.
Mohammad Nafisul Haque
Email: nafis.mallick@gmail.com
MOBILE No. +966577652352 | +919570387224
Subject: Application for the Post of QC Manager
PROFILE SUMMARY:
Professional Engineering in Mechanical Engineer with Noteworthy experience in Construction, Maintenance,
Start-up, Shutdown and Annual Turnaround Activities in the Oil/Gas and Petrochemical industries. Around 12
years of extensive work experience in various engineering inspection practice with proven leadership
capabilities and staff supervision, in a QC Department for Execution of work inspection / witness and testing of
Calibration | Hydro Test | Leak Test | Pneumatic Test, and Various type of Inspection.
 Welding, Structure, Piping, Pipeline Operations and Quality Control & Assurance Inspection &
Documentation.
 Extensive knowledge of the Welding Process, Non Destructive Testing, Distortion Control, Repair Rejection
Rate Control, Cost Reduction and other Quality Controls.
 Inspection in various welding process included GTAW, SMAW, FCAW and SAW, Material Welded Inconel,
Carbon Steel, Austenitic SS, ferritic SS, Clad material and Alloy Steel.
ORGANIZATIONAL EXPERIENCE
1. DAEAH Engineering & Construction Co. Ltd. , Saudi Arabia , UO1 Petro Rabigh Project ,Phase-II
Saudi Aramco Approved Site QC Manager Since 22nd December 2014 – Till date for Rabigh II SMP-4
Interconnecting Package.
Responsibilities:
 Participating in the kick off and weekly project progress meeting.
 Conducting QA/QC weekly Meeting with the contractor and PID to resolve the issues/concerns
related with quality.
 Conducting internal meeting with QA/QC Engineers & Discipline inspectors on daily basis and follow-
up daily site activities.
 Coordinate with the client items related to quality
 Verification of all documents related with inspection activities as per approved ITP.
 Maintaining all safety aspects both at site and offices as per company HSE policy thru HSE
representative.
 Interview / review prospective personnel
 Resolving of all quality related issues whenever it arises.
 Performing both internal and external audit at planned schedule.
 Follow-up the NCR and LBE until it will be rectified and closed.
 Attending some inspections in case of emergency.
 Review all the hydro test packages.
 Develop the QA/QC procedure & report format for some critical activities.
 To take care about all activities related with QA/QC.
 A Little experience of handling and closing of projects in oil & gas and petrochemical industry.
 Handling and closing of the projects as per Owner Specification and International Code.
 Review of QC dossier when the project will be completed and hand over to the clients.
2. DODSAL Engineering & Construction Pte. Ltd.| SGD-2 & 3 Project | Hameem, UAE
QC Piping Inspector Since 6th October 2012 – Till 19th June 2014 for Shah Gas Development Project
(SGD-2 & 3). (1 year 8 Months)
RESPONSIBILITIES:
 Inspection of Incoming Material as per Test Certificate and traceability records.
 Reviewing the Documents such as WPS/PQR, Welding consumable Control procedure and Vendor
documents of Metering skid according to specification.
 Inspection of piping spool before welding, fit-up inspection of joints e.g. root gap, root face, bevel angle
and checking the Pre-heat temperature to avoid hydrogen cracking as per approved WPS.
 Inter Pass temperature and post weld heat temperature (PWHT) inspection during and after welding of
alloy Steel Material like P11 and P22 materials.
 Carried out structural inspection on panel, sub-assembly, assembly, block erection stages.
 Fit up and welding inspection of structural, Inconel and clad material piping as per approved drawing
and related WPS.
 During welding checking Welding Parameters like polarity, current, voltage, position & direction of
welding as per approved WPS.
 Final dimension and weld visual inspection of piping and structural joints as per Section IX and ASME
B31.3 requirements.
 Proper Inspection of Pre-heating and PWHT of Alloy Steel Material (P11 & P22) and LTCS Material.
 Monitoring WQT of welders as per Section IX.
 Monitoring Welders for Correct usages of WPS & effective as well as cost control welding technique.
 Monitoring Weld Repairs and Resolving as per procedure.
 Reviewing NDT and RT Films as per ASME Section V.
 Witnessing and monitoring pressure tests, PWHT and interpret relevant charts.
 Handling DWR of daily progress of Welding and fit-up joints of piping.
 Witness of Hydro-testing of Piping fabricated spool.
 Site Erection as per approved drawing with proper line direction of spools and structure.
 Preparation and clearance of test pack as per line.
 Boiler and stem drum piping fit-up as well as welding inspection on site.
 Punch listing for walk down and reinstatement of test packs.
 Witness of bolt torque and tensioning as per approved flange management system (FMS).
