The document outlines the 10 step process for door testing and certification from project planning through labeling. The steps include initial project planning, testing, reporting, certification planning, factory auditing, and labeling. Testing involves fire, windstorm, and tornado resistance testing following relevant standards and taking 1-7 days to complete depending on the door and standards. Certification allows doors to be legally labeled showing they passed third party testing.
Tony Limas, California Group Quality Manager, Granite Construction, delivers a presentation, "The Return of Statistical Pay Factors" for state highway construction. Presentation delivered at the CalAPA Spring Asphalt Pavement Conference, held March 20-21, 2019 in Ontario, CA.
Tony Limas, California Group Quality Manager, Granite Construction, delivers a presentation, "The Return of Statistical Pay Factors" for state highway construction. Presentation delivered at the CalAPA Spring Asphalt Pavement Conference, held March 20-21, 2019 in Ontario, CA.
Quality Control & Quality Assurance of MS pipelineIEI GSC
This presentation re. QC & QA of M S pipelines was made at Gujarat State Centre of the Institution of Engineers (India) at Ahmedabad by Er. Manoj Raghavan of SGS (India) Ltd.
Varied of 10 Years of Experience with various Projects in the field of Oil & Gas, Petrochemicals Refinery in Mechanical Construction(on-plot & off-plot), High sour facility construction, Fabrication, Erection, In-Service Inspection & shutdown Inspection carried out inspection of high pressure Piping, Pipeline laying , valves, Pressure Vessel, Storage Tanks, Heat Exchanger, Boiler, Column, Heater & structural as a QA/QC Engineer, QA/QC Multi discipline Inspector, Mechanical Inspector, Sr. Inspection Engineer, piping/pipeline Inspector, Welding Inspector, Plant Inspector & Field Inspector(vendor inspection).
Quality Control & Quality Assurance of MS pipelineIEI GSC
This presentation re. QC & QA of M S pipelines was made at Gujarat State Centre of the Institution of Engineers (India) at Ahmedabad by Er. Manoj Raghavan of SGS (India) Ltd.
Varied of 10 Years of Experience with various Projects in the field of Oil & Gas, Petrochemicals Refinery in Mechanical Construction(on-plot & off-plot), High sour facility construction, Fabrication, Erection, In-Service Inspection & shutdown Inspection carried out inspection of high pressure Piping, Pipeline laying , valves, Pressure Vessel, Storage Tanks, Heat Exchanger, Boiler, Column, Heater & structural as a QA/QC Engineer, QA/QC Multi discipline Inspector, Mechanical Inspector, Sr. Inspection Engineer, piping/pipeline Inspector, Welding Inspector, Plant Inspector & Field Inspector(vendor inspection).
Our webinar on custom battery packs gives an insider look of the battery Development Timeline and Expectations. This walk through guide introduces you to the necessary steps that will get you from concept to production. A clear set of expectations is laid out to ensure there are no blind spots in our customers’ plan.
In this slide contains Introduction, overview and details of FACTORY ACCEPTANCE TEST
Presented by: P.NARESH (Department of pharmaceutical analysis).RIPER, anantapur
Packaging Solutions that Improve Time to MarketApril Bright
This session will discuss packaging solutions designed to improve time to market and lower costs for OEMs. Kelly Lucenti will discuss challenges imposed from the research and development phase to production, as well as trending issues with packaging design and validations. The presentation will highlight the importance of OEMs engaging their packaging groups early in the design phase, and ways that leveraging existing validations can speed time to market and cut major costs.
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORArtem Velychko
I am certified Coating/Insulation Supervisor with over 15 years' experience working on a range of Projects as Owner/Client representative. With the ability to work in different disciplines and cultures, either independently, or as part of a team, I am conscientious and have extensive knowledge of Health Safety & Environmental practices.
Results-orientated with a flexible attitude, I am able to use my skills in a variety of situations and to take into consideration the different protocols, working methods of teams that I have encountered and adapt to their contrasting routines. Possessing excellent organisation and delegation techniques, I have very well- developed communication and interpersonal skills and can adapt to different site problems quickly. I have a particular talent for client/user liaison, identification of problems and developing workable solutions for them.
Save $1-2mm per year per rig by installing this fully engineered API standard 53 compliant system.
www.AdvancedFabricTechnology.com
281-872-7272
ask for Jay!
