SYSTEMOVERVIEW
A Single-Source Solution
For over a decade, the Mesa Retaining Wall Systems from
Tensar Earth Technologies have been the retaining wall
solution of choice for both architects and engineers alike.
One of the only segmental retaining wall (SRW) systems with
a proven, positive mechanical connection, the Mesa Systems
offer superior and cost-effective solutions for all of your
structural and landscaped retaining wall needs in the
commercial, industrial, residential and transportation markets.
With a network of licensed manufacturers throughout the
United States, Canada and Latin America, the Mesa Systems
have become the new standard in SRW technology. Designed
as a truly integrated solution, they are the only SRW system
that comes from a single source of supply and demand.
Unlike other SRWs, every component of a Mesa Wall has
been specifically designed to work together for optimum
efficiency and performance. High-strength, low-absorption
concrete units, corrosive-resistant connectors and Tensar
Geogrids all work together to forge a mechanically stabilized
earth (MSE) system that meets or exceeds every industry
standard. In fact, this optimal connection strength is
so strong and reliable that core fill* is rarely needed or
required. This translates into reduced costs and faster
installation schedules.
If you’re looking for long-term durability, increased structural
integrity and simplified construction, all at lower costs than
conventional alternatives, specify the Mesa Retaining Wall
Systems on your next project.
* Core fill is defined as the aggregate fill added to the open void space
of the Mesa Unit.
The Connection You Can Count On™
>
Only Mesa®
Walls provide the dependability
engineers require, the efficient installation
contractors have come to expect and the
aesthetics owners and architects demand
in the industry today.
Tensar®
Geogrids
The Mesa Retaining Wall Systems owes its
strength and durability to Uniaxial (UX)
Geogrids, Tensar Earth Technologies’ patented
reinforcement geogrids. Due to their stiff
interlocking capabilities, these geogrids stand
the test of time, performing better than other
commercially available geosynthetics. For
more information, visit www.tensarcorp.com.
Mesa Systems’ Components
Component Function
Tensar Geogrids
High-density, polyethylene (HDPE) structural geogrids internally reinforce structure and fill materials.
Inert to chemical degradation, they can be used with non-select fill or even crushed concrete.
Mesa Segmental Units High-strength concrete block with a compressive strength that exceeds AASHTO standards (>4,000 psi).
Mesa Connectors
Unique locking connectors are designed to mechanically connect the Tensar Geogrids to the Mesa Units.
Provide a low-strain, end-bearing connection that is not dependent on friction for structural integrity and
allow walls to be built near vertical or with a
5
/8" setback.
Full Engineering and
Construction Services
Detailing, design, construction services, site assistance, drawings and construction installation available
for each Mesa project upon request.
Unlimited Landscapes, Structural Solutions
Whether you’re increasing useable land or improving
property value, the Mesa Systems can solve your most
challenging grade change requirements with a full line
of SRW products. From building large structural walls to
small tiered gardens, Mesa units blend effortlessly with the
natural surroundings of any site.
Aesthetically Versatile
Whether you’re creating stairs, 90-degree corners, or convex
or concave curves, Mesa Walls can easily accommodate a
variety of design considerations. Based on your specific
aesthetic requirements, units can be variegated by color and
texture, and walls can even be built by mixing different facing
options. Designs are limitless – architects and designers are
bound only by their imaginations.
Full Line of Products >
2
Standard Units – The most popular Mesa Unit in our full line of
products. The Standard Unit can be used for virtually any SRW need.
8"h x 18"w x 11"d nom./75 lbs.
XL Units – Unit has an extended “tail” that provides installers an
option for taller gravity wall installations.
8"h x 18"w x 22"d nom./110 lbs.
Ashford™
Units – Create randomly patterned, mosaic-like walls using
the Ashford Unit. Available in many different sizes for an infinite number
of facing options. Ashford Units are only available with a straight face.
Tall Unit: 16"h x 6"w x 11"d nom./60 lbs.
Medium Unit: 8"h x 12"w x 11"d nom./60 lbs.
Standard Unit: 8"h x 18"w x 11"d nom./75 lbs.
Gardener™
Units – Simple, do-it-yourself blocks that are perfect for
edgings, borders, sidewalks and other types of landscaped walls up
to 3-ft. high.
Gardener Unit: 4"h x 12"w x 8"d nom./25 lbs.
In addition to the units listed above, we also offer Mesa Cap,
Landscape and Corner Units. Manufacturing of each Mesa Unit
depends on local availability. For more information on the units
produced in your area, please call 800-TENSAR-1.
Creative Commercial and Industrial Projects >
When designing for commercial applications, the need to
combine creative looks with practical installations becomes a
necessity, all while maintaining the bottom line. That’s where
the Mesa Systems can help. By coexisting with both nature
and industry, a Mesa Wall combines creativity with
functionality, providing the ideal solution for any situation.
Endless Applications
• Commercial Developments – Retail malls, big box stores,
office complexes, etc.
• Recreational Jobs – Golf courses, amusement parks,
amphitheaters, sports facilities, etc.
• Municipal Projects – Schools, hospitals, government
buildings, public parks, libraries, etc.
• Industrial Sites – Manufacturing and waste facilities,
aggregate quarries, freight yards, mills, power plants
and much more.
Building on Codes
Local building codes are applicable to almost all retaining
walls in the commercial, industrial and even residential
markets. The importance of conforming to these codes is
increasingly imperative. If codes are not met, you risk the
chance of wall failure or fines. In fact, there is even a code
that regulates the design of SRWs that exceed four feet.
This ensures that all participants design and inspect
structural SRWs based on national standards. That’s why
we’re proud that the Mesa Systems have been positively
evaluated by the unified International Code Council (ICC)
Evaluation Service.
Standing Up to Industrial Sites
Industrial sites often have heavy loading conditions and
contain high-traffic areas. With a greater tolerance to
differential and total settlement, the superior connection
capabilities of the Mesa Systems make them the best
solution for these types of projects. In fact, Mesa Walls
can even be designed to stand up to extremely high static
loads and have been known to handle areas with the
highest seismic activities.
By coexisting with both nature and industry,
a Mesa Wall combines creativity with
functionality, providing the ideal solution
for any situation.
4
Whatever your need, you can be assured that by
building a Mesa Wall you are adding property value
to your land – it’s as simple as that.
Reliable Residential Applications >
Mesa Walls provide a variety of solutions for your single-
family and multi-family home projects. Whether you need a
structural or landscaped wall, Mesa Units coexist with nature
and industry and combine creativity with functionality to
provide the ideal solutions for any residential situation.
Whatever your need, you can be assured that by building
a Mesa Wall you are adding property value to your land –
it’s as simple as that.
Power of the Positive
There’s a lot to be said for beauty and versatility in the
residential market. But you want to make sure your wall
withstands the test of time. With structural walls, it all
comes down to connection. If you compromise connection
strength, you risk wall failure. Most other SRW systems rely
on aggregate interlock or friction between the components
to hold the geogrid reinforcement in place and call it a
“connection.” The Mesa Systems’ unmatched connection
strength assures efficiency and performance. This creates
a structural wall that will last for years to come.
More than Just Landscaped Walls
Beyond structural walls, your property can be enhanced
using simple landscaped wall designs. The Mesa Systems
offer simple aesthetic considerations to blend with any home
and are easier to maintain than other types of conventional
wall alternatives. Unlike treated lumber and railroad ties,
Mesa Units will not split, rot or warp. Their high-compression
concrete resists cracking and insect infestation. This assures
a maintenance-free and environmentally friendly wall that is
sure to please any property owner.
6
Tried and True Transportation Solutions >
With the Mesa Systems’ unmatched
structural mechanical connection,
you are assured connection integrity
where it is needed most – at the face.
Seldom is the connection of an SRW system tested
more than within the transportation market. Differential
settlement and traffic barriers, as well as construction and
seismic loads, can test the strength of any retaining wall.
In these scenarios, connection strength must be reliable.
With the Mesa Systems’ unmatched structural mechanical
connection, you are assured connection integrity where it
is needed most – at the face.
Exceptional Performance,
Uncompromising Integrity
With superior holding capabilities, the Mesa Systems’
positive, mechanical connection makes it the ideal solution
