WHAT TO EXPECT FROM
THE STATE AND THE
CITIZENS.
OBJECTIVES
OBJECTIVES:
1. EXPLAIN THE DRR RELATED LAWS AND
POLICIES.
2. AVAIL OF EXISTING DRR-RELATED
SERVICES, PROGRAMS AND PROJECTS.
3. ABIDE BY PUBLIC POLICIES ON DRRM.
DISASTER RISK REDUCTION AND
MANAGEMENT(DRRM)-RELATED
LAWS AND POLICIES.
PRESIDENTIAL DECREE NO.
1566
• IN 1978, FORMER PRESIDENT MARCOS MANDATED PRESIDENTIAL DECREE
NO.1566 TO STRENGTHEN THE PHILIPPINE DISASTER CONTROL.
• IT CREATED THE NATIONAL DISASTER COORDINATING COUNCIL (NDCC),
THE FOCAL ORGANIZATION FOR DISASTER MANAGEMENT IN TH COUNTRY
AT THAT TIME. IT WAS HEADED BY THE SECRETARY OF NATIONAL
DEFENSE. IT ALSO CREATED REGIONAL, PROVINCIAL, AND LOCAL
DISASTER COORDINATING COUNCILS.
• IN TERMS OF FUNDING, THE LOCAL GOVERNMENT UNITS (LGU) WERE TO
PROGRAM FUNDS TO BE USED FOR DISASTER PREPAREDNESS
INCLUDING ORGANIZATION OF THE LOCAL DISASTER COUNCILS
INFRASTRUCTURE, EQUIPMENT AND TRAINING OF TEAMS.
REPUBLIC ACT NO. 8185
• IN 1996, REPUBLIC ACT NO. 8185 WAS CREATED AFTER THE
REPUBLIC ACT NO. 7160, OR THE LOCAL GOVERNMENT CODE(LGC)
OF THE 1991, WAS ENACTED. THIS WAS BECAUSE WHEN THE LGC
ENABLED THE LGU’S TO ACCESS 5% OF THE ESTIMATED REVENUE
FROM THE REGULAR SOURCES FOR UNFORESEEN EXPENDITURES
SUCH AS THE OCCURRENCE OF CALAMITIES, BUT ONLY WHEN THE
PRESIDENT DECLARES THAT THE AREA IS IN A STATE OF CALAMITY.
REPUBLIC ACT NO. 8185
• REPUBLIC ACT NO. 8185 IDENTIFIED AREAS OF EXPENDITURE
SUCH AS RELIEF, REHABILITATION, RECONSTRUCTION AND
OTHER SERVICES WITH REGARDS TO CALAMITIES.
• IT GAVE THE POWER TO LOCAL DEVELOPMENT COUNCIL TO
MONITOR THE USE AND DISBURSEMENT OF THE LOCAL
CALAMITY FUND, WITHOUT CENTRALIZING THE DECISION-
MAKING PROCESS TO THE PRESIDENT.
NDCC FOUR POINT ACTION
PLAN
• IN 2005, THE GOVERNMENT SEEN THAT THE CURRENT
LAW ONLY FOCUS ON RESPONSE THAT THEY CREATED
THE NATIONAL FOUR POINT ACTION PLAN TO
SPEARHEAD PREVENTION AND MITIGATION.
NDCC FOUR POINT ACTION
PLAN
• IN ITS PLAN, IT CONTINUED:
1.) IMPROVING FORECASTING CAPABILITY OF
CONCERNED AGENCIES,
2.) ENGAGING THE LOCAL DISASTER COUNCILS,
3.) HOLDING ANNUAL DISASTER CONSCIOUSNESS
MONTH IN JULY AND,
4.) FORMALIZING STAKEHOLDER PARTNERSHIPS
THROUGH MEMORANDA OF AGREEMENT.
PHILIPPINE DISASTER RISK
REDUCTION AND
MANAGEMENT ACT
• IN 2010, AS THE PARADIGM SHIFTS FROM RESPONSE TO
MITIGATION. REPUBLIC ACT NO. 10121, ALSO KNOWN AS THE
PHILIPPINE DISASTER RISK REDUCTION MANAGEMENT ACT WAS
ENACTED.
