past 150 years, such activities have pumped enough carbon dioxide into the atmosphere to raise its levels higher than they have been for hundreds of thousands of years. ( Air Pollution Facts, Air Pollution Effects, Air Pollution Solutions, Air Pollution Causes National Geographic. ) California s air pollution levels are at an all time high and needs to be redressed. Ozone is one of the most dangerous main types of air
  • 14.
    Business Intelligence AndMarketing Analytics Essay Blogs / job portals / special interest groups take on BI and BA Business intelligence and business analytics... aren t they the same thing?Or are they describing opposite processes?There are a lot of big words that get thrown around in the world of BI, and it s easy to get lost in a whirlwind of interpretation.The diversity of opinion reflects the fluidity of how we understand the defining language of the field.It also demonstrates that in business intelligence, one term can mean different things to different people, depending on their business focus and their perspective.Though it is commonly called the BI field, the number of Google searches for business analytics have risen sharply in the past 10 years vs. a mild decline for business intelligence (google). I went through various blogs and special interest groups that are formed around these two terms i.e. business intelligence and business analytics. One common thing that I found is that most of them consider business intelligence and analytics as distinct but connected tools. They described business intelligence as a tool that provides a way of amassing data to find information primarily through asking questions, reporting, and online analytical processes. On the other hand, business analytics take advantage of statistical and quantitative data for explanatory and predictive modeling. Analytics focuses on solutions oriented capabilities which create value and convert information into knowledge. Moreover, both business
  • 15.
    Humanitarian Aid BeBanned Humanitarian Aid s main purpose is to provide aid to those who suffer from natural or man made disaster . Some of the humanitarian aid organizations include American Red Cross, Doctors without Borders, and the Mercy Corps. The number of humanitarian aid in countries is increasing to around 1 2 million organizations in India and 277,000 organizations in Russia. Some of the rescue missions that humanitarian aid attends to are disasters such as Hurricane Havrey or Hurricane Katrina. Although some look at humanitarian aid as a good and positive outlook, there have been many incidents where humanitarian aid has been selfish and has been done wrong. Humanitarian aid should be banned because ...humanitarian aid did as much or even more harm than good (Gourevitch) by prolonging war, creating reasons to call for aid, and taking advantage of the profits and donations given to those companies. Although many say humanitarian aid is civilizing war by withdrawing injured on the battlefield and removing them from hostilities. Personally, humanitarian aid does not only help very little during the war, but they prolong the war to get more money and benefits that they claim to need for the sake of the people s lives. When the Nigerian civil war began in 1967, humanitarian aids were there to help, but they did more harm during the war then they ever did good. The organizations were the reason behind the year and a half extension of this civil war causing tens of thousands dead, many more
  • 16.
    Nt1330 Unit 1Exercise 2 Reaction Paper Hi Marcos, Thank you for your help in working through this issue. I wanted to try a different approach since you are running lmutils instead of lmadmin. First. I wanted to confirm that you have the most recent version of the lmgrd.exe in addition to the freeflyr.exe. A newer lmgrd can be used with an older vendor daemon, but a newer vendor daemon might not work properly with an older lmgrd. When upgrading FreeFlyer to a newer version, you want to be sure to use the newest version of lmgrd and freeflyr. Were you able to download and unzip the entire Network Licensing zip file, including the License Administration Tools, lmadmin, and lmgrd folders? If not we d be happy to find a way to allow you to access and download the folder. If so, then I have included two methods to configure the License Server, one from a clean install and one using the current LMTools. The instructions are below:... Show more content on Helpwriting.net ... 2) Launch lmtools.exe 3) Navigate to the Config Services tab and fill in the Service Name (e.g. FF_LicenseServer), and the paths to the lmgrd.exe and license files. 4) In the Path to the debug log file text box, enter or browse to the debug log file that this license server writes. Prepending the debug log file name with the + character appends logging entries. The default location for the debug log file is the c:WindowsSystem32 folder. To specify a different location, make sure you specify a fully qualified path. 5) Once you have set up these paths, select Save Service . 6) Navigate to the Start/Stop/Reread tab, and select Start Server . 7) The FreeFlyer License Server is now running and ready for a client machine to
  • 17.
    Pernol Essay Is livingin pain destroying your normal lifestyle? Arthritis and Joint Pain are a debilitative disease which cause misery and frustration to your every day life. Pernol is described as The arthritis miracle from the sea , that will eliminate joint pain, aid joint lubrication and ease your suffering, to enable you to regain your mobility and quality of life once more. So what is it? The main active ingredient is a patented, highly purified 99% stabilised pharmaceutical grade oil, extracted from the Green Lipped Mussels (Perna canaliculus) which are exclusive to the New Zealand coastline along the South Island. It is a unique chronic joint pain and inflammation product new which completely alleviates inflammation, eliminating swelling, pain,... Show more content on Helpwriting.net ... The presence of this source of essential fatty acids provides the mussel with potent anti inflammatory activity. This can be passed on to consumers when the mussel or its concentrated pure oil is as the mussel acts as a unique filtration system extracting crucial and essential nutrients that have shown to provide phenomenal pain relief, aid joint lubrication and act as powerful anti inflammation agents. The main active ingredient of Pernol is a patented, highly purified 99% stabilised pharmaceutical grade oil, extracted from the Green Lipped Mussels ( Perna canaliculus ) which are exclusive to the New Zealand coastline along Marlborough Sounds area of the South Island. This unique chronic joint pain and inflammation formulation can alleviate inflammation, eliminate swelling, pain, joint stiffness, lack of mobility, irritation and the wearing down of cartilage. A key component in combating and relieving arthritis pain and inflammation is the Concentrated Natural Oil Blend of Salmon Oil, Fish Oil, Evening Primrose Oil, Lemon Oil and Celery Seed Oil. This blend, combines with and aids the 99% Green Lipped Mussel Oil Extract, to provide the crucial natural oil blend to ensure optimum joint lubrication and overall joint
  • 18.
    Analysis Of TheBlackbird Calls In Grief Irish poetry is a special and distant literary genre. The many aspects of folklore and tradition evident in the poetry create unmistakably Irish verse. This evident in three poems from The New Oxford Book of Irish Verse: poem 67 referred to as The blackbird calls in grief , poem 108 referred to as There are three , and All That is Left... by Michael Hartnett. Death is the topic of numerous poems throughout history, however, these poems address the taboo topic in an authentic and unpredictable fashion. Through verse, death is given a new exploration without clichГ©. This is accomplished using Irish voice, nature, and religion. The blackbird calls in grief is an anonymously written poem from the twelfth century. The narrator laments the death of loved ones. In the poem, the narrator begins by lamenting to a blackbird. He mourns the passing of both the birds and his own family. The bird is personified and the two share in their grief. The harm now happened to him/ not long since happened to me (Kinsella 85). An analogy is created equating the loss of the two families and the injustice of the loss. The bird is removed from the poem after the sixth stanza, the grief is only the narrators to bare. The seventh stanza questions God, O You who made the world, / Your bias is hard to bear:/ friends all around me are spared, / their woman and young survive (Kinsella 86). This poem is distinctive compared even to more modern poems. This is perhaps why the author chose to remain
  • 19.
