Project Brief
Introduction
The project involves the construction of a new recreation area for Taylor’s
University Lakeside Campus. The recreation area will be built on the
area beside of the Syopz Mall at Taylor’s University campus. The recreation
area is to be built as a park while can experience the view of the lake.
Requirement in a Project
 Project Requirement
 Contract Requirement
 Architecture Design Requirement
 Electrical Requirement
 Civil and Structural Design Requirement
Project Objective
The main objective is to build a park at Taylor’s University Lakeside
Campus, next to the Syopz Mall.
In doing so, the park needs to be able to respond to the aims of the client and
should be able to embody and deliver the following elements and
characteristics:
 Experience
o Provide a unique dining experience,
o Customers enjoy a spectacular view as when they are walking around
the park,
o Spectacular view of the park.
 Environmentally-friendly
o Fully utilize the lake without disrupting the natural scenery,
o Does not cause disturbances to the lake’s natural environment,
o Create more green scenery.
 Comfort
o Provide comfort while giving a natural feel,
o Provide more environment feeling.
Project benefits
 Provides a unique experience,
 Enhances the beauty of the lake,
 Increase more environment-friendly in the Taylor’s University,
 Increase publicity of Taylor’s University Lakeside Campus.
Stakeholders
1. Primary Users
 Staff and students of Taylor’s University Lakeside Campus.
2. Authorities
 Subang Jaya Town Council (MPSJ).
 Taylor’s University Faculty Management.
Authorization Approval
No
.
Procedure Authority Time to complete
1 Submission to Local
Authority
Subang Jaya Town
Council (MPSJ)
July 2013-November
2013
2 Obtain Development Order Planning Department July 2013-November
2013
3 Obtain Water Approval SYABAS July 2013-November
2013
4 Obtain Hoarding &
Signboard Approval
Subang Jaya Town
Council (MPSJ)
July 2013-November
2013
5 Obtain RORO Bin Approval Subang Jaya Town
Council (MPSJ)
July 2013-November
2013
6 Obtain Landscape Approval Subang Jaya Town
Council (MPSJ)
July 2013-November
2013
7 Obtain Building Plan
Approval
Subang Jaya Town
Council (MPSJ)
July 2013-November
2013
Site Analysis
Types of Development
On-Site Upgrading
Preserving their location, character and social structure but improve basic service and
physical environment. Land, lanes, road and open spaces are improved without changing
layout or plot sizes.
On-Site Reblocking
Improving infrastructure and physical conditions in existing communities by making some
adjustment to the layout of the houses and roads to install Sewers and drainage system
walkway & roads yet ensure continuity of community
On-Site Reconstructions
Demolished and rebuilt on land either under a long term lease or after negotiated to buy the
land.
MPSJ( Majlis Pembandaran Subang Jaya)
Application of plan approval
 Application letter
 Copy of landownership certified by Commissioner of Oath or Justice of Peace
 Copies of valid document like power of attorney/sales and purchase
agreement/tenancy agreement
 Six set of building plans property arranged and folded in A4 size prepared by
professional consultant
General Information
1. Title of plan should have:
 Types of Building
 Total number of unit
 Total number of floors
 Name of owner and company
 Address of Building owner
 Lot number/ title number
 Road/street name
 Section name
2. Building plan should completed with following
 Well defined location plan not more 1:1000 or more. Name of road should be
shown on location plan.
 Floor plan, vertical elevation plan (front rear and side), sections and roof plan with
scale of 1:100 or 1:200 (according to building size) .
 Drainage and sewage plan should be indicated clearly in the site plan.
 Road layout plan, entrance road access and vehicle parking lots together with the
traffic flow shown either in site plan or separately.
 Indicate calculation on plot ratio, calculation of building floor area in accordance
with usage such as office.
1) Consultant prepares plans and submits to DBKK
2) Plan checked for compliance of basic requirements for submission of plans
3A) If incomplete submit letter of non-compliance and return to consultant
3B) If complied, open file, calculate fee and send payment notice to consultant
4) Circulate plan to relevant department eg. Jabatan Bomba, Health Department and so on
5) Bomba and Medical comment about plan
6) Plan will be checked. If there is any complication or not straight forward, plan will be
referred to building plans committee.
7A) If does not comply with requirements, letter requesting, revision will be prepared and
sent to the consultant
7B) If complies with the requirement, approval letter will be prepared
8) Consultant will be contracted to collect building plan which has been endorsed with
approval
9) Approval plan filed
Brief goal
 Pitch for an idea in written form.
 Simpler the better but informative.