for critical transportation applications. The systems’
connection components are unaffected by abrasion, tearing
and hydrolysis – real considerations that undermine the
performance of frictional systems using woven polyester
geogrid reinforcement. The result is exceptional performance
and uncompromised structural integrity under a variety of soil,
loading and environmental conditions.
Recognized for Its High Standards
If it’s good enough for the Highway Innovative Technology
Evaluation Center (HITEC), chances are it will work for you.
Impartial performance reviews conducted by HITEC provide
credible and comprehensive information about products and
technologies that help DOT organizations make informed
purchasing decisions. The fact that the Mesa Systems are
one of the few geosynthetic-reinforced retaining wall systems
that have been evaluated by HITEC is often a determining
factor in most transportation projects.
For a complete copy of the Mesa Systems HITEC
evaluation, please call 800-TENSAR-1 or visit
www.tensarcorp.com.
8
MesaPro™
Software helps you make
sound technical decisions based on
your specific site requirements while
continuing to optimize your designs using
the Mesa Retaining Wall Systems.
Designing with MesaPro Software >
We are proud to offer engineers and architects our
MesaPro Software, the most advanced, computer-based
design software program available for the analysis of SRWs.
This unique program helps you make sound technical
decisions based on your specific site requirements while
continuing to optimize your designs using the Mesa
Retaining Wall Systems.
MesaPro Software has the flexibility to adjust design criteria
to meet project specifications. The program lets the user
work with all available types of Tensar Geogrid options
(all of which have been specifically developed for use with
the Mesa Systems). Engineers are also given such options
as choosing between Standard Mesa Units or High
Performance Mesa Units, selecting walls with or without
batter and designing for global stability.
Based on AASHTO, MesaPro Software has the flexibility to
conform to NCMA and other design requirements. It allows
you to save time when analyzing for global stability and
other unusual site and loading conditions, and it can help
you define up to five different foundation soil layers and
ground water locations. Design considerations include, but
are not limited to: bridge abutments, superimposed walls,
trapezoidal walls and back-to-back walls.
This interactive software provides you with immediate
feedback while allowing you to see your design as work
progresses. And, you have the confidence of knowing that
this program is offered by Tensar Earth Technologies, the
industry’s leader in soil reinforcement for over 20 years.
MesaPro Software can be run on Windows®
95, 98, 2000, NT
or XP platforms. It is available at a cost of $99 per program.
To order your copy, contact our customer service department
at 800-TENSAR-1.
Standard Mesa Design >
The information contained in this section is for
preliminary design use only. Prior to final design, a
registered design engineer should be consulted for
assistance. Tensar Earth Technologies accepts no
liability for the inappropriate use of this information.
Using the Charts:
The design charts on the following pages cover six
different design scenarios with a range in wall elevations
from 4 (1.2m) to 14 (4.2 m)-ft., increasing in height
incrementally by 2-ft. (600 mm). The design scenarios
alter the wall batter, backfill soil type and loading
conditions. Understanding these different scenarios
is important in selecting the proper solution for your
specific design.
• Wall Batter – The Mesa Units can be constructed at a
near vertical (±1%) or a 4.5° batter.
• Soil Types – The two backfill soil types are a sand
material (32°) and a silt or lean clay (28°). Foundation
soils are assumed to be competent.
• Loading Conditions – The three loading conditions
are a horizontal surface at the top of the wall with
no surcharge load, a horizontal surface at the top of
the wall with a uniform surcharge of 250 psf and a
3 horizontal to 1 vertical slope on top of the wall.
Once the proper design case has been identified, the chart
will present the geogrid type, length and spacing required.
All lengths listed are measured from the Mesa connection
to the last transverse bar on the Tensar Geogrid and are
uniform throughout the given elevation of the wall.
The design charts assume that the walls are constructed
in accordance with the Mesa Systems standard
specifications and construction guidelines. Please visit
www.tensarcorp.com or call 800-TENSAR-1 for more
information on Mesa Systems’ standards.
Typical Cross-Section (Near Vertical) Typical Cross-Section (5
/8" Setback)
10
Sand: Ø=32º; γ=120 pcf; c=0
Geogrid Length (L)
Geogrid Type
Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=6'L=5' L=7' L=8' L=9'
LH800 LH800 LH800 UX1100 UX1100 UX1100
Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0
H=4' H=6' H=8' H=10' H=12' H=14'
L=5.5' L=6.5' L=8' L=9.5' L=11' L=12'
LH800 LH800 UX1100 UX1100 UX1100 UX1100
REINFORCED BACKFILL SOIL TYPE
Sand: Ø=32º; γ=120 pcf; c=0
Geogrid Length (L)
Geogrid Type
Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14'
L=4.5' L=6'L=5.5' L=7.5' L=8.5' L=10'
LH800 LH800 LH800 UX1100 UX1100 UX1100
Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0
H=4' H=6' H=8' H=10' H=12' H=14'
L=5.5' L=6.5' L=8' L=9.5' L=11' L=12'
LH800 LH800 UX1100 UX1100 UX1100 UX1100
REINFORCED BACKFILL SOIL TYPE
Sand: Ø=32º; γ=120 pcf; c=0
Geogrid Length (L)
Geogrid Type
Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14'
L=4.5' L=5'L=4' L=6' L=7' L=8'
LH800 LH800 LH800 UX1100 UX1100 UX1100
Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0
H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=4.5' L=5.5' L=6.5' L=8' L=9'
LH800 LH800 UX1100 UX1100 UX1100 UX1100
REINFORCED BACKFILL SOIL TYPE
Mesa Design Charts >
12
Sand: Ø=32º; γ=120 pcf; c=0
Geogrid Length (L)
Geogrid Type
Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14'
L=4.5' L=5'L=4' L=6' L=7' L=8'
LH800 LH800 LH800 UX1100 UX1100 UX1100
Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0
H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=4.5' L=6' L=6.5' L=8' L=9'
LH800 LH800 LH800 UX1100 UX1100 UX1100
REINFORCED BACKFILL SOIL TYPE
Sand: Ø=32º; γ=120 pcf; c=0
Geogrid Length (L)
Geogrid Type
Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=5'L=4.5' L=6' L=7' L=8.5'
LH800 LH800 LH800 UX1100 UX1100 UX1100
Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0
H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=6' L=8' L=9.5' L=11' L=13'
LH800 LH800 LH800 UX1100 UX1100 UX1100
REINFORCED BACKFILL SOIL TYPE
Sand: Ø=32º; γ=120 pcf; c=0
Geogrid Length (L)
Geogrid Type
Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=5'L=4' L=6' L=7.5' L=8.5'
LH800 LH800 LH800 UX1100 UX1100 UX1100
Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0
H=4' H=6' H=8' H=10' H=12' H=14'
L=4' L=6' L=7.5' L=9' L=11' L=12.5'
LH800 LH800 LH800 UX1100 UX1100 UX1100
REINFORCED BACKFILL SOIL TYPE
For more detailed design guidelines, please refer to the Mesa Design Guidelines Manual and/or MesaPro Design
Software available from Tensar Earth Technologies. To order, visit www.tensarcorp.com or call 800-TENSAR-1.
The Many Different Faces of Mesa Walls >
Endless Design & Aesthetic Options
Beyond design, if your site needs a retaining wall, why
not make it as attractive and useful as possible? In today’s
competitive and ever-changing wall market, architects and
owners are continually looking for new ways to build walls
that look as good as they work. Not only do they want a wall
that is structurally sound, they also want a wall that blends
naturally with its surrounding environment.
The Mesa Systems are at the forefront of the industry
with a wide array of design options. From blending and
variegating colors and textures to planting greenery on
tiered walls and top slopes, walls become more than a
site solution – they become an appealing landscape
feature on your site.
Mesa Ashford™
System
Recent design and architectural trends are calling for
solutions with a uniform look and a more natural and
aesthetic appeal. SRWs are no exception.
The Mesa Ashford System is meeting this market demand
with an Ashlar-inspired, mosaic-like pattern facing. Locally
available in three different block sizes and several different
colors, Ashford Units can be split-faced providing a clean
line appearance or antiqued for a weathered look. And unlike
other ashlar-inspired SRW systems, the Mesa Ashford System
features a unique positive mechanical connection assuring a
stronger facing connection to the geogrid reinforcement.
Mesa Optima™
System
While Ashlar-inspired SRW systems are naturally beautiful
to look at, their installation and cost demand more from
standard SRW technology. That’s why the Mesa Systems are
proud to introduce the most recent and innovative addition
to our product line – the Mesa Optima System. The most
dependable and aesthetically pleasing molded-faced SRW
system available on the market today, Optima Walls get their
look from digitized form liners that have been manufactured
into three different standardized choices. These include: Flag
Stone, River Rock and Ledge Stone. Using precise laser
Mesa Walls are more than
a site solution: they create a
visually appealing landscape
feature on your site.
technology to recreate natural stone facings, a three-
dimensional image is superimposed onto the face of a Mesa