    The Dwarves ResearchPaper The land of Svartalhiem is a Dangerous one. The surface is plagued by a never ending raging storms. Lighting and thunder roam the skies has high power winds make it impossible for anything to take root. This causes the surface to develop into a dyeing wasteland. However, life has survived on Svartalhiem, driven underground by the winds. A labyrinth of caves, mines, rivers, and lakes have dug into the earth. Plant life is very minimal in these damp caverns; however, the caves can grow mushrooms of different varieties. These mushrooms would go on to support a lot of the different life forms of the realm. Most importantly, the Dwarves. The Dwarves are a race of humanoid creatures that look similar to humans, however they are short in stature ... Show more content on Helpwriting.net ... A harden warrior with a sol desire to conquer Svartalhiem. She is advised by a grand mage, Alviss, a sliver tongued and wise Dark Elf. Together, Galari and Alviss, rule over their city, Nidavellir. Similar to the Dwarves, the Dark Elves pay respects to their paragons Sudri and Vestri. These sisters lead their people into the safety of the darkness and founded Nidavellir. They were also known for leading attacks on Svartalhiem. There are other life forms living underground. Trolls are known for have small roaming communities. These monstrous figures are known for attacking small colonies of Dwarves and Dark Elves. There is also a numerus number of small colonies of goblins that cause mischief. Dimwitted they are easily fooled however they have a short temper. Then you have the spider queen and her children that haunt the forgotten mines long left untouched. These giant spiders are known for their toxic venom. Lastly, the rivers and lakes that make up the veins of the earth are home to some dangerous serpents. Dwarves and Dark Elves want weapons that can be used in battle and on the forge, thus both sides favor hammers. However, they still produce and use swords, maces, daggers, and
  • 20.
    How Did AncientEgypt s Relations With Foreign Power To a great extent Egypt s relations changed with foreign powers from the eighteenth to the nineteenth dynasties as Egyptian pharaohs adopted policies of diplomacy or military conquest. During the reign of Amenhotep III Egypt s relations with foreign powers continued to be focused on diplomacy rather than military conflict as Amenhotep sort to maintain peace and prosperity throughout the region. With the accession of Akhenatento the throne, Egypts relations with foreign powers and its vassal s changed dramatically with the rise of the expansionist Hittites and the decline of Mitanni. The nineteenth dynasty saw a shift in Egypt s foreign policy with its neighbours, as Seti I sort to restore the glory of Egypt and embarked on a campaign of expansionism... Show more content on Helpwriting.net ... The battle of Kadesh was the climax of hostilities between Egypt and Hittite, however, the battle served as the end of Egyptian expansionism in Syria Palestine. In year twenty one of Ramesses reign peace was achieved between Egypt and Hittite as evident from inscriptions at the Ramesseum, the Hypostyle Hall at Karnak and a Hittite tablet at its capital, Hattusas. In contrast to the early part of Ramesses reign, the quotation reflects the peace and prosperity experienced by both Egypt and Hittite during this period and the stability that continued throughout the reign of Ramesses. The treaty led to a formation of an alliance, a mutual defence pact and a promise of no further aggression. Trading improved with the reopening of Phoenician ports and removal of barriers to the Euphrates brought renewed trading opportunities. Diplomacy and marriages where used to maintain friendly relations between the two sides. Gifts were exchanged and Nefertari and the Hittite queen Pudukhapa exchanged correspondence and gifts of jewels as evident from letters. Further evident from letters is that in year thirty four of his reign Ramesses married a Hittite princess to strengthen Egypt Hittite relations. This was followed by another marriage to
  • 21.
    Artificial Venture Capital( Vc ) Market And... Artificial Venture Capital (VC) Market and Overregulation as Limitation of the Policy 7. (U) In addition to the limitations of the government led top down approaches to building startup ecosystem, unwise policy measures to cultivate a good venture capital (VC) investment environment is another limitation of the Creative Economy policy that must be addressed. In a 2014 research paper published in the Korean Journal of Financial Studies, Professor Song Chi seung of Wonkwang University points out, while the government led venture capital investments did play a considerable role in cultivating the VC investment environment in the ROK despite the global downturn of VC funds after the 2008 Financial Crisis, they now act as an impediment ... Show more content on Helpwriting.net ... The strict regulations for foreign VCs such as a minimum required investment of USD 1 million and the minimum number of employees to hire are the fixed costs to the foreign VCs investment in Korean startups and SMEs, he said. Mr. Lim contended that venture capital investment regulations must be eased not only to attract foreign venture capitalists but also to provide startups and VCs a more convenient platform for exits through initial public offerings (IPOs) or merge and acquisitions (M As). Furthermore, Mr. Lim observed that excessive regulations in other areas also prevent a robust growth of startup ecosystems. Specifically, the government s positive list approach to regulations preventing new services such as peer to peer (P2P) lending and Uber must be changed into a negative list approach. Controversial Roles of Chaebols in Building the ROK s Startup Ecosystem 9. (U) Above all, the strongest criticism against the Park administration s Creative Economy policy is the CCEIs dependence on chaebols for incubating startups and SMEs. The structure of CCEIs under which startups and SMEs must rely on the conglomerates for purchase of technologies, equity investment and marketing has drawn criticisms from both academia and political circles. The critics argue that the CCEIs have made startups and SMEs vulnerable to the conglomerates stealing of their intellectual property (IP) and forced them
  • 22.
    Advocate And Serve Crutchfieldand Grant identify six practices of high impact nonprofits: advocate and serve, make markets work, inspire evangelists, nurture nonprofit networks, master the art of adaptation, and share leadership. All of these practices proved to be crucial in the success of the twelve featured nonprofits, however, there are two practices that I find to be more intriguing than the rest. Advocate and serve and inspire evangelists are the two practices that stand out. The practice of advocate and serve was a new concept to me, which is, in part, why I found it particularly interesting. The practice of inspiring evangelists, is a concept I am familiar with, but I have never seen it articulated this well. Advocate and serve is complex practice. ... Show more content on Helpwriting.net ... This could be the answer to the issue addressed by Berger and Neuhaus in their essay entitled, To Empower People: From State to Civil Society. They write about the paradox of the public s desire for public services, coupled with their resistance to government intervention. When nonprofits are successful in advocating within the government sphere, they expand opportunities through means such as: increased government funding, tax breaks, changes to tax codes, policy changes, raised awareness, and, ultimately, changes to public behavior. These results allow nonprofits the opportunity to maximize their impact, therefore fulfilling the public need while keeping the government seemingly uninvolved. Regardless of one s beliefs on integrating advocacy and service, it is difficult to dispute that social aliments we face today stem from a deeper issue within the infrastructure of our society. Direct service organizations offer temporary solutions, a Band Aid, if you will, to buy time for change. Advocacy groups aim to resolve the root problem that results in the need for the Band Aid. We need direct service organizations. We need advocacy groups. Does it make sense for the two to be one in the
  • 23.
