EARTHWORK FOR
ROADS AND CANALS
Prepared By:
B.Govinda Rajulu
➔
Sl.
No
Chainage
/ Station
Depth /
Height
Mean Depth
/ Height (d)
Width (B) Area of
central portion
(BXd)
Area of sides
(Sd²)
Total sectional
Area
A = (Bd+Sd²)
Length
(L)
Quantity
Q = A X L
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Sl.
No
Chainage
/ Station
Depth /
Height
(d)
Width
(B)
Area of
central
portion (BXd)
Total (A1)
sectional Area
(Bd1 + Sd1²)
Total (A2)
sectional
Area
(Bd2+ Sd2²)
Mean sectional
Area
A = (A1+A2)/2
Length
(L)
Quantity
Q = A X L
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Example – 1:
A canal is in cutting and has a width of 4.00 m at bottom of the depth of cutting is 2.00 m and side slopes are
1 ½ : 1, find the area of cross section?
Solution: Given Data: - Width of canal = 4.00m; Depth of the cutting = 2.00 m; Side slopes = 1 ½ : 1 ( S: 1 / n: 1)
Area of c/s of canal = (b+nd)d (or) Bd + Sd²
(4 + 1.5*2)2 (or) 4x2 + 1.5 x 2²
4+3*2 (or) 8 + 6
= 14.00 Sq.m (or) 14.00 Sq.m
Example – 2:
A) Mid sectional area method.
A) Mean sectional area method.
Solution:
Mid - Sectional Area Method:
Volume of earth work (V) = Area of Mid point X Length
Area of the Midpoint = (b+nd)xd
Where b= 10 m, n = 1.5, d = 1+2+3/3 = 2 m. Am = (10 + 1.5*2)x2 = 26 sq. m
Therefore Volume of earthwork (V) = 26 X 120m = 3120 cu m.
Chainage 0 50 100 150 200
R. L of Ground 97.00 96.50 96.00 97.50 98.00
Height of the
Bank / Cutting
3.00 3.50 4.00 2.50 2.00
Formation Level 100.00 100.00 100.00 100.00 100.00
R. L of Ground 97.00 96.50 96.00 97.50 98.00
Chainage 0 50 100 150 200
…………
₹
₹
Chainage 10 11 12 13 14 15 16 17 18 19 20
R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105.00 104.10 104.62 104.00 103.30
R.L of Formation 107 Down gradient 1 in 150 Down gradient 1 in 100
Depth of
cutting
- - - - - - - - - - -
Height of bank 2.00 1.20 1.16 0.50 0.78 1.60 0.60 1.20 0.38 0.70 1.10
R. L of
Formation
107 106.80 106.60 106.40 106.20 105.90 105.60 105.30 105 104.70 104.40
R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105 104.10 104.62 104 103.30
Distance in m 300 330 360 390 420 450 480 510 540 570 600
Chainage 10 11 12 13 14 15 16 17 18 19 20
Station/
Chainage
Length Height /
Depth
Mean
Height/
Depth
(d)
Central
Area (Bd)
Side
Area
(Sd²)
Total
Section
Area
(Bd +Sd²)
Length in
b/w
stations
(L)
Quantity (Bd+Sd²) X L
Banking Cutting
10 300 2.00 - - - - - - -
11 330 1.20 1.60 16.00 5.12 21.12 30 633.60 -
12 360 1.16 1.18 11.80 2.78 14.58 30 437.40 -
13 390 0.50 0.83 8.30 1.38 9.68 30 290.40 -
14 420 0.78 0.64 6.40 0.82 7.22 30 216.60 -
15 450 1.60 1.19 11.90 2.83 14.73 30 441.90 -
16 480 0.60 1.10 11.00 2.42 13.42 30 402.60 -
17 510 1.20 0.90 9.00 1.62 10.62 30 318.60 -
18 540 0.38 0.79 7.90 1.25 9.15 30 274.50 -
19 570 0.70 0.54 5.40 0.58 5.98 30 179.40 -
20 600 1.10 0.90 9.00 1.62 10.62 30 318.60 -
TOTAL QUANTITY 3513.60 Cu m
Station/Ch
ainage
Length Height/
Depth
Area of
central
portion (Bd)
Area of
sides (Sd²)
Total Sectional
Area
(Bd +Sd²)
Mean
sectional
Area
Length b/w
stations
Quantity (Bd + Sd²) X L
Banking Cutting
10 300 2.00 20.00 8.00 28.00 - - - -
11 330 1.20 12.00 2.88 14.88 21.44 30 643.20 -
12 360 1.16 11.60 2.69 14.29 14.59 30 437.70 -
13 390 0.50 5.00 0.50 5.50 9.90 30 297.00 -
14 420 0.78 7.80 1.22 9.02 7.26 30 217.80 -
15 450 1.60 16.00 5.12 21.12 15.07 30 451.95 -
16 480 0.60 6.00 0.72 6.72 13.92 30 417.60 -
17 510 1.20 12.00 2.88 14.88 10.80 30 324.00 -
18 540 0.38 3.80 0.29 4.09 9.49 30 284.4 -
19 570 0.70 7.00 0.98 7.98 6.03 30 180.90 -
20 600 1.10 11.00 2.42 13.42 10.70 30 321.00 -
TOTAL QUANTITY 3575.10 cu m
Station /
Chainage
Length/
Distance
Height / Depth Mean Height /