 Ensuring that accurate, concise records of approved Procedures are maintained.
 Inspection and verification of various raw materials and applicable consumables are as per ITP.
 Co-ordinate with client project inspection unit for necessary project inspection for witnessing point and
hold point.
 Confirm repairs, re-testing and re-inspection in accordance with specifications.
 Monitoring piping fabrication work, fit-up welding and erection and co-ordinate to sub-contractor to
assure that construction activities effecting safety and quality are compliance with project
requirements.
 Prepare punch list for completed line and review test packages prior for hydro test.
 Witness of Hydro testing, pneumatic testing ; Air blowing ; flushing; with owner representative.
 Conducted Surveillance on all Mechanical Inspection related issues and coordination with the Project
Inspection Dept.
 Reviewing final package for hydro test approval and releasing for test.
 Checking the punch listing item as per P & ID and Isometric, such as pipe support, valves, guides, and
NDT completion.
 Final reinstatement and verification inspection, Piping of walkthrough, final mechanical completion and
inspection
3. Velosi Certification Services (I) Pvt. Ltd.| Mumbai
Inspection Engineer (TPI) 12th
January 2010 – 30th
August 2012 For ONGC (Oil & Natural Gas
Corporation) Assam Renewal Project.(470Km Pipeline and GGS Piping)) ( 2 years 7 Months)
RESPONSIBILITIES:
 Supervising EPC contractor and subcontractors, on behalf of the ONGC, to carry out inspection/ ensure
compliance with project specific QA/QC requirements such as Inspection Procedures/Checklists/ITPs
etc.
 Construction progress monitoring of all phase of work performed by EPC Contractor (civil, structural,
tank, Equipment and piping mainly) in the gas compressors & export metering areas issuing daily /
weekly reports for the company management.
 Review and comments of method statements , ITP, Test packs, inspection of items from this documents
requiring client attendance
 Verification of contractor check-list from test packs and witnessing the pressure tests of (above/
underground) piping system installed
 Verification on site the physical progress of work, the quality required level, safety condition
 Verifying contractor's check list for pressure test, mechanical completion / pre-commissioning stages.
 Review Sub-Contractor Piping and structural WPS, WQT, NDE, Procedure as per requirement.
 Carried out structural inspection on panel, sub-assembly, assembly, block erection stages.
 Certifying welding procedure specification (WPS) and welder’s qualification test (WQT) of contractor.
 Monitoring all welding, Painting, QA/QC inspection of contractors & ensuring that all codes, standards
and specification requirements are strictly adhere during execution & final signing off on reports.
 Inspection of IMIR for equipment’s, valves & fitting, pipe instruments, plates and others as per test
certificates & IRC.
 Verification of all QC related activities in Piping/Pipeline , Equipment(Static & Rotating, Tanks, Painting,
Fireproofing & Insulation
 Witness of hydro test as per client’s specification.
 Surveillance of stringing and welding of pipes.
 Final dimension and weld visual inspection of pipes as per API 5L and section IX requirements.
 Surveillance of fit-up inspection for proper root gap, groove angle, root face and pre-heat temperature
to avoid hydrogen cracking.
 Surveillance During welding of polarity, current, Voltage, position & direction of welding as per
approved WPS.
 To co-ordinate with client to undertake procedure qualification test (PQT) and inspection of prepared
test specimens and witness destructive tests.
 Inspection of coating material as per approved specification.
 During coating inspection of DFT and temperature as per approved procedure.
 Witnessing peel test of sleeve as per available Temperatures records.
 Pipe-book verification as per welding, RT, and coating reports.
 During lowering of pipe inspection of trench width & depth, Pipeline sequence as per approved line
sequence sheet.
 Witness of holiday detection test as per approved required voltage (25kv).
 Hold point inspection of drain & vent casing pipe thickness, carrier pipe, insulator fitting as per
dimension for Nala, River and road crossing area as well as restoration & drain of ROU.
 Inspection of crude oil & effluent tank as per approved code.
 Hold point inspection of Construction of new Storage tank as per API 650 Codes.
 Inspection related to tank e.g. Diesel check, RF pad, flange orientation, trusses, bottom & roof plate
dimension, ladder, platform orientation Wind girder , roof drain orientation, Overtly check , diameter of
tank as per approved drawing.
 Repair tank inspection as per API 653 Codes.
 Inspection of test separator and heater teeter structural frame as per approved drawing
4. Al-Suwaidi Trading & Development Co. Ltd.| Al-Khobar, Saudi Arabia
QC Welding & Piping Inspector Since 5th August 2007 – 13th August 2009 For Tasnee Ethylene
Cracking Furnace, OIEC, SSEM and Yuksel INSAAT Project. (2 years)
RESPONSIBILITIES:
 Inspection of Incoming Material as per Test Certificate and traceability records.
