Name: ARTEM VELYCHKO
DOB: 19.09.1980
Email: artemvelichko595@gmail.com
PROFILE
I am certified Coating/Insulation Supervisor with over 15 years' experience working on a range of Projects as Owner/Client
representative. With the ability to work in different disciplines and cultures, either independently, or as part of a team, I am
conscientious and have extensive knowledge of Health Safety & Environmental practices.
Results-orientatedwitha flexibleattitude, I am ableto use myskills ina variety of situations andto take intoconsiderationthe different
protocols, working methods of teams that I have encountered and adapt to their contrasting routines. Possessing excellent
organisationanddelegationtechniques,I have very well-developedcommunicationandinterpersonalskillsandcanadapt to different
site problemsquickly.I have a particulartalentfor client/userliaison,identification of problems and developing workable solutions for
them.
Having gained valuable relevant experience, I am now looking for a new position with an established commercial companyoffering
opportunities for me to utilise myexperience, further develop myskills and enhance myfuture career prospects.
TECHNICAL SKILLS
 International Background training and certified as a Coating /Insulation/PFP/ Supervisor.
 Owner/Client representative Supervisor.
 Extensive experience working on Projectsite.
 Actively used in practice Standards, Rules, Regulations NORSOK M-501, ASTM, PSPC.
 Leadership in managing multinational teams ofemployees and contractors.
 Good knowledge ofthe Shipbuilding and Repair Industry with good awareness ofConvention, Regulations, Codes,
Requirements and National Standards.
 Expertise in construction, understanding construction drawings.
 Excellentcommunication skills.
 Proficientin basic computer applications, including, MicrosoftOutlook and Office software programs.
 Proficientin speaking, writing and reading English.
 Close liaison with Classification Societies: LR, DNV, ABS, BV, RMRS, GL
 Factory inspection ofproducts and equipmentatmanufacturer and factory acceptance tests.
 Audit and assessmentall subcontractors involved in Project.
 Approval of drawings and engineering documents.
 Approval and supervision ofdefined testprocedures
 Verification offinal productcompliance and design and reliability testresults
 Preparation ofinspection reports, certificates, progress reports and site correspondence
 Participation at site meetings
 Carry out for Coating/Insulation inspections: that all requirements are metusing observation and inspection
strategies.
 Records inspection data, discusses results with those responsible and recommends necessary corrective actions
 Delivery all Projects in time and in Budget.
EDUCATION, TRAINING AND CERTIFICATES
Sevastopol NationalTechnicalUniversity 2000 - 2004
MSc of Shipbuilding&MarineTechnology
Training in “Prometheus”Training centerSt.Petersburg /Russia
PaintInspectorcertificate(EN473)02/5402 February 2005
FROSIO LEVEL III May 2010
FROSIO CertificateLevel 3 No. 5536(Valid until 26.05.2025)
InstituteofCorrosion ICORR
ICORRcertificateLevel 2PFP & Insulation No C5062/C5063(Valid untill12.12.2025) December 2014
PROFESSIONAL EXPERIENCE
New Building Projects:
CSSC Co, China
CMA CGM Group Oсt. 2018- up to present
Coating /Insulation Supervisor
 New Building Supervision of:
5 x LNG Powered Container Carrier – 23000 TEU
Responsibilities:
o Supervision for New building LNG Container vessels Project from Plan approval to Delivery.
o Inspection of Cargo containment System activities Mark III.
o Carry out of painting/insulation activities according to ITP and International standards.
o Inspected quality of Insulation and Passive Fire protection activities.
o Hot dip galvanizing coating inspection experience in galvanizing subcontractor plants.
o Used in practice Standards, Rules, Regulations NORSOK M-501, and PSPS.
o Compliance with ITP, specifications Project & Company Standards.
o Prepared Daily and final project reports and coatings technical file.
o Compliance with Health, Safety & Environmental responsibilities.
o Audit and assessment all Contractors/Subcontractors involved in Project.
o Approval of drawings ITP and Project Specification.
o Maintain clear and comprehensive weekly progress records of all tests and inspections
accordance to the project document management procedures.
o Coordinated Project management between Contractors and their subcontractors for all
aspects until delivery to Owner/Client.
