Disruptive Innovations
By Group 3
Presented By
Pushpak Elledu - 3275
Venkata Karthik - 3273
Vivekananda sai - 3576
Prachi Nitin
Priyamvadha
Harsh sharma
Atrey Bhardwaj
• It is not just the magnitude
of the advance
• If it works to sustain the
existing business model, it is
not disruptive
• A change in business model
from the existing one to a
new one which is more
efficient and/or better
addresses the demands of
consumers is the key
What Makes An Innovation
Disruptive?
Disruptive Technologies
• Bring new value propositions to market
• Underperform established products in mainstream markets
• Have characteristics that appeal to fringe or new customers
• Products are typically cheaper, simpler, smaller, less capable, but
more convenient to use
• “…disruptive technologies that may underperform today, relative to
what users in the market demand, may be fully performance-
competitive in that same market tomorrow.”
What is a disruptive technology?
Performance
(log. Scale)
TimeSource: Adapted from Christensen (1993)
Second technology
Third technology
First technology
A well researched example: hard disk drives
Source: Christensen, 1993
Intersecting Trajectories of Capacity Demanded versus Capacity Supplied in Rigid Disk Drives
Why are incumbents (often) sitting
ducks?
• Economic interest
• Better-off funding incremental supportive innovation
• Organizational logic
• Structural “fit”, interaction routines, collective tacit skills
• Social heritage
• Network embeddedness (customers, suppliers, partners)
• Wrong Value Network
• Context of corporation’s business environment leads to missing
competition arising from outside
• Organizational Structure
• Companies organized by a products substructure fail when
fundamental architecture changes
Why are incumbents (often) sitting
ducks?
• Core Competencies
• Firms fail when a technological change destroyed the value of competencies
previously cultivated and succeeded when new technologies enhanced them
• Technology S-curves
• Firms fail when they miss inflection points along their main product thrust
and specifically when they miss technologies advancing in related fields
• Wishful thinking
• The larger and more successful and organization becomes, the weaker the
argument that emerging markets can remain useful engines for growth.
The Incumbent's Weak Response
• Late, slow, half-hearted, tentative and ineffective
• On the “wrong” trajectory (accelerate their own, ignore the new)
• Lacking critical mass, under funded, under supported
• Expensive
. Time compression diseconomies
. Lasting stalemate
• Often strategically flawed
. Transfer of “old” value creation system
To Challengers, Disruptive Technologies Open A Window Of
Opportunity:
• They are disruptive for incumbents, supportive for challengers
• They mix technical , social and value innovations, making them difficult for
incumbents to emulate …
• They create / open vast new “low-end” markets to use a staging areas...
• They originate and spread below / beyond the radar screen of incumbents
• They draw on distant and diverse sources of knowledge
• They rely on new, or hard to enter, social networks
Disruptive Technologies
Established Disruptive Technology
Simulations via Training Classrooms Edutainment: Virtual Reality and Games
Face-to-face collaborative work Online forums/social networking
Face-to-face interaction Social Networking
Programmes of study delivered on
campus/blended learning with few
delivered totally online
Mobile Technology; Open Education
Resources; MOOCs (Massive Online Open
Courses)
Build prototypes 3D Printing
Are these companies clueless?
• Not every technology that looks disruptive is feasible.
• You cannot chase every possible disruptive technology to cover all
your bets
• Even technologies which are well-researched and appear to be
potentially disruptive can be very difficult to bring to market
• The Innovator's Dilemma: A company which is in an existing business
and listening to its existing customers feels that there is no need for
anything new.