 Reviewing the Documents such as WPS/PQR, Welding consumable Control procedure and Vendor
documents of Metering skid according to specification.
 Inspection of piping spool before welding, fit-up inspection of joints e.g. root gap, root face, bevel angle
and checking the Pre-heat temperature to avoid hydrogen cracking as per approved WPS.
 Inter Pass temperature and post weld heat temperature (PWHT) inspection during and after welding of
alloy Steel Material like P11 and P22 materials.
 Fit up and welding inspection of Inconel & clad material piping as per approved drawing and related
WPS.
 During welding checking Welding Parameters like polarity, current, voltage, position & direction of
welding as per approved WPS.
 Final dimension and weld visual inspection of piping joints as per Section IX and ASME B31.3
requirements.
 Proper Inspection of Pre-heating and PWHT of Alloy Steel Material (P11 & P22) and LTCS Material.
 Monitoring WQT of welders as per Section IX.
 Monitoring Welders for Correct usages of WPS and effective as well as cost control welding technique
 Monitoring Weld Repairs and Resolving as per procedure.
 Reviewing NDT and RT Films as per ASME Section V.
 Handling DWR of daily progress of Welding and fit-up joints of piping.
 Witness of Hydro-testing of Piping fabricated spool.
 Inspection of piping supports and structural supports.
 Inspection of all headers & spool piece for furnace as per approved drawing.
 Review of P & ID, Isometric & Plot plan drawing for proper inspection.
 Inspection of Spool Fabrication of piping, Piping Headers and pipe supports as per drawing
 Inspection of different types and sizes of valves as per approved drawing.
 Inspection of Site Erection & Installation of all the Instruments according to the Pressure.
 Site Inspection and implementation of installation of piping as per drawing and quality specification of
project requirement.
 Inspection of Fabrication of ladder & platform Welding and fit-up as per approved drawing.
 Inspection of New crude oil tank and Repair Tank as per API 650 & API 653.
 Diesel check inspection for bottom plate & trusses weld leakage of tanks.
 Hydrostatic test of heating coils of crude oil tanks.
 Inspection of Flange orientation as per approved drawing for tanks.
 Proper bending operation for hand rail & tank wind girder of tanks.
 Welding of tank as per approved WPS.
 Fully aware about productivity & efficiency rate of piping related processes, consumables & resources.
 Planning of work and delegate to contractor.
 Monitoring progress & take preventive as well as corrective action
 Hydro-test as per design pressure and temperature for test pack.
 Planning of work and delegate to Contractor.
 Monitoring Quality report & take preventive as well as corrective action.
 Ensuring the relevant documents such as route sheets, WPS, drawings, etc. are available with the
welders or operators during work.
5. Desein Pvt. Ltd.| near Savitri Cinema Delhi
PipingEngineer 1st August2006 – 30th May 2007 forMathon Left BankProject.(11 Months)
RESPONSIBILITIES :
 Fabricating pipe spool as per Approved Isometric drawings.
 Review of P & ID and plot plan for installation and erection of piping spool on site.
 Arrangement of equipment’s related to welding & other activities.
 Review all the activity related to pipe lying.
 Fabricating piping supports and structural supports.
 Proper Co-ordination with QC people for welding and IMIR of materials.
 Hydro-test as per design pressure and temperature.
 Obeying safety related activities.
6. Jacobs H & G Pvt. Ltd. | Okhla Phase III, Delhi
Inspection Engineer 1st September 2004– 20th July 2006 for Reliance Industries Project. (1 year 10
Months)
RESPONSIBILITIES:
 Inspection of pipes and fittings, Consumables, welding Machine for spool fabrication.
 Reviewing daily progress report for welding as fit up of spool fabrications.
 Piping inspections like Fit-Up, Erection, Installation, etc.
 Inspection of various types of industrial equipment such as Pumps, Valves, Piping Systems, Pipeline and
Various Tanks such as Crude Oil Tanks, Water Tanks, Chemical Injection Skid Tanks etc.
 Verify welding parameters and consumables during installation/construction activities.
 Verifying procedures and welders qualifications test.
 Looking after the entire tasks from design, fabrication and till the preparation of erection drawings.
 Developing Field Isometric, Piping Sketch and Welding Maps Drawings using AutoCAD software.
 Providing support to the organization in meeting the customers need.
 Working knowledge of design, manufacture, metallurgy, welding standards and legislation associated
with inspection of plant /equipment and familiar with QA/QC system and procedures.
 Technical ability in understanding codes, standards and inspection methods.
