architectscox graae + spackPalisades Recreation Center Cover
April 4th 2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
Palisades Recreation Center
PalisadesCitizensAssociation Meeting
April 4th,2017
5200 Sherier Place NW
Washington,DC 20016
April 4th 2017
April 4th 2017
April 4th 2017
architectscox graae + spackPalisadesRecreation Center Proposed First Floor Plan
March 6th,2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
30 8' 16' 32'
UP
UP
UPUP UP
UP
UP
UP
DN
DN
Court Size
48'x40'
Spaces
Office/Control
Office Storage
Staff Restroom
Subtotal
Public Entr.Lobby and Reception
Multi-Purpose Room
Multi-Purpose Room Storage
Classroom
Senior Lounge
Family Restroom
Subtotal
Gynmasuim
Gymnasium Storage
FitnessRoom
FitnessRoom Storage
Subtotal
Men'sRestroom
WomensRestroom
Warming/Demonstration Kitchen
Outdoor Storage
Kitchen Storage
FollowingAreasLocated at Lower
Level or Elsewhere on Site
General Build.Equip.and Stor.
Janitor'sClosets/Mop Sink
Trash /Recycling
Server/MDFRoom
Mechanical / Electrical Rooms
Subtotal
Total
Area
200
incl.abv.
175
420
1,670
130
incl.abv.
1,030
250
0
60
50
8,580
4,350
150
170
100
120
3,200
220
930
incl.abv.
310
370
55
2,825
incl.abv.
375
1/16" = 1'
3
4
6
5
12
11
9
8
1
7
10
13
14
15 Overlook/Terrace
1
34
5
6
7
8
9
10
11
12
13
14
15
Classroom
Lounge2
2
12
April 4th 2017
April 4th 2017
architectscox graae + spackPalisadesRecreation Center BuildingElevations
March 6th,2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
5
0 8' 16' 24'
1st Floor
±0' 0"
2nd Floor
+10' 8"
New Roof
+22' 6"
Existing Ridge
+27' 6"
1st Floor
±0' 0"
2nd Floor
+10' 8"
New Roof
+22' 6"
Existing Ridge
+27' 6"
East Elevation
North Elevation
3/32" = 1'
Notes(Proposed)
1. Repair paint,wood structure
2. Repair,paint wood dormer
3. Repair metal roofing
4. New wood shutter to match
original,typ.
5. Repl.windowsto closely match
original.Repair,paint wood trim
6. Wood trim repair,repaint
7. Repair guttersand downspouts
8. New entry doors
9. New Stair
10. Clean,repair,repaint brick
11. Not Used
12. Not Used
Notes(Existing)
1. Not Used
2. Brick
3. Rusticated brick
4. Slat mechanical equip.screen
5. Metal copingcolor matched to
slate wall
6. Slate wall cladding
7. Horiz.Aluminum louverscolor
matched to storefront
8. Aluminum storefront
9. Concrete wall
10. Not Used
11. New ramp
12. Metal awningover entry doors
13. Pre-finished metal wall panel
3 4 65
2
98
1
7
10
11
1 6
2
8
82 35 6
9
13
8 7
April 4th 2017
architectscox graae + spackPalisadesRecreation Center BuildingElevations
March 6th,2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
6
1st Floor
±0' 0"
1st Floor
±0' 0"
2nd Floor
+10' 8"
New Roof
+22' 6"
0 8' 16' 24'
Existing Ridge
+27' 6"
2nd Floor
+10' 8"
New Roof
+22' 6"
Existing Ridge
+27' 6"
South Elevation
West Elevation
3/32" = 1'
Notes(Proposed)
1. Repair paint,wood structure
2. Repair,paint wood dormer
3. Repair metal roofing
4. New wood shutter to match
original,typ.