Standard Unit. The result is an unmatched, visually attractive,
structural SRW solution that remains both cost-effective and
easy-to-install.
Designing for Special Considerations
Serpentine walls blend with naturally curving contours, while
inside and outside corners complement the traditionally
angular look of existing structures. With the Mesa Systems,
your design options know no bounds.
• Curves and Corners – Designing for inside, outside
and serpentine curves as well as 90° inside and outside
corners is easy as the unique locking connector
makes alignment and installation quick and simple.
• Steps – Whether you require steps in front or inside
of your wall, the Mesa Systems are up to the challenge.
By offering different units to aid in your project
requirements, virtually any design can be realized.
• Tiered and Terraced Walls – A less obtrusive
alternative than conventional wall solutions, tiered
and terraced walls can be built in areas with sufficient
land space. A typical design guideline for this type of
application is to have enough “green space” in between
walls that’s equal to twice the height of the lower wall
for each wall that is considered its own structure.
For more information on design and construction of these
or other special considerations, please refer to the Mesa
Installation and Special Considerations Manual. For local
availability on the different unit and color options in your area,
please contact your regional Mesa Systems’ representative.
14
Step 1:
Preconstruction Preparation
It is important to make yourself
familiar with the components of the
Mesa Systems prior to the start of
construction. Below is a list of these
components and the tools needed
to aid you in the construction of a
standard Mesa Wall.
Mesa Corner Units, drainage composite,
piping and geotextile materials may
also be required.
List of suggested tools for the
installation of the system:
• Dead blow hammer
• 2-ft. – 4-ft. level
• Utility saw and/or grinder
• Masonry string and chalk line
• Pitchfork (used to help remove
slack from geogrid)
• Shovels
• Compaction equipment
Step 2:
Prepare the Leveling Pad
Prepare the subgrade by excavating
vertically to plan elevation and
horizontally to design geogrid
lengths. If stockpiling excavated
material for reinforced fill, remove all
surface vegetation and debris prior to
backfill. Start the leveling pad at the
lowest elevation of the wall. Level the
prepared base with 6" of unreinforced
concrete or well-compacted granular
fill (gravel, road base or 3
/4" minus
[13 – 20 mm] crushed stone). The
leveling pad is typically 12" wider
than the Mesa Unit, 6" in front and
behind the Mesa Unit. Compact the
well-graded stone to 95% Standard
Proctor or greater.
Steps in the leveling pad are required
to change elevation. It is important
that the height of the step is equal
to the height of the number of unit
courses. Aggregate leveling pads are
generally overbuilt and should be
carefully trimmed down to meet the
proper elevation. If a concrete leveling
pad is used, it is important to have the
step-up heights match the Mesa Unit’s
height exactly. If not, grinding and/or
shimming may be required.
Step 3:
Install the Base Course
Once the pad is in place, begin by
making a wall line where the units will
rest. Chalk works well for concrete,
while string works well for aggregate.
Place the first course of Mesa Units
tightly together with the sides
touching and the textured face
outward. The first course must be
accurately placed to align with the
string line, carefully spaced and
leveled to facilitate construction and
enhance the appearance of the wall.
Occasionally a unit will have a slight
difference in height. If this occurs, a
geogrid rib or fingers may be used to
shim the face or tail back to level.
The following steps provide a general guide for installing
the Mesa Retaining Wall Systems. These steps will help
you through standard installation procedures from start to
finish. If you are installing the Mesa Systems on a specific
project and require more detailed information, please refer
to the Mesa Installation and Special Considerations Manual
or the project’s installation instructions and drawings
within the contract bid documents. A copy can be obtained
by calling 800-TENSAR-1, visiting www.tensarcorp.com
or contacting your local Mesa representative.
Standard Installation Procedures >
16
Step 4:
Geogrid and Connector Placement
Prior to placement of additional
courses, two Mesa Connectors are
inserted into each preceding Mesa
Unit. The flag’s (exposed portion of
the connector) orientation will create
the batter of the wall face. If the
design dictates the need for a geogrid
at a particular elevation, the Tensar
Geogrid will be installed with the Mesa
Connectors penetrating through the
geogrid apertures. Snug the geogrid
against the connector teeth, and then
drive the connector the rest of the
way using a rubber mallet. Note: The
transverse bar of the geogrid must be
pulled taut against the connectors
prior to final seating of the connector
into the block. Any slack in the geogrid
may be removed by anchoring it with
stakes or rebar.
Once the connectors and, when
required, the geogrid are in place, the
Mesa Units must be swept clean prior
to placing the next course. Failure to do
this can result in problems with seating
and leveling of the subsequent courses.
The “connected” geogrid can be
draped over the front face of the wall
while the backfill is placed up to the
geogrid elevation.
Step 5:
Place and Compact Backfill
Install drainage fill, typically 3
/4" well-
drained stone, behind the wall face
as directed by the design drawings
(12" min.). Peagravel should not be
used for drainage fill. Behind the
drainage fill, use backfill material that
meets project specifications. When
placing backfill over the geogrid layer,
the fill should be placed to minimize
any slack in the geogrid. Placing the fill
in a direction away from or parallel to
the face of the wall will minimize this
slack. In addition to the direction of
fill placement, a pitchfork can be used
to assist in fill over the geogrid and
remove slack.
Loose lifts of the reinforced fill shall
not exceed 6" where hand compaction
equipment is used, or 10" where heavy
compaction equipment is used. These
thicknesses may vary depending on
the approved project-specific soil types
used. Compact fill to 95% Standard
Proctor per ASTM D-698 or as required
by the contract documents. Note: Only
hand-operated compaction equipment
shall be used within 3-ft. of the tail of
the Mesa Units. Heavy equipment in
this area can dislocate the geogrids
and face units.
Step 6:
Install Additional Courses
Place the next course over the Mesa
Connectors on the previous course,
fitting the flags inside the open cavity
of the block. Pull the unit forward,
so that it makes contact with the
connectors. The vertical joint alignment
should be checked frequently as the
connectors allow the units to slide
from side to side. To maintain level on
each course as you build up, continue
to check for level front to back and side
to side. If needed, shim when required.
Once the current course is level,
continue to repeat steps 4 through 6
until final elevation is reached.
Step 7:
Place Cap Units (when required)
Using an approved, exterior concrete
adhesive, Cap Units may be secured to
the course of units below. These units
may be placed such that a nominal
1" overhang is achieved or flush with
the face of the wall.
For additional information on
installation quality and control
procedures, please refer to the
Mesa Installation and Special
Considerations Manual. This document
may be obtained at 800-TENSAR-1 or
www.tensarcorp.com.
Mesa Systems’ Components:
Mesa Standard Units Mesa Cap Units Mesa Connectors Tensar Geogrids
The Mesa Systems have increasingly become the solutions of choice
for residential, commercial and transportation applications. By
combining beauty and elegance with efficiency and performance,
Mesa Walls are built to stand the test of time.
Our entire distribution team throughout the United States, Canada
and Latin America is dedicated to providing you with the highest
quality products, service and support. With more than 30 in-house
engineers, Tensar Earth Technologies strives to keep its systems at
the forefront of today’s design technology and market trends.
For more information on the Mesa System, please call 800-TENSAR-1,
visit www.tensarcorp.com or e-mail info@tensarcorp.com. We are
happy to supply you with additional Mesa product information,
complete installation and design guidelines, system specifications,
design details, conceptual designs, sealed construction drawings,
preliminary cost estimates, summaries of completed projects, design
software and much more.
The Solutions of Choice >
By combining beauty and elegance with
efficiency and performance, Mesa Walls
are built to last the test of time.
18
Tensar Earth Technologies, Inc.
5883 Glenridge Drive, Suite 200
Atlanta, Georgia 30328
800-TENSAR-1
www.tensarcorp.com
Authorized
Representative:
MESA_BRO_ALL_E_1.06
©2006, Tensar Earth Technologies, Inc. Certain products and/or applications described or illustrated herein are protected
under one or more U.S. patents. Other U.S. patents are pending, and certain foreign patents and patent applications may
also exist. Trademark rights also apply as indicated herein. Final determination of the suitability of any information or
material for the use contemplated, and its manner of use, is the sole responsibility of the user. Printed in the U.S.A.