 Knowledge of HSE procedures & practices, planning and organizing, scheduling and Coordinating,
checking, Examining and recording.
 Assisting in the preparation and maintenance of various quality control standards, qualification of
welding procedure specifications and completing final inspection of Piping.
 Conducting WQT, PQR as per Client Requirement for welder and Procedure Qualification.
 Conducting Hydro-test and Pneumatic Test for Piping, Pipeline and Tanks.
 Check the availability and suitability of the welding equipment, filler material, pre-heating, welding,
heat treatment, bevels, the extent of the repairs made by the various welders (taking any corrective
action required), the heat treatment record diagrams.
 Perform pipes line up check, ensuring that all installed pipe/fittings are compliant to the correct
specification and that the material is in accordance with the specified material traceability requirements.
 Carry out visual inspections and issues relevant reports.
 Handle all piping & welding technical queries.
 Ensure that all welding, heat treatment and any hardness testing are in compliance with the relevant
codes and specifications.
 Orderly collect and manage/check documents certifying tests, controls and inspections documents,
ensuring that all welding and testing related records form a complete package and reflect the As Built
as accordingly.
 Ensure the correct implementation of the approved Quality Control Plans/Inspection Test Plans relevant
to welding by organization in charge of construction activities.
 Examine visually work in progress and effectively supervise repair procedures.
 Review welding requirements for field erected Structures, vessels, tanks, boilers and other process
plants
 Punch Listing for Walk down & Reinstatement of Test Pack.
 Pipe book Verification for Pipeline Process.
 Interpretation of Weld Joints
7. Rakhoh Enterprises, MIDC, Pune.
QC Engineersince 20th May 2003–15th August 2004 Thermax Ltd. Pune.( 1 year3 Months)
RESPONSIBILITIES:
 Inspection of Incoming Material as per Test Certificate and traceability records.
 Reviewing the Documents such as WPS/PQR, Welding consumable Control procedure and Vendor
documents of Metering skid according to specification.
 Inspection of piping spool before welding, fit-up inspection of joints e.g. Root gap, root face, bevel
angle and checking the Pre-heat temperature to avoid hydrogen cracking as per approved WPS.
 Inspection of welding and welding consumables as per approved WPS.
 Visual Inspection of weld joint as per acceptance criteria.
 Bending Inspection of plate, pipe for storage tanks and ladder of tanks as per approved drawing.
 Calibration and related documentation for welding machines, inspection tools, consumables.
 Checking all dimensions as per approved drawing as well as Documentation as per project.
 Monitoring WQT of welders as per Section IX.
 Monitoring Welders for Correct usages of WPS and effective as well as cost control welding technique
 Monitoring Weld Repairs and Resolving as per procedure.
 Reviewing NDT and RT Films as per ASME Section V.
 Handling DWR of daily progress of Welding and fit-up joints of piping.
 Preparing requests and coordinate with vendors for radiographic tests, load test etc.
 Witness of Hydro-testing of Piping fabricated spool.
 Performs welding inspection to monitor & verify the welding parameters to ensure correct essential
Variable and supplementary parameters are followed.
8. Rewale Engineering Pvt. Ltd| MIDC, Pune.
QC Inspector Since 20th May 2002– 20th January 2003 For Tata Telco, Pune (8 Months)
RESPONSIBILITIES:
 Inspection of Raw material as per test certificates.
 Inspection of actual product after production as per approved drawing.
 Ensuring all dimension of test piece for mass production.
 Review all the documents related to design for inspection.
Knowledge Purview:
 Well versed with the following Standards:
 ASME SEC IX, ASME SEC VIII, ASME SEC II and ASME Sec V
 API 1104, API 650 and API 653
 AWS D1.1 and AWS D1.6
Personal Details:
Date of Birth : 2nd April, 1979
Language : Fluent in English, Hindi, and Urdu.
Nationality : Indian
Passport Number : L1181793,
Date of Issue : 09.05.2013,
Date of Expiry : 08.05.2023
Place of Issue : Abu Dhabi
Driving License : Indian
Education & Certification
 B.TECH in Mechanical Engineering from PSC, Faridabad
 Diploma in Mechanical Engineering from K.C.T Polytechnic, Gulbarga | Karnataka
 CSWIP 3.1 (Certified Welding Inspector) From TWI UK , Cert. No.- 80495 , Expiry Date-
10.10.2018
 ASNT LEVEL II ( RT, PT , UT, MT ) From Dona World, Kolkata
 QMS ISO 9001-2008 Lead Auditor.
 SAUDI ARAMCO APPROVAL as a Site QC Manager
 SAUDI ARAMCO APPROVAL as a Piping QC Inspector
 Auto CAD Training from ESSAR Computers, Gulbarga, Karnataka in 2001.