• RA NO. 10121, IS AN ACT MANDATED TO STRENGTHEN DISASTER
MANAGEMENT IN THE PHILIPPINES. IT REPEALED PD NO. 1566
AND REPLACED THE NDCC WITH THE NATIONAL DISASTER RISK
REDUCTION AND MANAGEMENT COUNCIL (NDRRMC) AS A FOCAL
BODY.
PHILIPPINE DISASTER RISK
REDUCTION AND
MANAGEMENT ACT
• NDRRMC WAS NOW HEADED BY THE OFFICE OF CIVIL
DEFENSE (OCD) AS ITS IMPLEMENTING AGENCY AS ITS
FOCUS IS ON PREVENTION AND MITIGATION, THE LOCAL
DRRM FUND WAS ESTABLISHED.
• 70% OF WHICH SHALL BE USED FOR PRE-DISASTER
MEASURES. THE REST SHALL BE ALLOCATED AS QUICK
RESPONSE FUND, THAT IS SERVE AS A STAND-BY FUND FOR
RELIEF AND RECOVERY PROGRAMS.
DRR-RELATED SERVICES,
PROGRAMS AND PROJECTS
DRR-RELATED SERVICES,
PROGRAMS AND PROJECTS.
The NDRRMP covers 4 thematic areas:
1. Disaster Prevention and Mitigation.
2. Disaster Preparedness.
3. Disaster Response.
4. Disaster Rehabilitation and Recovery.
1. DISASTER PREVENTION AND
MITIGATION.
Overall Responsible Agency:
Department of Science and Technology (DOST)
Expected Outcome:
Avoid hazards and mitigate their potential impacts by
reducing vulnerabilities and exposure and enhancing
capacities of communities.
2. DISASTER PREPAREDNESS
Overall Responsible Agency:
Department of Interior and Local Government (DILG)
Expected Outcome:
Establish and strengthen capacities of communities to
anticipate, cope, and recover from the negative impact of
emergency and occurrences and disasters.
3. DISASTER RESPONSE
Overall Responsible Agency:
Department of Social Welfare and Development (DSWD)
Expected Outcome:
Provide life preservation and meet the basic subsidence
needs of affected population based on acceptable standards
during or immediately after a disaster.
4. DISASTER REHABILITATION
AND RECOVERY
Overall Responsible Agency:
National Economic and Development Authority (NEDA)
Expected Outcome:
After disaster restore and improve facilities, livelihood and
living condition and organizational capacities of affected
communities and reduce disaster risk in accordance with the
‘building back better’ principle.
FLAGSHIP PROJECT RELATED TO DISASTER
RISK REDUCTION AND MANAGEMENT
(DRRM)
• Project NOAH (Nationwide Operational Assessment of Hazards.)
-Is the Philippine’s primary disaster risk reduction and
management program under the Department of Science and
Technology (DOST) and its attached agencies, and the University
of the Philippines.
-It was a response to President Benigno Aquino III‘s call on
a better disaster prevention and mitigation system in the Philippines.
And was publicly launched on July, 6 2012.
PROJECT NOAH (NATIONWIDE
OPERATIONAL ASSESSMENT OF HAZARDS)
The project uses advanced technologies to enhance current geo-hazard
vulnerability maps. It is also developed with the help of the National Institute
of Geological Science and the College of Engineering of the University of
the Philippines, Philippine Atmospheric, Geophysical and Astronomical
Services Administration (PAGASA), Philippine Institute of Volcanology
and Seismology (PHIVOLCS), Advanced Science and Technology Institute
(ASTI) and the Science and Technology Information Institute (STI).
The project is now composed of 21 institutions from local and private
sectors including media and telecommunication companies.
PROJECT NOAH (NATIONWIDE
OPERATIONAL ASSESSMENT OF HAZARDS)
The program include 6 major components describes as follows:
• Distribution of Hydrometeorical devices such as automated rain gauges and
water level monitoring stations in major river basins and flood prone areas.
• Development of a Three-Dimensional flood inundation and hazards maps.
• Storm surge assessment and mitigation.
• A food center.
• Local development and operation od Doppler radar systems and landslide
sensors.
• The use of television and web portal to display real-time weather conditions.