Incumbents that respond successfully
• Widely distributed prospecting for and active sensing of
new knowledge, worldwide, including emerging / latent
market needs
• Cultivating absorptive capacity and knowledge melding
• Sustaining a pluralistic dialogue, internally and externally
• Creatively challenging existing orthodoxies and business
models
• Letting “autonomous” strategic processes flourish, and
select, at various levels, from their outcomes
• Fostering Internal differentiation of organization
Anti-Disruptive Technology
J. H. Helms, Ford Research Lab.
Lockheed Martin Aeronautics
Role Stealth multirole fighter
National origin United States
Manufacturer Lockheed Martin
Aeronautics
Produced 2006–present
Number built 63
Unit cost F-35C: US$199.4M (flyaway
cost, 2013)
Role Stealth air superiority fighter
National origin United States
Manufacturer Lockheed Martin Aeronautics
Boeing Defense, Space & Security
Produced F-22: 1996–2011
Number built 195
Unit cost US$150 million (flyaway cost for
FY2009)
Lockheed Martin F-22 Raptor Lockheed Martin F-35 Lightning II
Role Remote piloted aircraft,
UAV/UAS
Manufacturer General Atomics
Aeronautical Systems
Produced 1995–present
Number built 360 (285 RQ-1, 75 MQ-1)
Unit cost US$4.03 million (2010)
General Atomics MQ-1 Predator
Role Unmanned combat air
vehicle
National origin United States
Manufacturer General Atomics
Aeronautical Systems
Produced 2007–present
Number built 57
Unit cost US$16.9 million (2013)
General Atomics MQ-9 Reaper
UAS Data Link
• Pilot sits in Ground Control Station
(GCS)
• Can be located anywhere in the
world
• If line of sight exists, data is streamed
directly to GCS from drone
• If line of sight does not exist, a
satellite relay is utilized
• Spacecraft allow a pilot in Nevada
to control drone over Afghanistan
• No human limiting factors.
• In March 2011, the U.S. Air Force was
training more pilots for advanced
unmanned aerial vehicles than for any
other single weapons system.
A Part of the Aviation Revolution Unlimited
Applications
• Military/Security
– Defense
– Surveillance
• Civil
– Defense
– Natural Disasters
– Humanitarian Relief
• Science
– Environment
– Weather & Storm
Tracking
• Commercial
– Wireless
Communications
– Precision Agriculture
– Cargo Transport
Dull, Dirty, Dangerous Missions
Current Military Uses
• Significant increase in UAV usage by military forces
around the globe.
• Most prevalent role of UAVs in the military:
• Intelligence, surveillance, and reconnaissance (ISR)
• Air Strikes using missiles and bombs
• Over 40 countries currently possess or are
developing UAVs, including:
•The U.S.
•China
•India
•Great Britain
•Israel
Potential Benefits
• Cost effectiveness when doing reconnaissance in both small and large
areas.
• Loss of life is minimized.
• Can do reconnaissance without being spotted, due to ability to climb to
such a high altitude.
• Some are equipped with weaponry which can be used to strike down
targets.
• They are equipped with night vision and can see through clouds.
• Have the ability to stream video to anywhere (President, Secretary of
Defense, Generals etc.) .
• They're 1/20th of the weight of a fighter jet so they can fly longer on less
fuel.
Figure: UAV Annual Funding Profile (In Million $)
Source: OSD, UAV Roadmap 2002-2027, December 2002, p.20.
Figure 5 breaks out the planned funding for each UAV throughout the Future
Years Defense Plan (FYDP):
Figure compares manned to unmanned funding from 2000 to 2010. The chart reveals that UAVs will
make up an increased portion of aircraft funding over the FYDP, growing from 4% in 2000 to 31% in 2010.
• UAV have been proven effective on the battlefield and for
commercial/civilian use
• As time goes on, UAV's will become smaller, faster, fly higher and
stream better images.
• They should eventually replace fighter jets, and in doing so they
will save many lives.
• UAVs such as the Predator will one day replace manned fighter
The future of UAV’s depend on the answer to the
question “How Much Is a Human Life Worth?”
Is all lost?
If you are an established, successful company, how do you
counter?
• Choose 1 or 2 disruptive technologies that concern you the most and
participate
• Set up separate organization in separate location with constrained
funding
• Alternatively, invest in start-ups
• Manage expectations as markets are found for disruptive
technologies by trial and error
What can managers faced with disruptive
technologies do?
• Set up a separate organization small enough to get excited by small
gains.
• Plan for failure. Don’t bet all your resources on being right the first
time. Think of your initial efforts at commercializing a disruptive
technology as learning opportunities. Make revisions as you gather
data.
• Don’t count on breakthroughs. Move ahead early and find the
market for the current attributes of the technology. You will find it
outside the current mainstream market. You will also find that the
attributes that make disruptive technologies unattractive to
mainstream markets are the attributes on which the new markets will
be built.
• As we have seen the demand of UAV is increasing and they are expected to
gradually replace the role of fighter Jets in defense field.