Depth (d)
Sloping
Breadth of side
slope d√s²+1
Length in
between stations/
chainage
Total Area of both side
slopes (2X L X d√s²+1)
10 300 2.00 - - - -
11 330 1.20 1.60 3.58 30 214.80
12 360 1.16 1.18 2.63 30 157.80
13 390 0.50 0.83 1.85 30 111.00
14 420 0.78 0.64 1.42 30 85.80
15 450 1.60 1.19 2.65 30 159.60
16 480 0.60 1.10 2.45 30 147.60
17 510 1.20 0.90 2.00 30 120.60
18 540 0.38 0.79 1.77 30 106.20
19 570 0.70 0.54 1.20 30 72.60
20 600 1.10 0.90 2.00 30 120.60
TOTAL QUANTITY 1294.80 sq m
Item no Particulars of item Quantity Unit Rate Per Amount in
₹.
1 Earth work in Banking 3513.06 Cu m 345 % cu m 12,120.00
2 Turfing/ pitching for Side slopes 1294.80 Sq m 270 % sq m 3495.96
TOTAL COST in Rs. 16,000.00
₹
Chainage / Station / Distance of the point R. L. of Ground Level
420 118.60
450 119.25
480 119.40
510 118.85
540 118.50
570 117.25
600 116.80
630 117.15
660 117.20
Chainage 420 450 480 510 540 570 600 630 660
R.L. of G.L 118.60 119.25 119.40 118.85 118.50 117.25 116.80 117.15 117.20
R.L. of F.L 118.60 118.45 118.30 118.15 118.00 117.85 117.70 117.55 117.40
Height of the bank 0 - - - - 0.60 0.90 0.40 0.20
Depth of the Cutting 0 0.80 1.1 0.7 0.50 - - - -
Chainage R.L of
Ground
Distance Height /
Depth
Mean
height /
depth
Central
Area (Bd)
Area of
sides
(Sd²)
Total Sectional
Area (Bd+Sd²)
Length b/w
stations
Quantity (Bd+Sd²) X L
Banking Cutting
420 118.60 420 0 - - - - - - -
450 119.25 450 - 0.80 -0.40 4.80 0.24 5.04 30 - 151.20
480 119.40 480 -1.10 -0.95 11.40 1.35 12.75 30 - 382.50
510 118.85 510 -0.70 -0.90 10.80 1.22 12.02 30 - 360.60
540 118.50 540 -0.50 -0.60 7.20 0.54 7.74 30 - 232.20
passes 118.50 0 0 -0.25 3.00 0.09 3.09 14 - 43.26
570 117.25 570 0.60 0.30 3.60 0.18 3.78 16 60.48 -
600 116.80 600 0.90 0.75 9.00 1.23 10.23 30 306.90 -
630 117.15 630 0.40 0.65 7.80 0.85 8.65 30 259.50 -
660 117.20 660 0.20 0.30 3.60 0.18 3.70 30 113.40 -
Total Quantity 740.28
Cu m
1169.76
Cu m
Station /
Chainage
Height / Depth Mean Height / Depth
(d)
Sloping Breadth of
side slope d√s²+1
Length in between
stations/ chainage
Total Area of both side slopes
(2X L X d√s²+1)
420 0.00
450 - 0.80
480 -1.1 Being Cutting - No Turfing is to be taken.
510 -0.70
540 -0.50
Passes 0.00
570 0.60 0.30 0.67 16 21.44
600 0.90 0.75 1.68 30 100.80
630 0.40 0.65 1.45 30 87.00
660 0.20 0.30 0.67 30 40.20
TOTAL QUANTITY 249.54 sq .m
Item no Description of item Quantity Unit Rate Per Amount in
₹.
1 Earth work in Cutting 1169.76 Cu m 13.00 Cu m 15,206.88
2 Earthwork in banking 740.28 Cu m 13.00 Cu m 9,623.64
3 Turfing/ pitching for Side slopes 294.54 Sq m 9.00 Sq m 2,650.86
Sundries 518.62
TOTAL COST in Rs. 28,000.00
Chainage / Distance / Station R.L. of Ground
0 78.10
20 77.74
40 77.80
60 78.20 & 80.40
80 80.75
100 80.20
120 79.98
Chainage 0 20 40 60 80 100 120
R.L. of Ground 78.10 77.74 77.80 78.20
&
80.40
80.75 80.20 79.98
Formation Level 78.50 78.70 78.90 79.10 79.30 79.50 79.70
Height of Bank 0.40 0.96 1.10 0.90 - - -
Depth of Cutting - - - 1.30 1.45 0.70 0.28
Chainage R.L of
Ground
Distance Height /
Depth
Mean
height /
depth
Central
Area (Bd)
Area of
sides
(Sd²)
Total Sectional
Area (Bd+Sd²)
Length b/w
stations
Quantity (Bd+Sd²) X L
Banking Cutting
0 78.10 0 0.40 - - - - - - -
20 77.74 20 0.96 0.68 8.16 0.92 9.08 20 181.60 -
40 77.80 40 1.10 1.03 12.36 2.12 14.48 20 289.60 -
60 78.20 60 0.90 1.00 12.00 2.00 14.00 20 280.00 -
60 80.40 60 -1.30 - - - - - - -
80 80.75 80 -1.45 -1.375 -16.50 1.89 18.39 20 - 367.80
100 80.20 100 -0.70 -1.075 -12.90 1.16 14.06 20 - 281.20
120 79.98 120 -0.28 -0.49 -5.88 0.24 6.12 20 - 122.40
Total Quantity 751.20
Cu m
771.40
Cu m
EQS -  EARTHWORK FOR ROADS AND CANALS.pdf

