SlideShare a Scribd company logo
1 of 1
Download to read offline
DUTIES AND RESPONSIBILITIES: 
 
• Assisting the project manager and coordinating the project management team for development of 
a project management plan. 
• Assisting the project manager to implement and control the project management plan. 
• Assisting the project manager on stakeholder and interface management of the project. 
• Assisting the project manager on management of project delivery system and contractual issues. 
• Coordination, control and follow‐up of discipline lead Engineers activities and follow up of 
documents circulation in review and verification steps. 
• Deliver engineering documents according to schedule requirements with input and participation of 
Project Planner(s). 
• Manage technical interfaces with Client, joint ventures, and licensors and manage technical 
coordination of interfaces and discrepancies with lead engineers. 
• Coordinate engineering activities with Procurement, Subcontracts, Construction and 
Commissioning. 
• Provide engineering and document support to Construction and Commissioning on technical 
matters. 
• Assistance in determination of project risks and conducting risk analysis leading to development of 
risk response plan for the project. 
• Assistance in integrated project change management to assure the integrity of project plan. 
• Transmitting to all disciplines the necessary documents for the performance of their work as well 
as all relevant instructions related to the scope of contract throughout the Project execution phase. 
• Arrangement of regular meetings with project lead engineers, procurement assigned staff and 
project team 
• Determine the project document coding and circulation procedure and inform all the engineering 
disciplines and vendors. 
• Prepare the project document format and circulation procedure and inform all the engineering 
disciplines and vendors. 
• Coordination with project planning staff to determine documents status and inform all the 
engineering disciplines and vendors. 
• Controlling document control center of project (DCC) to prevent any problem in document 
circulation. 
• Take part in vendor bid analysis and in preparation of bid tabulations if necessary. 
•Take part, if necessary, in negotiations or technical clarifications with suppliers. 
• Assistance in preparation of tender package of project. 
• Approval of the following documents: ‐ Parts of project schedule related to engineering services, ‐ 
Engineering document list 
• Coordination with planning department in preparation of a setup of physical and man‐hour 
progress control system, 

More Related Content

What's hot

What's hot (11)

Investigation stage of the MYP Personal Project
Investigation stage of the MYP Personal ProjectInvestigation stage of the MYP Personal Project
Investigation stage of the MYP Personal Project
 
Reflection stage of the MYP Personal Project
Reflection stage of the MYP Personal ProjectReflection stage of the MYP Personal Project
Reflection stage of the MYP Personal Project
 
Project Sign Off Tempalte
Project Sign Off TempalteProject Sign Off Tempalte
Project Sign Off Tempalte
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management Services
 
Project initiation transition checklist
Project initiation transition checklistProject initiation transition checklist
Project initiation transition checklist
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
construction objectives
construction objectivesconstruction objectives
construction objectives
 
Project closing and methods
Project closing and methodsProject closing and methods
Project closing and methods
 
Assignment
AssignmentAssignment
Assignment
 
Project status-report
Project status-reportProject status-report
Project status-report
 
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN04
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN04PLS 2016: ILP Technical Committee latest expert guidance & documents – GN04
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN04
 

Viewers also liked

The Relationship of Technical Planning Capability and Evaluation of Coordinat...
The Relationship of Technical Planning Capability and Evaluation of Coordinat...The Relationship of Technical Planning Capability and Evaluation of Coordinat...
The Relationship of Technical Planning Capability and Evaluation of Coordinat...
irjes
 

Viewers also liked (7)

The Relationship of Technical Planning Capability and Evaluation of Coordinat...
The Relationship of Technical Planning Capability and Evaluation of Coordinat...The Relationship of Technical Planning Capability and Evaluation of Coordinat...
The Relationship of Technical Planning Capability and Evaluation of Coordinat...
 
Technical Comms Planning Nf
Technical Comms Planning NfTechnical Comms Planning Nf
Technical Comms Planning Nf
 
Role Of A Planner
Role Of A PlannerRole Of A Planner
Role Of A Planner
 
The Project Manager's Playbook, Bryan Barrow, 6th May 2015
The Project Manager's Playbook, Bryan Barrow, 6th May 2015The Project Manager's Playbook, Bryan Barrow, 6th May 2015
The Project Manager's Playbook, Bryan Barrow, 6th May 2015
 
Project planning: A career path
Project planning: A career pathProject planning: A career path
Project planning: A career path
 
Project planner job description
Project planner job descriptionProject planner job description
Project planner job description
 
A Planner's Playbook - Everything I learned about planning at Miami Ad School...
A Planner's Playbook - Everything I learned about planning at Miami Ad School...A Planner's Playbook - Everything I learned about planning at Miami Ad School...
A Planner's Playbook - Everything I learned about planning at Miami Ad School...
 

Similar to DUTIES AND RESPONSIBILITIES

CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
Ali oreidi
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
WadeLim
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
Khalid Hussain
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
Sunil Mall
 
Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas rev
Shibu Thomas
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
Royce Brown
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
WadeLim
 
Roles and-responsibilities-project manager
Roles and-responsibilities-project managerRoles and-responsibilities-project manager
Roles and-responsibilities-project manager
obsession56
 
Resume Raza Baloch
Resume Raza BalochResume Raza Baloch
Resume Raza Baloch
Raza Baloch
 

Similar to DUTIES AND RESPONSIBILITIES (20)

PMC .docx
PMC .docxPMC .docx
PMC .docx
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docx
 
Cover Letter (Meinhardt)
Cover Letter (Meinhardt)Cover Letter (Meinhardt)
Cover Letter (Meinhardt)
 
Project Technical lead
Project Technical leadProject Technical lead
Project Technical lead
 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas rev
 
ICI & ITD
ICI & ITD ICI & ITD
ICI & ITD
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Roles and-responsibilities-project manager
Roles and-responsibilities-project managerRoles and-responsibilities-project manager
Roles and-responsibilities-project manager
 
Resume Raza Baloch
Resume Raza BalochResume Raza Baloch
Resume Raza Baloch
 
MOSTAFA IBRAHIM2
MOSTAFA IBRAHIM2MOSTAFA IBRAHIM2
MOSTAFA IBRAHIM2
 
projectplanningandprojectworkplan-130828212658-phpapp02-converted.pptx
projectplanningandprojectworkplan-130828212658-phpapp02-converted.pptxprojectplanningandprojectworkplan-130828212658-phpapp02-converted.pptx
projectplanningandprojectworkplan-130828212658-phpapp02-converted.pptx
 
Engineering Services Consultant Your Guide to Success in Complex Projects.pptx
Engineering Services Consultant Your Guide to Success in Complex Projects.pptxEngineering Services Consultant Your Guide to Success in Complex Projects.pptx
Engineering Services Consultant Your Guide to Success in Complex Projects.pptx
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 

DUTIES AND RESPONSIBILITIES