5. Repl.windowsto closely match
original.Repair,paint wood trim
6. Wood trim repair,repaint
7. Repair guttersand downspouts
8. New entry doors
9. New Stair
10. Clean,repair,repaint brick
11. Not Used
12. Not Used
13. New ramp
Notes(Existing)
1. Scupper and Downspout
2. Brick
3. Rusticated brick
4. Slat mechanical equip.screen
5. Metal copingcolor matched to
slate wall
6. Slate wall cladding
7. Horiz.Aluminum louverscolor
matched to storefront
8. Aluminum storefront
9. Concrete wall
10. Not Used
11. New Ramp
12. Metal awningover entry doors
13. Pre-finished metal wall panel
9
8
12 16
7
2 34 5 612 12
13
13 13
8 23 56
9
88
84 1
1111
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
architectscox graae + spackPalisadesRecreation Center Title Block
January 5th,2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
E X I ST IN G   PH OTOS
April 4th 2017
architectscox graae + spackPalisadesRecreation Center Title Block
January 5th,2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
E X I ST IN G   PH OTOS
April 4th 2017
architectscox graae + spackPalisadesRecreation Center Title Block
January 5th,2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
EX ISTIN G  P HOTOS
April 4th 2017
architectscox graae + spackPalisadesRecreation Center Title Block
January 5th,2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
P RO PO S E D  SIT E   P L A N
N
TERRACE
BIKE RACKS/ TRASH RECEPTACLE
CONCRETE WALL WITH 
WOOD SEATING
FLAG POLE
ENTRANCE PLAZAEXISTING PATH
BIORETENTION 
PLANTING
BIORETENTION 
PLANTING
BENCH
RAINWATER STORAGE
RIVER ROCK STRIP AT 
BUILDING EDGE
EX. BASKETBALL 
COURT
EXISTING 
PLAYGROUND 
AND SPLASHPAD
RAMP
SEAT WALL
SLOT DRAIN 
ACCENT PLANTING
PORCH
COM
M
UNITY 
GARDENS
EXISTING LARGE 
CANOPY TREE
EXISTING FLOWERING TREES
COM
M
UNITY 
GARDENS
1 " = 2 0 '‐ 0 "
April 4th 2017
April 4th 2017
architectscox graae + spackPalisadesRecreation Center Title Block
January 5th,2017
copyright © cox graae + spack ar chitects 2016
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
22
MARCH 2017
P L A N T   MATE RI ALS
River Birch Flowering Dogwood Yoshino Cherry Crabapple
Bioretention planting Bioretention planting Accent planting
April 4th 2017
architectscox graae + spackPalisades Recreation Center TRAFFIC CONDITIONS
March 6th,2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
N
0 20' 40'10'
1"=20'
SHERIER PL NW
STOP
1
2
2
2
2
3 34
5
6
7
77
109
EXISTING PARK ENTRANCE
5
4
3
2 EXISTING SIDEWALK
EXISTING ADA PEDESTRIAN RAMP
EXISTING CROSSWALK
EXISTING LAWN
PROPOSED TRAFFIC HUMP
PER DDOT STANDARD 605.15
6 EXISTING BRICK PATH
7 EXISTING PARKING LANE
PROPOSED RAISED PEDESTRIAN
CROSSWALK PER DDOT STANDARD 605.16
9
1
KEY NOTES
10
EXISTING ON-SITE PARKING LOT8
April 4th 2017
architectscox graae + spackPalisades Recreation Center TRAFFIC CONDITIONS
March 6th,2017
copyright © cox graae + spack ar chitects 2017
scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT
N/A
April 4th 2017
Next Steps
Pre Construction / Site Investigations April 2017 to June 2017
Interior Demolition / Abatement May 2017 to June 2017
Site Construction / Expansion July 2017 to March 2018
Department of General Services (DGS)
Jackie Stanley, Community Outreach Specialist
Jackie.Stanley@dc.gov
Department of Parks & Recreation (DPR)
Brent Sisco, Landscape Architect
Brent.Sisco@dc.gov
Contact Information
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4, 2017)

Palisades Recreation Center - Palisades Citizens Association Meeting (April 4, 2017)

  • 1.
    architectscox graae +spackPalisades Recreation Center Cover April 4th 2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT Palisades Recreation Center PalisadesCitizensAssociation Meeting April 4th,2017 5200 Sherier Place NW Washington,DC 20016 April 4th 2017
  • 2.
  • 3.
  • 4.
    architectscox graae +spackPalisadesRecreation Center Proposed First Floor Plan March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 30 8' 16' 32' UP UP UPUP UP UP UP UP DN DN Court Size 48'x40' Spaces Office/Control Office Storage Staff Restroom Subtotal Public Entr.Lobby and Reception Multi-Purpose Room Multi-Purpose Room Storage Classroom Senior Lounge Family Restroom Subtotal Gynmasuim Gymnasium Storage FitnessRoom FitnessRoom Storage Subtotal Men'sRestroom WomensRestroom Warming/Demonstration Kitchen Outdoor Storage Kitchen Storage FollowingAreasLocated at Lower Level or Elsewhere on Site General Build.Equip.and Stor. Janitor'sClosets/Mop Sink Trash /Recycling Server/MDFRoom Mechanical / Electrical Rooms Subtotal Total Area 200 incl.abv. 175 420 1,670 130 incl.abv. 1,030 250 0 60 50 8,580 4,350 150 170 100 120 3,200 220 930 incl.abv. 310 370 55 2,825 incl.abv. 375 1/16" = 1' 3 4 6 5 12 11 9 8 1 7 10 13 14 15 Overlook/Terrace 1 34 5 6 7 8 9 10 11 12 13 14 15 Classroom Lounge2 2 12 April 4th 2017
  • 5.