THANK YOUUUUUUU

DRRRawr-Laws-and-Policies.pptx

  • 1.
    WHAT TO EXPECTFROM THE STATE AND THE CITIZENS.
  • 2.
  • 3.
    OBJECTIVES: 1. EXPLAIN THEDRR RELATED LAWS AND POLICIES. 2. AVAIL OF EXISTING DRR-RELATED SERVICES, PROGRAMS AND PROJECTS. 3. ABIDE BY PUBLIC POLICIES ON DRRM.
  • 4.
    DISASTER RISK REDUCTIONAND MANAGEMENT(DRRM)-RELATED LAWS AND POLICIES.
  • 5.
    PRESIDENTIAL DECREE NO. 1566 •IN 1978, FORMER PRESIDENT MARCOS MANDATED PRESIDENTIAL DECREE NO.1566 TO STRENGTHEN THE PHILIPPINE DISASTER CONTROL. • IT CREATED THE NATIONAL DISASTER COORDINATING COUNCIL (NDCC), THE FOCAL ORGANIZATION FOR DISASTER MANAGEMENT IN TH COUNTRY AT THAT TIME. IT WAS HEADED BY THE SECRETARY OF NATIONAL DEFENSE. IT ALSO CREATED REGIONAL, PROVINCIAL, AND LOCAL DISASTER COORDINATING COUNCILS. • IN TERMS OF FUNDING, THE LOCAL GOVERNMENT UNITS (LGU) WERE TO PROGRAM FUNDS TO BE USED FOR DISASTER PREPAREDNESS INCLUDING ORGANIZATION OF THE LOCAL DISASTER COUNCILS INFRASTRUCTURE, EQUIPMENT AND TRAINING OF TEAMS.
  • 6.
    REPUBLIC ACT NO.8185 • IN 1996, REPUBLIC ACT NO. 8185 WAS CREATED AFTER THE REPUBLIC ACT NO. 7160, OR THE LOCAL GOVERNMENT CODE(LGC) OF THE 1991, WAS ENACTED. THIS WAS BECAUSE WHEN THE LGC ENABLED THE LGU’S TO ACCESS 5% OF THE ESTIMATED REVENUE FROM THE REGULAR SOURCES FOR UNFORESEEN EXPENDITURES SUCH AS THE OCCURRENCE OF CALAMITIES, BUT ONLY WHEN THE PRESIDENT DECLARES THAT THE AREA IS IN A STATE OF CALAMITY.
  • 7.
    REPUBLIC ACT NO.8185 • REPUBLIC ACT NO. 8185 IDENTIFIED AREAS OF EXPENDITURE SUCH AS RELIEF, REHABILITATION, RECONSTRUCTION AND OTHER SERVICES WITH REGARDS TO CALAMITIES. • IT GAVE THE POWER TO LOCAL DEVELOPMENT COUNCIL TO MONITOR THE USE AND DISBURSEMENT OF THE LOCAL CALAMITY FUND, WITHOUT CENTRALIZING THE DECISION- MAKING PROCESS TO THE PRESIDENT.
  • 8.
    NDCC FOUR POINTACTION PLAN • IN 2005, THE GOVERNMENT SEEN THAT THE CURRENT LAW ONLY FOCUS ON RESPONSE THAT THEY CREATED THE NATIONAL FOUR POINT ACTION PLAN TO SPEARHEAD PREVENTION AND MITIGATION.
  • 9.
    NDCC FOUR POINTACTION PLAN • IN ITS PLAN, IT CONTINUED: 1.) IMPROVING FORECASTING CAPABILITY OF CONCERNED AGENCIES, 2.) ENGAGING THE LOCAL DISASTER COUNCILS, 3.) HOLDING ANNUAL DISASTER CONSCIOUSNESS MONTH IN JULY AND, 4.) FORMALIZING STAKEHOLDER PARTNERSHIPS THROUGH MEMORANDA OF AGREEMENT.
  • 10.