    A Brief Lookat Aerospace Engineering Discover Engineering: Aerospace Engineering According to Dictionary.com, engineering is a branch of science and technology that works with design and building. Also engineering is a career that focuses on solving problems by using the design process.Engineers work on the following: they solve, design, test and building things that humans use on a daily use. The Engineering Profession Chemical Engineering According to Wikipedia.com chemical engineering is solve problems by using science, for example, creating new materials or try to make energy by connecting two diamonds, or making things that don t damage the Earth or humans. Civil Engineering According to Dictionary.com, civil engineering is a career that deals with design problems, or design something that we see in our regular day and we use. For example: roads, bridges, canals, and others builds that the humans use. Electrical Engineering According to Wikipedia.com, electrical engineering works and solve problems related to electricity and electronics. Electrical engineering has started since the 19th century after the first telephone and electric power. Mechanical Engineering According to Wikipedia.com, mechanical engineering applies to math and physics to analysis a design or to solve a problem. They products and operates machines and tools that a human use on a daily basis.This field type of engineering also connects to electrical and civil engineering. My Engineering Profession The
  • 24.
    Persuasive Essay OnSocial Justice Eliezer Yudkowsky once said, You are personally responsible for becoming more ethical than the society you grew up in. This exact quote represents the initiative I plan on taking to promote social justice. Though I have yet to make a humongous contribution to the progress of society, I am steadily working towards it. The need for social justice is everywhere due to the acts of injustice that people, primarily minorities, face everyday. This includes police brutality, racism, and discrimination. That being said, action must be taken and I will do my part by starting in my own community Atlanta,GA. On July 7th, 2016, Michael George Smith Jr. was found hanging from a tree in Piedmont Park. Policeruled his death as a suicide, but of course everyone, including myself, suspected foul play. In addition to Michael s death, Alton Sterling and Philando Castile were both killed earlier that week. Both whom were unarmed and not disturbing any peace, yet were still shot and killed by the police. In response to all three of their deaths, protests erupted throughout downtown Atlanta. The day of the protest, my grandma and I were both watching the news, seeing everything that was happening. In the midst of us watching the news, she mumbled damn, 50 years later and ain t none changed . It then began to dwell on me that when it comes to police brutality, protesting has not changed anything. Even back in 1992, when the LA riots occurred after the Rodney Kingbeating, all of
  • 25.
    Literacy Task Literacy Task 1PRODUCINGBIODEGRADABLE PLASTIC JUST GOT CHEAPER AND GREENER The topic of this report is that producing biodegradable plastic just got cheaper and greener. What this report is about and how it relates to the society, technology and the environment will be discussed. Biodegradable plastic is plastic that is capable to decompose through the action of living organisms. It is originally from renewable resources and made from natural materials such as corn starch. Biodegradable plastic is also an alternative source of plastic. To produce it, First, lactic acid is fed into a reactor and converted into a type of pre plastic under high temperature and in a vacuum , Professor Bert Sels explains(2015). These are only the some of the ... Show more content on Helpwriting.net ... It also leave harmful chemical remains on earth. As compared to normal plastic, biodegradable plastic takes a shorter period of time to decompose. Normal plastic has harmful impacts on the environment such as affecting natural habitats and marine wildlife. In the final report for the department for the Environment Australia, at least 77 species of marine fauna have been recorded as being impacted by plastic debris in Australian waters over the last three decades (2009). The constant rise in biodegradable plastics of global production capacities in figure 4 increases the chances of biodegradable plastic fully replacing plastic as an alternative
  • 26.
    Tyson And BaffourSummary Tyson and Baffour (2004) wanted to explore the types of arts based strengths identified by adolescents and whether there was any relationship to psychiatric diagnosis. Tyson and Baffour conducted a study involving 108 adolescents admitted to an inpatient psychiatric unit. Results indicated that 71% of the adolescent s interviews reported an art based activity or strength. These activities and strengths included making art, listening to music, or writing, as their most frequently used coping strategy. The study stated that 100% of the clients who listed artmaking as their first coping strategy and 74% of those who identified writing as their primary coping strategy suffered internalizing disorders, such as depression and anxiety. (Tyson Baffour,
  • 27.
    Taming Of TheShrew And 10 Things I Hate About You Analysis Have you ever had a relationship that has moved on because of change? Maybe he or she was too different from when things started? The play Taming of the Shrew by William Shakespeare and the movie 10 Things I Hate About You explore how the relationship between Katherine and Petruchio have evolved throughout cultural differences. Whether showing this through Petruchio, Katherine, and how their relationship overall maneuver they act differently or stay the same because of cultural influence. This dictates their views and behaviors in their relationship. Petruchio and Katherine certainly have many differences from 16th century Italy to early 2000s United States. Let s explore these differences now, starting with Petruchio. If you have seen 10 Things I Hate About You, you would definitely remember the rebellious and sexy Patrick. Whether that be his black combat boots, long hair and rugged appearance, or the fact that he ate a live duck, this certainly shows. On the other hand, if you have read the play Taming of the Shrew you would see Petruchio as a visitor to Padua. Petruchio states his intentions in the city plainly, ... Show more content on Helpwriting.net ... At the conclusion of Taming of the Shrew Katherine is a different person entirely and is tamed by Petruchio. When asked by Petruchio to give a speech to the less loving wives, she lectures, And place your hands below your husband s foot; In token of which duty, if he please, My hand is ready, may it do him ease. (Act 5 Sc. 2 193 195) This explains that Katherine is telling the other ladies to do whatever their husbands command and that you should do anything for him. This is quite a contrast to the beginning of both the play and movie where both Katherine s are rebels and are very independent. Together, though, Katherine and Petruchio s relationship also has
  • 28.
    Case Study ofSnow Band Snow Brand Milk Products Crisis or Opportunity? Time for Corporate Revitalization Hong Kong Baptist University 10 June 2010 Contents |1. |Executive Summary |1 | |2. |Problem Identification |2 | |3. |Analysis |2 | |4. |Alternatives |4 | |5. |Recommendation |5 | |6. |Implementation... Show more content on Helpwriting.net ... Japan further imposed an indefinite ban on US beef in 2003 after the confirmed appearance of Bovine Spongiform Encephalopathy (BSE) in North America. 3. A new corporate governance structure, under which outside directors play important roles in managerial decisions, was sanctioned by the revised commercial code in April 2003. в†ђ Economic factors 1. Due to the BSE outbreak in Japan in 2001 and the subsequent beef mislabeling issues, consumers became leery of beef products in general and beef consumption declined as a result. 2. Japanese consumers reported significant declines in their perception of domestic beef as safe and healthy. в†ђ Social factors 1. SBM has significantly lost public trust and consumer confidence. 2. Post war Japan had seen a rise in consumer activism and consumer groups prominence. 3. Consumers became more aware of and concerned about food safety issues. 4. Common practices of beef mislabeling had led to a renewed call for ethics and integrity in Japanese businesses as well as a call for business to attend to risk management. Internal Analysis: в†ђ Corporate culture and leadership: 1. Currently, SBM had a traditional Japanese management style of uncertainty avoidance and harmonization, thus losing focus on customers and quality. Staff worked with a presupposition that a firm existed for the sake of its managers and employees, which fostered
  • 29.
