DISRUPTIVE TECHNOLOGIES 
A Disruptive Technology is a technology or innovation, which is initially a combination of niche 
technologies or innovative ideas to create a high end product or service, typically such which the existing 
market does not expect; and when the technology becomes affordable and accessible, it eventually ends 
up disrupting the existing consumer market and creating a market of its own. 
DIAGRAM1: Big Bang Market Adoption 
FIGURE 1: 
Different types of theories used to describe the market 
response to Disruptive Technologies. The Rogers’ 
theory explains this response in the form of a bell curve 
(grey), while the recent Big Bang theory explains it in 
the form of a shark fin curve (orange) 
• Sustaining Technologies are different from Disruptive Technologies in such that they only rely on evolutions and advancements in existing products, 
thus making firms compete against one another leveraging the improvements each firm can make in their product 
• In the nascent stage of a disruptive innovation, the market is largely exploratory and mostly led by smaller, innovation driven and entrepreneurial 
firms. Larger firms tend to stay away from disruptive innovations because either the margins are too tight for them; or their business structure is such 
that even willingly, they cannot enter the disruptive innovation market due to potential tradeoffs such as cannibalization 
• Every product market is dynamic and bound to encounter disruptions at some stage or the other. Disruptive innovations can even hurt successful, well 
managed companies that are responsive to their customers and have excellent R&D. Hence incumbent firms must constantly try to innovate and keep 
their products relevant in the market 
Source: KPMG, McKinsey & Company, Accenture
THE NEED TO ACKNOWLEDGE DISRUPTIVE TECHNOLOGIES 
FIGURE2: Expected Potential Impact of Selected Disruptive Technologies by 2016 
• In today’s age, technological advancements, speedy internet, super computing and so on are shaping the course of our economies, in addition to 
enabling us to enjoy highly comfortable lives, with the knowledge of the world literally at our fingertips 
•• We are today at the cusp of a probable technological revolution which might not only solve existing global problems, but could also transform the 
world as we see it and our lives as we live them 
• The world needs solutions to overcome a breadth of interconnected challenges, ranging from the economic to social issues, which could together 
result in an improvement in the quality of lives globally, if addressed properly 
• In such a dynamic environment, it could be potentially disastrous for individuals, companies, and even governments who refuse to embrace the 
emergence of the disruptive way of thinking, since many of these disruptive technologies possess the potential to trigger the solutions to our global 
problems 
• Innovators and investors, who recognize and attempt to seize the various opportunities in the development of disruptive technologies, stand to reap 
a first – mover advantage once these technologies manages to disrupt the existing market and capture the fancy of users around the world 
Major sectors which could be influenced by the Disruptive Technologies presented in this document include 
Manufacturing, Infrastructure, Energy, Healthcare, Education, Retail and Entertainment 
What follows is a list of 50 major Disruptive Technologies/ / / 
Innovations/ Products that currently exist in markets 
around the world; and have either caused disruptions in their corresponding sectors or are on the cusp of doing so 
Source: ‘Six Converging Technology Trends’, KPMG India and Nasscom, 2013
#1: 3D PRINTING 
CONCEPT: 3D printing is basically an additive manufacturing process in which objects are built layer by 
layer rather than through moulding or subtractive techniques. This technology allows the user to build real 
objects from virtual 3D objects. This is done by ‘cutting’ the virtual object in 2D slices and printing the real 
object slice by slice. 
INDUSTRY APPLICATION 
Consumer markets 
•Certain consumer product categories are 
relatively to make using technology 
easy this Manufacturing (General) 
•Cost cutting through elimination of tooling costs, 
reduction in wasted material, and reduced handling 
costs 
Manufacturing (Mold's) 
•Shortening setup 
•times, eliminating tooling errors and high efficient 
moulding process 
CURRENT STAGE: 
• 3D printing could generate an economic impact of USD 230 Billion to USD 550 Billion per year by 2025 
• Major techniques include selective laser sintering, direct metal laser sintering, fused deposition modeling, stereo lithography and inkjet bio‐printing 
• The biggest advantage of this technology is that it provides instant modeling to get an idea of the final product, which can cut costs and time 
significantly 
Source: McKinsey & Company, The Engineer Magazine
#2: THE INTERNET OF THINGS 
CONCEPT: The Internet of Things IoT) is a concept of embedding every object living (or being with sensors 
or actuators and generating their virtual representation on the internet. Identifying all objects in this 
unique manner can enable us to effectively track, monitor and even control them. 
INDUSTRY APPLICATION 
CURRENT STAGE: 
• Has to MANUFACTURING : • identifying bottlenecks • 
Optimizing processes 
the potential create economic 
impact of USD 2.7 Trillion to USD 6.2 
Trillion annually by 2025 
• around 8.7 Billion devices 
p gp 
HEALTHCARE : • Constant health monitoring • Detecting 
counterfeit drugs 
RETAIL: • Keeping track of inventory levels • Product 
details 
Currently are connected to internet and the 
number is expected to touch 40 
Billion by 2020 
ENERGY : • Smart Grid applications 
URBAN DEVELOPMENT : 
•Traffic monitoring Waste and Water management 
through smart meters and leak detection sensors y 
• The major challenge is to make use of 
the flood of the data that is provided 
by the sensors 
AGRICULTURE : • Soil sensors and Leaf sensors 
y 
Source: McKinsey & Company, Cisco Systems, Cisco Internet Business Solutions Group
CONCEPT: 
#3: BIG DATA ANALYTICS 
Big Data means the data sets with sizes beyond capacities of commonly used software tools to capture, 
curate, manage, and process the data within a tolerable elapsed time. Big Data Analytics technology 
refers to storing and managing large chunk of data in a single location for analysis and evaluation at later 
stages. However, the term Big Data is quite variable in terms of data sizes ranging from few dozens 
terabytes to many petabytes of data in a single data set. 
INDUSTRY APPLICATION 
CURRENT STAGE: 
• The global market of big data is 
Retail • Improved marketing, merchandising, operations, 
supply chain and after sales service 
expected to increase from USD 5.4 
Billion in 2012 to USD 48 Billion till 
2016 
• Clubbed with technologies like cloud 
computing, social media and mobile 
Healthcare •Real‐time exploration and predictive 
analytics of clinical data for R & D 
Telecom •Measure and analyze customer activities, 
customer churn call handling at call centers 
p g, 
internet; Big Data Analytics can offer 
benefits to sectors like education, 
defense, aerospace, government 
services and several others 
churn, Finance •Generate customer insight and reduce 
fraudulent practices 
Source: KPMG, International Journal of Internet Science, McKinsey & Company
#4: CLOUD CO MPUTING 
CONCEPT: Cloud computing means storing and accessing data and programs over the Internet instead of 
your computer's hard drive. Here cloud is simply the metaphor for internet. This technology can 
significantly reduce the need of the personal storage devices and hence can cut down user cost 
substantially. 
INDUSTRY APPLICATION 
Healthcare • Access and retrieve information stored in 
scattered systems in real time 
Telecom • Reduced cost in setting up infrastructure 
Retail • Data stored and accessed remotely for inventory 
reducing the time and cost 
Public Sector • Easy and fast access to data and applications 
remotely 
Information Technology • Cost cutting in infrastructure 
development as renting a cloud server is far cheaper than 
developing one 
CURRENT STAGE: 
• The total economic impact of cloud technology could be USD 1.7 Trillion to USD 6.2 Trillion annually by 2025 
• Cloud technology is the cornerstone for some of the most promising disruptive technologies like mobile internet, 
automation of knowledge work, internet of things and big data 
• Some of the major research areas for this technology are network capacity, security of data and cultural resistance 
source: kpmg , mckinsey & company
#5: ADVANCED NANO‐MATERIALS 
CONCEPT: Any use or manipulation of materials at a scale of less than 100 nanometers (10‐7 meters) can 
be termed as nanotechnology. Advanced nano‐materials can be created by direct modification of 
molecular sized nano‐particles using tools like atomic force microscopes, electron beam or laser 
lithography which are capable of dealing with nano‐scale features. 
INDUSTRY APPLICATION 
Healthcare 
•Rapid, inexpensive electronic DNA sequencing 
Energy 
•Application in solar cells 
•For energy storage as supercapacitors 
Electronics 
•Integrated Circuits 
•Transparent conducting electrodes, which 
can be used as touchscreens; LCDs 
CURRENT STAGE: 
• For healthcare, which will be the most benefitted sector through this technology, advanced nano‐materials could have a potential economic 
impact of USD 150 Billion to USD 500 Billion annually by 2025 
• Graphene is the most promising advanced material. It is one sixth the weight of steel and 100 times stronger. The production of Graphene 
has been started, however at high cost and in limited quantities 
Source: McKinsey & Company, Inmesol Power Solutions
#6: MOBILE DEVICES 
CONCEPT: Mobile devices have changed the way people access digital content. Smartphones and tablets 
have brought rich, digital content to the fingertips of consumers. The surging popularity of mobile devices 
like smartphones and tablet computers has created ripples across the computing industry. 
INDUSTRY APPLICATION 
Retail• Browse, compare and buy products online 
Healthcare • A patient can seek medical advice 
more often and have flexibility in terms of point of 
care 
G•oRviseer onfm meHneta lSteh csteorrvices 
•Involving citizens for better governance through 
maximum reach to the citizens 
Finance• Easy and fast access to banking services 
CURRENT STAGE: 
• Mobile handset and tablet shipments are envisaged to grow from 1567 Million in 2012 to 2162 Million till 2016 
• Today mobile devices are available in desirable size and shape at very reasonable price very easily. This includes mobile phones, tablets and 
mobile computers 
• j Gujarat g government has introduced m – Governance y system for more involvement of citizens. One such p example is of j Rajkot p 
Municipal 
Corporation, which provides SMS facility for interactive services, alert services and management services 
Source: KPMG
#7: AUGMENTED REALITY 
CONCEPT: Augmented Reality (AR) offers a live view of a physical, real‐world environment whose elements 
are enhanced by computer computer‐generated sensory input such as sound sound, video video, graphics or GPS data data. An AR 
system generates a composite view for the user that is the combination of the real scene viewed by the 
user and a virtual scene generated by the system that augments the scene with additional information. 
INDUSTRY APPLICATION 
Healthcare • Better view of body parts inside to aid the 
surgery 
Defense •• Improved navigation for Soldiers 
•Access to battlefield data in real time 
Education • Can enhance a standard curriculum 
•Better understanding by visual graphics 
Construction • Visualization of georeferenced models of 
•• construction sites, underground structures, •• cables and 
pipes using mobile devices 
Entertainment 
•Gaming, videos, music, photos, personalized apps 
Current Stage: 
• AR has gradually moved from the world of science fiction, to our everyday lives and now everyone from retailers to 
healthcare providers have embraced AR 
• The growth of the augmented reality applications market is expected to be exponential with the revenue growth 
from USD 181.25 Million in 2011 to USD 5,155.92 Million by 2016, at a CAGR of 95.35% from 2011 to 2016 
Source: Research and Markets 
y 
• High cost is currently a major challenge that in the large scale application of Augmented Reality
#8: NEXT GENERATION GENOMICS 
CONCEPT: DNA sequencing technologies, big data analytics and technologies with ability to modify 
organisms altogether are known as next generation genomics; these could power rapid acceleration in the 
field of biology as well as health care. This technology allows manipulation of genes for innovative disease 
treatments and new types of genetically engineered products. 
INDUSTRY APPLICATION 
Healthcare 
E d l id tifi ti d f 
CURRENT STAGE: 
• Next‐generation genomics could have a 
•Easy and early identification and cure of l f 
typical diseases like type 2 Diabetes 
•Accurate and quick cure of cancer at low 
costs 
Agriculture 
•Development of advanced varieties with 
potential economic impact of USD 700 
Billion to USD 1.6 Trillion per year by 2025 
• Advanced genomics may offer tremendous 
potential to develop personalized 
p treatments for cardiovascular diseases 
higher potential value 
Tissue Engineering 
•Creation of artificial organs as well as 
organisms 
• Next generation sequencing represents 
newer and cheaper methods for sequencing 
or decoding DNA 
•• Technical challenges include sequencing 
samples of low quality and/or quantity, 
reliable identification of structural and 
copy number variation and assessment of 
intratumour heterogeneity 
Source: McKinsey & Company, British Journal of Cancer
#9: MOBILE INTERNET 
CONCEPT: Mobile Internet is a combination of mobile computing devices, high high‐speed wireless connectivity, 
and applications. Basically it is the ability to access the internet on the mobile phone. This technology has 
brought a revolution in the information technology field with availability of as much information as 
required at just the tap of your finger. 
INDUSTRY APPLICATION 
Healthcare • Treatment of chronic diseases 
•Remote monitoring of patients 
Education • Online admission and classes 
•Improve learning inside and outside classrooms 
Public Sector • Citizen services 
Retail • Online Shopping 
Finance • Bill Payment and Online Transactions 
CURRENT STAGE: 
• Mobile Internet usage could generate global economic impact of USD 3.7 Trillion to USD 10.8 Trillion per year by 2025 
• Global mobile internet traffic reached 1.5 exabytes per month at the end of 2013 with over half a Billion (526 Million) mobile 
devices and connections added in 2013 
• The major challenges for the limitless growth of this technology are to pack more computing power, sharper displays, multiple 
sensors, and powerful antennas into ever‐smaller mobile devices 
Source: McKinsey & Company Cisco Visual Networking Index
#10: AUTOMATION OF KNOWLEDGE WORK 
CONCEPT: Use of computers to perform tasks that rely on complex analyses, subtle judgments, and 
creative problem solving. This technology enables computing into new realms and creates new 
relationships between knowledge workers and machines. This facilitates the replacement of man crew 
with machines for doing the basic jobs. 
INDUSTRY APPLICATION 
Healthcare • Chronic care 
•Cancer treatment diagnostics 
Education • One‐on‐one attention and coaching 
Business • Clerical 
•Customer service and sales 
Professional Services • Science and engineering 
•IT • Finance • Legal 
CURRENT STAGE: 
• The potential economic impact of knowledge automation tools could reach USD 5.2 Trillion to USD 6.7 Trillion per year by 2025 
• Technological, regulatory and organizational concerns can be some key areas of focus before the full utilization of this technology 
Source: McKinsey & Company
#11: ADVANCED ROBOTICS 
CONCEPT: Traditional robots can perform the tasks which require exceptional speed speed, precision precision, stamina or 
strength excellently in specific conditions. But the need of the hour is to have robots that have greater 
mobility, dexterity, flexibility, and adaptability in much diverse situations. This has encouraged the 
development of advanced robotics technologies. These technologies allows the robots to take complex 
judgments and execute tasks on their own. 
CURRENT STAGE: 
B 2025d d b i ld h ld id 
INDUSTRY APPLICATION 
Healthcare • Robotic surgery 
•Robotic Prosthetics 
Manufacturing • Benefit in production line 
•To perform repetitive, heavy, or dangerous 
• By 2025 advanced robotics could have a worldwide 
economic impact of USD 1.7 Trillion to USD 4.5 
Trillion annually 
• Apart from advanced technologies, high cost remains 
p p , y, g the major challenge for the procedures 
Service sector • Cleaning and Maintenance 
•Customer service and sales 
Defense • Automated Vehicles 
•Auto Guided Weapons 
worldwide acceptance of 
advanced robotics 
• For commercial adaption of this technology, 
investments of scale USD 1 Trillion to USD 1.6 Trillion 
may be required 
Aerospace • Space Shuttles • Aircrafts 
• For many businesses, advanced robotics promises 
significantly reduced labor costs, greater flexibility 
and reduced time to deliver products to the 
marketplace 
Source: McKinsey & Company, International Federation of Robotics
#12: SOCIAL MEDIA 
CONCEPT: Social Media is an instrument of communication; it is a platform that not only gives information 
but also allows users to interact with each other. It is not just a tool for communicating with friends and 
acquaintances; Social Media now exerts tremendous influence over the people around the world of all 
ages, to get and share information. 