 Design & Mfg. Technique Using CAD/CAM Certification from Indo Danish Tool Room(IDTR)
Jamshedpur Govt. of India(Ministry of SSI)

MD.NAFISUL HAQUE_original

  • 1.
    . Mohammad Nafisul Haque Email:nafis.mallick@gmail.com MOBILE No. +966577652352 | +919570387224 Subject: Application for the Post of QC Manager PROFILE SUMMARY: Professional Engineering in Mechanical Engineer with Noteworthy experience in Construction, Maintenance, Start-up, Shutdown and Annual Turnaround Activities in the Oil/Gas and Petrochemical industries. Around 12 years of extensive work experience in various engineering inspection practice with proven leadership capabilities and staff supervision, in a QC Department for Execution of work inspection / witness and testing of Calibration | Hydro Test | Leak Test | Pneumatic Test, and Various type of Inspection.  Welding, Structure, Piping, Pipeline Operations and Quality Control & Assurance Inspection & Documentation.  Extensive knowledge of the Welding Process, Non Destructive Testing, Distortion Control, Repair Rejection Rate Control, Cost Reduction and other Quality Controls.  Inspection in various welding process included GTAW, SMAW, FCAW and SAW, Material Welded Inconel, Carbon Steel, Austenitic SS, ferritic SS, Clad material and Alloy Steel. ORGANIZATIONAL EXPERIENCE 1. DAEAH Engineering & Construction Co. Ltd. , Saudi Arabia , UO1 Petro Rabigh Project ,Phase-II Saudi Aramco Approved Site QC Manager Since 22nd December 2014 – Till date for Rabigh II SMP-4 Interconnecting Package. Responsibilities:  Participating in the kick off and weekly project progress meeting.  Conducting QA/QC weekly Meeting with the contractor and PID to resolve the issues/concerns related with quality.  Conducting internal meeting with QA/QC Engineers & Discipline inspectors on daily basis and follow- up daily site activities.  Coordinate with the client items related to quality  Verification of all documents related with inspection activities as per approved ITP.  Maintaining all safety aspects both at site and offices as per company HSE policy thru HSE representative.  Interview / review prospective personnel  Resolving of all quality related issues whenever it arises.  Performing both internal and external audit at planned schedule.  Follow-up the NCR and LBE until it will be rectified and closed.  Attending some inspections in case of emergency.  Review all the hydro test packages.  Develop the QA/QC procedure & report format for some critical activities.  To take care about all activities related with QA/QC.  A Little experience of handling and closing of projects in oil & gas and petrochemical industry.  Handling and closing of the projects as per Owner Specification and International Code.  Review of QC dossier when the project will be completed and hand over to the clients. 2. DODSAL Engineering & Construction Pte. Ltd.| SGD-2 & 3 Project | Hameem, UAE QC Piping Inspector Since 6th October 2012 – Till 19th June 2014 for Shah Gas Development Project (SGD-2 & 3). (1 year 8 Months) RESPONSIBILITIES:  Inspection of Incoming Material as per Test Certificate and traceability records.  Reviewing the Documents such as WPS/PQR, Welding consumable Control procedure and Vendor documents of Metering skid according to specification.  Inspection of piping spool before welding, fit-up inspection of joints e.g. root gap, root face, bevel angle and checking the Pre-heat temperature to avoid hydrogen cracking as per approved WPS.  Inter Pass temperature and post weld heat temperature (PWHT) inspection during and after welding of alloy Steel Material like P11 and P22 materials.  Carried out structural inspection on panel, sub-assembly, assembly, block erection stages.  Fit up and welding inspection of structural, Inconel and clad material piping as per approved drawing and related WPS.
  • 2.