    Analysis Of AynRand s Anthem Ayn Rand, a Russian American novelist, philosopher, and playwright wrote the novella Anthem in 1937. During the time Rand was writing this novella, the ruthless dictator Joseph Stalin mercilessly ruled over Russia. Also during this time, the beginnings of World War II took place. These events more than likely inspired the plot for Anthem, a dystopian fiction. Rand s projection of the totalitarianism of Anthem s society is astounding, the book itself has feeling and meaning in correlation to today s world. Anthem depicts a collectivism dictatorship world of the future as in this world there is no I , these people are forced to follow a strict set of rules, and they are born in bulk, learning and knowing only what their higher powers want them to learn and know.... Show more content on Helpwriting.net ... The characters of the story refer to themselves as we or us forcing them into a bond of conventionality. In the novella, Rand expresses this fact by using we several times in the first chapter alone, stating sentences such as We are alone here under the earth...We are twenty one years old. We are six feet tall... We were born with a curse . In addition, Rand projects the collectivism of this society by allowing the reader to look into the minds of the main character Prometheus (formerly known as Equality 7 2521). Rand does this by writing this character in a way that portrays him as yearning to be an individual. This is proven throughout the novella as Prometheus struggles to find himself and his ego. Through this evidence, it is clear that Anthem shows a clear perspective on a collectivist dictatorship world of the future by expressing that in said world, there is no
  • 30.
    Essay on WilliamFaulkner s Absalom, Absalom! William Faulkner s Absalom, Absalom! William Faulkner s novel entitled Absalom, Absalom! is a book which systematically utilizes the concept of discovering the past in the present. Faulkner s use of the past in the present is pertinent in both the construction of the plot of Absalom, Absalom! as well as the extension of its interpreted meanings. Furthermore, Faulkner s writing of Absalom, Absalom! appears to have been motivated by the great ills and conflicts of the American South, which was most poignant during the American Civil War, while the title, as well as its implications, was simultaneously conceived in Faulkner s mind. The fact that the story of Absalom in the Old Testament and the plot of Absalom, Absalom! are so ... Show more content on Helpwriting.net ... The ability for Faulkner to obtain and convey the truth, or what one should do, does not, however, hinge upon his telling of the story. Instead, Faulkner presents, through his characters, similar inhibitions that existed in the story of Absalom in the Old Testament with the belief that the past in the present will reveal, being compelled separately and individually, truth for the benefit of the projected future. Within the context of Absalom, Absalom!, the revival of the past into the present is achieved by focusing on Thomas Sutpen s, or who is Colonel Sutpen s, deplorable story and how it is incorporated into the lives of those related to or associated with him. When Ms. Rosa Coldfield is relaying her interpretation of the past story of Colonel Sutpen to his friend s grandson, Quentin, Quentin battles to disassociate himself from the stigmas of the South, specifically the time period of the American Civil war, with which his grandfather, General Compson, was imbued: Then hearing would reconcile and he would seem to listen to two separate Quentins now the Quentin Compson preparing for Harvard in the South, the deep South dead since 1865 and peopled with garrulous outraged baffled ghosts, listening, having to listen, to one of the ghosts which had refused to lie still even longer than most had, telling him about old
  • 31.
    St. Tropez TanningTechniques Self tanners are an effective way to get a darker skin tone without harmful effects from the sun. Applying self tanning mist using the St. Tropez Tanning Technique takes several steps but will result in a deeper, darker and natural looking tan. Clothing should be removed before beginning, as well as glasses, deodorant, perfume, jewelery or make up. Only disposable underwear and St. Tropez Sticky Feet should be worn, to protect the feet. The hair should also be protected with a hairband. Moisturizer should then be applied to any dry areas including hands, elbows, knees and feet. Eyes should be closed and a deep breath taken as the mist is applied to the facial area. Beginning at the face, the mist should be applied by holding the spray gun level. Vertical strokes should be used, and the mist should be sprayed from the left to the right. Next the head should be turned to one side while the mist is applied down the face to the shoulder and across the side of the neck. The process should then be repeated on the opposite side of the neck. The gun should then be held sideways and sprayed across the front of the neck and under the chin, as the head is tilted up. Two to three additional strokes should then applied to the shoulders.... Show more content on Helpwriting.net ... Arms should then be held away from the body and the mist should be sprayed from the shoulder to the wrist, working from the outer to the inner arm. Care should be taken so that palms are not sprayed. Standing with legs hip width apart, arms held away from their body, the self tan is next applied to the legs. Beginning at the hip, the mist should be applied down to the ankle. The spray gun should be level and not pointed down, as this can result in the feet becoming too
  • 32.
    Key Elements OfA Contract Contacts are something we come across in our day to day lives, most of the time without even noticing it. Whether we are at a restaurant, buying a house or car, or even having a day at the spa. A contract is a written or expressed agreement between at least two parties to provide a service or product and can be legally enforced if drawn up correctly. It is most common for a contract to be written and signed by both parties, but there are other forms of contracts including expressed contract and implied in fact contracts. In an express contract, all elements are clearly stated either written or orally. Both parties must fully understand the terms and conditions that they are agreeing to. The not so transparent of contracts would be an... Show more content on Helpwriting.net ... This exchange of money would bind both parties to the agreement. Consideration is the next element of a contract. It is something of value that is exchanged between the parties involved in the contract in the form of money or promise to do something or perform. In order to qualify as consideration, it must be bargained for and legally sufficient. In this case, Stan (promisor) offers Jim and Laura (promisee) to hold the vehicle with a deposit of $100, Jim and Laura accepts, the $100 is the consideration (value) for the hold of the vehicle (performance). The consideration meets both qualifications because there is not a legal obligation already in place for the offer and it was bargained for by the exchange of promise and something of value. A contract must be for a legal purpose and not for any purpose that may break any laws. A court will not back up and support a contract that has any intention of breaking the law. Based on the information from the scenario, neither Jim, Laura nor Stan Salesman appear to have any illegal intent when entering the potential contract. Jim and Laura were legitimately looking to replace their current vehicle that had been giving them mechanical problems and to use it to travel from work and school. Being of legal age and of sound mind is the capacity of the contract. Capacity means a person s legal ability to enter into a contract. When looking at who can enter a contract a few
  • 33.
    Pediatric Dentistry Pediatric Clinicin Newark NJ is a service for pediatric dentistry. It is very important for children to see the pediatric dentist because this sets the foundation for their adult teeth. When visiting the Pediatric Clinic in Newark NJ, the dentist will clean teeth, examine teeth, diagnose conditions and make recommendations to patients. A child should visit the pediatric dentist six months after their first tooth has came in. During this time, the dentist is able to examine the development of your child s mouth and foresee any issues. Small children are susceptible to gum disease and tooth decay just like adults. This is why it is extremely important for you to take your child to the dentist. As soon as your baby s first tooth comes in,
  • 34.
    Essay The RelationshipBetween Producers and Audiences The relationship between producers and audiences Audience research, producer response to research and audience targeting A producer when beginning pre production or even before will most likely look at some form of survey s which would include things like possible cast members for the film and the amount of audience that would want to see possibly be interested in the genre. They will then take this to the writers and director of the particular film and they will make amendments to how the survey has come out. A producer will also look at the success of recent films of the same type; this is visible in recent times with the resurgence of vampire films following the success of twilight saga this has lead to TV series and films ... Show more content on Helpwriting.net ... A producer who knows that their film doesn t have a lot of money or publicity would use a film festival to get both of these things. Also these films will most likely be in art house cinemas but if one is particularly successful then this could move to multiplex cinemas the troll hunter is one of those films that has crossed the brigde from art house to multiplex and is now being shown in over 20 vue cinemas in the UK, the producer did this by getting the film publicity from channel 4 s sister channel E4 and making a competition for a private screening this made the film sort after which then lead to interest from multiplex cinemas. But for films that won t need that sort of publicity will have a big Hollywood premiere that would most likely have a segment on TV showing the premiere and would include interviews with the cast, director and any other notable person involved with the film. Celebrities from outside of the film will go also to show the films quality and also so that they themselves can get publicity, films like this will almost always be shown in multiplex cinemas this is the same for Cars 2 but will probably have this kind of showing but because it s a childs film the TV shows and so on will most probably be shown on kids TV most obviously the Disney
  • 35.