    PHILIPPINE DISASTER RISK REDUCTIONAND MANAGEMENT ACT • IN 2010, AS THE PARADIGM SHIFTS FROM RESPONSE TO MITIGATION. REPUBLIC ACT NO. 10121, ALSO KNOWN AS THE PHILIPPINE DISASTER RISK REDUCTION MANAGEMENT ACT WAS ENACTED. • RA NO. 10121, IS AN ACT MANDATED TO STRENGTHEN DISASTER MANAGEMENT IN THE PHILIPPINES. IT REPEALED PD NO. 1566 AND REPLACED THE NDCC WITH THE NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT COUNCIL (NDRRMC) AS A FOCAL BODY.
  • 11.
    PHILIPPINE DISASTER RISK REDUCTIONAND MANAGEMENT ACT • NDRRMC WAS NOW HEADED BY THE OFFICE OF CIVIL DEFENSE (OCD) AS ITS IMPLEMENTING AGENCY AS ITS FOCUS IS ON PREVENTION AND MITIGATION, THE LOCAL DRRM FUND WAS ESTABLISHED. • 70% OF WHICH SHALL BE USED FOR PRE-DISASTER MEASURES. THE REST SHALL BE ALLOCATED AS QUICK RESPONSE FUND, THAT IS SERVE AS A STAND-BY FUND FOR RELIEF AND RECOVERY PROGRAMS.
  • 12.
  • 13.
    DRR-RELATED SERVICES, PROGRAMS ANDPROJECTS. The NDRRMP covers 4 thematic areas: 1. Disaster Prevention and Mitigation. 2. Disaster Preparedness. 3. Disaster Response. 4. Disaster Rehabilitation and Recovery.
  • 14.
    1. DISASTER PREVENTIONAND MITIGATION. Overall Responsible Agency: Department of Science and Technology (DOST) Expected Outcome: Avoid hazards and mitigate their potential impacts by reducing vulnerabilities and exposure and enhancing capacities of communities.
  • 15.
    2. DISASTER PREPAREDNESS OverallResponsible Agency: Department of Interior and Local Government (DILG) Expected Outcome: Establish and strengthen capacities of communities to anticipate, cope, and recover from the negative impact of emergency and occurrences and disasters.
  • 16.
    3. DISASTER RESPONSE OverallResponsible Agency: Department of Social Welfare and Development (DSWD) Expected Outcome: Provide life preservation and meet the basic subsidence needs of affected population based on acceptable standards during or immediately after a disaster.
  • 17.
    4. DISASTER REHABILITATION ANDRECOVERY Overall Responsible Agency: National Economic and Development Authority (NEDA) Expected Outcome: After disaster restore and improve facilities, livelihood and living condition and organizational capacities of affected communities and reduce disaster risk in accordance with the ‘building back better’ principle.
  • 18.
    FLAGSHIP PROJECT RELATEDTO DISASTER RISK REDUCTION AND MANAGEMENT (DRRM) • Project NOAH (Nationwide Operational Assessment of Hazards.) -Is the Philippine’s primary disaster risk reduction and management program under the Department of Science and Technology (DOST) and its attached agencies, and the University of the Philippines. -It was a response to President Benigno Aquino III‘s call on a better disaster prevention and mitigation system in the Philippines. And was publicly launched on July, 6 2012.
  • 19.
    PROJECT NOAH (NATIONWIDE OPERATIONALASSESSMENT OF HAZARDS) The project uses advanced technologies to enhance current geo-hazard vulnerability maps. It is also developed with the help of the National Institute of Geological Science and the College of Engineering of the University of the Philippines, Philippine Atmospheric, Geophysical and Astronomical Services Administration (PAGASA), Philippine Institute of Volcanology and Seismology (PHIVOLCS), Advanced Science and Technology Institute (ASTI) and the Science and Technology Information Institute (STI). The project is now composed of 21 institutions from local and private sectors including media and telecommunication companies.
  • 20.
    PROJECT NOAH (NATIONWIDE OPERATIONALASSESSMENT OF HAZARDS) The program include 6 major components describes as follows: • Distribution of Hydrometeorical devices such as automated rain gauges and water level monitoring stations in major river basins and flood prone areas. • Development of a Three-Dimensional flood inundation and hazards maps. • Storm surge assessment and mitigation. • A food center. • Local development and operation od Doppler radar systems and landslide sensors. • The use of television and web portal to display real-time weather conditions.
  • 21.