Episode 22 : PROJECT EXECUTION
•Large components – used suitable cranes, usually are leased/rent
– electronically controllable by remote control
•Medium/Smaller components
hoists or fork‐lifts are used
are ordered to the building site at an early stage and intermediately stored there.
‐If possible, at the same time, during the assembly of main components, the assembly of medium/smaller components will begin.
‐Subcontractor is required to provide suitable packaging or tarpaulin cover
(cover for vessel opening such as nozzle, by means of plastic caps)
SAJJAD KHUDHUR ABBAS
Chemical Engineering , Al-Muthanna University, Iraq
Oil & Gas Safety and Health Professional – OSHACADEMY
Trainer of Trainers (TOT) - Canadian Center of Human
Development
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Remote sensing and monitoring are changing the mining industry for the better. These are providing innovative solutions to long-standing challenges. Those related to exploration, extraction, and overall environmental management by mining technology companies Odisha. These technologies make use of satellite imaging, aerial photography and sensors to collect data that might be inaccessible or from hazardous locations. With the use of this technology, mining operations are becoming increasingly efficient. Let us gain more insight into the key aspects associated with remote sensing and monitoring when it comes to mining.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Door testing 10_steps
1. The Door Testing and Certification Guide
Project Planning to Labeling in 10 Simple Steps
www.intertek-etlsemko.com
2. Door Testing and Certification:
Project Planning to Labeling in 10 Simple Steps
From project planning and test assembly preparation to certification planning and factory
audit preparation you’ll learn the simple steps you can take to speed the testing and
certification process. Our whitepaper details the door testing and certification process
including technical and regulatory requirements, project timelines, and test setup
procedures for Fire Testing, Windstorm Resistance, and Tornado Resistance projects.
What are the 10 steps of door testing and certification?
• Step 1: Project Planning
• Step 2: Project Proposal
• Step 3: Initial Product Review
• Step 4: Pre-Test Inspection (For Certification Test Only)
• Step 5: Test Assembly Preparation
• Step 6: Testing (Fire, Windstorm / Tornado Resistance)
• Step 7: Reporting
• Step 8: Certification Planning
• Step 9: Initial Factory Audit
• Step 10: Labeling
Step 1: Project Planning
• Client identifies product(s) for qualification
• Client supplies product information – construction and application drawings
• Client identifies target markets for sale or distribution
• Client identifies which ratings or standards will need to be met
• Timeline: Dependent on client delivery of project information
Step 2: Project Proposal
• Client supplies information collected in Step 1 as noted above
• Intertek prepares and delivers project proposal – often attached are credit
applications and client information forms for expediency.
• Client completes and returns the proposal or suggests revisions as necessary. A
deposit for the subtotal amount may be required at this stage.
• A copy of the signed proposal is forwarded to Intertek’s certification department
• Timeline: Intertek’s proposal is delivered within 48 hours
www.intertek-etlsemko.com
3. Step 3: Initial Product Review
• Intertek evaluates product information, drawings, etc. and advises on any areas of
concern.
o At this point the client may need to address concerns before making test
samples.
• Timeline: Projects are opened within 2-4 days of receipt of signed paperwork. The
review begins within 3-4 days after the project has been opened. The review time
may vary depending on curing time and product.
Step 4: Pre-Test Inspection (For Certification Test Only)
• An Intertek representative will:
o Witness and document construction of test sample
o Review component and assembly drawings, material type, size and
dimension
o Prepare a “Pre-Test Inspection Report” and send to Intertek lab
o Sign the test sample/package to be opened only at the test lab
• The client will:
o Seal and package the test sample
o If the sample requires custom clearance, it is advised to mark “Test
Samples for Destructive Testing, Commercial Value is Zero” on the
package and send to the Intertek lab designated in proposal
• Timeline:
o Domestic: Pretest sampling - up to 2 weeks. Doors are usually allowed
up to 28 days for adhesive conditioning then trimmed to test frame size.
Delivery to the lab is usually 1 week thereafter.
o International: Pretest sampling - up to 3 weeks. Delivery of the prepared
samples to the test lab may take 4-6 weeks depending on client’s
selected shipping method.
