The document describes a consultancy project focused on the design of pulp slurry lines for a multinational paper manufacturer facing a tight deadline. By proposing a shorter, less complex pipe routing, the design reduced capital costs while ensuring thorough engineering calculations on structural loads and stress. The completed project was delivered within budget and timescale, with minimal client supervision required.