Energy
Management
System
 We are in the trade of INDUSTRIAL AUTOMATION
 We are SYSTEM INTEGRATORS
 We work for YOUR BETTER & EASY LIFE
 We work towards YOUR PROFITABILITY
 We work AGAINST POLLUTION
 Best Rate of Return On Investment
 Best Quality Material
 Least Payback Time of Investment
 Best Solution of The Market
WHAT YOU NEED WHAT WE GIVE ?
1. Save on Electric Bills
2. Save Manpower Cost
3. Save Time
4. Better Control
5. Lesser Trouble
6. All in one - central Solution
1. 20 – 25% savings on electric
billing
2. Manpower Cost Limited
3. Total Time savings
4. Accuracy on Control
5. Least Trouble
6. ALL-IN-ONE Control
WHEN YOU CONVERT
ENERGY FROM ONE
FORM TO ANOTHER
ENORMOUS HEAT IS
GENERATED .
THE HEAT DISSIPATION
IS CONTROLLED
TO SAVE ENERGY INPUT
TO 20 – 25 % .
EINSTEIN’S HYPOTHESIS
WE PROVIDE : WE COMPENSATE :
 Savings on Electricity Bills
 Accuracy of Work
 Fastest monitoring
 Data control & Processing
 Single point control system
 Losses in the system
 Inaccurate monitoring
 Loss of Data
 Slow Information Processing
 Multi-point manual handling
ENERGY LOSS POINTS ENERGY SAVE POINTS
1) Point of Inefficiency
2) Componential loss
3) Time of Manual Optimization
4) Loss of capacity of machines
due to Depreciation
1) Inefficiency Reduced by
Automated coverage
2) Automated Optimization
of Componential loss
3) Total time saved = Total
Time value compensated
4) Compensated Depreciated
Capacity by automation
WHAT IS OPTIMIZATION DIGITAL CONTROL
 The control points of savings
are :

1st Step > Monitored by
Machine Interface

2nd Step > Data feedback
enters system

3rd Step > Processed to
required information

4th Step > information Used in
Digital Control
 The point of control
works on :

1) Centralized to single
function control point
 2) Performance covered
by a special software

3) One-point manual
intervention
lowers manpower cost

4) Accuracy & immediacy
on control ensured
QUANTITATIVE SAVINGS QUALITATIVE SAVINGS
 Savings on Electricity
Bills
 Compensation on Total
Manpower Expense
 Compensation on loss of
manual action time
 Compensation by
accuracy in control
 Centralized Solution
 Trouble free atmosphere
 Pre-programmed control
 System Accuracy
 Benefit on Action Time
 Easier work atmosphere
 Integrate the system by company project team
 Provide you the best Turnkey solution
 Provide you best quality OEM-s
 Provide you with AMC options
 Basic information on mechanism points
 Details of Electrical circuits & consumption
 Current Metering & Billing system details
 Plans for future increase of the system
Project
Head
•Company Consultation
•Outsourcing decision
Architect
•Planning of Building Requirements
•Designing of Electrical Circuit
Electrical
Engineers
•Consultancy
•Implementation
THANK YOU

More Related Content

What's hot

PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)
Akshay Tilak
 
Feedback control: Handout1
Feedback control: Handout1Feedback control: Handout1
Feedback control: Handout1
Wat Chayaprasert
 

What's hot (20)

Control system
Control systemControl system
Control system
 
Pid controller
Pid controllerPid controller
Pid controller
 
PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)PlantConnect – plant asset monitoring system (pams)
PlantConnect – plant asset monitoring system (pams)
 
Business Service Management (BSM) For Telco,
Business Service Management (BSM) For Telco,Business Service Management (BSM) For Telco,
Business Service Management (BSM) For Telco,
 
A brief about building management system
A brief about building management systemA brief about building management system
A brief about building management system
 
Control system
Control systemControl system
Control system
 
Open loop and closed loop
Open loop and closed loopOpen loop and closed loop
Open loop and closed loop
 
Balancing BEMS - April 2, 2015 - Michigan Energy Forum
Balancing BEMS - April 2, 2015 - Michigan Energy ForumBalancing BEMS - April 2, 2015 - Michigan Energy Forum
Balancing BEMS - April 2, 2015 - Michigan Energy Forum
 
Multi-agent controlled building management system
Multi-agent controlled building management systemMulti-agent controlled building management system
Multi-agent controlled building management system
 
Basics of Controller
Basics of ControllerBasics of Controller
Basics of Controller
 