    H.G. Wells TheTime Machine Essay examples When the time traveler thought of the future he made assumptions that would suggest that the in the future, society would act in a progressive manner. He believed that society would be free of disease, that the human species would be very advanced compared to the humans in his time, and that the human beings in this society would not know fear because of their advances in technology. These assumptions are soon proven false early on when the time traveler thought he ...had built the time machine in vain (21). The Sphinx puts pressure on a progressive time by suggesting that society does not progress all the time but will eventually regress. When the time traveler notices that the Sphinx, was greatly weather worn, and that imparted... Show more content on Helpwriting.net ... Relying on technology becomes associated with this utopian society, and certain problems such as laziness can arise because of this. Laziness as a result of dependency on technology proves to be fatal. An example of this would be when one thinks about the Sphinx s riddle. At first, society finds the answer to the riddle through one specific way of thinking and arriving at that answer, but because of technology anything originally learned can then be referenced so that eliminates the need to remember it. Now if someone who comes from a society that is dependent on technology is asked this riddle, he will have no way of answering the question because he would first need to look at technology for the answer. Wells suggests that this shows that after arriving to a utopian state, a society dependent on technology can have a reduced ability to think. When the time traveler first entered this society in the future, the first thing he noticed was the Sphinx that had its wings ...spread so it seemed to hover (18). There are other instances in the story where an idea is seen as just floating or hovering into the time traveler s mind. While he is thinking about how the Eloi have become reacquainted with fear ... suddenly there came into my head the memory of meat I had seen in the Underworld. It seemed odd how it floated into my mind... (49). This suggests that the time traveler is
  • 36.
    Into The WildBy John Krakauer Into the Wild Analysis John Krakauer s depiction of the tragic life of Chris McCandless in the award winning novel Into the Wild creates different schools of thought that brew a perfect storm for debate. Krakauer s polarizing style is what makes it so special, because no two people will feel the same way as they experience the journey of McCandless. One of the highly discussed topics of the novel relates to the idea that Chris journey of self discovery in his quest for ultimate freedom is inherently selfish or nobel. McCandless quest is noble in many ways. The first of which is his desire to leave behind the modern materialistic world and isolate himself to find peace. He also has this deep seated desire to fill a void, a missing... Show more content on Helpwriting.net ... One hundred and twenty three dollars in legal tender was promptly reduced to ash and smoke (pg.29). The act of burning all of his cash in this manner speaks to McCandless mindset. He truly believes he doesn t need money to make him happy and that he can survive without relying on riches to get him by. Relieving himself of money takes place on a consistent bases in the novel because Chris doesn t want the attachment to hold him back, or make his journey to easy. Another example of the simplistic life Chris Alex Supertramp McCandless is attempting to live can be obtained from the first interaction in the book. When Jim Gallien picks up Alex on the side of the road and drives him to the start of the Alaskan Wilderness, it says Alex admitted that the only food in his pack was a ten pound bag of rice. His gear seemed exceedingly minimal for the harsh conditions of the interior, which in April still lay buried under the winter snowpack...Alex insisted on giving Gallien his watch, his comb, and what he said was all his money... (pg.5 7). Even with almost nothing on him, Alex/Chris still attempts to rid himself of materialistic items like his watch, and again, his money. He wants nothing to hold him back so he can achieve the true reward of his journey, spiritual enlightenment. A big influence on Chris in the book is his fascination with literary artists and philosophers. The main four that inspire
  • 37.
    High School Vs.College Life Mukesh Mehata Professor: L Pierce English 1301.41002 5th October 2017 High School Vs. College Life As we go on in life we face many challenges and new situations that we deal with. A new situation that most people deal with is on college and high school. School plays one of the most significant stages in our lives. Many people spend more than 16 years to get an education in their life. Those years are different levels, some of them are more entertaining than others. A student must pass through high schooland college life in their student life. Even though people think that high school and college level are same, there is an important difference between them. Although high school and college life are divided among academic point of view, ... Show more content on Helpwriting.net ... The hours of credit classes are fixed by the administration in high school, without any flexibility. Classes are distributed on annual basis. Students get many excuses from missing classes, late submission of homework in high school whereas they get to lose their grades in college life. In High School, teacher manages to take their students to different educational excursion program, visit new places, parks, etc., whereas these are not done in college life. Parents can check for the grades of their kids in high school, but in college life, it is considered as privacy. It is easy to make friends in high school but in college life, it depends on common interest. These are some of the experiences done by almost every individual in high school life. College, on the other hand, is a choice if one wants to attend or not. An individual who is attending college life usually pays for his own education. Since they pay for their own education, they work hard enough to get success in their career. College life has much freedom of time schedule. They are flexible to work and study as per their need. This level prepares every individual to develop understanding and maintain a good career in life. Therefore, an individual after finish college degree can easily get a job. As soon as a person entered in college a sense of maturity comes to him. They realize everything in college is materialistic and college level is very practical. College life prepares
  • 38.
    The Origin OfLife On Earth According to astronomical research and geological evidence, scientist indicate the universe is approximately thirteen thousand eight hundred and twenty billion years old. The first link to humanity started with a primate group called Ardipithecus. While our ancestors have been around for about six million years, the modern form of humans only evolved about two hundred thousand years ago. The age of the Earth is estimated about four point fifty four billion years because that is the age of the oldest rocks with fossil evidence of life on earth. The oldest rocks on Earth found to date are the Acasta Gneisses in northwestern Canada near the Great Slave Lake, which are four point three billion years old. The study of the origin of life on Earth, more specifically abiogenesis, is the natural process of life arising from non living matter. Life on Earth is believed to have began from organic compounds about three point eight to four billion years ago. Despite several competing theories for how life arose on Earth scientist only know when life first appeared on Earth and are still far from answering how it appeared. Since it is hard to prove or disprove them, no fully accepted theories of the origin of life exists. What is life? This is a difficult question to answer, largely because life itself is not a simple concept. About four thousand five hundred million years ago the Earth collided with a planetoid the size of Mars. At this time, fragments orbiting the Earth formed the
  • 39.
    Social Labor Values AlicePaul once said There will never be a new world until women are a part it. Alice Paul and Lucy Burns shaped the voting rights in America. Alice Paul and Lucy Burns were suffragist who changed women s role during the twentieth century by holding suffrage campaigns and forming organizations. Their campaign, reconciles with the values of the social workprofession today. The values Alice Paul and Lucy Burn reconcile with was social justice and dignity and worth of the individual. Alice Paul and Lucy Burn understood the importance of empowering individuals and the importance for women to vote. Women who votes have the chance to elect a president who have their best interest and focus on their needs. However, before women earned the right to vote, women just stayed home with their kids and did housework. Women were considered weaker than men; they were not able to work. For this reason, women were discriminated against jobs, education and their right to vote. Like many social workers, Alice Paul and Lucy Burns understood gender equality and fought against it. Moreover, Iron Jawed Angels film portrays Alice Paul and Luck Burn passion for equality. Alice Paul and Lucy were committed to serving their community. Due to their commitment, Burn and other protesters picketed at the White House. Burn and other protesters went to the White House in an effort to let their voices hear by President Woodrow Wilson, so he can support the 19th amendment. The suffragists urged Wilson
  • 40.