New Building Projects:
HHIC Phil Co, Philippines
CMA CGM Group Feb. 2016 – Oсt.2018
Coating /Insulation/Supervisor
 New Building Supervision of:
3 x Container Carrier – 20600 TEU
Responsibilities:
o Supervision for New building Container vessels from Plan approval to Delivery.
o Carry out of painting/insulation inspections according to ITP and International standards.
o Inspected quality of whole Insulation and Passive Fire protection activities.
o Hot dip galvanizing coating inspection experience in galvanizing subcontractor plants.
o Used in practice Standards, Rules, Regulations NORSOK M-501, and PSPS.
o Compliance with ITP, specifications Project & Company Standards.
o Prepared Daily and final project reports and coatings technical file.
o Compliance with Health, Safety & Environmental responsibilities.
o Audit and assessment all subcontractors involved in Project.
o Approval of drawings ITP and Project Specification.
o Maintain clear and comprehensive weekly progress records of all tests and inspections
accordance to the project document management procedures.
o Coordinated Project management between Shipyard and their contractors for all aspects of
ship building in Block Stage/Hull Stage/Quay Stage until delivery to Owner/Client.
Samsung Co., LTD., Korea
CMA CGM Group Sept. 2013 – Sept.2015
Lead Coating Supervisor
 New Building Supervision of:
3 x Container Carrier – 18000 TEU
7 x Container Carrier – 9300 TEU
Responsibilities:
o Supervision for New building Container vessels from Plan approval to Delivery.
o Inspected of painting activities according to ITP including WBT according to PSPS standards.
o Coordinated painting team members Inspection and testing plan.
o Inspected quality of whole Insulation and Passive fire protection activities.
o Hot dip galvanizing coating inspection experience in galvanizing subcontractor factories.
o Used in practice Standards, Rules, Regulations NORSOK M-501, and PSPS.
o Compliance with ITP, specifications Project & Company Standards.
o Prepared Daily and final Project reports and coatings technical file.
o Strictly follow of Health, Safety & Environmental responsibilities.
o Audit and assessment all subcontractors involved in Project.
o Approval of drawings ITP and Project Specification.
o Maintain clear and comprehensive weekly progress records of all tests and inspections
accordance to the project document management procedures.
o Coordinated Project management between Shipyard and their contractors for all aspects of
ship building in Block Stage/Hull Stage/Quay Stage until delivery to Owner/Client.
DSMECo. Ltd, Korea Sept. 2011 - May2013
LibertyMaritime
Senior Lead CoatingSupervisor
 NewBuildingSupervision of:
4 x BulkCarriers –82KDWT
Responsibilities:
o Supervision for New building Bulk Carriers vessels from steel cutting to Delivery.
o Review and approval Specification and ITP.
o Carry out of Inspection and control quality of whole painting/Insulation/PFP activities execute
according to standards.
o Full control of compliance with Project specification.
o Prepared full and final project reports and coatings technical file (CTF).
o Ensure compliance with Health, Safety & Environmental responsibilities.
o Audit and assessment all subcontractors involved in project.
o Inspected outside subcontractors factories involved in project.
o Approval of drawings and Project specification.
o Maintain clear and comprehensive weekly progress records of all Coating/Insulation
inspections and send to Owner/Client.
o Prepared full and final Coating project reports and coatings technical file for Owner/Client.
o Coordinated Project between Shipyard and their contractors for all aspects of ship building in
Block Stage/Hull Stage/Quay Stage until delivery to Owner/Client.
o Delivery Project in time in Budget.
NewTimes&NewCentury Shipyards CoLtd, China
MarineManagementService
Paint Supervisor Oct.2009 -Jun 2011
 NewBuildingSupervisionof:
3 x SuezmaxCrudeOil Tankers-169KDWT
3x AframaxProductOil Tankers114KDWT
Responsibilities:
o Supervision for the New building Crude Oil/Product Oil Tankers vessels from steel cutting to
delivery.
o Ensured quality of whole painting job including WBT according to PSPS standards.
o Carry out of whole painting/Insulation activities including Cargo Tank & WBT.
o Inspection Insulation pipe system cold/hot insulation vessel Accommodation.
o Ensured full control of compliance with specification, ITP.
o Delivered all surface coatings, on time, on budget, to scope – full protection of ship owner’s
interests.
o Prepared full and final project reports and coatings technical file.
o Ensure compliance with Health, Safety & Environmental responsibilities.
o Approval of drawings and specification.
o Maintain clear and comprehensive weekly progress records of all tests and inspections
accordance to the project document management procedures.
o Prepared full and final project reports and coatings technical file.
o Coordinated Project between Shipyard and their contractors for all aspects of ship building in
dry dock.