INDUSTRY APPLICATION 
Retail • Connects with the customers and reach out 
to them personally know their interest and 
to preferences 
Healthcare • Remote patient care and monitoring 
•One‐to‐many’ doctor patient communication 
Government Sector • Enhance the outreach of 
government •• Effective citizen engagement and 
communication with all stakeholders in real‐time 
Finance • Understanding the customers’ opinion 
about services and products • Quick response to 
customer feedback 
CURRENT STAGE: 
• Total number of social media accounts are expected to grow from 3.13 Billion in 2012 to 4.87 Billion till 2016 
• The major advantage of this technology is that it facilitates open communication, leading to enhanced information discovery and delivery 
• Social Media is being used extensively by organizations for branding, advertising and corporate communications 
Source: KPMG
#13: AUTONOMOUS AND NEAR AUTONOMOUS VEHICLES 
CONCEPT: This includes vehicles which can be manipulated with little or no human intervention. This 
technology includes on‐board systems which continuously transmit information about vehicle status and 
location and this information allows real time monitoring as well as maneuvering if needed by remote 
operator. 
INDUSTRY APPLICATION 
Logistics • Long distance transport of goods 
•Deliveries of products from retail outlets to users 
using drones 
Defense • Unmanned Vehicles 
•Automated Aircrafts 
Automotive • Automatically driven vehicles 
Aerospace • Automated Space crafts 
CURRENT STAGE: 
• 01The potential economic impact of autonomous cars and trucks could be USD 200 Billion to USD 1.9 Trillion per year by 2025 
• Currently, we have autonomous vehicles, although still in experimental and development stage, the technology is entering consumer market 
with systems such as improved cruise control, automated parking, low speed autonomous driving, which in turn could lead to a full 
autonomy in driving 
• Benefits of this technology include reduced accidents, traffic reduction, higher safe speeds, cost reduction, time savings etc 
Source: McKinsey & Company, Commonwealth 
Scientific and Industrial Research Organization
#14: ADVANCED ENERGY STORAGE 
CONCEPT: Conversion of electricity into form that can be stored and converted back into a electrical 
energy for later use, providing energy on demand. This concept allows users to generate energy in times 
of low demand and store and use later in times of peak demands. 
INDUSTRY APPLICATION 
Automotive 
•Can make electric vehicles a viable option to 
conventional vehicles 
Energy/ Power 
•Rural and underserved areas can be provided 
with electricity 
•To store significant amount of energy for use 
in peak times 
CURRENT STAGE: 
• The economic impact of energy storage technologies has the potential to reach USD 90 Billion to USD 635 Billion annually in 2025 
• Some of the common technologies for energy storage are solid state batteries, flow batteries, flywheels, compressed air energy storage, 
thermal energy storage and Pumped Hydro Energy Storage(PHES) 
• The major advantage of this technology is for peak load shifting. This allows provision of power in times of peak demands with comparatively 
less infrastructure 
• However for all the benefits to be realized, these energy storage methods must be cost competitive with other methods 
Source: McKinsey & Company, Energy Storage Association
CONCEPT: Providing affordable to #15: UBIQUITOUS BROADBAND 
and accessible internet services almost all sections of the society, 
overcoming logistical, technological, economic and geographical challenges that might prevent such 
internet access. Ubiquitous broadband itself is not a new technology, but an application of the internet 
technology to the masses, which possesses great potential to help in the socio – economic development of 
the world. 
ll 
INDUSTRY APPLICATION 
All sectors 
•Having ubiquitous internet facilities can help 
in the commercial development of 
businesses, both from a financial as well as 
information sharing point of view 
•Internet can be used a powerful tool for the 
rapid social development of currently 
developing or under developed and 
economically backward nations 
CURRENT STAGE: 
• As of 2013, 134 countries had National Broadband Plans; India’s policy for National Optical Fibre Network was adopted in 2011 
• According to the Broadband Commission for Digital Development, more than 45% global internet penetration is envisaged by 2015 
Source: McKinsey & Company, Broadband Commission for Digital Development, 
International Telecommunication Union
CONCEPT: Paying computer #16: DIGITAL PAYMENTS 
for goods and/ or services using a combination of hardware, internet and 
digital stored value systems, without the need of exchanging hard cash physically. Digital payments also 
include Electronic Fund Transfers and digital currencies. Near Field Communication, Bluetooth Low 
Energy and Mobile Wallets are examples of technologies that aid in conducting digital payments. 
INDUSTRY APPLICATION 
Retail/ Consumer Markets 
R l t f ffli t b th 
•Replacement of offline payments by these 
cashless payment technologies 
•Reduction in the risk of physically carrying 
cash 
•Boost to e – commerce markets 
•Storing not just cash but coupons and other 
important cards via mobile wallets 
CURRENT STAGE: 
• A number of countries, banks and organizations have significantly embraced Digital Payment systems; and it is possible to use credit cards and 
electronic cash transfer to pay for services even in another country 
• Bluetooth Low Energy can replace Near Field Communication in the coming future because of its larger operating range and wider 
applicability 
• In addition to e – Commerce and e – payments, m – commerce (through mobile phones) is also a major contributor to the growing popularity 
of digital payments 
Source: McKinsey & Company, businessinsider.in, hongkiat.com
#17: UNIVERSAL BIOMETRIC IDENTITY 
CONCEPT: The technique of assigning an unique identification number or code to each and every 
individual person’s biological characteristics which helps the identity of that 
individual, linked to the person s certain characteristics, ensure person only during all activities related to the identification number carried out by the person. Biometric 
identifiers can include fingerprint scans, iris recognition, retinal scans or DNA identification. 
INDUSTRY APPLICATION 
All sectors 
•Assigning biometric identities to individuals can be considered more 
reliable than other traditional identifiers, since biometric identifiers 
are unique to each person and difficult to be replicated 
•Biometric identities can also help reducing scams or fraudulent 
activities against individuals 
•Biometric identifiers can also help to track persons having criminal 
records or linked to terrorist groups 
CURRENT STAGE: 
• The technology is fairly highly implemented in developed countries with a number of countries also having biometric ID card scanning systems 
installed at places frequented by people 
• Biometric ID cards are also linked to sensitive areas in organizations to limit access to public; and also to bank accounts to ensure safety of 
monetary transactions 
• Adaptive Biometrics, biometrics linked to the brain and heart signals are some of the recent advancements in this sector 
• India has issued Biometric ID cards (Aadhaar Cards) to more than 56 crore citizens under the UIDAI; this database is the largest biometric 
database in the world 
Source: UIDAI, McKinsey & Company, Center for 
Global Development, about.com, fastcompany.com
#18: IMMUNOTHERAPY 
CONCEPT: Method of treatment using the patient’s own immune system to fight diseases such as cancer or allergies, by 
ith ti l ti th i t t k t b i i tifi i l i t t i t th b d 
either stimulating the immune system to work smarter, or by giving artificial immune system proteins to the body. 
Immunotherapy treatments, also known as biotherapy or biological response modification, either boost the general 
immunity of the body, or train the immune system to specifically attack malevolent cells. 
INDUSTRY APPLICATION 
Healthcare 
•Medicinal treatments for certain diseases need to be 
taken on a regular basis, sometimes at a high cost, and 
even then might not be fully effective; immunotherapy 
provides the option of directly attacking the root cause 
of the disease and strengthening the immune system of 
the body 
CURRENT STAGE: 
• Immunotherapy research is currently focused on finding effective treatments for cancer and allergies 
• Immunotherapies need to undergo proper regulatory and legal approvals before they can be commercially implemented 
• j Major yp types of g biological p response modifiers include , Interferons, , Interleukins, Monoclonal , Antibodies, Vaccines and y Colony g 
Stimulating 
Factors 
Source: American Cancer Society, mdanderson.org, 
cancer.net, allergytherapeutics.com, hcplive.com
#19: INSURANCE SECURITIZATION 
CONCEPT: Financial tool, whereby insurers pool contractual debts, and transfer major risks on their books, 
through bonds or securities to capital market investors, thus reducing their exposure to insurance risks, 
reducing their costs of re – insurance, and allowing them increased liquidity to issue more insurance 
policies and services. Catastrophe bonds, Sidecars and Life Insurance Securitization are important 
segments of the Insurance Linked Securities (ILS) market. 
INDUSTRY APPLICATION 
Finance 
•Increasing risks of disasters and high mortality rates are 
putting pressure on insurers by increasing the risks they 
face; transferring risks to capital markets could be a 
cheaper, transparent and more liquidity providing 
model for insurance companies as compared to re – 
insurance 
•Lower cost of capital and efficient risk transfer possible 
through ILS; can offer investors a chance to be more 
prudent about how their invested capital is utilized 
CURRENT STAGE: 
• Including all sources of ILS capital, the amount of alternative capital in this segment could almost equal USD 60 Billion by 2015 
• ILS have been around for more than 15 years now, but only in recent years have they started putting real pressure on re – insurers 
• After the financial crisis of 2008 2008, a an mber number of stricter regulations ha e have come into effect regarding ILS which hich are aimed at red cing reducing the risks 
posed by ILS and the issuers of securities 
Source: Citi Group, The Economist, National 
Association of Insurance Commissioners, artemis.bm
#20: PRECISION AGRICULTURE 
CONCEPT: An agriculture management and optimization technique, which makes use of sensors, Global Positioning System 
(GPS) bi d t d di ti l ti t ll t l ti d t d it t d t d ti l dt l 
GPS), big data and predictive analytics to collect real – time data, and processes to understand spatial and temporal 
variations across a single field or multiple fields, or even variations in humidity, soil quality and crop maturity, thus giving a 
holistic overview of the impacts of current agriculture methods being used, and to make relevant modifications in the same, 
as per the data collected. Pictures of the fields are also taken using satellite imagery or Unmanned Aerial Vehicles (UAV), 
which combined with GPS and sensor – recorded data, precisely pinpoint the current crop status of any location in the field. 
INDUSTRY APPLICATION 
Agriculture 
•Increasing populations and demands for food are 
making it necessary to optimize and improve current 
crop production techniques, to ensure constant high 
yields; precision agriculture can help in forecasting crop 
outputs and thus making relevant modifications to boost 
these outputs 
Current Stage: 
• Precision agriculture technologies currently require expensive and robust IT infrastructure and monitoring resources 
• Venture Capital funds focused on agriculture technology are being established to promote precision agriculture 
• Cleantech startups related to food and agriculture reportedly experienced the biggest growth during the Q4 of 2013 
• Weather forecasting and modeling, cloud computing, data analytics and data management systems related to food and agriculture will also witness growth 
in conjunction with precision agriculture 
Source: Forbes, IBM, Cleantech Group, Michigan State University
#21: HYBRID VEHICLES 
CONCEPT: Any vehicle that combines more than one source of energy to provide propulsion for the functioning of the vehicle is called a hybrid 
vehicle Various sources of energy for hybrid vehicles include gasoline diesel natural gas electric batteries biofuel solar energy wind power and 
vehicle. gasoline, diesel, gas, batteries, biofuel, energy, even human muscle power. The most common types of hybrid vehicles used today combine a fossil fuel source with electricity. Hybrid vehicles 
include cars, motorbikes, trains, buses, cranes, boats and even submarines. 
INDUSTRY APPLICATION 
Automotive 
•Hybrid vehicles provide users with benefits such as 
more fuel efficiency, automatic shut off when not 
driving, regenerative braking; and lesser emissions 
Energy/ Environment 
•With such a huge global demand for vehicles, hybrid 
vehicles can help conserve energy, and also help 
reduce the carbon footprint 
CURRENT STAGE: 
• Hybrid vehicles are considered a bridge between conventional fuel powered vehicles and fully electric vehicles 
• A number of hybrid vehicle options are available to users today including full hybrids, mild hybrids and plug – in hybrids, depending on the 
users technical and financial preferences 
• Companies such as Toyota, Honda, Ford and Chevrolet are major players in the hybrid cars space 
Source: howstuffworks.com, fueleconomy.gov, hybridcars.com
#22: E – TAILING 
CONCEPT: Business to over is tailing (electronic retailing) 
Customer (B2C) interaction for the sale of goods and/ or services the internet known as e – retailing). 
e – tailing commonly involves an online brochure of goods, along with the user interface to purchase these goods and pay for them through a variety 
of payment methods, such as online payment portals. e – tailing also involves a bigger external logistical network of warehouses and product 
transport and delivery systems. 
INDUSTRY APPLICATION 
Retail/ Consumer Markets 
••e – tailing can completely eliminate the physical requirement of going to 
brick and mortar retailers for purchase of goods/ services 
•This makes the offering attractive for consumers who have a time or 
logistical constraint which hinders them from actually going to retail 
outlets 
•Consumers can browse through a multitude of product offerings, either 
on the same e – tail website, or on any number of such websites, before 
choosing the optimum product according to their taste and budget 
Current Stage: 
• e – tailing players have started capturing major market shares, boosted by prompt deliveries and novelties such as order tracking services and 
Cash On Delivery (COD) applications available 
• The Indian e – tailing market is expected to grow to around USD 22 Billion in the next five years, with major players such as Flipkart, Myntra and 
Amazon India expected to grow around 70 – 100 % on a year – on – year basis 
• m – commerce (shopping via mobiles) has also given a boost to the e – tailing industry, with almost all major e – tail players offering mobile 
shopping applications 
Source: moneycontrol.com, howstuffworks.com 
etailingindia.com, searchcio.techtarget.com
#23: POWERED EXOSKELETON 
CONCEPT: A bodysuit having a hard outer covering, and using a combination of motors, hydraulics and power supply 
y g g, g , y p pp y 
devices to primarily boost the strength and endurance of the user. Such exoskeletons can be used to leverage the benefits of 
technology to augment the capabilities of the human body, either in extreme conditions or in the presence of some 
disability. 
INDUSTRY APPLICATION 
Defense 
•The soldiers of the future will be able to wear 
such exoskeletons to navigate through hostile 
conditions during wars or rescue operations 
Healthcare 
•Exoskeletons are also being developed to help 
people with lower body disabilities to stand 
and move around 
CURRENT STAGE: 
• A large number of companies and organizations including the US Army are working on developing exoskeletons for a defense as well as 
healthcare point of view 
• According to Panasonic, the world’s first affordable and mass produced exoskeleton will be on sale 2015 onwards, costing around USD 5000 
• Issues concerning the development of exoskeletons include durable power supply, flexibility and motion controllers 
Source: Ekso Bionics, howstuffworks.com, extremetech.com
#24: GESTURE RECOGNITION 
CONCEPT: The interpretation of hand gestures and/ or facial expressions by a computer or a machine, thus 
reducing the use of conventional mechanical input devices, whilst increasing the Human Machine 
Interface (HMI). Gesture recognition uses a combination of computer programming, computer vision and 
image processing; and input devices such as wired gloves and a variety of cameras. 