More Related Content

What's hot

Sulphur infiltrated concrete
Sulphur infiltrated concreteSulphur infiltrated concrete
Sulphur infiltrated concrete
suraj bhanushali
 
Design of beam
Design of beamDesign of beam
Design of beam
raunak khurana
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
Elamathy Murugan
 
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Muhammad Irfan
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
Sourabh Jain
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
Saleem Malik
 
How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?
Civil Insider
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
Ayaz khan
 
Permeability of Soil
Permeability of SoilPermeability of Soil
Permeability of Soil
Arbaz Kazi
 
DUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptDUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE ppt
Vikrant Sharma
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
ABHISHEK SHARMA
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
SANJEEV Wazir
 
Boussinesq'S theory
Boussinesq'S theoryBoussinesq'S theory
Boussinesq'S theory
SANJEEV Wazir
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
Raj Shah
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
civilengineeringfreedownload
 
Canal lining
Canal liningCanal lining
Canal lining
MANJUNATH BORAKANAVAR
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
Prasad Manerikar
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
Gaurang Kakadiya
 
Design of steel structures Introduction
Design of steel structures IntroductionDesign of steel structures Introduction
Design of steel structures Introduction
Prakash Kumar Sekar
 
Embankment
EmbankmentEmbankment
Embankment
civilguna
 

What's hot (20)

Sulphur infiltrated concrete
Sulphur infiltrated concreteSulphur infiltrated concrete
Sulphur infiltrated concrete
 
Design of beam
Design of beamDesign of beam
Design of beam
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
 
How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
 
Permeability of Soil
Permeability of SoilPermeability of Soil
Permeability of Soil
 
DUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptDUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE ppt
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
 
Boussinesq'S theory
Boussinesq'S theoryBoussinesq'S theory
Boussinesq'S theory
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
 
Canal lining
Canal liningCanal lining
Canal lining
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Design of steel structures Introduction
Design of steel structures IntroductionDesign of steel structures Introduction
Design of steel structures Introduction
 
Embankment
EmbankmentEmbankment
Embankment
 

Similar to EQS - EARTHWORK FOR ROADS AND CANALS.pdf

Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Erik Ong
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
Sow Wei Henn
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Penny3688
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
algifakhri bagus maulana
 