SPP Shipyard Co Ltd, Korea
TopShips
PaintSupervisor Aug.2007 -Sep 2009
 NewBuildingSupervision of:
8x AframaxProductCarriers50KDWT
Responsibilities:
o Supervision for the New building Product Oil Tankers vessels from steel cutting to delivery.
o Ensured quality of whole painting job including WBTk according to PSPS standards.
o Ensured quality of whole painting job including Cargo Tank Coating according to standards.
o Ensured full control of compliance with specification.
o Delivered all surface coatings, on time, on budget, to scope – full protection of ship owner’s
interests.
o Prepared full and final project reports and coatings technical file.
o Ensure compliance with Health, Safety & Environmental responsibilities.
o Audit and assessment all subcontractors involved in project.
o Approval of drawings and specification.
o Maintain clear and comprehensive ongoing records of all tests and inspections accordance to
the project document management procedures.
o Prepared full and final project reports and coatings technical file.
o Coordinated Pproject management between Shipyard and their contractors for all aspects of
ship building in dry dock.
Ship Repair Service:
Sevastopol ShipRepairYard
Responsibilities:
Quality Management - Paint Department Jan 2004– Jun 2007
 Preparation of detailedspecificationsforvessels conversion andunderrepair/shiprepair.
 Managedallcoatingactivities/inspectionsProjectmanagementbetweenshipOwnersrepresentative,Shipyard andtheir
contractorsforall aspectsof shiprepairingindry dock.
ADDITIONAL INFORMATION
Language: EnglishFluent.RussianNative
Hobby:Diving
Driving License:(Russian,Korean,Phillipines)
Computer skills: MS Office.
http://www.linkedin.com/pub/artem-velychko/29/857/3a
REFERENCE CONTACTS
Peter Johansson: peter.johansson@walleniusmarine.com (Project Manager at SeaQuest)
Victor Firsov : vfirsov@hotmail.com (Site Manager at CMA CGM).
Eduard Tereshenko e.tereshchenko@scf-group.ru (Site Manager at SCF-GROUP)
Mike Alberton : mike.alberton.shi@gmail.com (Sr. Manager, Project Management Team 7 at
Samsung Heavy Industries)
Jan Iversen jan.iversen@cmashipsnb.com Site Manager / Project Manager at CMA CGM
Matthieu Courtois matthieu.courtois@cmashipsnb.com Site Manager at CMA CGM 23000 TEU Project

COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR

  • 1.
    Name: ARTEM VELYCHKO DOB:19.09.1980 Email: artemvelichko595@gmail.com PROFILE I am certified Coating/Insulation Supervisor with over 15 years' experience working on a range of Projects as Owner/Client representative. With the ability to work in different disciplines and cultures, either independently, or as part of a team, I am conscientious and have extensive knowledge of Health Safety & Environmental practices. Results-orientatedwitha flexibleattitude, I am ableto use myskills ina variety of situations andto take intoconsiderationthe different protocols, working methods of teams that I have encountered and adapt to their contrasting routines. Possessing excellent organisationanddelegationtechniques,I have very well-developedcommunicationandinterpersonalskillsandcanadapt to different site problemsquickly.I have a particulartalentfor client/userliaison,identification of problems and developing workable solutions for them. Having gained valuable relevant experience, I am now looking for a new position with an established commercial companyoffering opportunities for me to utilise myexperience, further develop myskills and enhance myfuture career prospects. TECHNICAL SKILLS  International Background training and certified as a Coating /Insulation/PFP/ Supervisor.  Owner/Client representative Supervisor.  Extensive experience working on Projectsite.  Actively used in practice Standards, Rules, Regulations NORSOK M-501, ASTM, PSPC.  Leadership in managing multinational teams ofemployees and contractors.  Good knowledge ofthe Shipbuilding and Repair Industry with good awareness ofConvention, Regulations, Codes, Requirements and National Standards.  Expertise in construction, understanding construction drawings.  Excellentcommunication skills.  Proficientin basic computer applications, including, MicrosoftOutlook and Office software programs.  Proficientin speaking, writing and reading English.  Close liaison with Classification Societies: LR, DNV, ABS, BV, RMRS, GL  Factory inspection ofproducts and equipmentatmanufacturer and factory acceptance tests.  Audit and assessmentall subcontractors involved in Project.  Approval of drawings and engineering documents.  Approval and supervision ofdefined testprocedures  Verification offinal productcompliance and design and reliability testresults  Preparation ofinspection reports, certificates, progress reports and site correspondence  Participation at site meetings  Carry out for Coating/Insulation inspections: that all requirements are metusing observation and inspection strategies.  Records inspection data, discusses results with those responsible and recommends necessary corrective actions  Delivery all Projects in time and in Budget. EDUCATION, TRAINING AND CERTIFICATES Sevastopol NationalTechnicalUniversity 2000 - 2004 MSc of Shipbuilding&MarineTechnology Training in “Prometheus”Training centerSt.Petersburg /Russia PaintInspectorcertificate(EN473)02/5402 February 2005 FROSIO LEVEL III May 2010 FROSIO CertificateLevel 3 No. 5536(Valid until 26.05.2025) InstituteofCorrosion ICORR ICORRcertificateLevel 2PFP & Insulation No C5062/C5063(Valid untill12.12.2025) December 2014
  • 2.