INDUSTRY APPLICATION 
Entertainment 
•Using gestures to control devices such as music players, 
smart phones and tablets 
Manufacturing 
•Using gestures to operate control panels in manufacturing 
units can save time 
Healthcare 
•Patients with disabilities will also be able to operate devices 
having gesture recognition 
Education 
•Novel and interactive methods of education can be 
introduced 
CURRENT STAGE: 
• Current gesture recognition devices use combinations of accelerometers, gyroscopes and infrared detectors as 
sensors; and are already finding applications in gaming consoles, smartphones and so on 
• The global Gesture Recognition market is expected to grow at a CAGR of 29.2% over 2013‐2018 
Source: digitaljournal.com; gizmodo.com; whatis.com
#25: MASSIVE ONLINE OPEN COURSE 
CONCEPT: A Massive Online Open Course (MOOC) is a method of providing online education to a very large number of students across the globe, free 
or at a very negligible cost as compared to conventional higher educational methods. MOOCs typically involve a MOOC platform, wherein students 
can access educational content in the form of lectures, reading material and related assignments, all online, thus reducing physical, financial and 
even time zone related difficulties. MOOCs may or may not grant credits to the applicants, and have different course durations depending on the 
course. 
INDUSTRY APPLICATION 
Education 
•Access to a broad range of courses, across sectors, and 
capable of catering to an almost unlimited number of 
students 
•Removing the physical and financial barriers can help 
spread education massively in developing countries 
and to people who cannot afford higher education 
••MOOC providers charge a nominal amount for 
certification; which is also acceptable to many students 
taking the course 
CURRENT STAGE: 
• MOOCs bring together a large number of stakeholders such as MOOC providers, Universities, Internet services 
providers and Venture Capitalists 
• Around 2230 MOOC players are currently operational, including profit/ not for profit organizations; and even 
conglomerates of Universities 
• p Adaptive g testing, p peer g g grading, yp typing g p pattern g recognition and other such g technologies are g being p 
developed to reduce 
the effect of cheating in MOOCs 
Source: The Complete University Guide; www.moocs.co; www.coursera.org
#26: SPEECH RECOGNITION 
CONCEPT: Speech is the ability of a computer, computer software program or hardware 
INDUSTRY APPLICATION 
recognition device to decode the human voice into digitized speech that can be interpreted by the computer or 
hardware device. This technology enables us to operate a device or perform commands without using 
the conventional input devices. 
CURRENT STAGE: 
• Speech recognition has developed 
Healthcare 
significantly in past few years. Today, 
this technology is offered in mobile 
devices as well as computers through 
Automatic Speech Recognition (ASR) 
software 
• The accuracy of speech recognition has 
•Medical documentation processes 
•Maintaining EHR (Electronic Health Records) 
Defense 
•Operating aircrafts smoothly 
also been increasing. The F‐35 pilot‐aircraft 
of US Air Force offers system 
speech recognition with an accuracy of 
~98% 
• Apart from technical challenges the 
high tech •Better control over weapons due to ease of input 
Business 
•Easy and fast document production with reduced labor 
of typing physically 
challenges, reliability of the inputs interpreted by 
the software remains a key issue of 
research 
Others • A boon for visually impaired peoples 
•Hands free computing • Home automation 
•Vehicle navigation systems • Mobile telephony 
Source: Department of Computer Engineering, Çukurova University; US Air Force
#27: QUANTUM COMPUTING 
CONCEPT: A method of computing that uses the principles of quantum physics to store information as a 1 or a 0 or 
a superposition of both at the same time time, instead of conventional binary computing which can store information 
only as a 1 or a 0, but not a superposition of the two. Using quantum superposition, in conjunction with the 
effects of quantum tunneling and entanglement, makes quantum computers consider all possible combinations of 
quantum bits (qubits) simultaneously, thus enabling them to perform calculations much faster than conventional 
digital computers. 
INDUSTRY APPLICATION 
All sectors 
•With tremendous amounts of data being generated 
across sectors everyday, superior computing abilities 
could make data analysis and management easier 
•Applications in cryptography and data encryption vis‐à‐ 
vis data protection 
CURRENT STAGE: 
• A number of Government agencies around the world are funding Quantum Computing programs from a national safety point of view 
• Quantum computing is still more of a theoretical concept which is in its practical infancy 
• The D –Wave is the only commercial Quantum Computer available in the world, priced around USD 10 Million and with very limited 
computing power; companies such as IBM are also developing Quantum Computers 
• High costs remain a major challenge f for Quantum Computers as f 
of now; topics such as coherence on a single qubit level and stringing 
multiple fully entangled qubits together are major current areas of research in this domain 
Source: D –Wave Systems, howstuffworks.com, 
about.com, extremetech.com, guardian.com
#28: BIOFUELS 
CONCEPT: A Biofuel can be described as a fuel that contains energy from geologically recent carbon 
fixation. These fuels are extracted from living organisms such as plants or microalgae. Biofuels differ from 
conventional fossil fuels in a way that Biofuels can be regenerated in short time period making them a 
renewable energy source. 
INDUSTRY APPLICATION 
CURRENT STAGE: 
• Among the various biofuels like Ethanol 
Power 
•Electricity generation is the single largest use of fuel 
•Biofuel can offer a viable alternative to conventionally 
used coal and natural gas 
Ethanol, 
Biodiesel, Green Diesel, Biofuel Gasoline, and 
Vegetable Oil, the most promising Biofuel today 
is the Biodiesel 
• In US, the NFESC, with several biodiesel 
industries, is developing biodiesel technologies. 
Automotive 
•Less dependence on fossil fuels 
•Clean and renewable fuel 
, p g g 
Another group of Spanish developers has 
announced a new biofuel made from trash 
• In India, the development of biofuels pivots 
around the cultivation and processing Jatropha 
plant seeds, which can grow on the wastelands 
Energy 
•Energy and cost efficient alternative to the 
conventionally used fuels like wood, natural gas etc. 
across India 
• Offering the biggest advantage of partially to 
fully replacement of the fossil fuels with clean 
and ecological fuels, Biofuels face technical 
challenges. Besides cost, the size of land needed 
to produce the biofuels in mass very Source: BerkeleyBioDiesel, http://biofuel.org.uk/ 
is large
#29: ELECTRONIC SKIN 
CONCEPT: Thin and flexible electronic material which can mimic the human skin in multiple ways. Using a 
combination of nanotechnology, sensors and conducting materials, electronic skin has been created which 
can sense pressure and temperature; and even stretch and heal itself. Electronic skin can be used to impart 
the ability of sensations to people using prosthetics and also to enable robots to feel human – like 
sensations. 
INDUSTRY APPLICATION 
Healthcare 
•Restoring sensations such as touch and temperature 
to people using prosthetics 
•To be used by patients with diseases such as 
Parkinson’s disease and epilepsy to constantly 
monitor health data 
••Applications wherein electronic skin will also be able 
to administer medicine to patients are being 
explored 
CURRENT STAGE: 
• A research team at Stanford University, USA has developed a self – healing skin; a research team at UC Berkeley, USA 
has also developed an electronic skin which also lights up when touched 
• Researchers have also constructed an electronic skin which is a combination of sensors that detect temperature and 
motion motion, resistive RAM for data storage storage, micro heaters and drugs; which is capable of monitoring the health of patients 
and administering drugs itself 
Source: IEEE Spectrum; nature.com; news.discovery.com
#30: CROSSBAR MEMORY 
CONCEPT: Crossbar Memory is a unique type of Non – Volatile Resistive Random Access Memory 
(RRAM) being developed by Crossbar, based in California, USA, which is a memory format that allows 
storage capacity of upto 1 Terabyte (TB) on a chip the size of a postage stamp. Further, Crossbar 
technology can be stacked vertically in 3D, providing multiple TB of storage on a single chip. According to 
Crossbar, this memory can disrupt the existing USD 60 Billion Flash memory market. 
INDUSTRY APPLICATION 
CURRENT STAGE: 
• By 2016, the demand for non – volatile memory 
is 48 4 Billion 
Entertainment and Consumer Markets 
•High storage capacity in laptops, tablet computers, 
smartphones and gaming systems 
expected to reach USD 48.4 • Crossbar has successfully developed its 
demonstration product in a commercial fab. This 
working silicon is a fully integrated monolithic 
CMOS controller and memory array chip 
Manufacturing and Business 
•Will be able to boost the success of the Internet of 
Things and the Industrial Internet 
•Extra storage capacities for IT systems and Cloud 
service providers 
• Crossbar is currently completing the 
characterization and optimization of this device 
•Real time automotive applications 
•Application in smart meters and thermostats 
Source: Crossbar Inc.; venturebeat.com
#31: CONCENTRATED SOLAR POWER 
CONCEPT: Concentrated Solar Power (CSP) Technologies use mirrors or lenses to concentrate the sunlight 
into a relatively small area, where this light is converted to heat. This heat then creates steam that drives 
steam engines to generate electric power. CSP systems have very wide ranges form remote power 
systems as small as few kilowatts up to grid‐connected power plants of 100’s of megawatts (MW). 
INDUSTRY APPLICATION 
Energy/ Power 
•CSP is most economically viable in large 
installations. This allows for economies of scale in 
production and installation, leading to price 
reductions 
•Moreover electricity system operators are 
accustomed to deal with large installations, which 
further help lead to widespread acceptance 
CURRENT STAGE: 
• The most widespread CSP technology used is parabolic‐trough plants which covers ~90% of CSP plants 
• Nokh Plant located in Rajasthan, by Godavari Green Energy is one of the major CSP plants in India. Spread over 400 acres of land, the plant 
has the capacity of 50 MW 
• The major challenge faced by this technology is the higher cost compared to other alternate technologies 
• h With proper f l financial support l b global l CSP capacity ld could reach h 147 GW b 
by 2020 
Source: Solar Energy Development Programmatic EIS, US Department of Energy
#32: WEARABLE BLUETOOTH RING 
CONCEPT: Wearable Bluetooth ring (g( ) Fin) is an g elegant y tiny device that can be worn on thumb to convert the user’s p 
palm 
into a gesture interface. With this technology one can control multiple devices supporting Bluetooth without even 
touching them. Fin can transmit natural gestures as commands to any connected Bluetooth device. 
INDUSTRY APPLICATION 
Entertainment 
•Wireless control of smartphones, TVs, and other 
connected devices 
Defense 
•Remote controlling of the weapons 
Augmented Reality 
•Controlling head mounted displays 
Virtual Modelling 
•Better visualization of concept models 
CURRENT STAGE: 
• Wearable Bluetooth ring is still in its research and development phase 
• High retail price is one of the prime concerns for widespread acceptance of this technology. However the cost could be cut to a reasonable 
amount once it mass production commences 
• Among the other benefits those will transform the way of living, the most important benefit is that the palm can be a touch interface for the 
visually impaired; and Fin can be used to control disability aids with the least amount of physical stress 
Source: Indiegogo, www.bgr.in, http://www.wearfin.com/
#33: HOLOGRAPHIC TELEPRESENCE 
CONCEPT: Projecting realistic, moving and 3D images of far off people or surroundings at some other place, to give the 
i i f th f ff / bj t t ll b i t t th l ti h th i j t d Th i 
impression of the far off persons/ objects actually being present at the location where the images are projected. The images 
of the subject are captured, compressed, transmitted over an internet network; then decompressed and projected at the 
target location using lasers, in a process similar to creating holograms. 
INDUSTRY APPLICATION 
Business/ Communication 
•Using Holographic Telepresence in business meetings/ to address 
public gatherings, to cut the travel times and logistical costs of the 
participants 
Entertainment 
•Using the technology to recreate artists and performers on the 
stage, who might not be able to actually perform 
Healthcare 
•Combined with telemedicine, the technology can be used to obtain 
medical advice from experts at far off locations 
Education 
• Interactive methods of teaching can be introduced; students can 
be taught by subject experts located at distant places 
CURRENT STAGE: 
• Telepresence technologies such as videoconferencing are already actively used for long distance communication 
• Britain based Musion uses an effect named ‘Pepper’s Ghost’ , popular with illusionists to beam moving images onto sloped glass. Poland based company Leia 
uses laser projectors to beam images onto a cloud of water vapor. This results in an effect wherby3D objects can be viewed and manipulated from every angle 
• Holographic Telepresence has been used to even create projections of dead artists for musical performances during events 
• Indian Prime Minister Mr. Narendra Modi extensively used innovative holographic telepresence while campaigning for the National Elections 2014; this has 
also been featured in the list of Guinness World Records 
Source: Musion, The Telegraph, whatis.com, telepresenceoptions.com
#34: DNA LASER PRINTING 
CONCEPT: A technology that uses laser to etch DNA on a molecular level. This etched DNA can then be 
injected into a cell to generate an organism programmed as per the specific input parameters. The 
technique uses microarray cloning to mass‐produce a Million oligonucleotides in parallel, and then uses 
massively parallel DNA sequencing to sort the different DNA variants and identify those with the desired 
sequence. 
INDUSTRY APPLICATION 
Healthcare 
•The Laser Printing technology is expected to reduce costs of 
generating the DNA, while also making the process more 
accurate and error free 
•This cost reduction could result in advancements in medical 
treatments 
•Opens up the possibility of preserving animals on the verge 
of extinction, and also of generating new living beings 
CURRENT STAGE: 
•• Traditional DNA printing is well known throughout the world, however a major concern is its very high cost and 
observed high error rate. These shortfalls could be overcome by the Laser Printing technology 
• US based Cambrian Genomics is leading the way in testing and developing DNA Laser Printing technology 
• This technology is still in its nascent stage and once fully developed can open up the doors to personalized healthcare 
applications 
Source: Cambrian Genomics, The Economic Times, www.prote.in, 
3dprintingindustry.com, laserfocusworld.com, extremetech.com
#35: OCEAN THERMAL ENERGY CONVERSION (OTEC) 
CONCEPT: OTEC a marine renewable technology that harnesses is energy the solar energy absorbed by 
the oceans to generate electric power. OTEC uses the temperature gradient between cooler deep and 
warmer shallow or surface ocean waters to run a heat engine and produce useful work, generally in the 
form of electricity. 
Industry Application 
Energy / Power 
•Clean and renewable source of energy 
•A base load electricity generation system which generates 
electricity 24 hours, all year long. 
Synergetic Products 
•Fresh water: Fresh water of quality at par with standard 
desalination plants 
•Food: Nutrient rich cold water from the deep ocean 
•Cooling: Cold water can be utilized for applications such as 
cooling greenhouses 
Current Stage: 
• World’s first operating OTEC plant is located in Okinawa island, Japan. The electricity generation capacity of the plant 
is estimated to be 50 kW 
• Lockheed Martin group along with Hong Kong‐based Group has planned to develop a OTEC pilot plant 
Source: OTEC News, OTEC Okinawa 
Reignwood that will be built off the coast of southern China
#36: BALLOON POWERED INTERNET 
CONCEPT: A project currently being undertaken by Google that involves a series of high – altitude 
balloons, floating in the stratosphere, higher than the altitude at which aeroplanes fly, and creating an 
aerial wireless network, to which users on the ground can connect to, if they have the corresponding 
receivers. The flight of the balloons is controlled by the direction of the wind, and the internet signal 
bounces from a terrestrial antenna, up to the balloon network and then down to the actual users on the 
earth. 
INDUSTRY APPLICATION 
All sectors 
•The aim of such projects is to 
provide affordable and accessible 
internet connectivity to developing/ 
under developed areas, where 
currently internet access is difficult 
to provide due to either logistical or 
cost issues 
Current Stage: 
• Google’s Project Loon has been started in June 2013 with an experimental pilot in New Zealand; the results of the pilot are being used to 
constantly refine the technology in a research facility in California’s Central Valley 
• Project Loon aims to establish a ring of uninterrupted connectivity around the 40th southern parallel during this pilot stage 
• One of the balloons used in the project has been able to traverse the globe in an impressive 22 days 
• In addition to the balloons, solar powered drones can also come up as a similar technology for providing global internet access 
Source: Project Loon, theverge.com, techcrunch.com
#37: PROSTHESIS 
CONCEPT: A prosthesis or prosthetic device is an artificial substitute for a missing human or animal body 
part. Prosthetic devices include, but are not limited to artificial limbs, eyes, ears; and even replacements 
for the heart, kidneys, skin and blood. Prosthetics are extremely helpful to amputees who might have lost 
their body parts in accidents or because of diseases. Prosthetics need to be carefully designed and 
manufactured as per the patient’s needs. 