More Related Content

What's hot

Innovative Retaining Wall Systems
Innovative Retaining Wall SystemsInnovative Retaining Wall Systems
Innovative Retaining Wall Systemsmecocca5
 
Southeast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileSoutheast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileDan MacDonald, P.Eng.
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelBlake Johnson
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Ramin Vaghei
 
Wall Innovators Brochure 2008
Wall Innovators Brochure 2008Wall Innovators Brochure 2008
Wall Innovators Brochure 2008jill.croteau
 
Precast concrete - drywall
Precast  concrete - drywallPrecast  concrete - drywall
Precast concrete - drywallDenis Patel
 
Sierra cs clagett_12.08
Sierra cs clagett_12.08Sierra cs clagett_12.08
Sierra cs clagett_12.08Tensar
 
Provisions for non -structural fastenings
Provisions for non -structural fasteningsProvisions for non -structural fastenings
Provisions for non -structural fasteningsSafaSheriff
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 
Garland Standing Seam Metal Brochure 2012
Garland Standing Seam Metal Brochure 2012Garland Standing Seam Metal Brochure 2012
Garland Standing Seam Metal Brochure 2012Richard Jones
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
 

What's hot (20)

Innovative Retaining Wall Systems
Innovative Retaining Wall SystemsInnovative Retaining Wall Systems
Innovative Retaining Wall Systems
 
Southeast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileSoutheast Stoney Trail Project Profile
Southeast Stoney Trail Project Profile
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
Cemscreed r
Cemscreed rCemscreed r
Cemscreed r
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
Earth Retention Solutions
Earth Retention SolutionsEarth Retention Solutions
Earth Retention Solutions
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Wall Innovators Brochure 2008
Wall Innovators Brochure 2008Wall Innovators Brochure 2008
Wall Innovators Brochure 2008
 
Precast concrete - drywall
Precast  concrete - drywallPrecast  concrete - drywall
Precast concrete - drywall
 
Sierra cs clagett_12.08
Sierra cs clagett_12.08Sierra cs clagett_12.08
Sierra cs clagett_12.08
 
Provisions for non -structural fastenings
Provisions for non -structural fasteningsProvisions for non -structural fastenings
Provisions for non -structural fastenings
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
SmartSlope Evolution
SmartSlope EvolutionSmartSlope Evolution
SmartSlope Evolution
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
MagnumStone: Engineered For Strength
MagnumStone: Engineered For StrengthMagnumStone: Engineered For Strength
MagnumStone: Engineered For Strength
 
Garland Standing Seam Metal Brochure 2012
Garland Standing Seam Metal Brochure 2012Garland Standing Seam Metal Brochure 2012
Garland Standing Seam Metal Brochure 2012
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
Theme Park & Attraction Experience
Theme Park & Attraction ExperienceTheme Park & Attraction Experience
Theme Park & Attraction Experience
 

Similar to Single-Source Retaining Wall Solution

Similar to Single-Source Retaining Wall Solution (20)

Trinity Living Walls of Filtrexx v.1
Trinity Living Walls of Filtrexx v.1Trinity Living Walls of Filtrexx v.1
Trinity Living Walls of Filtrexx v.1
 
StrataShield Brochure
StrataShield BrochureStrataShield Brochure
StrataShield Brochure
 
MegaDeck Heavy-Duty Composite Access MatsMega deck brochure oct2012
MegaDeck Heavy-Duty Composite Access MatsMega deck brochure oct2012MegaDeck Heavy-Duty Composite Access MatsMega deck brochure oct2012
MegaDeck Heavy-Duty Composite Access MatsMega deck brochure oct2012
 
Decorative mesh screens for buildings
Decorative mesh screens for buildingsDecorative mesh screens for buildings
Decorative mesh screens for buildings
 
Stainless Steel Green Wall Systems
Stainless Steel Green Wall Systems Stainless Steel Green Wall Systems
Stainless Steel Green Wall Systems
 
Advancement in retaining wall
Advancement  in retaining wallAdvancement  in retaining wall
Advancement in retaining wall
 
What is Mesa Segmental Retaining Wall System?
What is Mesa Segmental Retaining Wall System?What is Mesa Segmental Retaining Wall System?
What is Mesa Segmental Retaining Wall System?
 
Ashfix Fastener Range
Ashfix Fastener RangeAshfix Fastener Range
Ashfix Fastener Range
 
ASHFIX
ASHFIXASHFIX
ASHFIX
 
WallMax Products
WallMax ProductsWallMax Products
WallMax Products
 
Emin sg sistema dimension
Emin sg   sistema dimensionEmin sg   sistema dimension
Emin sg sistema dimension
 
Mesa cs westgate_1.07
Mesa cs westgate_1.07Mesa cs westgate_1.07
Mesa cs westgate_1.07
 
GreenLoxx Living Walls of Filtrexx v.1
GreenLoxx Living Walls of Filtrexx v.1GreenLoxx Living Walls of Filtrexx v.1
GreenLoxx Living Walls of Filtrexx v.1
 
Ashwall
AshwallAshwall
Ashwall
 
Precast Fence Forming Systems
Precast Fence Forming SystemsPrecast Fence Forming Systems
Precast Fence Forming Systems
 
UNITILE, DATA CENTER
UNITILE, DATA CENTER UNITILE, DATA CENTER
UNITILE, DATA CENTER
 
Ent assignment
Ent assignmentEnt assignment
Ent assignment
 
Garland Standing Seam_Brochure
Garland Standing Seam_BrochureGarland Standing Seam_Brochure
Garland Standing Seam_Brochure
 
Sunrise Solutions Inc.
Sunrise Solutions Inc.Sunrise Solutions Inc.
Sunrise Solutions Inc.
 