     During weldingchecking Welding Parameters like polarity, current, voltage, position & direction of welding as per approved WPS.  Final dimension and weld visual inspection of piping and structural joints as per Section IX and ASME B31.3 requirements.  Proper Inspection of Pre-heating and PWHT of Alloy Steel Material (P11 & P22) and LTCS Material.  Monitoring WQT of welders as per Section IX.  Monitoring Welders for Correct usages of WPS & effective as well as cost control welding technique.  Monitoring Weld Repairs and Resolving as per procedure.  Reviewing NDT and RT Films as per ASME Section V.  Witnessing and monitoring pressure tests, PWHT and interpret relevant charts.  Handling DWR of daily progress of Welding and fit-up joints of piping.  Witness of Hydro-testing of Piping fabricated spool.  Site Erection as per approved drawing with proper line direction of spools and structure.  Preparation and clearance of test pack as per line.  Boiler and stem drum piping fit-up as well as welding inspection on site.  Punch listing for walk down and reinstatement of test packs.  Witness of bolt torque and tensioning as per approved flange management system (FMS).  Ensuring that accurate, concise records of approved Procedures are maintained.  Inspection and verification of various raw materials and applicable consumables are as per ITP.  Co-ordinate with client project inspection unit for necessary project inspection for witnessing point and hold point.  Confirm repairs, re-testing and re-inspection in accordance with specifications.  Monitoring piping fabrication work, fit-up welding and erection and co-ordinate to sub-contractor to assure that construction activities effecting safety and quality are compliance with project requirements.  Prepare punch list for completed line and review test packages prior for hydro test.  Witness of Hydro testing, pneumatic testing ; Air blowing ; flushing; with owner representative.  Conducted Surveillance on all Mechanical Inspection related issues and coordination with the Project Inspection Dept.  Reviewing final package for hydro test approval and releasing for test.  Checking the punch listing item as per P & ID and Isometric, such as pipe support, valves, guides, and NDT completion.  Final reinstatement and verification inspection, Piping of walkthrough, final mechanical completion and inspection 3. Velosi Certification Services (I) Pvt. Ltd.| Mumbai Inspection Engineer (TPI) 12th January 2010 – 30th August 2012 For ONGC (Oil & Natural Gas Corporation) Assam Renewal Project.(470Km Pipeline and GGS Piping)) ( 2 years 7 Months) RESPONSIBILITIES:  Supervising EPC contractor and subcontractors, on behalf of the ONGC, to carry out inspection/ ensure compliance with project specific QA/QC requirements such as Inspection Procedures/Checklists/ITPs etc.  Construction progress monitoring of all phase of work performed by EPC Contractor (civil, structural, tank, Equipment and piping mainly) in the gas compressors & export metering areas issuing daily / weekly reports for the company management.  Review and comments of method statements , ITP, Test packs, inspection of items from this documents requiring client attendance  Verification of contractor check-list from test packs and witnessing the pressure tests of (above/ underground) piping system installed  Verification on site the physical progress of work, the quality required level, safety condition  Verifying contractor's check list for pressure test, mechanical completion / pre-commissioning stages.  Review Sub-Contractor Piping and structural WPS, WQT, NDE, Procedure as per requirement.  Carried out structural inspection on panel, sub-assembly, assembly, block erection stages.  Certifying welding procedure specification (WPS) and welder’s qualification test (WQT) of contractor.  Monitoring all welding, Painting, QA/QC inspection of contractors & ensuring that all codes, standards and specification requirements are strictly adhere during execution & final signing off on reports.  Inspection of IMIR for equipment’s, valves & fitting, pipe instruments, plates and others as per test certificates & IRC.  Verification of all QC related activities in Piping/Pipeline , Equipment(Static & Rotating, Tanks, Painting, Fireproofing & Insulation  Witness of hydro test as per client’s specification.  Surveillance of stringing and welding of pipes.  Final dimension and weld visual inspection of pipes as per API 5L and section IX requirements.  Surveillance of fit-up inspection for proper root gap, groove angle, root face and pre-heat temperature to avoid hydrogen cracking.
  • 3.