INDUSTRY APPLICATION 
Healthcare 
•To enable amputees to lead better lives by attaching 
artificial substitutes for their amputed body parts 
•Lightweight and high strength materials used these days 
have even made it possible for prosthetics to help the 
patient in participating in games and sports 
•Neurocognitive prosthetics are helping patients to physically 
reconstitute or augment cognitive processes such as 
executive function, attention, language and memory 
CURRENT STAGE: 
• Cutting edge materials such as carbon fiber, titanium and Kevlar allow prosthetics to be stronger and lighter, thus reducing the effort required 
to control them 
• Combinations of hydraulics, mechanical linkages, motors, computer microprocessors, and innovative combinations of these technologies give 
much more control to the prosthetic user; Myoelectric limbs, which control the limbs by converting muscle movements to electrical signals, 
have started to replace the cable operated limbs 
• Computer Aided Design and Computer Aided Manufacturing are used to design and manufacture prosthetics prosthetics; prosthetics generally cost 
around USD 5000 – USD 35000 
Source: Britannica Encyclopedia; www.howstuffworks.com
#38: DIGITAL PILL 
CONCEPT: A pill that contains an inbuilt sensor, which sends out information to an external patch worn 
by the patient, when the pill has been taken; the patch can then relay the information to a linked 
smartphone or tablet. A Digital Pill contains a sensor about the size of a grain of sand, alongwith copper 
and magnesium, which together create an electrical circuit when they come in contact with the human 
body’s digestive acids. This circuit then powers the sensor. 
INDUSTRY APPLICATION 
Healthcare 
•Since human beings are prone to missing out on 
regular doses of medicine; since patients with chronic 
diseases need to take their medicines regularly; and 
since it is necessary to constantly monitor the actual 
effects of the medicine, such pills will prove to be very 
successful in the healthcare industry 
CURRENT STAGE: 
• According to the World Health Organization (WHO), around 50% of patients around the world fail to take medicines correctly , 
while 50% drugs are prescribed incorrectly 
• US based Proteus Digital Health is developing such Digital Pills, expected to be in the market from 2015 
• Companies such as Otsuka Pharmaceuticals and Novartis are also working with Proteus to develop these digital medicines 
• Proteus is setting up a large scale testing and manufacturing facility for the Digital Pills in England 
Source: Proteus Digital Health, fastcoexist.com, 
histalkmobile.com, telegraph.co.uk, bbcnews.com
#39: VERTICAL FARMING 
CONCEPT: Cultivating crops on segments vertically stacked one over the other, mostly in indoor facilities, 
with artificial, user defined control over the light, water and nutrients needed by the plants to grow. Since 
vertical farming has stacks of crops growing upwards, this reduces the actual land surface area being used 
for agriculture; hence it is mostly associated with urban farming. Vertical farming uses LED light sources 
and hydroponics extensively for the development of the plants. 
INDUSTRY APPLICATION 
Agriculture 
•With a burgeoning population, ever increasing demand for food, and 
rising costs of land, vertical farming can serve as a solution to increase 
crop production, while reducing the horizontal usage of land 
•Growing crops indoors in controlled conditions can help us to grow 
crops all round the year, irrespective of weather conditions; and even 
reduce the usage of pesticides and insecticides 
•With proper technology to supply light, water and nutrients to plants, 
there could be no physical limit to the number of stories we can build 
on top of one another, to cultivate crops 
CURRENT STAGE: 
• Commercial vertical farming has already started in places like Singapore 
• A vertical farm is Pennsylvania, USA is set to be the world’s largest farm using such technology 
• Lighting systems for indoor farms farms, methods for supplying nutrients to plants; and ways of soil and water management 
in high storied vertical farms are current topics of research vis‐à‐vis vertical farming 
Source: verticalfarm.com, theguardian.com, howstuffworks.com, newscientist.com
#40: WIRELESS POWER 
CONCEPT: Electric supply to devices or gadgets, without the device being physically connected to a 
power source via cables. Wireless chargers are especially aimed at charging gadgets, while the device can 
still be used and moved from one place to another by the user. Major wireless – charging technology 
currently available are magnetic induction, magnetic resonance; and using a transmitter with small 
antennas to send radio waves to a receiver connected to the gadget wherein the gadget converts the 
energy from radio waves to DC power. 
INDUSTRY APPLICATION 
All sectors 
•Charging personal entertainment devices such as 
smartphones and tablets, wirelessly 
•Wirelessly charging medical implants such as 
pacemakers to eliminate their batteries and reduce 
their size 
••Extending the application of this technology to 
larger machines and even electric powered cars in 
future 
CURRENT STAGE: 
• Simple devices such as electric toothbrushes use the principle of magnetic induction for charging 
• Companies such as Energous and Witricity are actively developing chargers using the above mentioned technologies for charging gadgets 
• Researchers at Stanford University, y, USA have discovered a new g wavelength at which wireless p power could be transferred, , thus reducing g 
the 
size of conventional medical implants 
Source: MIT Technology Review, Electronic Engineering Journal, 
edition.cnn.com, howstuffworks.com, mddionline.com,
#41: ARTIFICIAL BRAIN 
CONCEPT: A synthetic brain, created by reverse engineering the mammalian brain down to INDUSTRY APPLICATION 
the molecular 
level. This can be achieved by the study of the brain’s architectural and functional principles. The focal 
point is reconstructing the brain piece by piece and building a virtual brain in a supercomputer. 
Healthcare 
•Better understanding of neurological diseases 
Research 
•Understanding the effect of drugs on the brain 
•More efficient neuroscientific research 
CURRENT STAGE: 
• Blue Brain Project is by far the most promising in this technology. Started in 2005, it has shown impressive results 
including development of a cellular mesocircuit of 100 neocortical columns with a million cells in total 
• A cellular rat brain is being developed with 100 mesocircuits, totaling a hundred million cells; and a cellular human 
brain is predicted to be developed by 2023 equivalent to 1000 rat brains with a total of a hundred billion cells 
• The major hurdle in achieving the goal is the computing power. Each simulated neuron requires the equivalent of a 
laptop computer. Hence a model of a full brain would require billions of laptops. However, with developing 
supercomputing technology artificial brain is an achievable goal 
Source: École Polytechnique Fédérale De Lausanne
#42: NANTENNA 
CONCEPT CONCEPT: N Nantenna (N Nano A Antenna) ) i is a i nanoscopic if i rectifying antenna, an i l experimental h l technology b i 
being 
developed, which will convert light to electric power. This technology is based on the concept of wireless power 
transmission. Nantenna is a very small rectifying antenna the size of a light wave, fabricated using nanotechnology, 
which acts as an antenna for light, converting light into electricity. 
INDUSTRY APPLICATION 
Energy / Power 
•Efficient use of solar energy than conventional 
devices 
•Though the current in each antenna is small, an 
array of them can generate significant amount 
of electricity 
•Nantenna arrays can be designed to absorb any 
frequency of light 
CURRENT STAGE: 
• As of now, Nantennas are being developed on experimental basis 
• One of the challenges is that the frequency at which Nantennas operate is very high. This adds complications for 
choice of diode 
• Another challenge is that current Nantennas are produced using electron beam lithography. This process is slow and 
expensive which limits the rife acceptance of this technology. 
Source: Integrated Defense Staff; Media Arts and Technology, University of California
#43: PROGRAMMABLE MATTER 
CONCEPT: Matter that can change its properties and/ or its shape, based upon either inputs provided by 
the user, or by the inputs received by the sensing system of the material itself. Programmable matter 
possesses properties such as computation, sensing, actuation and display. 
INDUSTRY APPLICATION 
All sectors 
•Manufactured products could be modified even 
after manufacture, either by external inputs, or 
by the inputs received by the product itself 
•Clothes made from programmable matter could 
modify their texture according to weather 
conditions 
•Prototypes of machines and devices could be 
built and rebuilt any number of times 
CURRENT STAGE: 
• A number of programmable materials such as Claytronics and Smartdust are being developed which are operated 
using computer science and/ or applications of computer networks 
• Researchers at MIT, USA are working on smart sand particles which could enable the material to form and reform 
shapes as per the user’s requirements 
Source: MIT News, mit.edu, harvard.edu
#44: AIRLESS TIRE 
CONCEPT: Non pneumatic tires, supported internally by compressible materials such as polymers, and not 
by air pressure are known as airless tires. An absence of the air filled tube removes the risk of these tires 
getting punctured, while these tires are being tested for their load carrying as well as shock handling 
capacity too. Airless tires are commonly combinations of solid inner hubs, polymeric spokes in distinct 
patterns, shear bands and treads. 
INDUSTRY APPLICATION 
Automotive 
•Reduction in the risk of tires getting punctured in 
challenging terrain, while providing possibly similar 
levels of load carrying capacity and shock absorbing 
capacity as pneumatic tires; and enhanced 
durability and minimal maintenance than 
conventional tires 
•Possible applications in heavy duty vehicles such as 
construction vehicles; or military vehicles 
CURRENT STAGE: 
• Airless tires have already been tested for light load carrying vehicles such as golf carts and lawn mowers; and even for 
certain military vehicles and All Terrain Vehicles (ATVs) 
• Major players in the tire industry such as Michelin and Bridgestone are developing different types of airless tires; 
Michelin’s version is called the Tweel, Bridgestone’s version is the Air‐Free Concept Tire 
• Resilient Technologies and Polaris both have airless tires based on a honeycomb shaped internal design 
Source: howstuffworks.com, gizmodo.com, airless‐tire.com
#45: HYBRID DRILL BITS 
CONCEPT: Drill bits which are combinations of conventional Polycrystalline Diamond Compact (PDC) drill 
bits and Roller Cone drill bits bits, use to drill heterogeneous sub – surface formations formations, during hydrocarbon 
exploration. These bits combine the cutting superiority of PDCs in soft formations, and the crushing 
strength and stability of roller cone bits in hard formations, to provide higher overall Rate Of Penetration 
(ROP) than a conventional bit used individually. 
INDUSTRY APPLICATION 
Energy 
•Drilling is a costly part of the hydrocarbon 
exploration and production process. Using 
hybrid bits reduces the time otherwise 
wasted in pulling out the drillstring and 
changing the bit, when encountered with a 
different sub – surface formation 
•This reduced drilling time, and increased 
utility of the drill bits can lead to a significant 
saving in costs for the operator 
CURRENT STAGE: 
• US based Baker Hughes Inc. is a pioneer in hybrid drill bit applications, with its range of Kymera Hybrid Drill Bits 
• Current major applications of hybrid drill bits include drilling interbedded formations, directional drilling and drilling wells 
experiencing torque and vibration problems 
• The hybrid drill bits have been proven to drill challenging formations in countries such as US, Brazil and Iceland, faster than 
conventional bits 
Source: Baker Hughes, National Oilwell Varco
#46: SMARTPHONE CO – PROCESSORS 
CONCEPT: A Co – Processor is a processor which assists the main processor in a smartphone in 
performing specific tasks such as motion sensing, thus decreasing the load on the main processor; 
freeing up main processing power and also helping to increase battery life of the phone. This does not 
imply that the main processors are not smart enough to perform these tasks; it is just that co – processors 
are much more power optimized. 
INDUSTRY APPLICATION 
Entertainment 
•Increase in the battery lives of smartphones is 
the major impact expected 
•Measurement of motion data from 
accelerometers, gyroscopes and compasses 
will be devotedly performed by co – 
processors, enabling usage of main processing 
capacity for other important tasks 
CURRENT STAGE: 
• The most prominent co – processors today are the ones used in Motorola’s Moto X and Apple’s iPhone 5S 
• The co – processors in the Moto X enable the phone to listen to voice commands, and also to detect motion; similar 
tasks are p performed y by the co – p processors in the iPhone 5S, in addition to g reducing network p g g pinging to save y 
battery 
life 
Source: Apple; Cnet; BGR; Techradar
#47: LASER BROADBAND 
CONCEPT: Advanced method of data transmission, primarily to be used to transmit data from satellites in 
space to receivers on the Earth. NASA is developing the technology under the Lunar Laser Communication 
Demonstration (LLCD) to transmit hundreds of Millions of bits of data per second from the moon to Earth. 
This would be equivalent to transmitting more than 100 HD television channels simultaneously. 
INDUSTRY APPLICATION 
CURRENT STAGE: 
• NASA has successfully tested the data transmission 
All sectors 
•In today’s world, an enormous amount of data is being collected and 
stored everyday all over the world 
•Such superfast methods of data transfer would help in vastly 
improving our understanding of the space, and help build more 
capacity of the LLCD by downloading both pre – 
decided files as well as real time data from the 
Lunar Atmosphere and Dust Environment Explorer 
(LADEE) 
• NASA required just five minutes to transfer a 
thus gigabyte of information effective space programs 
•When such broadband networks are made available on the earth, this 
will aid in rapid and secure data transfer, which will benefit 
development across all economic and social sectors 
information, and the limiting factor in 
transfer speed turned out not to be the LLCD’s 
transmission from the moon to the Earth, but 
LADEE’s transmission to the LLCD just a few short 
miles away 
• The laser signal could be read without error even 
in broad daylight and through light clouds; thus 
increasing confidence in its technical success. 
However, the signal wasn’t able to pass through 
thick clouds or obstructions to light, which was in 
line with NASA’s expectations 
Source: NASA; extremetech.com; dslreports.com
#48: SMART GRIDS 
CONCEPT: Smart grids are electrical grids that are integrated with computerized, two – way 
communication networks which, in addition to transmitting electricity, also collect electricity usage data 
and provide feedback to the electricity provider. Smart grids leverage the power of Information & 
Communication Technology to allow real time monitoring and modification of the electricity supply 
network, based on the trends in electricity consumption. 
INDUSTRY APPLICATION 
CURRENT STAGE: 
• Countries such as the USA, UK, China and many 
European nations are already actively involved in 
smart grid deployment or smart grid pilot projects 
Energy/ Power 
•Efficient transmission of electricity, lower operating 
costs, faster restoration of electricity after outages 
and reduced energy use during peak‐demand hours 
•Abilities of anticipation and isolation, which allows 
the system to locate problematic sections and to 
isolate those which might have failed 
grid modernization. Fourteen smart grid pilot 
• The Ministry of Power, Government of India, under 
the Restructured Accelerated Power Development 
and Reform Programme (R‐APDRP) is directing 
almost USD 10 Billion over the coming years to 
projects have been announced by the Government 
of India, which will be located all over the country 
• The Uttar Gujarat Vij Company Ltd. (UGVCL) has 
plans to roll out India’s first smart grid in Naroda 
and in Gujarat 2014 Infrastructure 
•Energy efficient infrastructure, enhanced cyber‐security, 
integration with sources of electricity like 
wind and solar power, energy security and reduced 
b Deesa North Gujarat, by April 2014. In 
collaboration with the Government of India, UGVCL 
will invest almost INR 50 crore to set up new 
infrastructure, meters, servers and analytic 
systems for smart grid 
carbon emissions 
Source: Ministry of Power, Govt. of India; US Dept. of Energy; Business Insider
#49: LITHIUM – AIR BATTERY 
CONCEPT: Batteries similar to traditional Lithium – ion batteries, in which the cathode is replaced by air, 
wherein the oxidation of lithium at the anode and the reduction of oxygen at the cathode induces a 
current flow. Since the cathode is air, such batteries are also called ‘breathing batteries’; having an air 
cathode also makes these batteries lightweight. Li – air batteries have very high energy densities 
compared to Li – ion batteries. 