Comparative Analysis of Pso-Pid and Hu-Pid
Comparative Analysis of Pso-Pid and Hu-PidComparative Analysis of Pso-Pid and Hu-Pid
Comparative Analysis of Pso-Pid and Hu-Pid
 
Controllers ppt
Controllers pptControllers ppt
Controllers ppt
 
Class 43 direct digital and supervisory control
Class 43   direct digital and supervisory controlClass 43   direct digital and supervisory control
Class 43 direct digital and supervisory control
 
Feedback control: Handout1
Feedback control: Handout1Feedback control: Handout1
Feedback control: Handout1
 
Thesis1
Thesis1Thesis1
Thesis1
 
Contro lsystem
Contro lsystemContro lsystem
Contro lsystem
 
Process control introduction
Process control   introductionProcess control   introduction
Process control introduction
 
Demystifying energy management tools
Demystifying energy management toolsDemystifying energy management tools
Demystifying energy management tools
 
INTERNET OF THINGS (ONLINE ENERGY MANAGEMENT)
INTERNET OF THINGS (ONLINE ENERGY MANAGEMENT)INTERNET OF THINGS (ONLINE ENERGY MANAGEMENT)
INTERNET OF THINGS (ONLINE ENERGY MANAGEMENT)
 
Temperature and Relative Humidity Monitoring System
Temperature and Relative Humidity Monitoring SystemTemperature and Relative Humidity Monitoring System
Temperature and Relative Humidity Monitoring System
 

Viewers also liked (12)

CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Presentation of our meeting in Latvia
Presentation of our meeting in LatviaPresentation of our meeting in Latvia
Presentation of our meeting in Latvia
 
Sap sd tables by lakshmi mahisarla
Sap sd tables by lakshmi mahisarlaSap sd tables by lakshmi mahisarla
Sap sd tables by lakshmi mahisarla
 
Penelitian kuantitatif - Epidemiologi Gizi
Penelitian kuantitatif - Epidemiologi GiziPenelitian kuantitatif - Epidemiologi Gizi
Penelitian kuantitatif - Epidemiologi Gizi
 
Pradeep CV
Pradeep CVPradeep CV
Pradeep CV
 
World Trade Organisation
World Trade OrganisationWorld Trade Organisation
World Trade Organisation
 
Pangan Fungsional
Pangan FungsionalPangan Fungsional
Pangan Fungsional
 
Pengertian dan fungsi bahan makanan
Pengertian dan fungsi bahan makananPengertian dan fungsi bahan makanan
Pengertian dan fungsi bahan makanan
 
The Role of the Internet Post-9:11 in Terrorism and Counterterrorism
The Role of the Internet  Post-9:11 in Terrorism and  Counterterrorism The Role of the Internet  Post-9:11 in Terrorism and  Counterterrorism
The Role of the Internet Post-9:11 in Terrorism and Counterterrorism
 
Sam W Resume
Sam W ResumeSam W Resume
Sam W Resume
 
HACCP
HACCPHACCP
HACCP
 
World Trade Organisation
World Trade OrganisationWorld Trade Organisation
World Trade Organisation
 

Similar to EnMS approach

Intelligent facility management & energy efficiency systems
Intelligent facility management & energy efficiency systemsIntelligent facility management & energy efficiency systems
Intelligent facility management & energy efficiency systems
Firas Obeido
 
Building Systems - Mock Company Presentation
Building Systems - Mock Company PresentationBuilding Systems - Mock Company Presentation
Building Systems - Mock Company Presentation
Michael Clarke
 

Similar to EnMS approach (20)

Intelligent facility management & energy efficiency systems
Intelligent facility management & energy efficiency systemsIntelligent facility management & energy efficiency systems
Intelligent facility management & energy efficiency systems
 
Energy management system slide 2
Energy management system slide 2Energy management system slide 2
Energy management system slide 2
 
Ia Ems
Ia EmsIa Ems
Ia Ems
 
SmartSense Suite
SmartSense SuiteSmartSense Suite
SmartSense Suite
 
Building Systems - Mock Company Presentation
Building Systems - Mock Company PresentationBuilding Systems - Mock Company Presentation
Building Systems - Mock Company Presentation
 
processing control CFD computational fluid dynamic.pptx
processing control CFD computational fluid dynamic.pptxprocessing control CFD computational fluid dynamic.pptx
processing control CFD computational fluid dynamic.pptx
 
Optimising Buildings through BeMS Analytics
Optimising Buildings through BeMS AnalyticsOptimising Buildings through BeMS Analytics
Optimising Buildings through BeMS Analytics
 
UNIT-I SYLABUS-2.ppt
UNIT-I SYLABUS-2.pptUNIT-I SYLABUS-2.ppt
UNIT-I SYLABUS-2.ppt
 
Energy management-system-ppt
Energy management-system-pptEnergy management-system-ppt
Energy management-system-ppt
 
1.ppt
1.ppt1.ppt
1.ppt
 
Energy Automation vs Energy Monitoring
Energy Automation vs Energy MonitoringEnergy Automation vs Energy Monitoring
Energy Automation vs Energy Monitoring
 
What Do Energy Management Systems Really Cost?
What Do Energy Management Systems Really Cost?What Do Energy Management Systems Really Cost?
What Do Energy Management Systems Really Cost?
 
