PlantConnect – plant asset monitoring system (pams)
1. An ISO 9001:2008 company
Plant Asset Management
Give VOICE to your Machine
2. Plant Asset Management
Ascent Informatics (India) Pvt. Ltd.
Plant Asset Management refers to any system through
which an organization optimally and sustainably manages
its assets and asset systems, their associated
performance, risks and expenditures over their life cycles
for the purpose of achieving its organizational strategic
plan
-British standard Institution, BSI PAS 55:2008
3. Plant Asset Management
Important aspects that need to be managed to ensure optimum asset
performance are as below
Plant Asset
Management
Maintenance
management
Energy
Monitoring
Performance
monitoring
Ensure assets
performance as per
expectation
Ensure availability
and uptime of assets
Measure and optimize
energy consumption
4. Start with measurement
• Quantifying asset performance gives a
clear view of its performance.
• Key performance indices (KPI) can
provide a clear view on asset
performance and help to identify areas
for improvement
• Quantify performance
• Compare it with historic trends or industry benchmarks
• Identify areas with scope for improvement
Objectives of KPIs
You cannot
manage what you
cannot measure..
Bill Hewlett
(Co-founder of Hewlett Packard)
5. KPIs
• Production outputs
• Production rate
• OEE / OFE – Overall equipment/factory efficiency
Plant performance KPIs
• Maintenance costs (Total, preventive, breakdown etc)
• Asset availability (Uptime / Uptime + Downtime)
• Mean time between failures = (total running hours / no of failures)
• Mean time to Restoration = (time to restoration / no of failures)
Maintenance KPIs
• Overall energy consumption
• Energy product footprint = energy consumption / units produced
• Energy intensity = energy consumption / output value
Energy KPIs
BS EN 15341
6. Machine Maintenance
• 80% of unscheduled downtime is preventable
• World is moving from scheduled maintenance to predictive and condition
based maintenance
What is happening
• Machine live data through online monitoring or automation systems will be
key input for decisions
Importance of machine data
8. Plant Asset Management Solution
Continuous monitoring of machines with a proactive approach
Asset Meta data &
information
Capturing machine
operations data
online via DAS
Data Historian in
PlantConnect
server
Online status &
condition
monitoring
Asset Health
Analyser
O & M Advisor and
communicator
KPI reports to
defined key
personnel
Push data into
enterprise system
like ERP
9. • Equipment installed in various
shops in a plant
Plant Asset Management Solution (PAM)
• PlantConnect DAS/s installed in
each shop. It collects data from
equipment in real time
• The data from each shop is sent
to PlantConnect server through
LAN / internet. Two options for
data collection and upload –
- Continuous
- Need based
• PlantConnect server processes
the data…tops it up with
intelligence…and presents it to
different types of users from
maintenance, operations
department and management
• Each user sees what is relevant
to him/her
10. PlantConnect PAM Modules
Data Visualization
Alarm Management
Historian
Asset Maintenance
Data Analysis and Reporting
Integration
Configuration
11. What PlantConnect provides…
• Monitor KPIs for set parameters.
• Generate reports on KPIs for various stake holders from shop floor to top floor
• Continuous monitoring of asset conditions to take better informed maintenance
decision
Asset monitoring
• Entire maintenance management can be done through central monitoring room.
Qualified maintenance engineers required per machine will reduce
• Maintenance alerts and alarms will be received even through SMS / email
making the system omni present.
• Historical data will be captured for trending and analysis
Central monitoring
Ascent Informatics (India) Pvt. Ltd.
12. Reducing costs & enhancing benefits PAM
• Move towards lean manufacturing with
minimal losses
• Reduce production losses and
enhance quality
• Reduce production costs per unit
• On time preventive maintenance
resulting in savings related to
“break down” oriented
maintenance
• Reduction in downtime reduces
production time losses and
enhanced productivity
• Identify energy wastages. Plug
the same to reduce overall
energy consumption
• Energy costs per unit can be
monitored and benchmarked
• Informed inputs for pricing
decisions
14. Thank You!
Dr. Arvind Tilak, CEO
arvind.tilak@aiplindia.com
Mr. Anand Taparia, Manager – Business Dev.
anand.taparia@aiplindia.com
Or call us at +91 20 6500 4608
Ascent Informatics (India) Pvt. Ltd.
‘Dnyanamayi’, 1, Shreeniketan Society,
Kothrud, Pune 411038, India
www.plantconnect.net
www.ascentautomation.com