INDUSTRY APPLICATION 
Energy 
•Li – air batteries are being envisaged to be 
used majorly in electric car applications. Their 
reduced weight and increased energy density 
could help increase the energy efficiency of 
electric vehicles 
CURRENT STAGE: 
• Automobile companies such as Volkswagen are developing Li – air batteries to be used in their electric vehicles 
• Researchers at MIT, USA have developed a genetically modified virus, which can increase the surface area of the nanowires used as 
electrodes in the Li – air battery, which can then improve the performance and durability of Li – air batteries; Active research is also going on 
to find the optimum electrolytic solution to be used in Li – air batteries 
• In addition to Li – air batteries, Sodium – air batteries and Aluminium – air batteries are also researched and developed 
Source: extremetech.com, cleantechnica.com, 
theengineer.co.uk, gizmag.com, greencarreports.com
#50: ANTIBACTERIAL FABRIC 
CONCEPT: Fabric embedded or imbibed with nano particles (generally silver particles) which prevent bacterial colonization on the fabric fabric, thus 
keeping the fabric disinfected and hygienic, while also minimizing bad odors emanating from the fabric. These silver ion nano particle networks are 
quite durable, and have been shown to not harm the human skin. 
INDUSTRY APPLICATION 
Textile 
•Disinfected, odor free and durable clothes are 
highly desirable in sport wear or gear 
designed for outdoor activities 
Healthcare 
•The antibacterial properties make such fabrics 
excellent contenders to be used in bandages, 
surgical wear and other such wound treatment 
related fabrics 
CURRENT STAGE: 
• Such Antibacterial Fabric is being manufactured around the world, even for use in furniture, home textiles, beddings, 
mattresses and so on 
• Researchers at Australia’s RMIT University have now developed silver nano wire enabled fabrics, which can kill of 
b i bacteria i hi within j just 10 i minutes of f contact; h the i environmental li impacts f of hi this f b i fabric are now b i being i d 
examined 
Source: Trevira, HHL Technology, wisegeek.com, gizmag.com
Organized By Knowledge Partner National Partner 
Visit us at ww.vibrantgujarat.com

Vibrant Gujarat Summit profile on Disruptive Technologies

  • 2.
    DISRUPTIVE TECHNOLOGIES ADisruptive Technology is a technology or innovation, which is initially a combination of niche technologies or innovative ideas to create a high end product or service, typically such which the existing market does not expect; and when the technology becomes affordable and accessible, it eventually ends up disrupting the existing consumer market and creating a market of its own. DIAGRAM1: Big Bang Market Adoption FIGURE 1: Different types of theories used to describe the market response to Disruptive Technologies. The Rogers’ theory explains this response in the form of a bell curve (grey), while the recent Big Bang theory explains it in the form of a shark fin curve (orange) • Sustaining Technologies are different from Disruptive Technologies in such that they only rely on evolutions and advancements in existing products, thus making firms compete against one another leveraging the improvements each firm can make in their product • In the nascent stage of a disruptive innovation, the market is largely exploratory and mostly led by smaller, innovation driven and entrepreneurial firms. Larger firms tend to stay away from disruptive innovations because either the margins are too tight for them; or their business structure is such that even willingly, they cannot enter the disruptive innovation market due to potential tradeoffs such as cannibalization • Every product market is dynamic and bound to encounter disruptions at some stage or the other. Disruptive innovations can even hurt successful, well managed companies that are responsive to their customers and have excellent R&D. Hence incumbent firms must constantly try to innovate and keep their products relevant in the market Source: KPMG, McKinsey & Company, Accenture
  • 3.
    THE NEED TOACKNOWLEDGE DISRUPTIVE TECHNOLOGIES FIGURE2: Expected Potential Impact of Selected Disruptive Technologies by 2016 • In today’s age, technological advancements, speedy internet, super computing and so on are shaping the course of our economies, in addition to enabling us to enjoy highly comfortable lives, with the knowledge of the world literally at our fingertips •• We are today at the cusp of a probable technological revolution which might not only solve existing global problems, but could also transform the world as we see it and our lives as we live them • The world needs solutions to overcome a breadth of interconnected challenges, ranging from the economic to social issues, which could together result in an improvement in the quality of lives globally, if addressed properly • In such a dynamic environment, it could be potentially disastrous for individuals, companies, and even governments who refuse to embrace the emergence of the disruptive way of thinking, since many of these disruptive technologies possess the potential to trigger the solutions to our global problems • Innovators and investors, who recognize and attempt to seize the various opportunities in the development of disruptive technologies, stand to reap a first – mover advantage once these technologies manages to disrupt the existing market and capture the fancy of users around the world Major sectors which could be influenced by the Disruptive Technologies presented in this document include Manufacturing, Infrastructure, Energy, Healthcare, Education, Retail and Entertainment What follows is a list of 50 major Disruptive Technologies/ / / Innovations/ Products that currently exist in markets around the world; and have either caused disruptions in their corresponding sectors or are on the cusp of doing so Source: ‘Six Converging Technology Trends’, KPMG India and Nasscom, 2013
  • 4.
    #1: 3D PRINTING CONCEPT: 3D printing is basically an additive manufacturing process in which objects are built layer by layer rather than through moulding or subtractive techniques. This technology allows the user to build real objects from virtual 3D objects. This is done by ‘cutting’ the virtual object in 2D slices and printing the real object slice by slice. INDUSTRY APPLICATION Consumer markets •Certain consumer product categories are relatively to make using technology easy this Manufacturing (General) •Cost cutting through elimination of tooling costs, reduction in wasted material, and reduced handling costs Manufacturing (Mold's) •Shortening setup •times, eliminating tooling errors and high efficient moulding process CURRENT STAGE: • 3D printing could generate an economic impact of USD 230 Billion to USD 550 Billion per year by 2025 • Major techniques include selective laser sintering, direct metal laser sintering, fused deposition modeling, stereo lithography and inkjet bio‐printing • The biggest advantage of this technology is that it provides instant modeling to get an idea of the final product, which can cut costs and time significantly Source: McKinsey & Company, The Engineer Magazine
  • 5.
    #2: THE INTERNETOF THINGS CONCEPT: The Internet of Things IoT) is a concept of embedding every object living (or being with sensors or actuators and generating their virtual representation on the internet. Identifying all objects in this unique manner can enable us to effectively track, monitor and even control them. INDUSTRY APPLICATION CURRENT STAGE: • Has to MANUFACTURING : • identifying bottlenecks • Optimizing processes the potential create economic impact of USD 2.7 Trillion to USD 6.2 Trillion annually by 2025 • around 8.7 Billion devices p gp HEALTHCARE : • Constant health monitoring • Detecting counterfeit drugs RETAIL: • Keeping track of inventory levels • Product details Currently are connected to internet and the number is expected to touch 40 Billion by 2020 ENERGY : • Smart Grid applications URBAN DEVELOPMENT : •Traffic monitoring Waste and Water management through smart meters and leak detection sensors y • The major challenge is to make use of the flood of the data that is provided by the sensors AGRICULTURE : • Soil sensors and Leaf sensors y Source: McKinsey & Company, Cisco Systems, Cisco Internet Business Solutions Group
  • 6.
    CONCEPT: #3: BIGDATA ANALYTICS Big Data means the data sets with sizes beyond capacities of commonly used software tools to capture, curate, manage, and process the data within a tolerable elapsed time. Big Data Analytics technology refers to storing and managing large chunk of data in a single location for analysis and evaluation at later stages. However, the term Big Data is quite variable in terms of data sizes ranging from few dozens terabytes to many petabytes of data in a single data set. INDUSTRY APPLICATION CURRENT STAGE: • The global market of big data is Retail • Improved marketing, merchandising, operations, supply chain and after sales service expected to increase from USD 5.4 Billion in 2012 to USD 48 Billion till 2016 • Clubbed with technologies like cloud computing, social media and mobile Healthcare •Real‐time exploration and predictive analytics of clinical data for R & D Telecom •Measure and analyze customer activities, customer churn call handling at call centers p g, internet; Big Data Analytics can offer benefits to sectors like education, defense, aerospace, government services and several others churn, Finance •Generate customer insight and reduce fraudulent practices Source: KPMG, International Journal of Internet Science, McKinsey & Company
  • 7.
    #4: CLOUD COMPUTING CONCEPT: Cloud computing means storing and accessing data and programs over the Internet instead of your computer's hard drive. Here cloud is simply the metaphor for internet. This technology can significantly reduce the need of the personal storage devices and hence can cut down user cost substantially. INDUSTRY APPLICATION Healthcare • Access and retrieve information stored in scattered systems in real time Telecom • Reduced cost in setting up infrastructure Retail • Data stored and accessed remotely for inventory reducing the time and cost Public Sector • Easy and fast access to data and applications remotely Information Technology • Cost cutting in infrastructure development as renting a cloud server is far cheaper than developing one CURRENT STAGE: • The total economic impact of cloud technology could be USD 1.7 Trillion to USD 6.2 Trillion annually by 2025 • Cloud technology is the cornerstone for some of the most promising disruptive technologies like mobile internet, automation of knowledge work, internet of things and big data • Some of the major research areas for this technology are network capacity, security of data and cultural resistance source: kpmg , mckinsey & company
  • 8.
    #5: ADVANCED NANO‐MATERIALS CONCEPT: Any use or manipulation of materials at a scale of less than 100 nanometers (10‐7 meters) can be termed as nanotechnology. Advanced nano‐materials can be created by direct modification of molecular sized nano‐particles using tools like atomic force microscopes, electron beam or laser lithography which are capable of dealing with nano‐scale features. INDUSTRY APPLICATION Healthcare •Rapid, inexpensive electronic DNA sequencing Energy •Application in solar cells •For energy storage as supercapacitors Electronics •Integrated Circuits •Transparent conducting electrodes, which can be used as touchscreens; LCDs CURRENT STAGE: • For healthcare, which will be the most benefitted sector through this technology, advanced nano‐materials could have a potential economic impact of USD 150 Billion to USD 500 Billion annually by 2025 • Graphene is the most promising advanced material. It is one sixth the weight of steel and 100 times stronger. The production of Graphene has been started, however at high cost and in limited quantities Source: McKinsey & Company, Inmesol Power Solutions
  • 9.
    #6: MOBILE DEVICES CONCEPT: Mobile devices have changed the way people access digital content. Smartphones and tablets have brought rich, digital content to the fingertips of consumers. The surging popularity of mobile devices like smartphones and tablet computers has created ripples across the computing industry. INDUSTRY APPLICATION Retail• Browse, compare and buy products online Healthcare • A patient can seek medical advice more often and have flexibility in terms of point of care G•oRviseer onfm meHneta lSteh csteorrvices •Involving citizens for better governance through maximum reach to the citizens Finance• Easy and fast access to banking services CURRENT STAGE: • Mobile handset and tablet shipments are envisaged to grow from 1567 Million in 2012 to 2162 Million till 2016 • Today mobile devices are available in desirable size and shape at very reasonable price very easily. This includes mobile phones, tablets and mobile computers • j Gujarat g government has introduced m – Governance y system for more involvement of citizens. One such p example is of j Rajkot p Municipal Corporation, which provides SMS facility for interactive services, alert services and management services Source: KPMG
  • 10.
    #7: AUGMENTED REALITY CONCEPT: Augmented Reality (AR) offers a live view of a physical, real‐world environment whose elements are enhanced by computer computer‐generated sensory input such as sound sound, video video, graphics or GPS data data. An AR system generates a composite view for the user that is the combination of the real scene viewed by the user and a virtual scene generated by the system that augments the scene with additional information. INDUSTRY APPLICATION Healthcare • Better view of body parts inside to aid the surgery Defense •• Improved navigation for Soldiers •Access to battlefield data in real time Education • Can enhance a standard curriculum •Better understanding by visual graphics Construction • Visualization of georeferenced models of •• construction sites, underground structures, •• cables and pipes using mobile devices Entertainment •Gaming, videos, music, photos, personalized apps Current Stage: • AR has gradually moved from the world of science fiction, to our everyday lives and now everyone from retailers to healthcare providers have embraced AR • The growth of the augmented reality applications market is expected to be exponential with the revenue growth from USD 181.25 Million in 2011 to USD 5,155.92 Million by 2016, at a CAGR of 95.35% from 2011 to 2016 Source: Research and Markets y • High cost is currently a major challenge that in the large scale application of Augmented Reality
  • 11.
    #8: NEXT GENERATIONGENOMICS CONCEPT: DNA sequencing technologies, big data analytics and technologies with ability to modify organisms altogether are known as next generation genomics; these could power rapid acceleration in the field of biology as well as health care. This technology allows manipulation of genes for innovative disease treatments and new types of genetically engineered products. INDUSTRY APPLICATION Healthcare E d l id tifi ti d f CURRENT STAGE: • Next‐generation genomics could have a •Easy and early identification and cure of l f typical diseases like type 2 Diabetes •Accurate and quick cure of cancer at low costs Agriculture •Development of advanced varieties with potential economic impact of USD 700 Billion to USD 1.6 Trillion per year by 2025 • Advanced genomics may offer tremendous potential to develop personalized p treatments for cardiovascular diseases higher potential value Tissue Engineering •Creation of artificial organs as well as organisms • Next generation sequencing represents newer and cheaper methods for sequencing or decoding DNA •• Technical challenges include sequencing samples of low quality and/or quantity, reliable identification of structural and copy number variation and assessment of intratumour heterogeneity Source: McKinsey & Company, British Journal of Cancer
  • 12.
    #9: MOBILE INTERNET CONCEPT: Mobile Internet is a combination of mobile computing devices, high high‐speed wireless connectivity, and applications. Basically it is the ability to access the internet on the mobile phone. This technology has brought a revolution in the information technology field with availability of as much information as required at just the tap of your finger. INDUSTRY APPLICATION Healthcare • Treatment of chronic diseases •Remote monitoring of patients Education • Online admission and classes •Improve learning inside and outside classrooms Public Sector • Citizen services Retail • Online Shopping Finance • Bill Payment and Online Transactions CURRENT STAGE: • Mobile Internet usage could generate global economic impact of USD 3.7 Trillion to USD 10.8 Trillion per year by 2025 • Global mobile internet traffic reached 1.5 exabytes per month at the end of 2013 with over half a Billion (526 Million) mobile devices and connections added in 2013 • The major challenges for the limitless growth of this technology are to pack more computing power, sharper displays, multiple sensors, and powerful antennas into ever‐smaller mobile devices Source: McKinsey & Company Cisco Visual Networking Index
  • 13.
    #10: AUTOMATION OFKNOWLEDGE WORK CONCEPT: Use of computers to perform tasks that rely on complex analyses, subtle judgments, and creative problem solving. This technology enables computing into new realms and creates new relationships between knowledge workers and machines. This facilitates the replacement of man crew with machines for doing the basic jobs. INDUSTRY APPLICATION Healthcare • Chronic care •Cancer treatment diagnostics Education • One‐on‐one attention and coaching Business • Clerical •Customer service and sales Professional Services • Science and engineering •IT • Finance • Legal CURRENT STAGE: • The potential economic impact of knowledge automation tools could reach USD 5.2 Trillion to USD 6.7 Trillion per year by 2025 • Technological, regulatory and organizational concerns can be some key areas of focus before the full utilization of this technology Source: McKinsey & Company
  • 14.
