1. Excavation shall be measured in stages of 1.5m and include getting the earth at least 1m clear of the edge. 2. Filling under floors shall include spreading in layers up to 20cm thick, watering, ramming and leveling. 3. For works requiring formwork, damp proofing or other coverings, authorized quantities or actual excavation will be measured, with working spaces of 60cm or 1.5m depending on the work.