    Should Genetically ModifiedFlar-Svr Tomatoes Be Available... Investigation into Genetically Modified Flavr Savr Tomatoes, should they be available for human consumption. Technology has been advancing at an increasingly high rate; as a result scientists have used this development to create genetically modified foods. Biotechnologies used to genetically modify foods have contributed to the controversial statements, whether or not genetically modified foods should be available for human consumption. Genetic Modified plants and foods such as the Flavr Savr Tomato enhanced through the use of biotechnologies have sparked arguments in favour and against. Those in favour consider that they are advantageous for humans, those against believe that it is detrimental for human consumption and altering the ... Show more content on Helpwriting.net ... Conversely, The Flavr Savour tomato possesses supressed activity of the enzyme polygalacturonase. The suppression contributes to the fruits ability to stay harder for longer allowing it to stay on the vine. This suppression allows the tomato to develop its natural flavours and ripen as it stays on the vine for a longer time period. This flavour saving process lead to the products name The Flavr Savr . The Flavr Savr tomato is created through the use of antisense gene technologies to decrease the polygalacturonase activity. The kan(r) is a gene from the bacteria Escherichia coli, alongside with the gene from the Flavr Savr tomato they are inserted into a plasmid that resembles a round ring of DNA. These plasmids are further inserted into a group of normal tomato cells in a medium growth that contains the kanamycin antibiotic Engel 7. This process produces the APH (3 ) II substance that allows the cell to become resistant to the antibiotic. This process is used to identify the genetically transformed genes. The gene of the Flavr Savr initially coded for a strand of RNA, which was the reverse strand of RNA that occurs in a natural tomato plant. The original RNA strand contains the enzyme polygalacturonase degrading the cell wall, making the fruit soft. The RNA strand made from the Flavr Savr gene binds to the polygalacturonase RNA in a process to cancel each other out as demonstrated in figure 1. The antisense gene is a
  • 41.
    Mr. Douglas MurrowCase Paper Mr. Douglas Murrow Based on the information presented in the case of 39 year old Douglas Murrow, he has been charged with criminal infractions consisting of breaking and entering his parent s home in the middle of the night, as well as physically assaulting them. Murrow constantly theorizes about a conspiracy plot against him and has consistently displayed episodes of paranoid, delusional behavior. Murrow s erratic behavior is marked by the belief that his parents are conspiring with his doctor to force him to take psychopharmaceuticals. The delusional ideation is amplified by Murrow s insistence that his parents are entering into his apartment at night to torture him while he is asleep (Laureate Education, Inc., 2017). Rationalizing the Competency Evaluation... Show more content on Helpwriting.net ... Murrow s eccentric fantasies persistently clouds his grasp of reality; creating a substantial hindrance in the progress of the case and competency to decipher the difference between right and wrong. Murrow s irrational actions and delusional ideation places him in a position of danger to others, as well as himself, especially if the case results in a prison sentence. As such, the competency assessment should successfully yield a diagnosis for Paranoid Personality Disorder (PPD) since Murrow meets all seven of the diagnostic criteria. Utilizing the Interdisciplinary Fitness Interview (IFI), Murrow s delusions (e.g. tainted milk and juice and episodes of torture by the hands of his parents) are likely to surface well after the assessment is complete. The revised Fitness Interview Test (FIT R) should also prove Murrow unfit to stand trial (Slobogin, Hafemeister, Mossman, Reisner, 2014; Greene Heilbrun, 2014; Laureate Education, Inc.,
  • 42.
    Glucocorticoids Glucocorticoids are steroidhormones which are produced predominantly in the adrenal gland in response to stress (1, 2, 8). The physiological effects of glucocorticoids occurs when the hormone are bind to and mediated by the glucocorticoid receptor (2, 4), and it play wide ranges of vital physiological roles that are necessary for healthy implantation, and pregnancyprocesses (1). Glucocorticoids not only play an important role in the regulation of the cardiovascular, metabolic, immunological and other homoeostatic functions of the fetus (2, 5). It also inhibit the growth and development of tissues and organ systems, which in term increase the risk of developing various symptoms, and impaired brain function (2). This essay will explore how... Show more content on Helpwriting.net ... notably altering behaviour and cognition, as well as disease susceptibility in adulthood (6). Stress hormones like glucocorticoids and CRH could interact with their receptors in the foetal brain, which have an influence on neuronal differentiation and function at different stages of development (9). During pregnancy, maternal psychosocial stress threatens the CNS and shortens the length of gestation (8). Low birth weight can also alter brain development and is associated with behavioural and cognitive disorders in adulthood (1, 4, 5, 6, 7, 8, 9). The offspring of stressed mothers are more likely to have reduced head circumferences (7), show emotional problems (7, 9), impaired memory (4, 5, 7) as well as supress cognitive performances including schizophrenia (5, 6, 9), attention deficit (5, 6, 9), antisocial behaviour (2, 6, 7), increased vulnerability to post traumatic stress disorder (PTSD), learning difficulties (6, 9), anxiety disorders and depression (4, 6, 8, 9), impaired intelligence and thus lower school grades (7,
  • 43.
    Small and MediumSized Enterprises Chapter tow Literature review In most western economics Small and medium sized enterprise (SME) development is considered as a key to economic growth, innovations and market competition (Acs and Audretch, 1990). In transition countries, the contribution of SMEs is important for the sustaining ideology of the free market, generate income, innovation and creating jobs (Johnson and Loveman, 1995). So far, most of the transition countries still suffer from high unemployment rates even after being on the transition path for over a decade. Since national stabilization efforts and strong SME sectors could provide future employment opportunity and contribute to economic growth. In general, to consider variation between transition countries, in mature market economies, characteristics of private business are not necessarily different, yet they are unique because they tend to take on extreme proportions (Smallbone and Welter, 2001). In many cases, the transition process environment for doing business, the weak institutions and poor governance law and regulations made the growth of SMEs slow (Aidis, 2005). Corruption and environmental changes In transition countries are much larger scale than in advanced western countries. Most of studies in private businesses have identified the obstacles which they are affecting business operations like formal barriers which associated with the role of the government, such as high level of taxes (Bohata and Mladek, 1999; Hashi, 2001; Bartlett
  • 44.