    #11: ADVANCED ROBOTICS CONCEPT: Traditional robots can perform the tasks which require exceptional speed speed, precision precision, stamina or strength excellently in specific conditions. But the need of the hour is to have robots that have greater mobility, dexterity, flexibility, and adaptability in much diverse situations. This has encouraged the development of advanced robotics technologies. These technologies allows the robots to take complex judgments and execute tasks on their own. CURRENT STAGE: B 2025d d b i ld h ld id INDUSTRY APPLICATION Healthcare • Robotic surgery •Robotic Prosthetics Manufacturing • Benefit in production line •To perform repetitive, heavy, or dangerous • By 2025 advanced robotics could have a worldwide economic impact of USD 1.7 Trillion to USD 4.5 Trillion annually • Apart from advanced technologies, high cost remains p p , y, g the major challenge for the procedures Service sector • Cleaning and Maintenance •Customer service and sales Defense • Automated Vehicles •Auto Guided Weapons worldwide acceptance of advanced robotics • For commercial adaption of this technology, investments of scale USD 1 Trillion to USD 1.6 Trillion may be required Aerospace • Space Shuttles • Aircrafts • For many businesses, advanced robotics promises significantly reduced labor costs, greater flexibility and reduced time to deliver products to the marketplace Source: McKinsey & Company, International Federation of Robotics
  • 15.
    #12: SOCIAL MEDIA CONCEPT: Social Media is an instrument of communication; it is a platform that not only gives information but also allows users to interact with each other. It is not just a tool for communicating with friends and acquaintances; Social Media now exerts tremendous influence over the people around the world of all ages, to get and share information. INDUSTRY APPLICATION Retail • Connects with the customers and reach out to them personally know their interest and to preferences Healthcare • Remote patient care and monitoring •One‐to‐many’ doctor patient communication Government Sector • Enhance the outreach of government •• Effective citizen engagement and communication with all stakeholders in real‐time Finance • Understanding the customers’ opinion about services and products • Quick response to customer feedback CURRENT STAGE: • Total number of social media accounts are expected to grow from 3.13 Billion in 2012 to 4.87 Billion till 2016 • The major advantage of this technology is that it facilitates open communication, leading to enhanced information discovery and delivery • Social Media is being used extensively by organizations for branding, advertising and corporate communications Source: KPMG
  • 16.
    #13: AUTONOMOUS ANDNEAR AUTONOMOUS VEHICLES CONCEPT: This includes vehicles which can be manipulated with little or no human intervention. This technology includes on‐board systems which continuously transmit information about vehicle status and location and this information allows real time monitoring as well as maneuvering if needed by remote operator. INDUSTRY APPLICATION Logistics • Long distance transport of goods •Deliveries of products from retail outlets to users using drones Defense • Unmanned Vehicles •Automated Aircrafts Automotive • Automatically driven vehicles Aerospace • Automated Space crafts CURRENT STAGE: • 01The potential economic impact of autonomous cars and trucks could be USD 200 Billion to USD 1.9 Trillion per year by 2025 • Currently, we have autonomous vehicles, although still in experimental and development stage, the technology is entering consumer market with systems such as improved cruise control, automated parking, low speed autonomous driving, which in turn could lead to a full autonomy in driving • Benefits of this technology include reduced accidents, traffic reduction, higher safe speeds, cost reduction, time savings etc Source: McKinsey & Company, Commonwealth Scientific and Industrial Research Organization
  • 17.
    #14: ADVANCED ENERGYSTORAGE CONCEPT: Conversion of electricity into form that can be stored and converted back into a electrical energy for later use, providing energy on demand. This concept allows users to generate energy in times of low demand and store and use later in times of peak demands. INDUSTRY APPLICATION Automotive •Can make electric vehicles a viable option to conventional vehicles Energy/ Power •Rural and underserved areas can be provided with electricity •To store significant amount of energy for use in peak times CURRENT STAGE: • The economic impact of energy storage technologies has the potential to reach USD 90 Billion to USD 635 Billion annually in 2025 • Some of the common technologies for energy storage are solid state batteries, flow batteries, flywheels, compressed air energy storage, thermal energy storage and Pumped Hydro Energy Storage(PHES) • The major advantage of this technology is for peak load shifting. This allows provision of power in times of peak demands with comparatively less infrastructure • However for all the benefits to be realized, these energy storage methods must be cost competitive with other methods Source: McKinsey & Company, Energy Storage Association
  • 18.
    CONCEPT: Providing affordableto #15: UBIQUITOUS BROADBAND and accessible internet services almost all sections of the society, overcoming logistical, technological, economic and geographical challenges that might prevent such internet access. Ubiquitous broadband itself is not a new technology, but an application of the internet technology to the masses, which possesses great potential to help in the socio – economic development of the world. ll INDUSTRY APPLICATION All sectors •Having ubiquitous internet facilities can help in the commercial development of businesses, both from a financial as well as information sharing point of view •Internet can be used a powerful tool for the rapid social development of currently developing or under developed and economically backward nations CURRENT STAGE: • As of 2013, 134 countries had National Broadband Plans; India’s policy for National Optical Fibre Network was adopted in 2011 • According to the Broadband Commission for Digital Development, more than 45% global internet penetration is envisaged by 2015 Source: McKinsey & Company, Broadband Commission for Digital Development, International Telecommunication Union
  • 19.
    CONCEPT: Paying computer#16: DIGITAL PAYMENTS for goods and/ or services using a combination of hardware, internet and digital stored value systems, without the need of exchanging hard cash physically. Digital payments also include Electronic Fund Transfers and digital currencies. Near Field Communication, Bluetooth Low Energy and Mobile Wallets are examples of technologies that aid in conducting digital payments. INDUSTRY APPLICATION Retail/ Consumer Markets R l t f ffli t b th •Replacement of offline payments by these cashless payment technologies •Reduction in the risk of physically carrying cash •Boost to e – commerce markets •Storing not just cash but coupons and other important cards via mobile wallets CURRENT STAGE: • A number of countries, banks and organizations have significantly embraced Digital Payment systems; and it is possible to use credit cards and electronic cash transfer to pay for services even in another country • Bluetooth Low Energy can replace Near Field Communication in the coming future because of its larger operating range and wider applicability • In addition to e – Commerce and e – payments, m – commerce (through mobile phones) is also a major contributor to the growing popularity of digital payments Source: McKinsey & Company, businessinsider.in, hongkiat.com
  • 20.
    #17: UNIVERSAL BIOMETRICIDENTITY CONCEPT: The technique of assigning an unique identification number or code to each and every individual person’s biological characteristics which helps the identity of that individual, linked to the person s certain characteristics, ensure person only during all activities related to the identification number carried out by the person. Biometric identifiers can include fingerprint scans, iris recognition, retinal scans or DNA identification. INDUSTRY APPLICATION All sectors •Assigning biometric identities to individuals can be considered more reliable than other traditional identifiers, since biometric identifiers are unique to each person and difficult to be replicated •Biometric identities can also help reducing scams or fraudulent activities against individuals •Biometric identifiers can also help to track persons having criminal records or linked to terrorist groups CURRENT STAGE: • The technology is fairly highly implemented in developed countries with a number of countries also having biometric ID card scanning systems installed at places frequented by people • Biometric ID cards are also linked to sensitive areas in organizations to limit access to public; and also to bank accounts to ensure safety of monetary transactions • Adaptive Biometrics, biometrics linked to the brain and heart signals are some of the recent advancements in this sector • India has issued Biometric ID cards (Aadhaar Cards) to more than 56 crore citizens under the UIDAI; this database is the largest biometric database in the world Source: UIDAI, McKinsey & Company, Center for Global Development, about.com, fastcompany.com
  • 21.
    #18: IMMUNOTHERAPY CONCEPT:Method of treatment using the patient’s own immune system to fight diseases such as cancer or allergies, by ith ti l ti th i t t k t b i i tifi i l i t t i t th b d either stimulating the immune system to work smarter, or by giving artificial immune system proteins to the body. Immunotherapy treatments, also known as biotherapy or biological response modification, either boost the general immunity of the body, or train the immune system to specifically attack malevolent cells. INDUSTRY APPLICATION Healthcare •Medicinal treatments for certain diseases need to be taken on a regular basis, sometimes at a high cost, and even then might not be fully effective; immunotherapy provides the option of directly attacking the root cause of the disease and strengthening the immune system of the body CURRENT STAGE: • Immunotherapy research is currently focused on finding effective treatments for cancer and allergies • Immunotherapies need to undergo proper regulatory and legal approvals before they can be commercially implemented • j Major yp types of g biological p response modifiers include , Interferons, , Interleukins, Monoclonal , Antibodies, Vaccines and y Colony g Stimulating Factors Source: American Cancer Society, mdanderson.org, cancer.net, allergytherapeutics.com, hcplive.com
  • 22.
    #19: INSURANCE SECURITIZATION CONCEPT: Financial tool, whereby insurers pool contractual debts, and transfer major risks on their books, through bonds or securities to capital market investors, thus reducing their exposure to insurance risks, reducing their costs of re – insurance, and allowing them increased liquidity to issue more insurance policies and services. Catastrophe bonds, Sidecars and Life Insurance Securitization are important segments of the Insurance Linked Securities (ILS) market. INDUSTRY APPLICATION Finance •Increasing risks of disasters and high mortality rates are putting pressure on insurers by increasing the risks they face; transferring risks to capital markets could be a cheaper, transparent and more liquidity providing model for insurance companies as compared to re – insurance •Lower cost of capital and efficient risk transfer possible through ILS; can offer investors a chance to be more prudent about how their invested capital is utilized CURRENT STAGE: • Including all sources of ILS capital, the amount of alternative capital in this segment could almost equal USD 60 Billion by 2015 • ILS have been around for more than 15 years now, but only in recent years have they started putting real pressure on re – insurers • After the financial crisis of 2008 2008, a an mber number of stricter regulations ha e have come into effect regarding ILS which hich are aimed at red cing reducing the risks posed by ILS and the issuers of securities Source: Citi Group, The Economist, National Association of Insurance Commissioners, artemis.bm
  • 23.
    #20: PRECISION AGRICULTURE CONCEPT: An agriculture management and optimization technique, which makes use of sensors, Global Positioning System (GPS) bi d t d di ti l ti t ll t l ti d t d it t d t d ti l dt l GPS), big data and predictive analytics to collect real – time data, and processes to understand spatial and temporal variations across a single field or multiple fields, or even variations in humidity, soil quality and crop maturity, thus giving a holistic overview of the impacts of current agriculture methods being used, and to make relevant modifications in the same, as per the data collected. Pictures of the fields are also taken using satellite imagery or Unmanned Aerial Vehicles (UAV), which combined with GPS and sensor – recorded data, precisely pinpoint the current crop status of any location in the field. INDUSTRY APPLICATION Agriculture •Increasing populations and demands for food are making it necessary to optimize and improve current crop production techniques, to ensure constant high yields; precision agriculture can help in forecasting crop outputs and thus making relevant modifications to boost these outputs Current Stage: • Precision agriculture technologies currently require expensive and robust IT infrastructure and monitoring resources • Venture Capital funds focused on agriculture technology are being established to promote precision agriculture • Cleantech startups related to food and agriculture reportedly experienced the biggest growth during the Q4 of 2013 • Weather forecasting and modeling, cloud computing, data analytics and data management systems related to food and agriculture will also witness growth in conjunction with precision agriculture Source: Forbes, IBM, Cleantech Group, Michigan State University
  • 24.
    #21: HYBRID VEHICLES CONCEPT: Any vehicle that combines more than one source of energy to provide propulsion for the functioning of the vehicle is called a hybrid vehicle Various sources of energy for hybrid vehicles include gasoline diesel natural gas electric batteries biofuel solar energy wind power and vehicle. gasoline, diesel, gas, batteries, biofuel, energy, even human muscle power. The most common types of hybrid vehicles used today combine a fossil fuel source with electricity. Hybrid vehicles include cars, motorbikes, trains, buses, cranes, boats and even submarines. INDUSTRY APPLICATION Automotive •Hybrid vehicles provide users with benefits such as more fuel efficiency, automatic shut off when not driving, regenerative braking; and lesser emissions Energy/ Environment •With such a huge global demand for vehicles, hybrid vehicles can help conserve energy, and also help reduce the carbon footprint CURRENT STAGE: • Hybrid vehicles are considered a bridge between conventional fuel powered vehicles and fully electric vehicles • A number of hybrid vehicle options are available to users today including full hybrids, mild hybrids and plug – in hybrids, depending on the users technical and financial preferences • Companies such as Toyota, Honda, Ford and Chevrolet are major players in the hybrid cars space Source: howstuffworks.com, fueleconomy.gov, hybridcars.com
  • 25.
    #22: E –TAILING CONCEPT: Business to over is tailing (electronic retailing) Customer (B2C) interaction for the sale of goods and/ or services the internet known as e – retailing). e – tailing commonly involves an online brochure of goods, along with the user interface to purchase these goods and pay for them through a variety of payment methods, such as online payment portals. e – tailing also involves a bigger external logistical network of warehouses and product transport and delivery systems. INDUSTRY APPLICATION Retail/ Consumer Markets ••e – tailing can completely eliminate the physical requirement of going to brick and mortar retailers for purchase of goods/ services •This makes the offering attractive for consumers who have a time or logistical constraint which hinders them from actually going to retail outlets •Consumers can browse through a multitude of product offerings, either on the same e – tail website, or on any number of such websites, before choosing the optimum product according to their taste and budget Current Stage: • e – tailing players have started capturing major market shares, boosted by prompt deliveries and novelties such as order tracking services and Cash On Delivery (COD) applications available • The Indian e – tailing market is expected to grow to around USD 22 Billion in the next five years, with major players such as Flipkart, Myntra and Amazon India expected to grow around 70 – 100 % on a year – on – year basis • m – commerce (shopping via mobiles) has also given a boost to the e – tailing industry, with almost all major e – tail players offering mobile shopping applications Source: moneycontrol.com, howstuffworks.com etailingindia.com, searchcio.techtarget.com
  • 26.
    #23: POWERED EXOSKELETON CONCEPT: A bodysuit having a hard outer covering, and using a combination of motors, hydraulics and power supply y g g, g , y p pp y devices to primarily boost the strength and endurance of the user. Such exoskeletons can be used to leverage the benefits of technology to augment the capabilities of the human body, either in extreme conditions or in the presence of some disability. INDUSTRY APPLICATION Defense •The soldiers of the future will be able to wear such exoskeletons to navigate through hostile conditions during wars or rescue operations Healthcare •Exoskeletons are also being developed to help people with lower body disabilities to stand and move around CURRENT STAGE: • A large number of companies and organizations including the US Army are working on developing exoskeletons for a defense as well as healthcare point of view • According to Panasonic, the world’s first affordable and mass produced exoskeleton will be on sale 2015 onwards, costing around USD 5000 • Issues concerning the development of exoskeletons include durable power supply, flexibility and motion controllers Source: Ekso Bionics, howstuffworks.com, extremetech.com
  • 27.
    #24: GESTURE RECOGNITION CONCEPT: The interpretation of hand gestures and/ or facial expressions by a computer or a machine, thus reducing the use of conventional mechanical input devices, whilst increasing the Human Machine Interface (HMI). Gesture recognition uses a combination of computer programming, computer vision and image processing; and input devices such as wired gloves and a variety of cameras. INDUSTRY APPLICATION Entertainment •Using gestures to control devices such as music players, smart phones and tablets Manufacturing •Using gestures to operate control panels in manufacturing units can save time Healthcare •Patients with disabilities will also be able to operate devices having gesture recognition Education •Novel and interactive methods of education can be introduced CURRENT STAGE: • Current gesture recognition devices use combinations of accelerometers, gyroscopes and infrared detectors as sensors; and are already finding applications in gaming consoles, smartphones and so on • The global Gesture Recognition market is expected to grow at a CAGR of 29.2% over 2013‐2018 Source: digitaljournal.com; gizmodo.com; whatis.com
  • 28.