    PROFESSIONAL EXPERIENCE New BuildingProjects: CSSC Co, China CMA CGM Group Oсt. 2018- up to present Coating /Insulation Supervisor  New Building Supervision of: 5 x LNG Powered Container Carrier – 23000 TEU Responsibilities: o Supervision for New building LNG Container vessels Project from Plan approval to Delivery. o Inspection of Cargo containment System activities Mark III. o Carry out of painting/insulation activities according to ITP and International standards. o Inspected quality of Insulation and Passive Fire protection activities. o Hot dip galvanizing coating inspection experience in galvanizing subcontractor plants. o Used in practice Standards, Rules, Regulations NORSOK M-501, and PSPS. o Compliance with ITP, specifications Project & Company Standards. o Prepared Daily and final project reports and coatings technical file. o Compliance with Health, Safety & Environmental responsibilities. o Audit and assessment all Contractors/Subcontractors involved in Project. o Approval of drawings ITP and Project Specification. o Maintain clear and comprehensive weekly progress records of all tests and inspections accordance to the project document management procedures. o Coordinated Project management between Contractors and their subcontractors for all aspects until delivery to Owner/Client. New Building Projects: HHIC Phil Co, Philippines CMA CGM Group Feb. 2016 – Oсt.2018 Coating /Insulation/Supervisor  New Building Supervision of: 3 x Container Carrier – 20600 TEU Responsibilities: o Supervision for New building Container vessels from Plan approval to Delivery. o Carry out of painting/insulation inspections according to ITP and International standards. o Inspected quality of whole Insulation and Passive Fire protection activities. o Hot dip galvanizing coating inspection experience in galvanizing subcontractor plants. o Used in practice Standards, Rules, Regulations NORSOK M-501, and PSPS. o Compliance with ITP, specifications Project & Company Standards. o Prepared Daily and final project reports and coatings technical file. o Compliance with Health, Safety & Environmental responsibilities. o Audit and assessment all subcontractors involved in Project. o Approval of drawings ITP and Project Specification. o Maintain clear and comprehensive weekly progress records of all tests and inspections accordance to the project document management procedures. o Coordinated Project management between Shipyard and their contractors for all aspects of ship building in Block Stage/Hull Stage/Quay Stage until delivery to Owner/Client.
  • 3.
    Samsung Co., LTD.,Korea CMA CGM Group Sept. 2013 – Sept.2015 Lead Coating Supervisor  New Building Supervision of: 3 x Container Carrier – 18000 TEU 7 x Container Carrier – 9300 TEU Responsibilities: o Supervision for New building Container vessels from Plan approval to Delivery. o Inspected of painting activities according to ITP including WBT according to PSPS standards. o Coordinated painting team members Inspection and testing plan. o Inspected quality of whole Insulation and Passive fire protection activities. o Hot dip galvanizing coating inspection experience in galvanizing subcontractor factories. o Used in practice Standards, Rules, Regulations NORSOK M-501, and PSPS. o Compliance with ITP, specifications Project & Company Standards. o Prepared Daily and final Project reports and coatings technical file. o Strictly follow of Health, Safety & Environmental responsibilities. o Audit and assessment all subcontractors involved in Project. o Approval of drawings ITP and Project Specification. o Maintain clear and comprehensive weekly progress records of all tests and inspections accordance to the project document management procedures. o Coordinated Project management between Shipyard and their contractors for all aspects of ship building in Block Stage/Hull Stage/Quay Stage until delivery to Owner/Client. DSMECo. Ltd, Korea Sept. 2011 - May2013 LibertyMaritime Senior Lead CoatingSupervisor  NewBuildingSupervision of: 4 x BulkCarriers –82KDWT Responsibilities: o Supervision for New building Bulk Carriers vessels from steel cutting to Delivery. o Review and approval Specification and ITP. o Carry out of Inspection and control quality of whole painting/Insulation/PFP activities execute according to standards. o Full control of compliance with Project specification. o Prepared full and final project reports and coatings technical file (CTF). o Ensure compliance with Health, Safety & Environmental responsibilities. o Audit and assessment all subcontractors involved in project. o Inspected outside subcontractors factories involved in project. o Approval of drawings and Project specification. o Maintain clear and comprehensive weekly progress records of all Coating/Insulation inspections and send to Owner/Client. o Prepared full and final Coating project reports and coatings technical file for Owner/Client. o Coordinated Project between Shipyard and their contractors for all aspects of ship building in Block Stage/Hull Stage/Quay Stage until delivery to Owner/Client. o Delivery Project in time in Budget.