SAS-Metal Ceiling
SAS-Metal CeilingSAS-Metal Ceiling
SAS-Metal Ceiling
 

More from EMIN Sistemas Geotecnicos

Emin sg sistemas anclajes helicoidales chance
Emin sg sistemas anclajes helicoidales chanceEmin sg sistemas anclajes helicoidales chance
Emin sg sistemas anclajes helicoidales chanceEMIN Sistemas Geotecnicos
 
Emin sg fundaciones subestaciones transmision
Emin sg fundaciones subestaciones transmisionEmin sg fundaciones subestaciones transmision
Emin sg fundaciones subestaciones transmisionEMIN Sistemas Geotecnicos
 
Emin sg fundaciones pilotes helicoidales energia solar
Emin sg fundaciones pilotes helicoidales energia solarEmin sg fundaciones pilotes helicoidales energia solar
Emin sg fundaciones pilotes helicoidales energia solarEMIN Sistemas Geotecnicos
 
Emin sistemas geotecnicos catalogo mantas control erosion tensar
Emin sistemas geotecnicos catalogo mantas control erosion tensarEmin sistemas geotecnicos catalogo mantas control erosion tensar
Emin sistemas geotecnicos catalogo mantas control erosion tensarEMIN Sistemas Geotecnicos
 
Emin sistemas geotecnicos catalogo sistemas control erosion tensar
Emin sistemas geotecnicos catalogo sistemas control erosion tensarEmin sistemas geotecnicos catalogo sistemas control erosion tensar
Emin sistemas geotecnicos catalogo sistemas control erosion tensarEMIN Sistemas Geotecnicos
 
Mantas Control Erosion North American Green Catalogo
Mantas Control Erosion North American Green CatalogoMantas Control Erosion North American Green Catalogo
Mantas Control Erosion North American Green CatalogoEMIN Sistemas Geotecnicos
 
Control Erosion Aplicacion Hidraulica Tensar
Control Erosion Aplicacion Hidraulica TensarControl Erosion Aplicacion Hidraulica Tensar
Control Erosion Aplicacion Hidraulica TensarEMIN Sistemas Geotecnicos
 

More from EMIN Sistemas Geotecnicos (20)

Catalogo control de erosión Emin
Catalogo control de erosión EminCatalogo control de erosión Emin
Catalogo control de erosión Emin
 
Emin sg sistemas anclajes helicoidales chance
Emin sg sistemas anclajes helicoidales chanceEmin sg sistemas anclajes helicoidales chance
Emin sg sistemas anclajes helicoidales chance
 
Emin sg sistema tripod
Emin sg sistema tripodEmin sg sistema tripod
Emin sg sistema tripod
 
Emin sg productos hubbell
Emin sg productos hubbellEmin sg productos hubbell
Emin sg productos hubbell
 
Emin sg pilotes helicoidales cimentaciones
Emin sg pilotes helicoidales cimentacionesEmin sg pilotes helicoidales cimentaciones
Emin sg pilotes helicoidales cimentaciones
 
Emin sg pilotes helicoidales chance
Emin sg pilotes helicoidales chanceEmin sg pilotes helicoidales chance
Emin sg pilotes helicoidales chance
 
Emin sg hubbell anclaje
Emin sg hubbell anclajeEmin sg hubbell anclaje
Emin sg hubbell anclaje
 
Emin sg herramientas anclaje
Emin sg herramientas anclajeEmin sg herramientas anclaje
Emin sg herramientas anclaje
 
Emin sg fundaciones subestaciones transmision
Emin sg fundaciones subestaciones transmisionEmin sg fundaciones subestaciones transmision
Emin sg fundaciones subestaciones transmision
 
Emin sg fundaciones pilotes helicoidales energia solar
Emin sg fundaciones pilotes helicoidales energia solarEmin sg fundaciones pilotes helicoidales energia solar
Emin sg fundaciones pilotes helicoidales energia solar
 
Emin sg chance torres transmision brasil
Emin sg chance torres transmision brasilEmin sg chance torres transmision brasil
Emin sg chance torres transmision brasil
 
Emin sg chance sistema anclaje
Emin sg chance sistema anclajeEmin sg chance sistema anclaje
Emin sg chance sistema anclaje
 
Emin sg aplicaciones energia solar
Emin sg aplicaciones energia solarEmin sg aplicaciones energia solar
Emin sg aplicaciones energia solar
 
Emin sistemas geotecnicos catalogo mantas control erosion tensar
Emin sistemas geotecnicos catalogo mantas control erosion tensarEmin sistemas geotecnicos catalogo mantas control erosion tensar
Emin sistemas geotecnicos catalogo mantas control erosion tensar
 
Emin sistemas geotecnicos catalogo sistemas control erosion tensar
Emin sistemas geotecnicos catalogo sistemas control erosion tensarEmin sistemas geotecnicos catalogo sistemas control erosion tensar
Emin sistemas geotecnicos catalogo sistemas control erosion tensar
 
Sistema Refuerzo Pavimentos Glasgrid
Sistema Refuerzo Pavimentos GlasgridSistema Refuerzo Pavimentos Glasgrid
Sistema Refuerzo Pavimentos Glasgrid
 
Tubos Geotextil Catalogo 2014
Tubos Geotextil Catalogo 2014Tubos Geotextil Catalogo 2014
Tubos Geotextil Catalogo 2014
 
Mantas Control Erosion North American Green Catalogo
Mantas Control Erosion North American Green CatalogoMantas Control Erosion North American Green Catalogo
Mantas Control Erosion North American Green Catalogo
 
Control Erosion Aplicacion Hidraulica Tensar
Control Erosion Aplicacion Hidraulica TensarControl Erosion Aplicacion Hidraulica Tensar
Control Erosion Aplicacion Hidraulica Tensar
 
Geoceldas Envirogrid Ficha Tecnica
Geoceldas Envirogrid Ficha TecnicaGeoceldas Envirogrid Ficha Tecnica
Geoceldas Envirogrid Ficha Tecnica
 

Recently uploaded

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Single-Source Retaining Wall Solution