Step 5: Test Assembly Preparation
• Option 1 – Client prehangs the doors for test and ships to Intertek to be installed in
test setup.
• Option 2 – Client sends the doors to Intertek for machining and installation in test
setup.
• Upon receipt, technicians will inspect the samples. If all match the Pre-Test
Inspection Report, construction of the test assemblies will begin.
• Test assemblies are built in accordance with the test plan including all assembly
components.
• Timeline: Test plans are based on client preference and availability. Test assemblies
can be prepared in as few as 2 days if all materials have been supplied. Where
cementitious materials are used a cure time of 7 days is normally required.
www.intertek-etlsemko.com
4. Step 6a: Fire Testing
• Conducted under positive or neutral pressure following standard time vs.
temperature curves.
• Doors must meet temperature rise criteria (when applicable), resist the passage of
fire, and stay securely in the opening through the test period.
• Test methods include but are not limited to:
o US & Canada: NFPA 252, UL 10 (B/C), UBC 7-2 (1994/1997), CAN4
S104
o International: BS 476, parts 21 & 22 and ISO 3008.
• Timeline: Ranges from 20 minutes to 3 hours depending on product construction and
requirements of standard
Step 6a: Fire Testing Test Setup
• Research Scale or Pilot Scale: Provides data prior to larger scale tests. Used to
qualify a variable in the assembly and components (Example: Adhesives).
• Mid-Scale: Used when single swing doors are required.
• Full-Scale: Used for multiple doors or a pair in a test wall.
Step 6b: Windstorm Resistance Testing
• Testing of hurricane-resistant products
o Required for State of Florida, and may be required in IRC and IBC from
the Gulf coast up the Eastern seaboard.
• Test standards include:
o Door assemblies: ASTM E330, ASTM E1886, ASTM E1996
o Door assemblies: TAS 201, TAS 202, TAS 203 for Miami Dade County
o Individual components: ANSI A250.13
• Timeline: Tests typically range from 3 to 7 days depending on size and/or
configuration, and number of rating options needed.
Step 6b: Windstorm Resistance Test Setup
• Several approaches
o Assembly tests to High Velocity Hurricane Zone requirements for South
Florida (Miami Dade) approval (TAS 201,202, 203); also requires
notification of upcoming test via Miami Dade submittal
o Component testing per ANSI A250.13
o Assembly tests per ASTM E1886/E1996
o Combination component and assembly testing to Miami Dade
requirements, ANSI A250.13 and ASTM E1886/E1996
• Product design must be documented and verified by a pre-test inspection, or post-
test examination of cut sections.
www.intertek-etlsemko.com
5. • Client must specify target design load (DL)…….enhanced protection, etc). If client is
unsure of what his product's DL may be, an R & D test project will be conducted to
establish the appropriate DL.)
• Structural performance testing is conducted first at 1.5 times the DL. If Miami-Dade
requirements are also required, the water penetration, air infiltration and forced entry
tests will be conducted within this first series of tests.
• Impact testing is then conducted, with the cyclic load tests conducted following.
Doors must remain closed, and prevent penetration of the missile(s).
• Variations in the assembly (i.e., anchorage, hardware options, etc) will be considered,
and may be included in the 3 assemblies required for the impact and cyclic load tests.
These variations should be discussed with your project manager prior to the start of
testing.
• Glazed doors and/or frames with sidelights and/or transoms require separate tests.
• Tests are conducted on the largest size to be certified.
Step 6c: Tornado Resistance Testing
• Testing of tornado-resistant products including static load and impact
• Test methods include:
o FEMA 320 - Taking Shelter from the Storm – Building a Safe Room in
Your House
o FEMA 361 - Design and Construction Guidance for Community Shelter
o National Storm Shelter Association requirements
• Note: Work is currently being done to develop a formal ANSI test method.
• Timeline: Tornado resistance testing can be completed in 1 day.