    The Beginnings ofa National Literary Tradition Essay The Beginnings of a National Literary Tradition Canadians throughout their history have been concerned over the status of their national literature. One of the major problems facing early Canadian writers was that the language and poetic conventions that they had inherited from the Old World were inadequate for the new scenery and conditions in which they now found themselves. Writers such as Susanna Moodie, Samuel Hearne, and Oliver Goldsmith were what I would consider Immigrant authors. Even though they were writing in Canada about Canada their style and their audiences were primarily England and Europe. These authors wrote from an Old World perspective and therefore were not truly Canadian authors. It took a group of ... Show more content on Helpwriting.net ... Lampman signaled the move from the Immigrant authors like Moodie and her counterparts toward a true and distinct Canadian literary movement. It is important to note that in order to appreciate the quality of 19th Century Canadian literature, an effort of sympathy and a leap of imagination are both needed because it is here in the 19th Century that our nations true poetic history begins. In early Canadian poetry the most influential and universal poet is undoubtedly Archibald Lampman. While his career, like his life, were short lived his poetry remains as a reminder to the origins of Canadian literary thought. Lampman was one of our first major literary figures to try and identify a national literature. He realized the importance of having a specifically Canadian literary tradition. An important stepping point in Lampman s career came after he read the work Orion by Charles G.D. Roberts. Lampman describes his over powering emotion when as a youth he came across this published work(in the quote on the title page). The importance of having this distinct literary school was a driving inspiration in his art. Lampman is regarded as the most talented of The Confederation Poets ( W.J. Keith 18). It is amazing that this unspectacular man could have such a profound effect on the evolution of Canadian literary tradition. His upbringing was in a very conservative environment as Lampman
  • 45.
    American in the1980 s Essay The 1980 s is one of the most interesting decades that was experienced in the United States. Dealing with the stock market, the coming up of new inventions, all the way to the types of music people listened to. During the 1980s, the only thing that made Americans be Americans was because of the things they were provided with. Many Americans had fun throughout the 1980s with materialistic, glamorous, and technological life styles; therefore there were different economical problems that Americans faced. During the 1980 s, many Americans were incredibly materialistic; they were only concerned with the things in life, not with life as it was. In the musical world, Madonna was becoming popular. One of her greatest hits, Material Girl, ... Show more content on Helpwriting.net ... There were many styles that people were able to work with. First off, one of the most common styles was the retro style. Retro was, in a way, inspired by disco. Americans would often wear flares, which were types of jeans where the legs got bigger and flared out towards the bottom of the foot (CITATION, #). This proves that retro was just one of the major fashion statements in the 1980s. Another style that Americans tried out was the Glamour style. This fashion included top of the line designers like CoCo Chanel, Versace, and Oscar de la Renta. These designers made a significant impact on the glamorous lifestyle. Glamorous was over the top, but in a fashionable or unique way that people like to dress (CITATION, #). People would wear skirts with a huge puffball at the bottom of it, or switch it up to a nice tight fitting pencil skirt. The economy was a huge factor. Obviously people wanted the best of the best, but the economy was not doing that well (CITATION, #). There were some bad things about the agriculture. Since the United States is just coming out of a recession, they were working on rebuilding businesses in the city so they could expand their business and try to earn back some of the money they lost. This proves that at this point in the 80s, life was not so glamorous because people had to worry about earning back the assets that they lost along with businesses. The farm economy was
  • 46.
    4230 Hw 3 1.Corporatemalfeasance is defined as deceptive and/or fraudulent activities carried out by corporate officers. Usually the CEO is held responsible for corporate problems, but a firm s board is essential to preventing malfeasance and ensuring that management acts with integrity. I would describe some of Messier s actions as corporate malfeasance. For example, Messier repurchased a significant amount of VivendiUniversal s stock (i.e., 6.4 billion Euros from 2001 2002) to fund employee stock optiongrants. Because Messier was so focused on the firm s stock, his focus was not on the firm s financial stability nor did he make the best use of excess cash. Further, the accounting rules used were questionable, as Vivendi Universal used, and ... Show more content on Helpwriting.net ... Messier was dedicated to Americanizing the firm, taking away from its French heritage. When Messier decided to sell off Vivendi Environment, the parent company s most profitable business, to finance a deal with USA Networks he continued to transform the firm into a media first business neglecting the firm s water supply roots. Now the parent company was left with debt and many overvalued assets. Vivendi Universal would eventually have to write down significant amounts due to excessive goodwill estimates from acquisitions. Messier was stubborn. He declared that these loses were not reflective of the company s sound operations and tried to blame Lescure, the decision maker for Canal Plus, for the parent company s business failure, deeming Canal Plus as a tumor for Vivendi Universal. All in all, Messier was adamant in keeping to the story that his firm was in good financial position, and, because he had the support of board members (who he had initially appointed), others believed this story as well. His persistence in growing the business fogged his perception of reality he was managing a failing business. It is clear that Messier did a poor job as CEO. 3.Messier was a victim of bad timing, however, his failure as a CEO should not only be attributed to poor timing. Yes, the dot.com bubble burst during his tenure, which may have caused him to over value some acquired firms. Other issues
  • 47.
    The Atomic BombOf World War II The atom bomb was no Great Decision. It was merely another powerful weapon in the arsenal of righteousness said Harry S. Truman. The atomic bomb is considered a weapon of mass destruction because of the insurmountable damage and causalities such attack can cause. The United States resorted to the creation of such incredible weapon as a means to annihilate or alter the Axis powers. However, this all began due to the September 1, 1939, German attack to Poland and the Pearl Harbor bombings by Japan. These actions by the Axis powers would result in one of the deadliest global wars in human history. World War II involved the vast majority of the world s nations. An estimated 50 million to 85 million died in the events that occurred in World War II. The origin and development of the atomic bomb during World War II changed forever the direction of the war and posed the United States as a champion in military strategies; this endeavor also known as the Manhattan Projectserved as catalyst in WWII. During this time, the world s most intelligent scientists discovered that German physicists were learning to produce a bomb that could cause immense destruction. The fear of such a bomb led scientists Albert Einstein and Enrico Fermi to inform President Franklin D. Roosevelt of Germany s plans. Renowned scientist, Albert Einstein had fled Nazi persecution and was by then living in the United States; he delivered a letter to President Roosevelt on October 11, 1939. In the letter,
  • 48.
    Essay On WomenIn Antigone The play Antigone by Sophocles perfectly demonstrates the values of a society can alienate an individual for such thing as gender. Antigone, the protagonist, demonstrates her strong personality throughout the play as she believes that women have the right to express their opinions, rather than to listen to the society or to the man with more power. However, with Antigonebeing a woman, everyone treated her differently. Antigone s character proves that women are not born as a second class, and they have the right to express their beliefs. For example from the play, in the beginning, Antigone asked her sister, Ismene, to bury her brother together with Antigone. However, Ismene disagrees with her sister s opinion because Ismene is scared of Creon since she was portrayed to be the type of girl that will follow the men s lead in this play. Antigone said, To wreck itself; the worst that can befall/ Is but to die an honorable death (Sophocles 95 96) and I would not welcome such a fellowship./ Go thine own way; myself will bury him (Sophocles 69 70). From this, Antigone shows that she is not afraid of danger or death and she will do whatever she feels is right for her late brother. ... Show more content on Helpwriting.net ... With that being said, because Antigone was born as a woman in that time period, her actions were not approved by others. Everyone, including her sister Ismene, believes that Antigone needs to listen and follow Creon s order if she doesn t want to die. When Antigone asked her sister to bury their dead brother in secret, Ismene said, Weak women, think of that,/ Not framed by nature to content with men (Sophocles 60 61). In other words, Ismene believes that women are supposed to be weak and need protection, rather than to fight against
  • 49.