  • 2. A Single-Source Solution For over a decade, the Mesa Retaining Wall Systems from Tensar Earth Technologies have been the retaining wall solution of choice for both architects and engineers alike. One of the only segmental retaining wall (SRW) systems with a proven, positive mechanical connection, the Mesa Systems offer superior and cost-effective solutions for all of your structural and landscaped retaining wall needs in the commercial, industrial, residential and transportation markets. With a network of licensed manufacturers throughout the United States, Canada and Latin America, the Mesa Systems have become the new standard in SRW technology. Designed as a truly integrated solution, they are the only SRW system that comes from a single source of supply and demand. Unlike other SRWs, every component of a Mesa Wall has been specifically designed to work together for optimum efficiency and performance. High-strength, low-absorption concrete units, corrosive-resistant connectors and Tensar Geogrids all work together to forge a mechanically stabilized earth (MSE) system that meets or exceeds every industry standard. In fact, this optimal connection strength is so strong and reliable that core fill* is rarely needed or required. This translates into reduced costs and faster installation schedules. If you’re looking for long-term durability, increased structural integrity and simplified construction, all at lower costs than conventional alternatives, specify the Mesa Retaining Wall Systems on your next project. * Core fill is defined as the aggregate fill added to the open void space of the Mesa Unit. The Connection You Can Count On™ > Only Mesa® Walls provide the dependability engineers require, the efficient installation contractors have come to expect and the aesthetics owners and architects demand in the industry today. Tensar® Geogrids The Mesa Retaining Wall Systems owes its strength and durability to Uniaxial (UX) Geogrids, Tensar Earth Technologies’ patented reinforcement geogrids. Due to their stiff interlocking capabilities, these geogrids stand the test of time, performing better than other commercially available geosynthetics. For more information, visit www.tensarcorp.com. Mesa Systems’ Components Component Function Tensar Geogrids High-density, polyethylene (HDPE) structural geogrids internally reinforce structure and fill materials. Inert to chemical degradation, they can be used with non-select fill or even crushed concrete. Mesa Segmental Units High-strength concrete block with a compressive strength that exceeds AASHTO standards (>4,000 psi). Mesa Connectors Unique locking connectors are designed to mechanically connect the Tensar Geogrids to the Mesa Units. Provide a low-strain, end-bearing connection that is not dependent on friction for structural integrity and allow walls to be built near vertical or with a 5 /8" setback. Full Engineering and Construction Services Detailing, design, construction services, site assistance, drawings and construction installation available for each Mesa project upon request.
  • 3. Unlimited Landscapes, Structural Solutions Whether you’re increasing useable land or improving property value, the Mesa Systems can solve your most challenging grade change requirements with a full line of SRW products. From building large structural walls to small tiered gardens, Mesa units blend effortlessly with the natural surroundings of any site. Aesthetically Versatile Whether you’re creating stairs, 90-degree corners, or convex or concave curves, Mesa Walls can easily accommodate a variety of design considerations. Based on your specific aesthetic requirements, units can be variegated by color and texture, and walls can even be built by mixing different facing options. Designs are limitless – architects and designers are bound only by their imaginations. Full Line of Products > 2 Standard Units – The most popular Mesa Unit in our full line of products. The Standard Unit can be used for virtually any SRW need. 8"h x 18"w x 11"d nom./75 lbs. XL Units – Unit has an extended “tail” that provides installers an option for taller gravity wall installations. 8"h x 18"w x 22"d nom./110 lbs. Ashford™ Units – Create randomly patterned, mosaic-like walls using the Ashford Unit. Available in many different sizes for an infinite number of facing options. Ashford Units are only available with a straight face. Tall Unit: 16"h x 6"w x 11"d nom./60 lbs. Medium Unit: 8"h x 12"w x 11"d nom./60 lbs. Standard Unit: 8"h x 18"w x 11"d nom./75 lbs. Gardener™ Units – Simple, do-it-yourself blocks that are perfect for edgings, borders, sidewalks and other types of landscaped walls up to 3-ft. high. Gardener Unit: 4"h x 12"w x 8"d nom./25 lbs. In addition to the units listed above, we also offer Mesa Cap, Landscape and Corner Units. Manufacturing of each Mesa Unit depends on local availability. For more information on the units produced in your area, please call 800-TENSAR-1.
  • 4. Creative Commercial and Industrial Projects > When designing for commercial applications, the need to combine creative looks with practical installations becomes a necessity, all while maintaining the bottom line. That’s where the Mesa Systems can help. By coexisting with both nature and industry, a Mesa Wall combines creativity with functionality, providing the ideal solution for any situation. Endless Applications • Commercial Developments – Retail malls, big box stores, office complexes, etc. • Recreational Jobs – Golf courses, amusement parks, amphitheaters, sports facilities, etc. • Municipal Projects – Schools, hospitals, government buildings, public parks, libraries, etc. • Industrial Sites – Manufacturing and waste facilities, aggregate quarries, freight yards, mills, power plants and much more. Building on Codes Local building codes are applicable to almost all retaining walls in the commercial, industrial and even residential markets. The importance of conforming to these codes is increasingly imperative. If codes are not met, you risk the chance of wall failure or fines. In fact, there is even a code that regulates the design of SRWs that exceed four feet. This ensures that all participants design and inspect structural SRWs based on national standards. That’s why we’re proud that the Mesa Systems have been positively evaluated by the unified International Code Council (ICC) Evaluation Service. Standing Up to Industrial Sites Industrial sites often have heavy loading conditions and contain high-traffic areas. With a greater tolerance to differential and total settlement, the superior connection capabilities of the Mesa Systems make them the best solution for these types of projects. In fact, Mesa Walls can even be designed to stand up to extremely high static loads and have been known to handle areas with the highest seismic activities. By coexisting with both nature and industry, a Mesa Wall combines creativity with functionality, providing the ideal solution for any situation.
  • 5. 4
  • 6. Whatever your need, you can be assured that by building a Mesa Wall you are adding property value to your land – it’s as simple as that.
  • 7. Reliable Residential Applications > Mesa Walls provide a variety of solutions for your single- family and multi-family home projects. Whether you need a structural or landscaped wall, Mesa Units coexist with nature and industry and combine creativity with functionality to provide the ideal solutions for any residential situation. Whatever your need, you can be assured that by building a Mesa Wall you are adding property value to your land – it’s as simple as that. Power of the Positive There’s a lot to be said for beauty and versatility in the residential market. But you want to make sure your wall withstands the test of time. With structural walls, it all comes down to connection. If you compromise connection strength, you risk wall failure. Most other SRW systems rely on aggregate interlock or friction between the components to hold the geogrid reinforcement in place and call it a “connection.” The Mesa Systems’ unmatched connection strength assures efficiency and performance. This creates a structural wall that will last for years to come. More than Just Landscaped Walls Beyond structural walls, your property can be enhanced using simple landscaped wall designs. The Mesa Systems offer simple aesthetic considerations to blend with any home and are easier to maintain than other types of conventional wall alternatives. Unlike treated lumber and railroad ties, Mesa Units will not split, rot or warp. Their high-compression concrete resists cracking and insect infestation. This assures a maintenance-free and environmentally friendly wall that is sure to please any property owner. 6