  • 4.
    NewTimes&NewCentury Shipyards CoLtd,China MarineManagementService Paint Supervisor Oct.2009 -Jun 2011  NewBuildingSupervisionof: 3 x SuezmaxCrudeOil Tankers-169KDWT 3x AframaxProductOil Tankers114KDWT Responsibilities: o Supervision for the New building Crude Oil/Product Oil Tankers vessels from steel cutting to delivery. o Ensured quality of whole painting job including WBT according to PSPS standards. o Carry out of whole painting/Insulation activities including Cargo Tank & WBT. o Inspection Insulation pipe system cold/hot insulation vessel Accommodation. o Ensured full control of compliance with specification, ITP. o Delivered all surface coatings, on time, on budget, to scope – full protection of ship owner’s interests. o Prepared full and final project reports and coatings technical file. o Ensure compliance with Health, Safety & Environmental responsibilities. o Approval of drawings and specification. o Maintain clear and comprehensive weekly progress records of all tests and inspections accordance to the project document management procedures. o Prepared full and final project reports and coatings technical file. o Coordinated Project between Shipyard and their contractors for all aspects of ship building in dry dock. SPP Shipyard Co Ltd, Korea TopShips PaintSupervisor Aug.2007 -Sep 2009  NewBuildingSupervision of: 8x AframaxProductCarriers50KDWT Responsibilities: o Supervision for the New building Product Oil Tankers vessels from steel cutting to delivery. o Ensured quality of whole painting job including WBTk according to PSPS standards. o Ensured quality of whole painting job including Cargo Tank Coating according to standards. o Ensured full control of compliance with specification. o Delivered all surface coatings, on time, on budget, to scope – full protection of ship owner’s interests. o Prepared full and final project reports and coatings technical file. o Ensure compliance with Health, Safety & Environmental responsibilities. o Audit and assessment all subcontractors involved in project. o Approval of drawings and specification. o Maintain clear and comprehensive ongoing records of all tests and inspections accordance to the project document management procedures. o Prepared full and final project reports and coatings technical file. o Coordinated Pproject management between Shipyard and their contractors for all aspects of ship building in dry dock.
  • 5.
    Ship Repair Service: SevastopolShipRepairYard Responsibilities: Quality Management - Paint Department Jan 2004– Jun 2007  Preparation of detailedspecificationsforvessels conversion andunderrepair/shiprepair.  Managedallcoatingactivities/inspectionsProjectmanagementbetweenshipOwnersrepresentative,Shipyard andtheir contractorsforall aspectsof shiprepairingindry dock. ADDITIONAL INFORMATION Language: EnglishFluent.RussianNative Hobby:Diving Driving License:(Russian,Korean,Phillipines) Computer skills: MS Office. http://www.linkedin.com/pub/artem-velychko/29/857/3a REFERENCE CONTACTS Peter Johansson: peter.johansson@walleniusmarine.com (Project Manager at SeaQuest) Victor Firsov : vfirsov@hotmail.com (Site Manager at CMA CGM). Eduard Tereshenko e.tereshchenko@scf-group.ru (Site Manager at SCF-GROUP) Mike Alberton : mike.alberton.shi@gmail.com (Sr. Manager, Project Management Team 7 at Samsung Heavy Industries) Jan Iversen jan.iversen@cmashipsnb.com Site Manager / Project Manager at CMA CGM Matthieu Courtois matthieu.courtois@cmashipsnb.com Site Manager at CMA CGM 23000 TEU Project