    Essay About HomelessPeople Thomas crossed the road, looking both ways before he dashed across the cracked pavement. Just because the crosswalk was blinking a little green man didn t mean the early morning New York commuters wouldn t run him down if he took too long. In his hand was a small brown package from the deli behind him that crinkled as he moved. After crossing the street he stopped for a moment to catch his breath. Despite being young, he was not in the best shape, and running was not something he did often. As he pushed his sandy blond hair out of his face, and straightened his tie, which has flipped over his shoulder. His brown eyes locked onto his motivation for crossing the street. With his lungs need for oxygen satiated, he took a few hesitant steps... Show more content on Helpwriting.net ... The man opened the bag, and pulled out a sandwich. It was rather basic; turkey, cheese, tomato and lettuce, slice in half and wrapped in brown paper. The type of food you buy when you don t know what the other person likes to eat. I don t think I can finish this all by myself, The man said as Thomas had started to walk away. Would you care to join me? Thomas paused, looking the man over. The man smiled, his straight white teeth peeking out from under his greying beard and mustache, I don t bite. Thomas checked his watch, 7:32 am. I suppose I have some time before I need to be at work, he said, plopping down on the cold hard sidewalk. The man handed him the half of the sandwich that was still wrapped, and took a bite of his own. Chewing slowly he shut his eyes, savoring the taste. It s been awhile since I ve had company for breakfast. The man chuckled at his own joke and turned to look at Thomas. I m Ed, he said holding out his hand. Thomas took his hand and shook it, surprised by the firmness of the handshake. Nice to meet you Ed. I m Thomas. He released Ed s hand hand began to unwrap his half of the sandwich. Thomas is a business name, Joked Ed, as he swallowed down his third big bite. Do your friends call ya Tom? All My friends are business friends, said Thomas. So, they all call me Thomas. He shrugged his shoulders. My Mom calls me Tommy. Ed chuckled, and looked at Thomas from the
  • 50.
    The Causes OfWork-Related Stress In The Workplace Work related stress is a very serious problem that will end up costing companies millions of dollars as a result of employee productivity declining. It always falls back on the management team to find solutions to their employee s stress within the means of the company. This problem needs to be addressed very rapidly because if not dealt with the end results will be negative effects for both the employee and employer. Employees that are stressed need to recognize the signs of stressbecause they will be susceptible to mental health problems such as depression, which can lead to a build up of chronic diseases if exposed to prolonged stress. This essay will discuss the causes of work related stress and suggest some solutions. In any organization one of the utmost crucial tasks is management. Management is the act of dealing with or the act of controlling people or processes. For an organization to run its activities it needs to have a very efficient management team. To manage a group can also be said it is the step of making the choice concerning people, systems, and objectives in an organization. It is not a science but an act which necessitates human attendance and determination. The primary functions of any management are planning, organizing, staffing, directing, coordinating, report and budgeting (Nahavandi, Denhardt Aristigueta 2015). When it comes to planning, management is involved in the planning of all their department activities which leads to the production
  • 51.
    Analyzing Blues Music TheBlues: Genre Analysis The blues is a musical genre that originated among African Americans in the Southern United States in the late 19th and early 20th centuries. From these humble and provincial origins it has come to be appreciated all over the country and the world, and has also spread its influence even more widely by way of its offspring, jazz and rock. While the word genre is certainly appropriate, the blues can be defined more specifically as a closely related set of melodies, harmonies, rhythmic patterns and bar structures. Unlike many musical genres, the blues is very tightly focused in fact it could be said without much fear of exaggeration that all blues songs are variations on one song. Nevertheless, as time went on the blues lost some of its stereotyped or formulaic aspect and loosened up its structure to encompass a variety of forms of expression. Basically, blues melodies are built around a major scale with fairly strong pentatonic character. However, the third tone of the scale tends to be sung (or to the extent possible, played) slightly flat (a blue third ), or to be bent from the minor third up to the major third. Less often, the seventh and fifth tones of the scale are given similar treatment. The harmony (provided by the guitar or piano in the original solo format of blues performance) relies mainly on the I, IV, and V chords, although some versions also make use of the VI and II. The typical progression moves from the I chord to the IV, back
  • 52.
    Coca Cola Struggleswith Ethics Case Study 4 The Coca Cola Company Struggles with Ethical Crises Case #11 January 5, 2014 1)The corporate role in any company builds the foundation of how a company succeeds and, also, how the public views them. Their organizational performance is based on how the company is run and what ethical structure they have in place. Their social responsibility runs parallel with their organizational performance. If a company is not successful within themselves they cannot be successful within society. The first thing a stakeholder will assess is the culture of the corporation. This involves identifying the mission, values and norms of the company. This information can typically be found in corporate documents or on company s... Show more content on Helpwriting.net ... Any chance of losing a consumer s trust should be avoided at all costs. Once trust is lost it is a long road back to regaining it. Coca Cola needs to learn from these past mistakes and not let them happen again. Claims of discrimination have also haunted them. In 1999 a large group of African American employees accused the company of discriminating in areas of pay, promotion and performance evaluation. Although they strongly denied the allegations, the lawsuit caused a lot of unrest within the company. Out of this Coca Cola created a diversity council which is something they should have had to begin with. It is always better for a company to be proactive rather than reactive. Coca Cola has also been plagued with a mixture of competition issues with claims of dirty marketing tactics as well as non compliance with laws with other countries. They have had to deal with accusation s of channel stuffing, a method used to get rid of surplus stock at the end of a quarter to cause the appearance of increased sales. I think that Coca cola has learned a lot from their ethical crisis but has a ways to go. To be proactive, they have made local education and community improvement program a top priority. They also offer grants to various colleges both local and abroad. Recycling has become a priority to them also. Chair Neville Isdell received the
  • 53.
    Role of CostAccounting and Ethical Consideration RUNNING HEADER: Role of Cost Accounting and Ethical Consideration Role of Cost Accounting and Ethical Consideration Introduction Cost accounting is used to help management understand how much it cost to run a business. Understanding the role of cost accounting is important when one is trying to put together a team of managers to help run the company. The CEO of a merchandising organization needs to hire a CFO to run the accounting system, but the CEO has little understanding of cost accounting. The CEO will hire a consultant to help her understand the role of cost accounting, the role of ethics in cost accounting, and compare and contrast the absorption and variable costing. Role of Cost Accounting Cost accounting is the area ... Show more content on Helpwriting.net ... Ethical analysis needs to be instutionalized as an integral part of phases in decision making process. Compare and Contrast Absorption and Variable Cost It is important for the CEO is the manufacturing organization to understand the different between absorption cost and variable cost. One different between the two are the way accounting treats fixed manufacturing overhead. Absorption cost is all the manufacturing overhead costs applied to the manufactured goods (Hilton, 2003). Variable cost is applied to work in process as product cost, and fixed overhead costs are expensed as period cost. Other different is the timing of when fixed overhead becomes an expense. Variable fixed cost is expense immediately, and absorption fixed cost is inventoried until the goods are sold. Fixed cost is expense in both accounting system. Both systems have advantages and it will be up to management to decide which works best for their organization. Below is a list of each system advantages: Advantages of Absorption costing Fixed MOH is treated as the same as other product costs, e.g. DM, DL Consistent with long run pricing decisions that must cover full cost External reporting and income tax law require AC Advantages of Variable