  • 8. Tried and True Transportation Solutions > With the Mesa Systems’ unmatched structural mechanical connection, you are assured connection integrity where it is needed most – at the face. Seldom is the connection of an SRW system tested more than within the transportation market. Differential settlement and traffic barriers, as well as construction and seismic loads, can test the strength of any retaining wall. In these scenarios, connection strength must be reliable. With the Mesa Systems’ unmatched structural mechanical connection, you are assured connection integrity where it is needed most – at the face. Exceptional Performance, Uncompromising Integrity With superior holding capabilities, the Mesa Systems’ positive, mechanical connection makes it the ideal solution for critical transportation applications. The systems’ connection components are unaffected by abrasion, tearing and hydrolysis – real considerations that undermine the performance of frictional systems using woven polyester geogrid reinforcement. The result is exceptional performance and uncompromised structural integrity under a variety of soil, loading and environmental conditions. Recognized for Its High Standards If it’s good enough for the Highway Innovative Technology Evaluation Center (HITEC), chances are it will work for you. Impartial performance reviews conducted by HITEC provide credible and comprehensive information about products and technologies that help DOT organizations make informed purchasing decisions. The fact that the Mesa Systems are one of the few geosynthetic-reinforced retaining wall systems that have been evaluated by HITEC is often a determining factor in most transportation projects. For a complete copy of the Mesa Systems HITEC evaluation, please call 800-TENSAR-1 or visit www.tensarcorp.com.
  • 9. 8
  • 10. MesaPro™ Software helps you make sound technical decisions based on your specific site requirements while continuing to optimize your designs using the Mesa Retaining Wall Systems. Designing with MesaPro Software > We are proud to offer engineers and architects our MesaPro Software, the most advanced, computer-based design software program available for the analysis of SRWs. This unique program helps you make sound technical decisions based on your specific site requirements while continuing to optimize your designs using the Mesa Retaining Wall Systems. MesaPro Software has the flexibility to adjust design criteria to meet project specifications. The program lets the user work with all available types of Tensar Geogrid options (all of which have been specifically developed for use with the Mesa Systems). Engineers are also given such options as choosing between Standard Mesa Units or High Performance Mesa Units, selecting walls with or without batter and designing for global stability. Based on AASHTO, MesaPro Software has the flexibility to conform to NCMA and other design requirements. It allows you to save time when analyzing for global stability and other unusual site and loading conditions, and it can help you define up to five different foundation soil layers and ground water locations. Design considerations include, but are not limited to: bridge abutments, superimposed walls, trapezoidal walls and back-to-back walls. This interactive software provides you with immediate feedback while allowing you to see your design as work progresses. And, you have the confidence of knowing that this program is offered by Tensar Earth Technologies, the industry’s leader in soil reinforcement for over 20 years. MesaPro Software can be run on Windows® 95, 98, 2000, NT or XP platforms. It is available at a cost of $99 per program. To order your copy, contact our customer service department at 800-TENSAR-1.
  • 11. Standard Mesa Design > The information contained in this section is for preliminary design use only. Prior to final design, a registered design engineer should be consulted for assistance. Tensar Earth Technologies accepts no liability for the inappropriate use of this information. Using the Charts: The design charts on the following pages cover six different design scenarios with a range in wall elevations from 4 (1.2m) to 14 (4.2 m)-ft., increasing in height incrementally by 2-ft. (600 mm). The design scenarios alter the wall batter, backfill soil type and loading conditions. Understanding these different scenarios is important in selecting the proper solution for your specific design. • Wall Batter – The Mesa Units can be constructed at a near vertical (±1%) or a 4.5° batter. • Soil Types – The two backfill soil types are a sand material (32°) and a silt or lean clay (28°). Foundation soils are assumed to be competent. • Loading Conditions – The three loading conditions are a horizontal surface at the top of the wall with no surcharge load, a horizontal surface at the top of the wall with a uniform surcharge of 250 psf and a 3 horizontal to 1 vertical slope on top of the wall. Once the proper design case has been identified, the chart will present the geogrid type, length and spacing required. All lengths listed are measured from the Mesa connection to the last transverse bar on the Tensar Geogrid and are uniform throughout the given elevation of the wall. The design charts assume that the walls are constructed in accordance with the Mesa Systems standard specifications and construction guidelines. Please visit www.tensarcorp.com or call 800-TENSAR-1 for more information on Mesa Systems’ standards. Typical Cross-Section (Near Vertical) Typical Cross-Section (5 /8" Setback) 10
  • 12. Sand: Ø=32º; γ=120 pcf; c=0 Geogrid Length (L) Geogrid Type Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=6'L=5' L=7' L=8' L=9' LH800 LH800 LH800 UX1100 UX1100 UX1100 Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0 H=4' H=6' H=8' H=10' H=12' H=14' L=5.5' L=6.5' L=8' L=9.5' L=11' L=12' LH800 LH800 UX1100 UX1100 UX1100 UX1100 REINFORCED BACKFILL SOIL TYPE Sand: Ø=32º; γ=120 pcf; c=0 Geogrid Length (L) Geogrid Type Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14' L=4.5' L=6'L=5.5' L=7.5' L=8.5' L=10' LH800 LH800 LH800 UX1100 UX1100 UX1100 Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0 H=4' H=6' H=8' H=10' H=12' H=14' L=5.5' L=6.5' L=8' L=9.5' L=11' L=12' LH800 LH800 UX1100 UX1100 UX1100 UX1100 REINFORCED BACKFILL SOIL TYPE Sand: Ø=32º; γ=120 pcf; c=0 Geogrid Length (L) Geogrid Type Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14' L=4.5' L=5'L=4' L=6' L=7' L=8' LH800 LH800 LH800 UX1100 UX1100 UX1100 Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0 H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=4.5' L=5.5' L=6.5' L=8' L=9' LH800 LH800 UX1100 UX1100 UX1100 UX1100 REINFORCED BACKFILL SOIL TYPE Mesa Design Charts >
  • 13. 12 Sand: Ø=32º; γ=120 pcf; c=0 Geogrid Length (L) Geogrid Type Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14' L=4.5' L=5'L=4' L=6' L=7' L=8' LH800 LH800 LH800 UX1100 UX1100 UX1100 Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0 H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=4.5' L=6' L=6.5' L=8' L=9' LH800 LH800 LH800 UX1100 UX1100 UX1100 REINFORCED BACKFILL SOIL TYPE Sand: Ø=32º; γ=120 pcf; c=0 Geogrid Length (L) Geogrid Type Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=5'L=4.5' L=6' L=7' L=8.5' LH800 LH800 LH800 UX1100 UX1100 UX1100 Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0 H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=6' L=8' L=9.5' L=11' L=13' LH800 LH800 LH800 UX1100 UX1100 UX1100 REINFORCED BACKFILL SOIL TYPE Sand: Ø=32º; γ=120 pcf; c=0 Geogrid Length (L) Geogrid Type Wall Height (H) H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=5'L=4' L=6' L=7.5' L=8.5' LH800 LH800 LH800 UX1100 UX1100 UX1100 Silt/Lean Clay: Ø=28º; γ=120 pcf; c=0 H=4' H=6' H=8' H=10' H=12' H=14' L=4' L=6' L=7.5' L=9' L=11' L=12.5' LH800 LH800 LH800 UX1100 UX1100 UX1100 REINFORCED BACKFILL SOIL TYPE For more detailed design guidelines, please refer to the Mesa Design Guidelines Manual and/or MesaPro Design Software available from Tensar Earth Technologies. To order, visit www.tensarcorp.com or call 800-TENSAR-1.
  • 14. The Many Different Faces of Mesa Walls > Endless Design & Aesthetic Options Beyond design, if your site needs a retaining wall, why not make it as attractive and useful as possible? In today’s competitive and ever-changing wall market, architects and owners are continually looking for new ways to build walls that look as good as they work. Not only do they want a wall that is structurally sound, they also want a wall that blends naturally with its surrounding environment. The Mesa Systems are at the forefront of the industry with a wide array of design options. From blending and variegating colors and textures to planting greenery on tiered walls and top slopes, walls become more than a site solution – they become an appealing landscape feature on your site. Mesa Ashford™ System Recent design and architectural trends are calling for solutions with a uniform look and a more natural and aesthetic appeal. SRWs are no exception. The Mesa Ashford System is meeting this market demand with an Ashlar-inspired, mosaic-like pattern facing. Locally available in three different block sizes and several different colors, Ashford Units can be split-faced providing a clean line appearance or antiqued for a weathered look. And unlike other ashlar-inspired SRW systems, the Mesa Ashford System features a unique positive mechanical connection assuring a stronger facing connection to the geogrid reinforcement. Mesa Optima™ System While Ashlar-inspired SRW systems are naturally beautiful to look at, their installation and cost demand more from standard SRW technology. That’s why the Mesa Systems are proud to introduce the most recent and innovative addition to our product line – the Mesa Optima System. The most dependable and aesthetically pleasing molded-faced SRW system available on the market today, Optima Walls get their look from digitized form liners that have been manufactured into three different standardized choices. These include: Flag Stone, River Rock and Ledge Stone. Using precise laser Mesa Walls are more than a site solution: they create a visually appealing landscape feature on your site.