     Surveillance Duringwelding of polarity, current, Voltage, position & direction of welding as per approved WPS.  To co-ordinate with client to undertake procedure qualification test (PQT) and inspection of prepared test specimens and witness destructive tests.  Inspection of coating material as per approved specification.  During coating inspection of DFT and temperature as per approved procedure.  Witnessing peel test of sleeve as per available Temperatures records.  Pipe-book verification as per welding, RT, and coating reports.  During lowering of pipe inspection of trench width & depth, Pipeline sequence as per approved line sequence sheet.  Witness of holiday detection test as per approved required voltage (25kv).  Hold point inspection of drain & vent casing pipe thickness, carrier pipe, insulator fitting as per dimension for Nala, River and road crossing area as well as restoration & drain of ROU.  Inspection of crude oil & effluent tank as per approved code.  Hold point inspection of Construction of new Storage tank as per API 650 Codes.  Inspection related to tank e.g. Diesel check, RF pad, flange orientation, trusses, bottom & roof plate dimension, ladder, platform orientation Wind girder , roof drain orientation, Overtly check , diameter of tank as per approved drawing.  Repair tank inspection as per API 653 Codes.  Inspection of test separator and heater teeter structural frame as per approved drawing 4. Al-Suwaidi Trading & Development Co. Ltd.| Al-Khobar, Saudi Arabia QC Welding & Piping Inspector Since 5th August 2007 – 13th August 2009 For Tasnee Ethylene Cracking Furnace, OIEC, SSEM and Yuksel INSAAT Project. (2 years) RESPONSIBILITIES:  Inspection of Incoming Material as per Test Certificate and traceability records.  Reviewing the Documents such as WPS/PQR, Welding consumable Control procedure and Vendor documents of Metering skid according to specification.  Inspection of piping spool before welding, fit-up inspection of joints e.g. root gap, root face, bevel angle and checking the Pre-heat temperature to avoid hydrogen cracking as per approved WPS.  Inter Pass temperature and post weld heat temperature (PWHT) inspection during and after welding of alloy Steel Material like P11 and P22 materials.  Fit up and welding inspection of Inconel & clad material piping as per approved drawing and related WPS.  During welding checking Welding Parameters like polarity, current, voltage, position & direction of welding as per approved WPS.  Final dimension and weld visual inspection of piping joints as per Section IX and ASME B31.3 requirements.  Proper Inspection of Pre-heating and PWHT of Alloy Steel Material (P11 & P22) and LTCS Material.  Monitoring WQT of welders as per Section IX.  Monitoring Welders for Correct usages of WPS and effective as well as cost control welding technique  Monitoring Weld Repairs and Resolving as per procedure.  Reviewing NDT and RT Films as per ASME Section V.  Handling DWR of daily progress of Welding and fit-up joints of piping.  Witness of Hydro-testing of Piping fabricated spool.  Inspection of piping supports and structural supports.  Inspection of all headers & spool piece for furnace as per approved drawing.  Review of P & ID, Isometric & Plot plan drawing for proper inspection.  Inspection of Spool Fabrication of piping, Piping Headers and pipe supports as per drawing  Inspection of different types and sizes of valves as per approved drawing.  Inspection of Site Erection & Installation of all the Instruments according to the Pressure.  Site Inspection and implementation of installation of piping as per drawing and quality specification of project requirement.  Inspection of Fabrication of ladder & platform Welding and fit-up as per approved drawing.  Inspection of New crude oil tank and Repair Tank as per API 650 & API 653.  Diesel check inspection for bottom plate & trusses weld leakage of tanks.  Hydrostatic test of heating coils of crude oil tanks.  Inspection of Flange orientation as per approved drawing for tanks.  Proper bending operation for hand rail & tank wind girder of tanks.  Welding of tank as per approved WPS.  Fully aware about productivity & efficiency rate of piping related processes, consumables & resources.  Planning of work and delegate to contractor.  Monitoring progress & take preventive as well as corrective action  Hydro-test as per design pressure and temperature for test pack.  Planning of work and delegate to Contractor.
  • 4.
     Monitoring Qualityreport & take preventive as well as corrective action.  Ensuring the relevant documents such as route sheets, WPS, drawings, etc. are available with the welders or operators during work. 5. Desein Pvt. Ltd.| near Savitri Cinema Delhi PipingEngineer 1st August2006 – 30th May 2007 forMathon Left BankProject.(11 Months) RESPONSIBILITIES :  Fabricating pipe spool as per Approved Isometric drawings.  Review of P & ID and plot plan for installation and erection of piping spool on site.  Arrangement of equipment’s related to welding & other activities.  Review all the activity related to pipe lying.  Fabricating piping supports and structural supports.  Proper Co-ordination with QC people for welding and IMIR of materials.  Hydro-test as per design pressure and temperature.  Obeying safety related activities. 6. Jacobs H & G Pvt. Ltd. | Okhla Phase III, Delhi Inspection Engineer 1st September 2004– 20th July 2006 for Reliance Industries Project. (1 year 10 Months) RESPONSIBILITIES:  Inspection of pipes and fittings, Consumables, welding Machine for spool fabrication.  Reviewing daily progress report for welding as fit up of spool fabrications.  Piping inspections like Fit-Up, Erection, Installation, etc.  Inspection of various types of industrial equipment such as Pumps, Valves, Piping Systems, Pipeline and Various Tanks such as Crude Oil Tanks, Water Tanks, Chemical Injection Skid Tanks etc.  Verify welding parameters and consumables during installation/construction activities.  Verifying procedures and welders qualifications test.  Looking after the entire tasks from design, fabrication and till the preparation of erection drawings.  