• As Lockheed Martin Aeronautics doesn't have drone division the most
optimum solution would be to collaborate with others to get a foothold in
that sector.
• Example: For F-22 Raptor Lockheed Martin Aeronautics is the prime
contractor and is responsible for the majority of the airframe, weapon
systems and final assembly, while Program partner Boeing Defense, Space
& Security provides the wings, aft fuselage, avionics integration, and
training systems.
• A similar approach can be taken to collaborate with General Atomics
Aeronautical Systems to design a new unmanned combat vehicle integrating
the strengths of both companies.
What should Lockheed Martin Aeronautics do in such a situation?
Drones as a Disruptive Innovation Technology

Drones as a Disruptive Innovation Technology

  • 1.
    Disruptive Innovations By Group3 Presented By Pushpak Elledu - 3275 Venkata Karthik - 3273 Vivekananda sai - 3576 Prachi Nitin Priyamvadha Harsh sharma Atrey Bhardwaj
  • 2.
    • It isnot just the magnitude of the advance • If it works to sustain the existing business model, it is not disruptive • A change in business model from the existing one to a new one which is more efficient and/or better addresses the demands of consumers is the key What Makes An Innovation Disruptive?
  • 3.
    Disruptive Technologies • Bringnew value propositions to market • Underperform established products in mainstream markets • Have characteristics that appeal to fringe or new customers • Products are typically cheaper, simpler, smaller, less capable, but more convenient to use • “…disruptive technologies that may underperform today, relative to what users in the market demand, may be fully performance- competitive in that same market tomorrow.”
  • 4.
    What is adisruptive technology? Performance (log. Scale) TimeSource: Adapted from Christensen (1993) Second technology Third technology First technology
  • 5.
    A well researchedexample: hard disk drives Source: Christensen, 1993 Intersecting Trajectories of Capacity Demanded versus Capacity Supplied in Rigid Disk Drives
  • 6.
    Why are incumbents(often) sitting ducks? • Economic interest • Better-off funding incremental supportive innovation • Organizational logic • Structural “fit”, interaction routines, collective tacit skills • Social heritage • Network embeddedness (customers, suppliers, partners) • Wrong Value Network • Context of corporation’s business environment leads to missing competition arising from outside • Organizational Structure • Companies organized by a products substructure fail when fundamental architecture changes
  • 7.
    Why are incumbents(often) sitting ducks? • Core Competencies • Firms fail when a technological change destroyed the value of competencies previously cultivated and succeeded when new technologies enhanced them • Technology S-curves • Firms fail when they miss inflection points along their main product thrust and specifically when they miss technologies advancing in related fields • Wishful thinking • The larger and more successful and organization becomes, the weaker the argument that emerging markets can remain useful engines for growth.
  • 8.
    The Incumbent's WeakResponse • Late, slow, half-hearted, tentative and ineffective • On the “wrong” trajectory (accelerate their own, ignore the new) • Lacking critical mass, under funded, under supported • Expensive . Time compression diseconomies . Lasting stalemate • Often strategically flawed . Transfer of “old” value creation system
  • 9.
    To Challengers, DisruptiveTechnologies Open A Window Of Opportunity: • They are disruptive for incumbents, supportive for challengers • They mix technical , social and value innovations, making them difficult for incumbents to emulate … • They create / open vast new “low-end” markets to use a staging areas... • They originate and spread below / beyond the radar screen of incumbents • They draw on distant and diverse sources of knowledge • They rely on new, or hard to enter, social networks
  • 10.
    Disruptive Technologies Established DisruptiveTechnology Simulations via Training Classrooms Edutainment: Virtual Reality and Games Face-to-face collaborative work Online forums/social networking Face-to-face interaction Social Networking Programmes of study delivered on campus/blended learning with few delivered totally online Mobile Technology; Open Education Resources; MOOCs (Massive Online Open Courses) Build prototypes 3D Printing
  • 11.
    Are these companiesclueless? • Not every technology that looks disruptive is feasible. • You cannot chase every possible disruptive technology to cover all your bets • Even technologies which are well-researched and appear to be potentially disruptive can be very difficult to bring to market • The Innovator's Dilemma: A company which is in an existing business and listening to its existing customers feels that there is no need for anything new.
  • 12.
