The document provides an agenda and updates for a project meeting about the construction of the new Duke Ellington School of the Arts. The agenda includes sections on the site plan, exterior elevations, floor plans, and construction progress photos. Site plans show the school's location and layout. Elevation drawings depict the building's appearance from each side. Floor plans illustrate each level of the interior. Construction photos document progress including foundation work, steel installation, and the future performance hall. The meeting concluded with a question and answer session.