Save Time, Money and Hair with ManageCO2
Save Time, Money and Hair with ManageCO2Save Time, Money and Hair with ManageCO2
Save Time, Money and Hair with ManageCO2
 
Pharmaceutical automation
Pharmaceutical automationPharmaceutical automation
Pharmaceutical automation
 
Industrial Control System.pptx
Industrial Control System.pptxIndustrial Control System.pptx
Industrial Control System.pptx
 
Industrial Control System.pptx
Industrial Control System.pptxIndustrial Control System.pptx
Industrial Control System.pptx
 
Ems
EmsEms
Ems
 
Ems
EmsEms
Ems
 
Eaton Enterprise Data Centers Sep 2010
Eaton Enterprise Data Centers Sep 2010Eaton Enterprise Data Centers Sep 2010
Eaton Enterprise Data Centers Sep 2010
 
process control system
process control systemprocess control system
process control system
 

Recently uploaded

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 

Recently uploaded (20)

Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 

EnMS approach

  • 2.  We are in the trade of INDUSTRIAL AUTOMATION  We are SYSTEM INTEGRATORS  We work for YOUR BETTER & EASY LIFE  We work towards YOUR PROFITABILITY  We work AGAINST POLLUTION
  • 3.  Best Rate of Return On Investment  Best Quality Material  Least Payback Time of Investment  Best Solution of The Market
  • 4. WHAT YOU NEED WHAT WE GIVE ? 1. Save on Electric Bills 2. Save Manpower Cost 3. Save Time 4. Better Control 5. Lesser Trouble 6. All in one - central Solution 1. 20 – 25% savings on electric billing 2. Manpower Cost Limited 3. Total Time savings 4. Accuracy on Control 5. Least Trouble 6. ALL-IN-ONE Control
  • 5. WHEN YOU CONVERT ENERGY FROM ONE FORM TO ANOTHER ENORMOUS HEAT IS GENERATED . THE HEAT DISSIPATION IS CONTROLLED TO SAVE ENERGY INPUT TO 20 – 25 % . EINSTEIN’S HYPOTHESIS
  • 6.
  • 7. WE PROVIDE : WE COMPENSATE :  Savings on Electricity Bills  Accuracy of Work  Fastest monitoring  Data control & Processing  Single point control system  Losses in the system  Inaccurate monitoring  Loss of Data  Slow Information Processing  Multi-point manual handling
  • 8. ENERGY LOSS POINTS ENERGY SAVE POINTS 1) Point of Inefficiency 2) Componential loss 3) Time of Manual Optimization 4) Loss of capacity of machines due to Depreciation 1) Inefficiency Reduced by Automated coverage 2) Automated Optimization of Componential loss 3) Total time saved = Total Time value compensated 4) Compensated Depreciated Capacity by automation
  • 9. WHAT IS OPTIMIZATION DIGITAL CONTROL  The control points of savings are :  1st Step > Monitored by Machine Interface  2nd Step > Data feedback enters system  3rd Step > Processed to required information  4th Step > information Used in Digital Control  The point of control works on :  1) Centralized to single function control point  2) Performance covered by a special software  3) One-point manual intervention lowers manpower cost  4) Accuracy & immediacy on control ensured
  • 10. QUANTITATIVE SAVINGS QUALITATIVE SAVINGS  Savings on Electricity Bills  Compensation on Total Manpower Expense  Compensation on loss of manual action time  Compensation by accuracy in control  Centralized Solution  Trouble free atmosphere  Pre-programmed control  System Accuracy  Benefit on Action Time  Easier work atmosphere
  • 11.  Integrate the system by company project team  Provide you the best Turnkey solution  Provide you best quality OEM-s  Provide you with AMC options
  • 12.  Basic information on mechanism points  Details of Electrical circuits & consumption  Current Metering & Billing system details  Plans for future increase of the system
  • 13. Project Head •Company Consultation •Outsourcing decision Architect •Planning of Building Requirements •Designing of Electrical Circuit Electrical Engineers •Consultancy •Implementation