Brief Structure
 The Goal : Identity core nugget explains the goal.
 The Idea : Version of one's 5 second pitch.
 The Problem : Modified version of pitch, set-up provides framework for the
idea.
 The Audience : What's the idea for? If you are pitching directly to your
customer in an appropriate way for their consumption
 The Approach : Explain how the idea works
 Challenges & Unknown: Questions that will be asked and missed out important
stuff
Design Brief
Design brief is a written document which has to be translated spatially ad technically by an
architect
 Must be written prior to the appointment of an architect
 Provide a clear framework for the development of a design that meets the needs
and aspiration of the architectural service client
 Good thorough brief will form the basis of the professional agreement the client
will sign with the architect
 Clarify on service, cost, timing and procedure -identify objective and main priority
of the project Writing
 Generic guidance and empirical evidence about space standards and performance
requirement. Generic guidance should always tuned to the specific site
 Existing building as qualitative reference
Aim Design Brief Should Have
 Mission &Vision
 Objective
 Performance requirement and measures.
Practical requirement for the relationship between spaces, focusing on performance
requirement instead of detail. Convenient to give a schedule of area.
 Design criteria and principle of designs
 Priority
 Management decisions and responsibility
 Time frame, limits about time scale
 Limits about budget
 As much factual information about the current condition of the building or site as it
is available. It may be better to give a summary and include relevant drawings and
document in appendix
Writing Effective Brief
Purpose of project brief
 Give everyone started with a common understanding of goal
 Gives direction and against those who test concept and execution as one moves
through projects -provide clarity on why you're doing this project
Writing the brief
 Provide a list of requirement and include all relevant info specification
 Size and location of design
 Critical elements
 Limitation
Avoid prescribe solution. Be clear what project needs to achieve so designer can explore
ideas.
Benchmark in mind
 Provide a list of things that you as a client wants to avoid.
Budget
 Provide budget prevent wasting time and resource when trying to maximize budget
 Provide budget allow designer to know if project is going to be worthwhile
Timeframe
 Detailed schedule of the project and set realistic deadline for the completion of
work
 Take into account the various stage of the design project such as consultation,
concept development production and delivering.
Getting consultation permits
 Submission to local authority through OSC Apply for pre-building approval at the
one stop center of municipality of Kuala Lumpur. However, the builders need to
visit agencies that provide the pre-approval in order to obtain information.
 Obtain development order from planning department *planning permission issued
by DO by PD of local authority authorities development of land. Permit is valid for
12 months, within which time construction begins.
1. 120 days for large scale project
Consisting of complicated development plans, building or more than five levels,
construction involving layout plans for a development area of more than 2acres or
project affecting the popularity density and change of zone area.
2. 60 days for mid-scale project Fewer than 5
levels, fewer than 5,000 square feet or involving changes/addition/alteration made
to available shops/housing unit.
3. 45 days for small-scale projects Involving
addition/changes/ alteration to existing bungalow units, two storey units and terrace
units and now bungalow units built accordance with approved layout plans only.
BORANG B1
PENERIMAAN PERMOHONAN KELULUSAN PELAN BANGUNAN
( OSC ke Pemohon )
Rujukan :
Tarikh:
………………………………
………………………………
………………………………
( Pemohon )
Permohonan tuan untuk kelulusan Pelan Bangunan, rujukan…………………………………( PBT ) telah
diterima bagi
projek…………………………………………………………………………………………………………
….
………………………………………………………………………………………………………….………
………
Sekian, terima kasih.
………………………………
………………………………
………………………………
( OSC/ PBT )
Salinan kepada:
 JKT
 MIDA
Kod Rujukan PBT :
Kod Rujukan
MIDA :
BORANG B2
PERMOHONAN BAGI KELULUSAN PELAN BANGUNAN
( OSC ke Agensi Teknikal )
Rujukan :
Tarikh:
……………………………….
……………………………….
( Agensi Teknikal )
Bersama-sama ini disertakan permohonan kelulusan Pelan Bangunan dari
syarikat……………………………………………………………………untuk……………………………
…………. ………………………………………………………………………
………………………………….. ……………………………………………………………..
………………………
Sila beri ulasan/ perakuan dalam tempoh 30 hari dari tarikh penerimaan ke pejabat ini untuk tindakan.
Sekian, terima kasih.
……………………………..
……………………………..
( OSC/ PBT )
Salinan kepada :
…………………………………..
…………………………………..
( Pemohon )
Kod Rujukan PBT :
Kod Rujukan MIDA :
Document 1