Step 6c: Tornado Resistance Test Setup
• Testing is assembly based
• Installed in simulated wall – typically wood framing, concrete or CMU with specified
anchorage
• Impact test with 15 pound 2x4 at 100 miles per hour (5,014 foot-pounds)
• Impact at multiple locations including near latch and hinge points
• Static load tests (positive and negative) at 250 PSF on separate (unimpacted)
assembly
• Assemblies must prevent missile penetration, remain closed and limit dynamic
deflection to 3” or less
Step 7: Reporting
• Upon successful test results Intertek will issue:
o Test Report or Engineering Evaluation Report (Listing Report for
Certification) to the client and Intertek Certification department
o Draft Listing and Authorization to Mark (ATM) to the Intertek Certification
department.
www.intertek-etlsemko.com
6. Step 8: Certification Planning
• Intertek sends the client a “Certification & Listing Agreement”.
o The client signs and returns the document along with a deposit (if
applicable) to Intertek.
o The client receives a signed copy for records.
• Note: Not all products require a physical label as some only need to be “Listed”. For
those products that do require a label, presence of an authorized label, such as
Intertek’s WH Mark, is the only legal proof that a third party has certified the product.
• Timeline: Once the listing report has been accepted a certification agreement is
prepared.
Step 9: Initial Factory Audit (IFA)
• An Intertek inspector will visit your factory:
o Review flow chart of production process and in-house quality control
during production
o Review training records of critical personnel
o Conduct raw material inspection & QC done by factory
o Witness a representative layup
o Complete final inspection after production is completed (prior to shipping)
o Secure arrangements and certification label controller
o If the IFA is successful, the inspector will provide the Authorization to
Mark (ATM).
• Timeline: Domestic – 10 days, International – 14 days
Step 10: Labeling
• The client may apply certification labels to the product, packaging, or both
(recommended).
• An Intertek inspector will conduct unannounced, quarterly inspections to verify all
processes identified during the IFA are being followed.
• Non-conformances are immediately reported to the client and Intertek.
o The client is required to resolve immediately and communicate evidence
of resolution to Intertek.
o Delay / failure to resolve can result in suspension or termination of
certification.
www.intertek-etlsemko.com
7. Additional Resources
How can I further accelerate the process?
• Using our proprietary web-based tool you can:
o Initiate projects online and track project status
o Access listings and specs via a secure site - 24/7/365
o Distribute notifications of product updates, listings to customers
o Replace paper delivery and 3-ring binder system
o Educate customers by mapping marketing literature, installation
instructions, etc. to a product listing
o Print your own labels
… Get the product information you need sooner so you can manufacture and market
your products faster.
Are their any quick hints to be aware of?
• Once the Listing Report has been accepted a Certification Agreement is prepared…
sign and return agreement on that day and it can be finalized by Intertek within 1-2
days.
• The Certification Agreement can be issued when the signed proposal is returned.
Once Intertek has a signed agreement and an accepted Listing Report, only the
Factory Audit is remaining.
• Subscribe to SpecDirect and speed the entire process. The SpecDirect contract can
be offered along with the testing program proposal.
www.intertek-etlsemko.com
8. About Intertek
Intertek is recognized by all major code bodies throughout the world. We are a Nationally
Recognized Testing Laboratory (NRTL) by OSHA; recognized by Standards Council of
Canada (SCC); and A2LA, APLAC, and ILAC accredited for Asia and other parts of the
world. In North America we are recognized by the International Codes Council Evaluation
Service (ICC-ES) and serve as an administrator for multiple Builders Hardware
Manufacturers Association (BHMA) certification programs.
What testing, certification, and evaluation services does Intertek offer?
• WH Mark for North America
• Performance evaluations; durability and product comparison
• Environmental testing
• Flammability, flame spread, and fire resistance testing
• Structural, physical and mechanical evaluations
What specific accreditations does Intertek hold?
• ICC-International Accreditation Services (IAS) for testing and certification of building
materials
• American Association of Laboratory Accreditation (A2LA)
• American National Standards Institute (ANSI)
• Department of Housing and Urban Development (HUD)
• Recognized by the Occupational Safety and Health Administration (OSHA) as a
Nationally Recognized Testing Laboratory (NRTL)
• Standards Council of Canada (SCC)
• Testing Laboratory accredited to ISO/IEC 17025
• Inspection Agency accredited to ISO/IEC 17020
• Certification Organization accredited to ISO Guide 65
For more information on Intertek’s door testing and certification capabilities or to
start a project right away, call 1-800-967-5352,
email icenter@intertek.com, or visit www.intertek-etlsemko.com.
www.intertek-etlsemko.com