23262483 unit-cost-derivation
23262483 unit-cost-derivation23262483 unit-cost-derivation
23262483 unit-cost-derivation
imaduddin91
 
Tabel baja standard
Tabel baja standardTabel baja standard
Tabel baja standard
Rudi Putra Reog
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
ANANDA DS
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
Omar Faruque
 
Wide flange-shape-jisg3192
Wide flange-shape-jisg3192Wide flange-shape-jisg3192
Wide flange-shape-jisg3192
Junaida Wally
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good file
Ziad Salem
 
Lecture9 traverse
Lecture9 traverseLecture9 traverse
Lecture9 traverse
Ethan Nagekeo
 
محاسبات
محاسباتمحاسبات
محاسبات
alireza hashemi
 
Datos fins terrs
Datos fins terrsDatos fins terrs
Datos fins terrs
construye_sa
 
SLM project presentation
SLM project presentationSLM project presentation
SLM project presentation
Hesham Ibrahim
 
Hss dimensions steeltubeinstitute
Hss dimensions steeltubeinstituteHss dimensions steeltubeinstitute
Hss dimensions steeltubeinstitute
tecnidibujos
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
Prefeito Municipal de Trindade Jânio Darrot
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
ing_eliali4748
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
darmadi ir,mm
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
imaduddin91
 

Similar to EQS - EARTHWORK FOR ROADS AND CANALS.pdf (20)

Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
 
23262483 unit-cost-derivation
23262483 unit-cost-derivation23262483 unit-cost-derivation
23262483 unit-cost-derivation
 
Tabel baja standard
Tabel baja standardTabel baja standard
Tabel baja standard
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Wide flange-shape-jisg3192
Wide flange-shape-jisg3192Wide flange-shape-jisg3192
Wide flange-shape-jisg3192
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good file
 
Lecture9 traverse
Lecture9 traverseLecture9 traverse
Lecture9 traverse
 
محاسبات
محاسباتمحاسبات
محاسبات
 
Datos fins terrs
Datos fins terrsDatos fins terrs
Datos fins terrs
 
SLM project presentation
SLM project presentationSLM project presentation
SLM project presentation
 
Hss dimensions steeltubeinstitute
Hss dimensions steeltubeinstituteHss dimensions steeltubeinstitute
Hss dimensions steeltubeinstitute
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
LBA-1.pdf
 
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 

Recently uploaded

CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 

Recently uploaded (20)

CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 

EQS - EARTHWORK FOR ROADS AND CANALS.pdf

  • 1. EARTHWORK FOR ROADS AND CANALS Prepared By: B.Govinda Rajulu
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. Sl. No Chainage / Station Depth / Height Mean Depth / Height (d) Width (B) Area of central portion (BXd) Area of sides (Sd²) Total sectional Area A = (Bd+Sd²) Length (L) Quantity Q = A X L (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Sl. No Chainage / Station Depth / Height (d) Width (B) Area of central portion (BXd) Total (A1) sectional Area (Bd1 + Sd1²) Total (A2) sectional Area (Bd2+ Sd2²) Mean sectional Area A = (A1+A2)/2 Length (L) Quantity Q = A X L (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
  • 9. Example – 1: A canal is in cutting and has a width of 4.00 m at bottom of the depth of cutting is 2.00 m and side slopes are 1 ½ : 1, find the area of cross section? Solution: Given Data: - Width of canal = 4.00m; Depth of the cutting = 2.00 m; Side slopes = 1 ½ : 1 ( S: 1 / n: 1) Area of c/s of canal = (b+nd)d (or) Bd + Sd² (4 + 1.5*2)2 (or) 4x2 + 1.5 x 2² 4+3*2 (or) 8 + 6 = 14.00 Sq.m (or) 14.00 Sq.m
  • 10. Example – 2: A) Mid sectional area method. A) Mean sectional area method. Solution:
  • 11. Mid - Sectional Area Method: Volume of earth work (V) = Area of Mid point X Length Area of the Midpoint = (b+nd)xd Where b= 10 m, n = 1.5, d = 1+2+3/3 = 2 m. Am = (10 + 1.5*2)x2 = 26 sq. m Therefore Volume of earthwork (V) = 26 X 120m = 3120 cu m.
  • 12. Chainage 0 50 100 150 200 R. L of Ground 97.00 96.50 96.00 97.50 98.00
  • 13. Height of the Bank / Cutting 3.00 3.50 4.00 2.50 2.00 Formation Level 100.00 100.00 100.00 100.00 100.00 R. L of Ground 97.00 96.50 96.00 97.50 98.00 Chainage 0 50 100 150 200
  • 15.
  • 16.
  • 17. ₹ ₹ Chainage 10 11 12 13 14 15 16 17 18 19 20 R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105.00 104.10 104.62 104.00 103.30 R.L of Formation 107 Down gradient 1 in 150 Down gradient 1 in 100
  • 18. Depth of cutting - - - - - - - - - - - Height of bank 2.00 1.20 1.16 0.50 0.78 1.60 0.60 1.20 0.38 0.70 1.10 R. L of Formation 107 106.80 106.60 106.40 106.20 105.90 105.60 105.30 105 104.70 104.40 R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105 104.10 104.62 104 103.30 Distance in m 300 330 360 390 420 450 480 510 540 570 600 Chainage 10 11 12 13 14 15 16 17 18 19 20
  • 19. Station/ Chainage Length Height / Depth Mean Height/ Depth (d) Central Area (Bd) Side Area (Sd²) Total Section Area (Bd +Sd²) Length in b/w stations (L) Quantity (Bd+Sd²) X L Banking Cutting 10 300 2.00 - - - - - - - 11 330 1.20 1.60 16.00 5.12 21.12 30 633.60 - 12 360 1.16 1.18 11.80 2.78 14.58 30 437.40 - 13 390 0.50 0.83 8.30 1.38 9.68 30 290.40 - 14 420 0.78 0.64 6.40 0.82 7.22 30 216.60 - 15 450 1.60 1.19 11.90 2.83 14.73 30 441.90 - 16 480 0.60 1.10 11.00 2.42 13.42 30 402.60 - 17 510 1.20 0.90 9.00 1.62 10.62 30 318.60 - 18 540 0.38 0.79 7.90 1.25 9.15 30 274.50 - 19 570 0.70 0.54 5.40 0.58 5.98 30 179.40 - 20 600 1.10 0.90 9.00 1.62 10.62 30 318.60 - TOTAL QUANTITY 3513.60 Cu m
  • 20. Station/Ch ainage Length Height/ Depth Area of central portion (Bd) Area of sides (Sd²) Total Sectional Area (Bd +Sd²) Mean sectional Area Length b/w stations Quantity (Bd + Sd²) X L Banking Cutting 10 300 2.00 20.00 8.00 28.00 - - - - 11 330 1.20 12.00 2.88 14.88 21.44 30 643.20 - 12 360 1.16 11.60 2.69 14.29 14.59 30 437.70 - 13 390 0.50 5.00 0.50 5.50 9.90 30 297.00 - 14 420 0.78 7.80 1.22 9.02 7.26 30 217.80 - 15 450 1.60 16.00 5.12 21.12 15.07 30 451.95 - 16 480 0.60 6.00 0.72 6.72 13.92 30 417.60 - 17 510 1.20 12.00 2.88 14.88 10.80 30 324.00 - 18 540 0.38 3.80 0.29 4.09 9.49 30 284.4 - 19 570 0.70 7.00 0.98 7.98 6.03 30 180.90 - 20 600 1.10 11.00 2.42 13.42 10.70 30 321.00 - TOTAL QUANTITY 3575.10 cu m