    #25: MASSIVE ONLINEOPEN COURSE CONCEPT: A Massive Online Open Course (MOOC) is a method of providing online education to a very large number of students across the globe, free or at a very negligible cost as compared to conventional higher educational methods. MOOCs typically involve a MOOC platform, wherein students can access educational content in the form of lectures, reading material and related assignments, all online, thus reducing physical, financial and even time zone related difficulties. MOOCs may or may not grant credits to the applicants, and have different course durations depending on the course. INDUSTRY APPLICATION Education •Access to a broad range of courses, across sectors, and capable of catering to an almost unlimited number of students •Removing the physical and financial barriers can help spread education massively in developing countries and to people who cannot afford higher education ••MOOC providers charge a nominal amount for certification; which is also acceptable to many students taking the course CURRENT STAGE: • MOOCs bring together a large number of stakeholders such as MOOC providers, Universities, Internet services providers and Venture Capitalists • Around 2230 MOOC players are currently operational, including profit/ not for profit organizations; and even conglomerates of Universities • p Adaptive g testing, p peer g g grading, yp typing g p pattern g recognition and other such g technologies are g being p developed to reduce the effect of cheating in MOOCs Source: The Complete University Guide; www.moocs.co; www.coursera.org
  • 29.
    #26: SPEECH RECOGNITION CONCEPT: Speech is the ability of a computer, computer software program or hardware INDUSTRY APPLICATION recognition device to decode the human voice into digitized speech that can be interpreted by the computer or hardware device. This technology enables us to operate a device or perform commands without using the conventional input devices. CURRENT STAGE: • Speech recognition has developed Healthcare significantly in past few years. Today, this technology is offered in mobile devices as well as computers through Automatic Speech Recognition (ASR) software • The accuracy of speech recognition has •Medical documentation processes •Maintaining EHR (Electronic Health Records) Defense •Operating aircrafts smoothly also been increasing. The F‐35 pilot‐aircraft of US Air Force offers system speech recognition with an accuracy of ~98% • Apart from technical challenges the high tech •Better control over weapons due to ease of input Business •Easy and fast document production with reduced labor of typing physically challenges, reliability of the inputs interpreted by the software remains a key issue of research Others • A boon for visually impaired peoples •Hands free computing • Home automation •Vehicle navigation systems • Mobile telephony Source: Department of Computer Engineering, Çukurova University; US Air Force
  • 30.
    #27: QUANTUM COMPUTING CONCEPT: A method of computing that uses the principles of quantum physics to store information as a 1 or a 0 or a superposition of both at the same time time, instead of conventional binary computing which can store information only as a 1 or a 0, but not a superposition of the two. Using quantum superposition, in conjunction with the effects of quantum tunneling and entanglement, makes quantum computers consider all possible combinations of quantum bits (qubits) simultaneously, thus enabling them to perform calculations much faster than conventional digital computers. INDUSTRY APPLICATION All sectors •With tremendous amounts of data being generated across sectors everyday, superior computing abilities could make data analysis and management easier •Applications in cryptography and data encryption vis‐à‐ vis data protection CURRENT STAGE: • A number of Government agencies around the world are funding Quantum Computing programs from a national safety point of view • Quantum computing is still more of a theoretical concept which is in its practical infancy • The D –Wave is the only commercial Quantum Computer available in the world, priced around USD 10 Million and with very limited computing power; companies such as IBM are also developing Quantum Computers • High costs remain a major challenge f for Quantum Computers as f of now; topics such as coherence on a single qubit level and stringing multiple fully entangled qubits together are major current areas of research in this domain Source: D –Wave Systems, howstuffworks.com, about.com, extremetech.com, guardian.com
  • 31.
    #28: BIOFUELS CONCEPT:A Biofuel can be described as a fuel that contains energy from geologically recent carbon fixation. These fuels are extracted from living organisms such as plants or microalgae. Biofuels differ from conventional fossil fuels in a way that Biofuels can be regenerated in short time period making them a renewable energy source. INDUSTRY APPLICATION CURRENT STAGE: • Among the various biofuels like Ethanol Power •Electricity generation is the single largest use of fuel •Biofuel can offer a viable alternative to conventionally used coal and natural gas Ethanol, Biodiesel, Green Diesel, Biofuel Gasoline, and Vegetable Oil, the most promising Biofuel today is the Biodiesel • In US, the NFESC, with several biodiesel industries, is developing biodiesel technologies. Automotive •Less dependence on fossil fuels •Clean and renewable fuel , p g g Another group of Spanish developers has announced a new biofuel made from trash • In India, the development of biofuels pivots around the cultivation and processing Jatropha plant seeds, which can grow on the wastelands Energy •Energy and cost efficient alternative to the conventionally used fuels like wood, natural gas etc. across India • Offering the biggest advantage of partially to fully replacement of the fossil fuels with clean and ecological fuels, Biofuels face technical challenges. Besides cost, the size of land needed to produce the biofuels in mass very Source: BerkeleyBioDiesel, http://biofuel.org.uk/ is large
  • 32.
    #29: ELECTRONIC SKIN CONCEPT: Thin and flexible electronic material which can mimic the human skin in multiple ways. Using a combination of nanotechnology, sensors and conducting materials, electronic skin has been created which can sense pressure and temperature; and even stretch and heal itself. Electronic skin can be used to impart the ability of sensations to people using prosthetics and also to enable robots to feel human – like sensations. INDUSTRY APPLICATION Healthcare •Restoring sensations such as touch and temperature to people using prosthetics •To be used by patients with diseases such as Parkinson’s disease and epilepsy to constantly monitor health data ••Applications wherein electronic skin will also be able to administer medicine to patients are being explored CURRENT STAGE: • A research team at Stanford University, USA has developed a self – healing skin; a research team at UC Berkeley, USA has also developed an electronic skin which also lights up when touched • Researchers have also constructed an electronic skin which is a combination of sensors that detect temperature and motion motion, resistive RAM for data storage storage, micro heaters and drugs; which is capable of monitoring the health of patients and administering drugs itself Source: IEEE Spectrum; nature.com; news.discovery.com
  • 33.
    #30: CROSSBAR MEMORY CONCEPT: Crossbar Memory is a unique type of Non – Volatile Resistive Random Access Memory (RRAM) being developed by Crossbar, based in California, USA, which is a memory format that allows storage capacity of upto 1 Terabyte (TB) on a chip the size of a postage stamp. Further, Crossbar technology can be stacked vertically in 3D, providing multiple TB of storage on a single chip. According to Crossbar, this memory can disrupt the existing USD 60 Billion Flash memory market. INDUSTRY APPLICATION CURRENT STAGE: • By 2016, the demand for non – volatile memory is 48 4 Billion Entertainment and Consumer Markets •High storage capacity in laptops, tablet computers, smartphones and gaming systems expected to reach USD 48.4 • Crossbar has successfully developed its demonstration product in a commercial fab. This working silicon is a fully integrated monolithic CMOS controller and memory array chip Manufacturing and Business •Will be able to boost the success of the Internet of Things and the Industrial Internet •Extra storage capacities for IT systems and Cloud service providers • Crossbar is currently completing the characterization and optimization of this device •Real time automotive applications •Application in smart meters and thermostats Source: Crossbar Inc.; venturebeat.com
  • 34.
    #31: CONCENTRATED SOLARPOWER CONCEPT: Concentrated Solar Power (CSP) Technologies use mirrors or lenses to concentrate the sunlight into a relatively small area, where this light is converted to heat. This heat then creates steam that drives steam engines to generate electric power. CSP systems have very wide ranges form remote power systems as small as few kilowatts up to grid‐connected power plants of 100’s of megawatts (MW). INDUSTRY APPLICATION Energy/ Power •CSP is most economically viable in large installations. This allows for economies of scale in production and installation, leading to price reductions •Moreover electricity system operators are accustomed to deal with large installations, which further help lead to widespread acceptance CURRENT STAGE: • The most widespread CSP technology used is parabolic‐trough plants which covers ~90% of CSP plants • Nokh Plant located in Rajasthan, by Godavari Green Energy is one of the major CSP plants in India. Spread over 400 acres of land, the plant has the capacity of 50 MW • The major challenge faced by this technology is the higher cost compared to other alternate technologies • h With proper f l financial support l b global l CSP capacity ld could reach h 147 GW b by 2020 Source: Solar Energy Development Programmatic EIS, US Department of Energy
  • 35.
    #32: WEARABLE BLUETOOTHRING CONCEPT: Wearable Bluetooth ring (g( ) Fin) is an g elegant y tiny device that can be worn on thumb to convert the user’s p palm into a gesture interface. With this technology one can control multiple devices supporting Bluetooth without even touching them. Fin can transmit natural gestures as commands to any connected Bluetooth device. INDUSTRY APPLICATION Entertainment •Wireless control of smartphones, TVs, and other connected devices Defense •Remote controlling of the weapons Augmented Reality •Controlling head mounted displays Virtual Modelling •Better visualization of concept models CURRENT STAGE: • Wearable Bluetooth ring is still in its research and development phase • High retail price is one of the prime concerns for widespread acceptance of this technology. However the cost could be cut to a reasonable amount once it mass production commences • Among the other benefits those will transform the way of living, the most important benefit is that the palm can be a touch interface for the visually impaired; and Fin can be used to control disability aids with the least amount of physical stress Source: Indiegogo, www.bgr.in, http://www.wearfin.com/
  • 36.
    #33: HOLOGRAPHIC TELEPRESENCE CONCEPT: Projecting realistic, moving and 3D images of far off people or surroundings at some other place, to give the i i f th f ff / bj t t ll b i t t th l ti h th i j t d Th i impression of the far off persons/ objects actually being present at the location where the images are projected. The images of the subject are captured, compressed, transmitted over an internet network; then decompressed and projected at the target location using lasers, in a process similar to creating holograms. INDUSTRY APPLICATION Business/ Communication •Using Holographic Telepresence in business meetings/ to address public gatherings, to cut the travel times and logistical costs of the participants Entertainment •Using the technology to recreate artists and performers on the stage, who might not be able to actually perform Healthcare •Combined with telemedicine, the technology can be used to obtain medical advice from experts at far off locations Education • Interactive methods of teaching can be introduced; students can be taught by subject experts located at distant places CURRENT STAGE: • Telepresence technologies such as videoconferencing are already actively used for long distance communication • Britain based Musion uses an effect named ‘Pepper’s Ghost’ , popular with illusionists to beam moving images onto sloped glass. Poland based company Leia uses laser projectors to beam images onto a cloud of water vapor. This results in an effect wherby3D objects can be viewed and manipulated from every angle • Holographic Telepresence has been used to even create projections of dead artists for musical performances during events • Indian Prime Minister Mr. Narendra Modi extensively used innovative holographic telepresence while campaigning for the National Elections 2014; this has also been featured in the list of Guinness World Records Source: Musion, The Telegraph, whatis.com, telepresenceoptions.com
  • 37.
    #34: DNA LASERPRINTING CONCEPT: A technology that uses laser to etch DNA on a molecular level. This etched DNA can then be injected into a cell to generate an organism programmed as per the specific input parameters. The technique uses microarray cloning to mass‐produce a Million oligonucleotides in parallel, and then uses massively parallel DNA sequencing to sort the different DNA variants and identify those with the desired sequence. INDUSTRY APPLICATION Healthcare •The Laser Printing technology is expected to reduce costs of generating the DNA, while also making the process more accurate and error free •This cost reduction could result in advancements in medical treatments •Opens up the possibility of preserving animals on the verge of extinction, and also of generating new living beings CURRENT STAGE: •• Traditional DNA printing is well known throughout the world, however a major concern is its very high cost and observed high error rate. These shortfalls could be overcome by the Laser Printing technology • US based Cambrian Genomics is leading the way in testing and developing DNA Laser Printing technology • This technology is still in its nascent stage and once fully developed can open up the doors to personalized healthcare applications Source: Cambrian Genomics, The Economic Times, www.prote.in, 3dprintingindustry.com, laserfocusworld.com, extremetech.com
  • 38.
    #35: OCEAN THERMALENERGY CONVERSION (OTEC) CONCEPT: OTEC a marine renewable technology that harnesses is energy the solar energy absorbed by the oceans to generate electric power. OTEC uses the temperature gradient between cooler deep and warmer shallow or surface ocean waters to run a heat engine and produce useful work, generally in the form of electricity. Industry Application Energy / Power •Clean and renewable source of energy •A base load electricity generation system which generates electricity 24 hours, all year long. Synergetic Products •Fresh water: Fresh water of quality at par with standard desalination plants •Food: Nutrient rich cold water from the deep ocean •Cooling: Cold water can be utilized for applications such as cooling greenhouses Current Stage: • World’s first operating OTEC plant is located in Okinawa island, Japan. The electricity generation capacity of the plant is estimated to be 50 kW • Lockheed Martin group along with Hong Kong‐based Group has planned to develop a OTEC pilot plant Source: OTEC News, OTEC Okinawa Reignwood that will be built off the coast of southern China
  • 39.
    #36: BALLOON POWEREDINTERNET CONCEPT: A project currently being undertaken by Google that involves a series of high – altitude balloons, floating in the stratosphere, higher than the altitude at which aeroplanes fly, and creating an aerial wireless network, to which users on the ground can connect to, if they have the corresponding receivers. The flight of the balloons is controlled by the direction of the wind, and the internet signal bounces from a terrestrial antenna, up to the balloon network and then down to the actual users on the earth. INDUSTRY APPLICATION All sectors •The aim of such projects is to provide affordable and accessible internet connectivity to developing/ under developed areas, where currently internet access is difficult to provide due to either logistical or cost issues Current Stage: • Google’s Project Loon has been started in June 2013 with an experimental pilot in New Zealand; the results of the pilot are being used to constantly refine the technology in a research facility in California’s Central Valley • Project Loon aims to establish a ring of uninterrupted connectivity around the 40th southern parallel during this pilot stage • One of the balloons used in the project has been able to traverse the globe in an impressive 22 days • In addition to the balloons, solar powered drones can also come up as a similar technology for providing global internet access Source: Project Loon, theverge.com, techcrunch.com
  • 40.
    #37: PROSTHESIS CONCEPT:A prosthesis or prosthetic device is an artificial substitute for a missing human or animal body part. Prosthetic devices include, but are not limited to artificial limbs, eyes, ears; and even replacements for the heart, kidneys, skin and blood. Prosthetics are extremely helpful to amputees who might have lost their body parts in accidents or because of diseases. Prosthetics need to be carefully designed and manufactured as per the patient’s needs. INDUSTRY APPLICATION Healthcare •To enable amputees to lead better lives by attaching artificial substitutes for their amputed body parts •Lightweight and high strength materials used these days have even made it possible for prosthetics to help the patient in participating in games and sports •Neurocognitive prosthetics are helping patients to physically reconstitute or augment cognitive processes such as executive function, attention, language and memory CURRENT STAGE: • Cutting edge materials such as carbon fiber, titanium and Kevlar allow prosthetics to be stronger and lighter, thus reducing the effort required to control them • Combinations of hydraulics, mechanical linkages, motors, computer microprocessors, and innovative combinations of these technologies give much more control to the prosthetic user; Myoelectric limbs, which control the limbs by converting muscle movements to electrical signals, have started to replace the cable operated limbs • Computer Aided Design and Computer Aided Manufacturing are used to design and manufacture prosthetics prosthetics; prosthetics generally cost around USD 5000 – USD 35000 Source: Britannica Encyclopedia; www.howstuffworks.com
  • 41.