  • 15. technology to recreate natural stone facings, a three- dimensional image is superimposed onto the face of a Mesa Standard Unit. The result is an unmatched, visually attractive, structural SRW solution that remains both cost-effective and easy-to-install. Designing for Special Considerations Serpentine walls blend with naturally curving contours, while inside and outside corners complement the traditionally angular look of existing structures. With the Mesa Systems, your design options know no bounds. • Curves and Corners – Designing for inside, outside and serpentine curves as well as 90° inside and outside corners is easy as the unique locking connector makes alignment and installation quick and simple. • Steps – Whether you require steps in front or inside of your wall, the Mesa Systems are up to the challenge. By offering different units to aid in your project requirements, virtually any design can be realized. • Tiered and Terraced Walls – A less obtrusive alternative than conventional wall solutions, tiered and terraced walls can be built in areas with sufficient land space. A typical design guideline for this type of application is to have enough “green space” in between walls that’s equal to twice the height of the lower wall for each wall that is considered its own structure. For more information on design and construction of these or other special considerations, please refer to the Mesa Installation and Special Considerations Manual. For local availability on the different unit and color options in your area, please contact your regional Mesa Systems’ representative. 14
  • 16. Step 1: Preconstruction Preparation It is important to make yourself familiar with the components of the Mesa Systems prior to the start of construction. Below is a list of these components and the tools needed to aid you in the construction of a standard Mesa Wall. Mesa Corner Units, drainage composite, piping and geotextile materials may also be required. List of suggested tools for the installation of the system: • Dead blow hammer • 2-ft. – 4-ft. level • Utility saw and/or grinder • Masonry string and chalk line • Pitchfork (used to help remove slack from geogrid) • Shovels • Compaction equipment Step 2: Prepare the Leveling Pad Prepare the subgrade by excavating vertically to plan elevation and horizontally to design geogrid lengths. If stockpiling excavated material for reinforced fill, remove all surface vegetation and debris prior to backfill. Start the leveling pad at the lowest elevation of the wall. Level the prepared base with 6" of unreinforced concrete or well-compacted granular fill (gravel, road base or 3 /4" minus [13 – 20 mm] crushed stone). The leveling pad is typically 12" wider than the Mesa Unit, 6" in front and behind the Mesa Unit. Compact the well-graded stone to 95% Standard Proctor or greater. Steps in the leveling pad are required to change elevation. It is important that the height of the step is equal to the height of the number of unit courses. Aggregate leveling pads are generally overbuilt and should be carefully trimmed down to meet the proper elevation. If a concrete leveling pad is used, it is important to have the step-up heights match the Mesa Unit’s height exactly. If not, grinding and/or shimming may be required. Step 3: Install the Base Course Once the pad is in place, begin by making a wall line where the units will rest. Chalk works well for concrete, while string works well for aggregate. Place the first course of Mesa Units tightly together with the sides touching and the textured face outward. The first course must be accurately placed to align with the string line, carefully spaced and leveled to facilitate construction and enhance the appearance of the wall. Occasionally a unit will have a slight difference in height. If this occurs, a geogrid rib or fingers may be used to shim the face or tail back to level. The following steps provide a general guide for installing the Mesa Retaining Wall Systems. These steps will help you through standard installation procedures from start to finish. If you are installing the Mesa Systems on a specific project and require more detailed information, please refer to the Mesa Installation and Special Considerations Manual or the project’s installation instructions and drawings within the contract bid documents. A copy can be obtained by calling 800-TENSAR-1, visiting www.tensarcorp.com or contacting your local Mesa representative. Standard Installation Procedures >
  • 17. 16 Step 4: Geogrid and Connector Placement Prior to placement of additional courses, two Mesa Connectors are inserted into each preceding Mesa Unit. The flag’s (exposed portion of the connector) orientation will create the batter of the wall face. If the design dictates the need for a geogrid at a particular elevation, the Tensar Geogrid will be installed with the Mesa Connectors penetrating through the geogrid apertures. Snug the geogrid against the connector teeth, and then drive the connector the rest of the way using a rubber mallet. Note: The transverse bar of the geogrid must be pulled taut against the connectors prior to final seating of the connector into the block. Any slack in the geogrid may be removed by anchoring it with stakes or rebar. Once the connectors and, when required, the geogrid are in place, the Mesa Units must be swept clean prior to placing the next course. Failure to do this can result in problems with seating and leveling of the subsequent courses. The “connected” geogrid can be draped over the front face of the wall while the backfill is placed up to the geogrid elevation. Step 5: Place and Compact Backfill Install drainage fill, typically 3 /4" well- drained stone, behind the wall face as directed by the design drawings (12" min.). Peagravel should not be used for drainage fill. Behind the drainage fill, use backfill material that meets project specifications. When placing backfill over the geogrid layer, the fill should be placed to minimize any slack in the geogrid. Placing the fill in a direction away from or parallel to the face of the wall will minimize this slack. In addition to the direction of fill placement, a pitchfork can be used to assist in fill over the geogrid and remove slack. Loose lifts of the reinforced fill shall not exceed 6" where hand compaction equipment is used, or 10" where heavy compaction equipment is used. These thicknesses may vary depending on the approved project-specific soil types used. Compact fill to 95% Standard Proctor per ASTM D-698 or as required by the contract documents. Note: Only hand-operated compaction equipment shall be used within 3-ft. of the tail of the Mesa Units. Heavy equipment in this area can dislocate the geogrids and face units. Step 6: Install Additional Courses Place the next course over the Mesa Connectors on the previous course, fitting the flags inside the open cavity of the block. Pull the unit forward, so that it makes contact with the connectors. The vertical joint alignment should be checked frequently as the connectors allow the units to slide from side to side. To maintain level on each course as you build up, continue to check for level front to back and side to side. If needed, shim when required. Once the current course is level, continue to repeat steps 4 through 6 until final elevation is reached. Step 7: Place Cap Units (when required) Using an approved, exterior concrete adhesive, Cap Units may be secured to the course of units below. These units may be placed such that a nominal 1" overhang is achieved or flush with the face of the wall. For additional information on installation quality and control procedures, please refer to the Mesa Installation and Special Considerations Manual. This document may be obtained at 800-TENSAR-1 or www.tensarcorp.com. Mesa Systems’ Components: Mesa Standard Units Mesa Cap Units Mesa Connectors Tensar Geogrids
  • 18. The Mesa Systems have increasingly become the solutions of choice for residential, commercial and transportation applications. By combining beauty and elegance with efficiency and performance, Mesa Walls are built to stand the test of time. Our entire distribution team throughout the United States, Canada and Latin America is dedicated to providing you with the highest quality products, service and support. With more than 30 in-house engineers, Tensar Earth Technologies strives to keep its systems at the forefront of today’s design technology and market trends. For more information on the Mesa System, please call 800-TENSAR-1, visit www.tensarcorp.com or e-mail info@tensarcorp.com. We are happy to supply you with additional Mesa product information, complete installation and design guidelines, system specifications, design details, conceptual designs, sealed construction drawings, preliminary cost estimates, summaries of completed projects, design software and much more. The Solutions of Choice > By combining beauty and elegance with efficiency and performance, Mesa Walls are built to last the test of time.
  • 19. 18
  • 20. Tensar Earth Technologies, Inc. 5883 Glenridge Drive, Suite 200 Atlanta, Georgia 30328 800-TENSAR-1 www.tensarcorp.com Authorized Representative: MESA_BRO_ALL_E_1.06 ©2006, Tensar Earth Technologies, Inc. Certain products and/or applications described or illustrated herein are protected under one or more U.S. patents. Other U.S. patents are pending, and certain foreign patents and patent applications may also exist. Trademark rights also apply as indicated herein. Final determination of the suitability of any information or material for the use contemplated, and its manner of use, is the sole responsibility of the user. Printed in the U.S.A.