  • 21. Station / Chainage Length/ Distance Height / Depth Mean Height / Depth (d) Sloping Breadth of side slope d√s²+1 Length in between stations/ chainage Total Area of both side slopes (2X L X d√s²+1) 10 300 2.00 - - - - 11 330 1.20 1.60 3.58 30 214.80 12 360 1.16 1.18 2.63 30 157.80 13 390 0.50 0.83 1.85 30 111.00 14 420 0.78 0.64 1.42 30 85.80 15 450 1.60 1.19 2.65 30 159.60 16 480 0.60 1.10 2.45 30 147.60 17 510 1.20 0.90 2.00 30 120.60 18 540 0.38 0.79 1.77 30 106.20 19 570 0.70 0.54 1.20 30 72.60 20 600 1.10 0.90 2.00 30 120.60 TOTAL QUANTITY 1294.80 sq m
  • 22. Item no Particulars of item Quantity Unit Rate Per Amount in ₹. 1 Earth work in Banking 3513.06 Cu m 345 % cu m 12,120.00 2 Turfing/ pitching for Side slopes 1294.80 Sq m 270 % sq m 3495.96 TOTAL COST in Rs. 16,000.00
  • 23. ₹ Chainage / Station / Distance of the point R. L. of Ground Level 420 118.60 450 119.25 480 119.40 510 118.85 540 118.50 570 117.25 600 116.80 630 117.15 660 117.20
  • 24. Chainage 420 450 480 510 540 570 600 630 660 R.L. of G.L 118.60 119.25 119.40 118.85 118.50 117.25 116.80 117.15 117.20 R.L. of F.L 118.60 118.45 118.30 118.15 118.00 117.85 117.70 117.55 117.40 Height of the bank 0 - - - - 0.60 0.90 0.40 0.20 Depth of the Cutting 0 0.80 1.1 0.7 0.50 - - - -
  • 25. Chainage R.L of Ground Distance Height / Depth Mean height / depth Central Area (Bd) Area of sides (Sd²) Total Sectional Area (Bd+Sd²) Length b/w stations Quantity (Bd+Sd²) X L Banking Cutting 420 118.60 420 0 - - - - - - - 450 119.25 450 - 0.80 -0.40 4.80 0.24 5.04 30 - 151.20 480 119.40 480 -1.10 -0.95 11.40 1.35 12.75 30 - 382.50 510 118.85 510 -0.70 -0.90 10.80 1.22 12.02 30 - 360.60 540 118.50 540 -0.50 -0.60 7.20 0.54 7.74 30 - 232.20 passes 118.50 0 0 -0.25 3.00 0.09 3.09 14 - 43.26 570 117.25 570 0.60 0.30 3.60 0.18 3.78 16 60.48 - 600 116.80 600 0.90 0.75 9.00 1.23 10.23 30 306.90 - 630 117.15 630 0.40 0.65 7.80 0.85 8.65 30 259.50 - 660 117.20 660 0.20 0.30 3.60 0.18 3.70 30 113.40 - Total Quantity 740.28 Cu m 1169.76 Cu m
  • 26. Station / Chainage Height / Depth Mean Height / Depth (d) Sloping Breadth of side slope d√s²+1 Length in between stations/ chainage Total Area of both side slopes (2X L X d√s²+1) 420 0.00 450 - 0.80 480 -1.1 Being Cutting - No Turfing is to be taken. 510 -0.70 540 -0.50 Passes 0.00 570 0.60 0.30 0.67 16 21.44 600 0.90 0.75 1.68 30 100.80 630 0.40 0.65 1.45 30 87.00 660 0.20 0.30 0.67 30 40.20 TOTAL QUANTITY 249.54 sq .m
  • 27. Item no Description of item Quantity Unit Rate Per Amount in ₹. 1 Earth work in Cutting 1169.76 Cu m 13.00 Cu m 15,206.88 2 Earthwork in banking 740.28 Cu m 13.00 Cu m 9,623.64 3 Turfing/ pitching for Side slopes 294.54 Sq m 9.00 Sq m 2,650.86 Sundries 518.62 TOTAL COST in Rs. 28,000.00
  • 28. Chainage / Distance / Station R.L. of Ground 0 78.10 20 77.74 40 77.80 60 78.20 & 80.40 80 80.75 100 80.20 120 79.98
  • 29. Chainage 0 20 40 60 80 100 120 R.L. of Ground 78.10 77.74 77.80 78.20 & 80.40 80.75 80.20 79.98 Formation Level 78.50 78.70 78.90 79.10 79.30 79.50 79.70 Height of Bank 0.40 0.96 1.10 0.90 - - - Depth of Cutting - - - 1.30 1.45 0.70 0.28
  • 30. Chainage R.L of Ground Distance Height / Depth Mean height / depth Central Area (Bd) Area of sides (Sd²) Total Sectional Area (Bd+Sd²) Length b/w stations Quantity (Bd+Sd²) X L Banking Cutting 0 78.10 0 0.40 - - - - - - - 20 77.74 20 0.96 0.68 8.16 0.92 9.08 20 181.60 - 40 77.80 40 1.10 1.03 12.36 2.12 14.48 20 289.60 - 60 78.20 60 0.90 1.00 12.00 2.00 14.00 20 280.00 - 60 80.40 60 -1.30 - - - - - - - 80 80.75 80 -1.45 -1.375 -16.50 1.89 18.39 20 - 367.80 100 80.20 100 -0.70 -1.075 -12.90 1.16 14.06 20 - 281.20 120 79.98 120 -0.28 -0.49 -5.88 0.24 6.12 20 - 122.40 Total Quantity 751.20 Cu m 771.40 Cu m