Developing Field Isometric, Piping Sketch and Welding Maps Drawings using AutoCAD software.  Providing support to the organization in meeting the customers need.  Working knowledge of design, manufacture, metallurgy, welding standards and legislation associated with inspection of plant /equipment and familiar with QA/QC system and procedures.  Technical ability in understanding codes, standards and inspection methods.  Knowledge of HSE procedures & practices, planning and organizing, scheduling and Coordinating, checking, Examining and recording.  Assisting in the preparation and maintenance of various quality control standards, qualification of welding procedure specifications and completing final inspection of Piping.  Conducting WQT, PQR as per Client Requirement for welder and Procedure Qualification.  Conducting Hydro-test and Pneumatic Test for Piping, Pipeline and Tanks.  Check the availability and suitability of the welding equipment, filler material, pre-heating, welding, heat treatment, bevels, the extent of the repairs made by the various welders (taking any corrective action required), the heat treatment record diagrams.  Perform pipes line up check, ensuring that all installed pipe/fittings are compliant to the correct specification and that the material is in accordance with the specified material traceability requirements.  Carry out visual inspections and issues relevant reports.  Handle all piping & welding technical queries.  Ensure that all welding, heat treatment and any hardness testing are in compliance with the relevant codes and specifications.  Orderly collect and manage/check documents certifying tests, controls and inspections documents, ensuring that all welding and testing related records form a complete package and reflect the As Built as accordingly.  Ensure the correct implementation of the approved Quality Control Plans/Inspection Test Plans relevant to welding by organization in charge of construction activities.  Examine visually work in progress and effectively supervise repair procedures.  Review welding requirements for field erected Structures, vessels, tanks, boilers and other process plants  Punch Listing for Walk down & Reinstatement of Test Pack.  Pipe book Verification for Pipeline Process.  Interpretation of Weld Joints 7. Rakhoh Enterprises, MIDC, Pune. QC Engineersince 20th May 2003–15th August 2004 Thermax Ltd. Pune.( 1 year3 Months) RESPONSIBILITIES:  Inspection of Incoming Material as per Test Certificate and traceability records.  Reviewing the Documents such as WPS/PQR, Welding consumable Control procedure and Vendor documents of Metering skid according to specification.
  • 5.
     Inspection ofpiping spool before welding, fit-up inspection of joints e.g. Root gap, root face, bevel angle and checking the Pre-heat temperature to avoid hydrogen cracking as per approved WPS.  Inspection of welding and welding consumables as per approved WPS.  Visual Inspection of weld joint as per acceptance criteria.  Bending Inspection of plate, pipe for storage tanks and ladder of tanks as per approved drawing.  Calibration and related documentation for welding machines, inspection tools, consumables.  Checking all dimensions as per approved drawing as well as Documentation as per project.  Monitoring WQT of welders as per Section IX.  Monitoring Welders for Correct usages of WPS and effective as well as cost control welding technique  Monitoring Weld Repairs and Resolving as per procedure.  Reviewing NDT and RT Films as per ASME Section V.  Handling DWR of daily progress of Welding and fit-up joints of piping.  Preparing requests and coordinate with vendors for radiographic tests, load test etc.  Witness of Hydro-testing of Piping fabricated spool.  Performs welding inspection to monitor & verify the welding parameters to ensure correct essential Variable and supplementary parameters are followed. 8. Rewale Engineering Pvt. Ltd| MIDC, Pune. QC Inspector Since 20th May 2002– 20th January 2003 For Tata Telco, Pune (8 Months) RESPONSIBILITIES:  Inspection of Raw material as per test certificates.  Inspection of actual product after production as per approved drawing.  Ensuring all dimension of test piece for mass production.  Review all the documents related to design for inspection. Knowledge Purview:  Well versed with the following Standards:  ASME SEC IX, ASME SEC VIII, ASME SEC II and ASME Sec V  API 1104, API 650 and API 653  AWS D1.1 and AWS D1.6 Personal Details: Date of Birth : 2nd April, 1979 Language : Fluent in English, Hindi, and Urdu. Nationality : Indian Passport Number : L1181793, Date of Issue : 09.05.2013, Date of Expiry : 08.05.2023 Place of Issue : Abu Dhabi Driving License : Indian Education & Certification  B.TECH in Mechanical Engineering from PSC, Faridabad  Diploma in Mechanical Engineering from K.C.T Polytechnic, Gulbarga | Karnataka  CSWIP 3.1 (Certified Welding Inspector) From TWI UK , Cert. No.- 80495 , Expiry Date- 10.10.2018  ASNT LEVEL II ( RT, PT , UT, MT ) From Dona World, Kolkata  QMS ISO 9001-2008 Lead Auditor.  SAUDI ARAMCO APPROVAL as a Site QC Manager  SAUDI ARAMCO APPROVAL as a Piping QC Inspector  Auto CAD Training from ESSAR Computers, Gulbarga, Karnataka in 2001.  Design & Mfg. Technique Using CAD/CAM Certification from Indo Danish Tool Room(IDTR) Jamshedpur Govt. of India(Ministry of SSI)