DIG Engineering
Operations Review
Open Projects
&
Planned Project
QT-107 Rev-A
Current Projects
 LEIT-1 Transition production to Mexico successful
 Product modifications included:
 New PVM specified
 Software revisions to include addition of charge pump & major bug fix
 New LCD specified
 First 300 unit production run built and tested with Zero
defects
 Second 400 units delivered on 4-30-14, in test today.
Current Controller Projects
 RBC Controller In production
 Production Capacity increased from 200 unit/day to
400/units
 Ongoing production improvement to increase capacity to
650 units / day
 Tooling and Fixture enhancement
 Value Stream Mapping and Lean Mfg Process improvement
 Labor Capacity
 Floor Layout to support single piece flow
Current Projects
 LOHE - Working with our Partners AGI, we are
undergoing testing of the first 28 unit in the
engineering pilot run
 Electronics, PVM and Super Capacitor charging system initial
testing with no issues.
 Changes to the Lid, Bottom enclosure, Key Pad and Flow tube are
in process and expected to be completed by May xx.
 Pressure and Flow testing in progress to establish flow rates related
to head pressure.
 Manufacturing Assembly and test instruction under development
through AGI
 Test fixture PCB development with JM expected 5-10-14
Current Projects
 RBC-1 98 Unit Pilot run delivered from AGI
 Initial testing on 4 units verified basic functionality
 Software update to include improved navigation menu
 Complete build up and test of pilot run scheduled for 5-8-1
 Remaining issues
 Software testing and release
 Plastics approval
 Assembly instructions development
Current Projects
 RBC-6 Initial Prototype is functional
 Software development in process
 Test Plan under development
Current Projects
 LEIT 5 Software port from LEIT-2 to LEIT-5 in
progress
 Project plan and schedule in development
 Requirements under review
Current Projects
 Diaphragm improvements in process
 to eliminate flash causing leakage in the
 Anti-Syphon
 Actuator Valve
 The other one
Solenoid Improvement
Projects S305
 S305 Improvements:
 Characterize key performance measures to understand
interrelation of key variables to the design
 Redesign the solenoid housing to support control of key
measurements affecting performance
 Redesign the solenoid magnetic housing to control Flux Line
density and distribution.
 Design new solenoid body and magnetics for manufacturing
assembly ease to gain consistency in quality

Solenoid Improvement
Projects LEMA 1600
 1600 Improvements:
 Characterize key performance measures to understand
interrelation of key variables to the design for long distance
operation up to 7000 ft.
 Redesign the solenoid housing to support control of key
measurements affecting performance
 Design new solenoid body and magnetics for manufacturing
assembly ease to gain consistency in quality
 Redesign the capacitor charge pump circuit to improve
delay times for On/Off operation, simplify the design and
reduce cost
Project Planning In Progress
 Budget review and analysis of existing projects to
understand cost and performance issuers leading to
late projects.
 Develop Budgets and Schedules for the completing of
existing projects
 Develop Work Breakdown Schedules
 Define development tasks
 Define manpower & resources required
 Execute and track projects using EVM
Upcoming Planned Projects
 ISO9000 Process framework planning
 ISO Implementation Team Training
 Issue Tracking System Implementation & Training
 ESD Program Implantation in manufacturing
 Product qualification and test program formalization
 MRP- System Upgrades and Integration with Sales,
Purchasing and Manufacturing
 Quality Metrics (Monthly Review) Format
 Quality Manual Development (ISO compliant)

More Related Content

What's hot

alaa soliman cv
alaa soliman cvalaa soliman cv
alaa soliman cv
Alaa Eldien Ahmed
 
Resume Acc
Resume AccResume Acc
Resume Acc
mohammed yousuf
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Leon Chacon
 
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
GreenData.IO
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
Erin L Kelley
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
Hassan Khawaja
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
Dylan Gonsalves
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
Rashesh Shah
 
Case Study: Design of Pulp Slurry Lines
Case Study: Design of Pulp Slurry LinesCase Study: Design of Pulp Slurry Lines
Case Study: Design of Pulp Slurry Lines
Flex Process
 
Procurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineeringProcurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineering
Prizztech
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
Robert Cahill
 
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
Paul Warrington
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
Dr. Mohamed A. El-Reedy
 
InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _
Jeremiah Diaz
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
Larry Smock
 
Segment 4 Fort Macon
Segment 4 Fort MaconSegment 4 Fort Macon
Segment 4 Fort Macon
StuartECU
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
David Karbach
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
Anil Pachpande
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
arnel moncada
 

What's hot (20)

alaa soliman cv
alaa soliman cvalaa soliman cv
alaa soliman cv
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
 
Case Study: Design of Pulp Slurry Lines
Case Study: Design of Pulp Slurry LinesCase Study: Design of Pulp Slurry Lines
Case Study: Design of Pulp Slurry Lines
 
Procurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineeringProcurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineering
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
 
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
 
InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _InstallerTraining11_14_2014Final _
InstallerTraining11_14_2014Final _
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
Segment 4 Fort Macon
Segment 4 Fort MaconSegment 4 Fort Macon
Segment 4 Fort Macon
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
 