    #38: DIGITAL PILL CONCEPT: A pill that contains an inbuilt sensor, which sends out information to an external patch worn by the patient, when the pill has been taken; the patch can then relay the information to a linked smartphone or tablet. A Digital Pill contains a sensor about the size of a grain of sand, alongwith copper and magnesium, which together create an electrical circuit when they come in contact with the human body’s digestive acids. This circuit then powers the sensor. INDUSTRY APPLICATION Healthcare •Since human beings are prone to missing out on regular doses of medicine; since patients with chronic diseases need to take their medicines regularly; and since it is necessary to constantly monitor the actual effects of the medicine, such pills will prove to be very successful in the healthcare industry CURRENT STAGE: • According to the World Health Organization (WHO), around 50% of patients around the world fail to take medicines correctly , while 50% drugs are prescribed incorrectly • US based Proteus Digital Health is developing such Digital Pills, expected to be in the market from 2015 • Companies such as Otsuka Pharmaceuticals and Novartis are also working with Proteus to develop these digital medicines • Proteus is setting up a large scale testing and manufacturing facility for the Digital Pills in England Source: Proteus Digital Health, fastcoexist.com, histalkmobile.com, telegraph.co.uk, bbcnews.com
  • 42.
    #39: VERTICAL FARMING CONCEPT: Cultivating crops on segments vertically stacked one over the other, mostly in indoor facilities, with artificial, user defined control over the light, water and nutrients needed by the plants to grow. Since vertical farming has stacks of crops growing upwards, this reduces the actual land surface area being used for agriculture; hence it is mostly associated with urban farming. Vertical farming uses LED light sources and hydroponics extensively for the development of the plants. INDUSTRY APPLICATION Agriculture •With a burgeoning population, ever increasing demand for food, and rising costs of land, vertical farming can serve as a solution to increase crop production, while reducing the horizontal usage of land •Growing crops indoors in controlled conditions can help us to grow crops all round the year, irrespective of weather conditions; and even reduce the usage of pesticides and insecticides •With proper technology to supply light, water and nutrients to plants, there could be no physical limit to the number of stories we can build on top of one another, to cultivate crops CURRENT STAGE: • Commercial vertical farming has already started in places like Singapore • A vertical farm is Pennsylvania, USA is set to be the world’s largest farm using such technology • Lighting systems for indoor farms farms, methods for supplying nutrients to plants; and ways of soil and water management in high storied vertical farms are current topics of research vis‐à‐vis vertical farming Source: verticalfarm.com, theguardian.com, howstuffworks.com, newscientist.com
  • 43.
    #40: WIRELESS POWER CONCEPT: Electric supply to devices or gadgets, without the device being physically connected to a power source via cables. Wireless chargers are especially aimed at charging gadgets, while the device can still be used and moved from one place to another by the user. Major wireless – charging technology currently available are magnetic induction, magnetic resonance; and using a transmitter with small antennas to send radio waves to a receiver connected to the gadget wherein the gadget converts the energy from radio waves to DC power. INDUSTRY APPLICATION All sectors •Charging personal entertainment devices such as smartphones and tablets, wirelessly •Wirelessly charging medical implants such as pacemakers to eliminate their batteries and reduce their size ••Extending the application of this technology to larger machines and even electric powered cars in future CURRENT STAGE: • Simple devices such as electric toothbrushes use the principle of magnetic induction for charging • Companies such as Energous and Witricity are actively developing chargers using the above mentioned technologies for charging gadgets • Researchers at Stanford University, y, USA have discovered a new g wavelength at which wireless p power could be transferred, , thus reducing g the size of conventional medical implants Source: MIT Technology Review, Electronic Engineering Journal, edition.cnn.com, howstuffworks.com, mddionline.com,
  • 44.
    #41: ARTIFICIAL BRAIN CONCEPT: A synthetic brain, created by reverse engineering the mammalian brain down to INDUSTRY APPLICATION the molecular level. This can be achieved by the study of the brain’s architectural and functional principles. The focal point is reconstructing the brain piece by piece and building a virtual brain in a supercomputer. Healthcare •Better understanding of neurological diseases Research •Understanding the effect of drugs on the brain •More efficient neuroscientific research CURRENT STAGE: • Blue Brain Project is by far the most promising in this technology. Started in 2005, it has shown impressive results including development of a cellular mesocircuit of 100 neocortical columns with a million cells in total • A cellular rat brain is being developed with 100 mesocircuits, totaling a hundred million cells; and a cellular human brain is predicted to be developed by 2023 equivalent to 1000 rat brains with a total of a hundred billion cells • The major hurdle in achieving the goal is the computing power. Each simulated neuron requires the equivalent of a laptop computer. Hence a model of a full brain would require billions of laptops. However, with developing supercomputing technology artificial brain is an achievable goal Source: École Polytechnique Fédérale De Lausanne
  • 45.
    #42: NANTENNA CONCEPTCONCEPT: N Nantenna (N Nano A Antenna) ) i is a i nanoscopic if i rectifying antenna, an i l experimental h l technology b i being developed, which will convert light to electric power. This technology is based on the concept of wireless power transmission. Nantenna is a very small rectifying antenna the size of a light wave, fabricated using nanotechnology, which acts as an antenna for light, converting light into electricity. INDUSTRY APPLICATION Energy / Power •Efficient use of solar energy than conventional devices •Though the current in each antenna is small, an array of them can generate significant amount of electricity •Nantenna arrays can be designed to absorb any frequency of light CURRENT STAGE: • As of now, Nantennas are being developed on experimental basis • One of the challenges is that the frequency at which Nantennas operate is very high. This adds complications for choice of diode • Another challenge is that current Nantennas are produced using electron beam lithography. This process is slow and expensive which limits the rife acceptance of this technology. Source: Integrated Defense Staff; Media Arts and Technology, University of California
  • 46.
    #43: PROGRAMMABLE MATTER CONCEPT: Matter that can change its properties and/ or its shape, based upon either inputs provided by the user, or by the inputs received by the sensing system of the material itself. Programmable matter possesses properties such as computation, sensing, actuation and display. INDUSTRY APPLICATION All sectors •Manufactured products could be modified even after manufacture, either by external inputs, or by the inputs received by the product itself •Clothes made from programmable matter could modify their texture according to weather conditions •Prototypes of machines and devices could be built and rebuilt any number of times CURRENT STAGE: • A number of programmable materials such as Claytronics and Smartdust are being developed which are operated using computer science and/ or applications of computer networks • Researchers at MIT, USA are working on smart sand particles which could enable the material to form and reform shapes as per the user’s requirements Source: MIT News, mit.edu, harvard.edu
  • 47.
    #44: AIRLESS TIRE CONCEPT: Non pneumatic tires, supported internally by compressible materials such as polymers, and not by air pressure are known as airless tires. An absence of the air filled tube removes the risk of these tires getting punctured, while these tires are being tested for their load carrying as well as shock handling capacity too. Airless tires are commonly combinations of solid inner hubs, polymeric spokes in distinct patterns, shear bands and treads. INDUSTRY APPLICATION Automotive •Reduction in the risk of tires getting punctured in challenging terrain, while providing possibly similar levels of load carrying capacity and shock absorbing capacity as pneumatic tires; and enhanced durability and minimal maintenance than conventional tires •Possible applications in heavy duty vehicles such as construction vehicles; or military vehicles CURRENT STAGE: • Airless tires have already been tested for light load carrying vehicles such as golf carts and lawn mowers; and even for certain military vehicles and All Terrain Vehicles (ATVs) • Major players in the tire industry such as Michelin and Bridgestone are developing different types of airless tires; Michelin’s version is called the Tweel, Bridgestone’s version is the Air‐Free Concept Tire • Resilient Technologies and Polaris both have airless tires based on a honeycomb shaped internal design Source: howstuffworks.com, gizmodo.com, airless‐tire.com
  • 48.
    #45: HYBRID DRILLBITS CONCEPT: Drill bits which are combinations of conventional Polycrystalline Diamond Compact (PDC) drill bits and Roller Cone drill bits bits, use to drill heterogeneous sub – surface formations formations, during hydrocarbon exploration. These bits combine the cutting superiority of PDCs in soft formations, and the crushing strength and stability of roller cone bits in hard formations, to provide higher overall Rate Of Penetration (ROP) than a conventional bit used individually. INDUSTRY APPLICATION Energy •Drilling is a costly part of the hydrocarbon exploration and production process. Using hybrid bits reduces the time otherwise wasted in pulling out the drillstring and changing the bit, when encountered with a different sub – surface formation •This reduced drilling time, and increased utility of the drill bits can lead to a significant saving in costs for the operator CURRENT STAGE: • US based Baker Hughes Inc. is a pioneer in hybrid drill bit applications, with its range of Kymera Hybrid Drill Bits • Current major applications of hybrid drill bits include drilling interbedded formations, directional drilling and drilling wells experiencing torque and vibration problems • The hybrid drill bits have been proven to drill challenging formations in countries such as US, Brazil and Iceland, faster than conventional bits Source: Baker Hughes, National Oilwell Varco
  • 49.
    #46: SMARTPHONE CO– PROCESSORS CONCEPT: A Co – Processor is a processor which assists the main processor in a smartphone in performing specific tasks such as motion sensing, thus decreasing the load on the main processor; freeing up main processing power and also helping to increase battery life of the phone. This does not imply that the main processors are not smart enough to perform these tasks; it is just that co – processors are much more power optimized. INDUSTRY APPLICATION Entertainment •Increase in the battery lives of smartphones is the major impact expected •Measurement of motion data from accelerometers, gyroscopes and compasses will be devotedly performed by co – processors, enabling usage of main processing capacity for other important tasks CURRENT STAGE: • The most prominent co – processors today are the ones used in Motorola’s Moto X and Apple’s iPhone 5S • The co – processors in the Moto X enable the phone to listen to voice commands, and also to detect motion; similar tasks are p performed y by the co – p processors in the iPhone 5S, in addition to g reducing network p g g pinging to save y battery life Source: Apple; Cnet; BGR; Techradar
  • 50.
    #47: LASER BROADBAND CONCEPT: Advanced method of data transmission, primarily to be used to transmit data from satellites in space to receivers on the Earth. NASA is developing the technology under the Lunar Laser Communication Demonstration (LLCD) to transmit hundreds of Millions of bits of data per second from the moon to Earth. This would be equivalent to transmitting more than 100 HD television channels simultaneously. INDUSTRY APPLICATION CURRENT STAGE: • NASA has successfully tested the data transmission All sectors •In today’s world, an enormous amount of data is being collected and stored everyday all over the world •Such superfast methods of data transfer would help in vastly improving our understanding of the space, and help build more capacity of the LLCD by downloading both pre – decided files as well as real time data from the Lunar Atmosphere and Dust Environment Explorer (LADEE) • NASA required just five minutes to transfer a thus gigabyte of information effective space programs •When such broadband networks are made available on the earth, this will aid in rapid and secure data transfer, which will benefit development across all economic and social sectors information, and the limiting factor in transfer speed turned out not to be the LLCD’s transmission from the moon to the Earth, but LADEE’s transmission to the LLCD just a few short miles away • The laser signal could be read without error even in broad daylight and through light clouds; thus increasing confidence in its technical success. However, the signal wasn’t able to pass through thick clouds or obstructions to light, which was in line with NASA’s expectations Source: NASA; extremetech.com; dslreports.com
  • 51.
    #48: SMART GRIDS CONCEPT: Smart grids are electrical grids that are integrated with computerized, two – way communication networks which, in addition to transmitting electricity, also collect electricity usage data and provide feedback to the electricity provider. Smart grids leverage the power of Information & Communication Technology to allow real time monitoring and modification of the electricity supply network, based on the trends in electricity consumption. INDUSTRY APPLICATION CURRENT STAGE: • Countries such as the USA, UK, China and many European nations are already actively involved in smart grid deployment or smart grid pilot projects Energy/ Power •Efficient transmission of electricity, lower operating costs, faster restoration of electricity after outages and reduced energy use during peak‐demand hours •Abilities of anticipation and isolation, which allows the system to locate problematic sections and to isolate those which might have failed grid modernization. Fourteen smart grid pilot • The Ministry of Power, Government of India, under the Restructured Accelerated Power Development and Reform Programme (R‐APDRP) is directing almost USD 10 Billion over the coming years to projects have been announced by the Government of India, which will be located all over the country • The Uttar Gujarat Vij Company Ltd. (UGVCL) has plans to roll out India’s first smart grid in Naroda and in Gujarat 2014 Infrastructure •Energy efficient infrastructure, enhanced cyber‐security, integration with sources of electricity like wind and solar power, energy security and reduced b Deesa North Gujarat, by April 2014. In collaboration with the Government of India, UGVCL will invest almost INR 50 crore to set up new infrastructure, meters, servers and analytic systems for smart grid carbon emissions Source: Ministry of Power, Govt. of India; US Dept. of Energy; Business Insider
  • 52.
    #49: LITHIUM –AIR BATTERY CONCEPT: Batteries similar to traditional Lithium – ion batteries, in which the cathode is replaced by air, wherein the oxidation of lithium at the anode and the reduction of oxygen at the cathode induces a current flow. Since the cathode is air, such batteries are also called ‘breathing batteries’; having an air cathode also makes these batteries lightweight. Li – air batteries have very high energy densities compared to Li – ion batteries. INDUSTRY APPLICATION Energy •Li – air batteries are being envisaged to be used majorly in electric car applications. Their reduced weight and increased energy density could help increase the energy efficiency of electric vehicles CURRENT STAGE: • Automobile companies such as Volkswagen are developing Li – air batteries to be used in their electric vehicles • Researchers at MIT, USA have developed a genetically modified virus, which can increase the surface area of the nanowires used as electrodes in the Li – air battery, which can then improve the performance and durability of Li – air batteries; Active research is also going on to find the optimum electrolytic solution to be used in Li – air batteries • In addition to Li – air batteries, Sodium – air batteries and Aluminium – air batteries are also researched and developed Source: extremetech.com, cleantechnica.com, theengineer.co.uk, gizmag.com, greencarreports.com
  • 53.
    #50: ANTIBACTERIAL FABRIC CONCEPT: Fabric embedded or imbibed with nano particles (generally silver particles) which prevent bacterial colonization on the fabric fabric, thus keeping the fabric disinfected and hygienic, while also minimizing bad odors emanating from the fabric. These silver ion nano particle networks are quite durable, and have been shown to not harm the human skin. INDUSTRY APPLICATION Textile •Disinfected, odor free and durable clothes are highly desirable in sport wear or gear designed for outdoor activities Healthcare •The antibacterial properties make such fabrics excellent contenders to be used in bandages, surgical wear and other such wound treatment related fabrics CURRENT STAGE: • Such Antibacterial Fabric is being manufactured around the world, even for use in furniture, home textiles, beddings, mattresses and so on • Researchers at Australia’s RMIT University have now developed silver nano wire enabled fabrics, which can kill of b i bacteria i hi within j just 10 i minutes of f contact; h the i environmental li impacts f of hi this f b i fabric are now b i being i d examined Source: Trevira, HHL Technology, wisegeek.com, gizmag.com
  • 54.
    Organized By KnowledgePartner National Partner Visit us at ww.vibrantgujarat.com