  • 6.
    architectscox graae +spackPalisadesRecreation Center BuildingElevations March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 5 0 8' 16' 24' 1st Floor ±0' 0" 2nd Floor +10' 8" New Roof +22' 6" Existing Ridge +27' 6" 1st Floor ±0' 0" 2nd Floor +10' 8" New Roof +22' 6" Existing Ridge +27' 6" East Elevation North Elevation 3/32" = 1' Notes(Proposed) 1. Repair paint,wood structure 2. Repair,paint wood dormer 3. Repair metal roofing 4. New wood shutter to match original,typ. 5. Repl.windowsto closely match original.Repair,paint wood trim 6. Wood trim repair,repaint 7. Repair guttersand downspouts 8. New entry doors 9. New Stair 10. Clean,repair,repaint brick 11. Not Used 12. Not Used Notes(Existing) 1. Not Used 2. Brick 3. Rusticated brick 4. Slat mechanical equip.screen 5. Metal copingcolor matched to slate wall 6. Slate wall cladding 7. Horiz.Aluminum louverscolor matched to storefront 8. Aluminum storefront 9. Concrete wall 10. Not Used 11. New ramp 12. Metal awningover entry doors 13. Pre-finished metal wall panel 3 4 65 2 98 1 7 10 11 1 6 2 8 82 35 6 9 13 8 7 April 4th 2017
  • 7.
    architectscox graae +spackPalisadesRecreation Center BuildingElevations March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 6 1st Floor ±0' 0" 1st Floor ±0' 0" 2nd Floor +10' 8" New Roof +22' 6" 0 8' 16' 24' Existing Ridge +27' 6" 2nd Floor +10' 8" New Roof +22' 6" Existing Ridge +27' 6" South Elevation West Elevation 3/32" = 1' Notes(Proposed) 1. Repair paint,wood structure 2. Repair,paint wood dormer 3. Repair metal roofing 4. New wood shutter to match original,typ. 5. Repl.windowsto closely match original.Repair,paint wood trim 6. Wood trim repair,repaint 7. Repair guttersand downspouts 8. New entry doors 9. New Stair 10. Clean,repair,repaint brick 11. Not Used 12. Not Used 13. New ramp Notes(Existing) 1. Scupper and Downspout 2. Brick 3. Rusticated brick 4. Slat mechanical equip.screen 5. Metal copingcolor matched to slate wall 6. Slate wall cladding 7. Horiz.Aluminum louverscolor matched to storefront 8. Aluminum storefront 9. Concrete wall 10. Not Used 11. New Ramp 12. Metal awningover entry doors 13. Pre-finished metal wall panel 9 8 12 16 7 2 34 5 612 12 13 13 13 8 23 56 9 88 84 1 1111 April 4th 2017
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
    April 4th 2017 architectscoxgraae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 E X I ST IN G   PH OTOS
  • 15.
    April 4th 2017 architectscoxgraae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 E X I ST IN G   PH OTOS
  • 16.
    April 4th 2017 architectscoxgraae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 EX ISTIN G  P HOTOS
  • 17.
    April 4th 2017 architectscoxgraae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 P RO PO S E D  SIT E   P L A N N TERRACE BIKE RACKS/ TRASH RECEPTACLE CONCRETE WALL WITH  WOOD SEATING FLAG POLE ENTRANCE PLAZAEXISTING PATH BIORETENTION  PLANTING BIORETENTION  PLANTING BENCH RAINWATER STORAGE RIVER ROCK STRIP AT  BUILDING EDGE EX. BASKETBALL  COURT EXISTING  PLAYGROUND  AND SPLASHPAD RAMP SEAT WALL SLOT DRAIN  ACCENT PLANTING PORCH COM M UNITY  GARDENS EXISTING LARGE  CANOPY TREE EXISTING FLOWERING TREES COM M UNITY  GARDENS 1 " = 2 0 '‐ 0 "
  • 18.
  • 19.
    April 4th 2017 architectscoxgraae + spackPalisadesRecreation Center Title Block January 5th,2017 copyright © cox graae + spack ar chitects 2016 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT 22 MARCH 2017 P L A N T   MATE RI ALS River Birch Flowering Dogwood Yoshino Cherry Crabapple Bioretention planting Bioretention planting Accent planting
  • 20.
    April 4th 2017 architectscoxgraae + spackPalisades Recreation Center TRAFFIC CONDITIONS March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT N 0 20' 40'10' 1"=20' SHERIER PL NW STOP 1 2 2 2 2 3 34 5 6 7 77 109 EXISTING PARK ENTRANCE 5 4 3 2 EXISTING SIDEWALK EXISTING ADA PEDESTRIAN RAMP EXISTING CROSSWALK EXISTING LAWN PROPOSED TRAFFIC HUMP PER DDOT STANDARD 605.15 6 EXISTING BRICK PATH 7 EXISTING PARKING LANE PROPOSED RAISED PEDESTRIAN CROSSWALK PER DDOT STANDARD 605.16 9 1 KEY NOTES 10 EXISTING ON-SITE PARKING LOT8
  • 21.
    April 4th 2017 architectscoxgraae + spackPalisades Recreation Center TRAFFIC CONDITIONS March 6th,2017 copyright © cox graae + spack ar chitects 2017 scale:OWNER CONTRACTOR LANDSCAPE ARCHITECT N/A
  • 22.
  • 23.
    Next Steps Pre Construction / Site Investigations April 2017 to June 2017 Interior Demolition / AbatementMay 2017 to June 2017 Site Construction / Expansion July 2017 to March 2018
  • 24.