    Incumbents that respondsuccessfully • Widely distributed prospecting for and active sensing of new knowledge, worldwide, including emerging / latent market needs • Cultivating absorptive capacity and knowledge melding • Sustaining a pluralistic dialogue, internally and externally • Creatively challenging existing orthodoxies and business models • Letting “autonomous” strategic processes flourish, and select, at various levels, from their outcomes • Fostering Internal differentiation of organization
  • 13.
    Anti-Disruptive Technology J. H.Helms, Ford Research Lab.
  • 14.
  • 15.
    Role Stealth multirolefighter National origin United States Manufacturer Lockheed Martin Aeronautics Produced 2006–present Number built 63 Unit cost F-35C: US$199.4M (flyaway cost, 2013) Role Stealth air superiority fighter National origin United States Manufacturer Lockheed Martin Aeronautics Boeing Defense, Space & Security Produced F-22: 1996–2011 Number built 195 Unit cost US$150 million (flyaway cost for FY2009) Lockheed Martin F-22 Raptor Lockheed Martin F-35 Lightning II
  • 16.
    Role Remote pilotedaircraft, UAV/UAS Manufacturer General Atomics Aeronautical Systems Produced 1995–present Number built 360 (285 RQ-1, 75 MQ-1) Unit cost US$4.03 million (2010) General Atomics MQ-1 Predator Role Unmanned combat air vehicle National origin United States Manufacturer General Atomics Aeronautical Systems Produced 2007–present Number built 57 Unit cost US$16.9 million (2013) General Atomics MQ-9 Reaper
  • 17.
    UAS Data Link •Pilot sits in Ground Control Station (GCS) • Can be located anywhere in the world • If line of sight exists, data is streamed directly to GCS from drone • If line of sight does not exist, a satellite relay is utilized • Spacecraft allow a pilot in Nevada to control drone over Afghanistan • No human limiting factors. • In March 2011, the U.S. Air Force was training more pilots for advanced unmanned aerial vehicles than for any other single weapons system.
  • 18.
    A Part ofthe Aviation Revolution Unlimited Applications • Military/Security – Defense – Surveillance • Civil – Defense – Natural Disasters – Humanitarian Relief • Science – Environment – Weather & Storm Tracking • Commercial – Wireless Communications – Precision Agriculture – Cargo Transport Dull, Dirty, Dangerous Missions
  • 19.
    Current Military Uses •Significant increase in UAV usage by military forces around the globe. • Most prevalent role of UAVs in the military: • Intelligence, surveillance, and reconnaissance (ISR) • Air Strikes using missiles and bombs • Over 40 countries currently possess or are developing UAVs, including: •The U.S. •China •India •Great Britain •Israel
  • 20.
    Potential Benefits • Costeffectiveness when doing reconnaissance in both small and large areas. • Loss of life is minimized. • Can do reconnaissance without being spotted, due to ability to climb to such a high altitude. • Some are equipped with weaponry which can be used to strike down targets. • They are equipped with night vision and can see through clouds. • Have the ability to stream video to anywhere (President, Secretary of Defense, Generals etc.) . • They're 1/20th of the weight of a fighter jet so they can fly longer on less fuel.
  • 21.
    Figure: UAV AnnualFunding Profile (In Million $) Source: OSD, UAV Roadmap 2002-2027, December 2002, p.20. Figure 5 breaks out the planned funding for each UAV throughout the Future Years Defense Plan (FYDP):
  • 22.
    Figure compares mannedto unmanned funding from 2000 to 2010. The chart reveals that UAVs will make up an increased portion of aircraft funding over the FYDP, growing from 4% in 2000 to 31% in 2010.
  • 23.
    • UAV havebeen proven effective on the battlefield and for commercial/civilian use • As time goes on, UAV's will become smaller, faster, fly higher and stream better images. • They should eventually replace fighter jets, and in doing so they will save many lives. • UAVs such as the Predator will one day replace manned fighter The future of UAV’s depend on the answer to the question “How Much Is a Human Life Worth?”
  • 24.
    Is all lost? Ifyou are an established, successful company, how do you counter? • Choose 1 or 2 disruptive technologies that concern you the most and participate • Set up separate organization in separate location with constrained funding • Alternatively, invest in start-ups • Manage expectations as markets are found for disruptive technologies by trial and error
  • 25.