Similar to Eng_1st Qtr 2014 Ops Meeting

Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
Sher Chuhan
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
Rommel Siasat
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves Energy
Jim Cahill
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
Elugbe Ambrose
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
Yizhe Liu
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
Bhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
Bhupat Kanani
 
GRA16-8
GRA16-8GRA16-8
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
Sathish Balasubramani
 
SUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CVSUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
Michael Leeper
 
Resume - Naveen Kumar
Resume - Naveen KumarResume - Naveen Kumar
Resume - Naveen Kumar
Naveen kumar saravana
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
Bright Singh Chellathurai
 
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET Journal
 
James Bullen CV
James Bullen CVJames Bullen CV
James Bullen CV
James Bullen
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Atul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS Consultant
Atul Kumar
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
satya prasad
 
160kV 35um spot
160kV 35um spot160kV 35um spot
160kV 35um spot
Eric Miller
 
Item no
Item noItem no
Item no
rehant
 

Similar to Eng_1st Qtr 2014 Ops Meeting (20)

Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves Energy
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
SUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CVSUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CV
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Resume - Naveen Kumar
Resume - Naveen KumarResume - Naveen Kumar
Resume - Naveen Kumar
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
 
James Bullen CV
James Bullen CVJames Bullen CV
James Bullen CV
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Atul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS Consultant
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
160kV 35um spot
160kV 35um spot160kV 35um spot
160kV 35um spot
 
Item no
Item noItem no
Item no
 

Eng_1st Qtr 2014 Ops Meeting

  • 1. Kurt Holobaugh 2014.4.26 v1 DIG Engineering Operations Review Open Projects & Planned Project QT-107 Rev-A
  • 2. Current Projects  LEIT-1 Transition production to Mexico successful  Product modifications included:  New PVM specified  Software revisions to include addition of charge pump & major bug fix  New LCD specified  First 300 unit production run built and tested with Zero defects  Second 400 units delivered on 4-30-14, in test today.
  • 3. Current Controller Projects  RBC Controller In production  Production Capacity increased from 200 unit/day to 400/units  Ongoing production improvement to increase capacity to 650 units / day  Tooling and Fixture enhancement  Value Stream Mapping and Lean Mfg Process improvement  Labor Capacity  Floor Layout to support single piece flow
  • 4. Current Projects  LOHE - Working with our Partners AGI, we are undergoing testing of the first 28 unit in the engineering pilot run  Electronics, PVM and Super Capacitor charging system initial testing with no issues.  Changes to the Lid, Bottom enclosure, Key Pad and Flow tube are in process and expected to be completed by May xx.  Pressure and Flow testing in progress to establish flow rates related to head pressure.  Manufacturing Assembly and test instruction under development through AGI  Test fixture PCB development with JM expected 5-10-14
  • 5. Current Projects  RBC-1 98 Unit Pilot run delivered from AGI  Initial testing on 4 units verified basic functionality  Software update to include improved navigation menu  Complete build up and test of pilot run scheduled for 5-8-1  Remaining issues  Software testing and release  Plastics approval  Assembly instructions development
  • 6. Current Projects  RBC-6 Initial Prototype is functional  Software development in process  Test Plan under development
  • 7. Current Projects  LEIT 5 Software port from LEIT-2 to LEIT-5 in progress  Project plan and schedule in development  Requirements under review
  • 8. Current Projects  Diaphragm improvements in process  to eliminate flash causing leakage in the  Anti-Syphon  Actuator Valve  The other one
  • 9. Solenoid Improvement Projects S305  S305 Improvements:  Characterize key performance measures to understand interrelation of key variables to the design  Redesign the solenoid housing to support control of key measurements affecting performance  Redesign the solenoid magnetic housing to control Flux Line density and distribution.  Design new solenoid body and magnetics for manufacturing assembly ease to gain consistency in quality 
  • 10. Solenoid Improvement Projects LEMA 1600  1600 Improvements:  Characterize key performance measures to understand interrelation of key variables to the design for long distance operation up to 7000 ft.  Redesign the solenoid housing to support control of key measurements affecting performance  Design new solenoid body and magnetics for manufacturing assembly ease to gain consistency in quality  Redesign the capacitor charge pump circuit to improve delay times for On/Off operation, simplify the design and reduce cost
  • 11. Project Planning In Progress  Budget review and analysis of existing projects to understand cost and performance issuers leading to late projects.  Develop Budgets and Schedules for the completing of existing projects  Develop Work Breakdown Schedules  Define development tasks  Define manpower & resources required  Execute and track projects using EVM
  • 12. Upcoming Planned Projects  ISO9000 Process framework planning  ISO Implementation Team Training  Issue Tracking System Implementation & Training  ESD Program Implantation in manufacturing  Product qualification and test program formalization  MRP- System Upgrades and Integration with Sales, Purchasing and Manufacturing  Quality Metrics (Monthly Review) Format  Quality Manual Development (ISO compliant)