    What can managersfaced with disruptive technologies do? • Set up a separate organization small enough to get excited by small gains. • Plan for failure. Don’t bet all your resources on being right the first time. Think of your initial efforts at commercializing a disruptive technology as learning opportunities. Make revisions as you gather data. • Don’t count on breakthroughs. Move ahead early and find the market for the current attributes of the technology. You will find it outside the current mainstream market. You will also find that the attributes that make disruptive technologies unattractive to mainstream markets are the attributes on which the new markets will be built.
  • 26.
    • As wehave seen the demand of UAV is increasing and they are expected to gradually replace the role of fighter Jets in defense field. • As Lockheed Martin Aeronautics doesn't have drone division the most optimum solution would be to collaborate with others to get a foothold in that sector. • Example: For F-22 Raptor Lockheed Martin Aeronautics is the prime contractor and is responsible for the majority of the airframe, weapon systems and final assembly, while Program partner Boeing Defense, Space & Security provides the wings, aft fuselage, avionics integration, and training systems. • A similar approach can be taken to collaborate with General Atomics Aeronautical Systems to design a new unmanned combat vehicle integrating the strengths of both companies. What should Lockheed Martin Aeronautics do in such a situation?

Editor's Notes

  • #3 What makes an innovation disruptive is not just the magnitude of the advance. An innovation could represent a major scientific accomplishment but if it works to sustain the existing business model it is not disruptive. It is the change in business model from the existing one to a new one which is more efficient and/or better addresses the demands of consumers that is the key. Because the disruption threatens the existing business model, those leading or profiting from the existing model are likely to oppose the innovation. Of course disruptive innovation is only one type of possible innovation. The cumulative effect of small, non-disruptive innovations can be very large. However, since game-changing innovation is the topic of today's session, that is where we focused our work.
  • #18 Ground control stations can be located anywhere in the world. The US Air Force has ground control stations in Nevada and California for the Reapers and Global Hawks. These ground control stations link to the vehicle either directly using antennas, or using a relay communications spacecraft on orbit . The spacecraft can also be utilized to beam information such as images and live video to commanders all over the world.
  • #20 Currently, our military’s air needs are satisfiedby a mix of manned and unmanned capabilities. While both platforms provide offensive capabilities and a “birds eye view” to ground-based forces, UAVs do so at a reduced cost compared to their manned counterparts and without endangering the lives of pilots or aircrews.1 Their popularity has grown so much in recent years that, according to the Brookings Institute, 44 countries either possess or are developing UAVs and, in 2010, the U.S. Air Force trained more UAV pilots than traditional fighter and bomber pilots combined.7The most utilized functions of UAV’s in the military are in intelligence, surveillance, reconnaissance, and air strikes. Given their ability to stay aloft for long periods of time with minimal human involvement, UAV’s have proven well-suited for these missions. Capable of being armed with a wide array of sensors, recording devices, communications equipment, and offensive weaponry, their versatility allows for their deployment in a variety of missions. Given this functional flexibility, its unsurprising their involvement in military operations dates back to at least the Bosnian Conflict during the early1990s. Since its highly covert beginnings, they have increasingly become a staple of American military operations in Iraq,Afghanistan and the global war on terrorism. This trend is clearly evidenced by the more than 2,500 people killed by UAV-launched missiles fired as part of a CIA run program in Pakistan’s tribal areas and the involvement of both Predator and Sentinel drones during the operation that took down Osama bin Laden.5Additional examples of UAVs increasing usage by militaries around the globe include:- Israel’s use of unmanned aircraft over Gaza and other Palestinian-controlled areas1- China’s development of 25 new drone models possessing a diverse range of mission-capabilities- Iran’s claim to possess at least two dronescapable of long-range, offensive strike missions- And the U.S. military utilizing at least ten different types of UAVs during the war in Iraq3 
  • #24 In conclusion, Unmanned Aerial Systems can provide near continuous, real time information of the battlefield or other areas being investigated. They come in various different shapes and sized, and are used by the military and civilian world for a multitude of applications. They allow pilots and other aircrew to no longer be at risk, and allow aircraft to operate beyond what humans are capable of. They are expensive but if a unmanned vehicle crashes or is shot down, there is no loss of life. The public will have to decide if that is worth the cost, but in the meantime the market for UAS’s has shown tremendous growth and that will continue in the near future.