More Related Content

What's hot

Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
Michael Barbera
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
Pradeep Singh
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
SRINIVASA RAO KOLLA
 
Resume 05_02_15
Resume 05_02_15Resume 05_02_15
Resume 05_02_15
Steven Vorndran
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
Rachael Lyman
 
Measure E Update
Measure E UpdateMeasure E Update
Measure E Update
mreska
 
TONEY GASCO CV updated
TONEY GASCO CV updatedTONEY GASCO CV updated
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
Vic Carino
 
ICI final project
ICI final projectICI final project
ICI final project
LY97
 
Ici final project
Ici final projectIci final project
Ici final project
温 庄壁
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
Maurita N. H. Walker
 
Karen Sevillano CV QS
Karen Sevillano CV QSKaren Sevillano CV QS
Karen Sevillano CV QS
karen Sevillano, CE/Master Plumber
 
Geo structurals pvt. ltd.
Geo structurals pvt. ltd.Geo structurals pvt. ltd.
Geo structurals pvt. ltd.
Jimmy George
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
Shreenivash Chandra
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
Saikat Roy
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Sakib Nizam
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
Fernando Bravo, P.E., CFM
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
Mahesh Narayanan Subburam
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
Siddique Pasha
 

What's hot (19)

Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
Resume 05_02_15
Resume 05_02_15Resume 05_02_15
Resume 05_02_15
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
 
Measure E Update
Measure E UpdateMeasure E Update
Measure E Update
 
TONEY GASCO CV updated
TONEY GASCO CV updatedTONEY GASCO CV updated
TONEY GASCO CV updated
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
ICI final project
ICI final projectICI final project
ICI final project
 
Ici final project
Ici final projectIci final project
Ici final project
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 
Karen Sevillano CV QS
Karen Sevillano CV QSKaren Sevillano CV QS
Karen Sevillano CV QS
 
Geo structurals pvt. ltd.
Geo structurals pvt. ltd.Geo structurals pvt. ltd.
Geo structurals pvt. ltd.
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 

Viewers also liked

Kebenaran merancang
Kebenaran merancangKebenaran merancang
Kebenaran merancangJaclyn Hwang
 
Telekom tower
Telekom towerTelekom tower
Telekom tower
NatalieKi
 
Kebenaran merancang
Kebenaran merancangKebenaran merancang
Kebenaran merancang
khairulcastiel
 
BS Role
BS RoleBS Role
Rating 1 introduction
Rating 1  introductionRating 1  introduction
Rating 1 introduction
Rohayu Majid
 
Construction Industry
Construction IndustryConstruction Industry
Construction Industry
Sharath Murali
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
Debbie Loh
 
Building construction
Building constructionBuilding construction
Building construction
DRM Investments LTD
 

Viewers also liked (8)

Kebenaran merancang
Kebenaran merancangKebenaran merancang
Kebenaran merancang
 
Telekom tower
Telekom towerTelekom tower
Telekom tower
 
Kebenaran merancang
Kebenaran merancangKebenaran merancang
Kebenaran merancang
 
BS Role
BS RoleBS Role
BS Role
 
Rating 1 introduction
Rating 1  introductionRating 1  introduction
Rating 1 introduction
 
Construction Industry
Construction IndustryConstruction Industry
Construction Industry
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
 
Building construction
Building constructionBuilding construction
Building construction
 

Similar to Document 1

Research development
Research developmentResearch development
Research development
J-Sern Phua
 
Project background
Project backgroundProject background
Project background
Nicholas Yap Wei Tyng
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
KhangWei Chin
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
JamesMoy7
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
Pinky Chan
 
ICIP2G
ICIP2GICIP2G
Project 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationProject 1 ICI & ITD Presentation
Project 1 ICI & ITD Presentation
Afiqah Zariful
 
nancyevangelista CV
nancyevangelista CVnancyevangelista CV
nancyevangelista CV
Nanz Evangelista
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
Amulya Gupta
 
Project Name
 Project Name                                       Project Name
Project Name
TatianaMajor22
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
Bonny Sam
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
Ayman Issa
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDAN
Mani Kandan
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
Sithick Mohamed .
 
Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016
Prajeesh Koorakkapadam
 
Auberry Proposal 20110318
Auberry Proposal 20110318Auberry Proposal 20110318
Auberry Proposal 20110318
Jon Zuber
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
温 庄壁
 
Project charter j
Project charter jProject charter j
Project charter j
Jitendrasingh Dongariya
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
sundeep khare
 
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar
 

Similar to Document 1 (20)

Research development
Research developmentResearch development
Research development
 
Project background
Project backgroundProject background
Project background
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Project 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationProject 1 ICI & ITD Presentation
Project 1 ICI & ITD Presentation
 
nancyevangelista CV
nancyevangelista CVnancyevangelista CV
nancyevangelista CV
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
Project Name
 Project Name                                       Project Name
Project Name
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDAN
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016
 
Auberry Proposal 20110318
Auberry Proposal 20110318Auberry Proposal 20110318
Auberry Proposal 20110318
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
 
Project charter j
Project charter jProject charter j
Project charter j
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
 
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015
 

More from Erik Ong

Management science
Management scienceManagement science
Management science
Erik Ong
 
Bubble deck & hollow core slab
Bubble deck & hollow core slabBubble deck & hollow core slab
Bubble deck & hollow core slab
Erik Ong
 
BS 2
BS 2BS 2
BS 2
Erik Ong
 
Site surveying report (theodolite)
Site surveying report (theodolite)Site surveying report (theodolite)
Site surveying report (theodolite)
Erik Ong
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Erik Ong
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
Erik Ong
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
Erik Ong
 
ITD: Project 3
ITD: Project 3ITD: Project 3
ITD: Project 3
Erik Ong
 
ITD: Project 2
ITD: Project 2ITD: Project 2
ITD: Project 2
Erik Ong
 
CL Project 2B
CL Project 2BCL Project 2B
CL Project 2B
Erik Ong
 
Constructed Landscape: Project 2a II
Constructed Landscape: Project 2a IIConstructed Landscape: Project 2a II
Constructed Landscape: Project 2a II
Erik Ong
 
Constructed Landscape: Project 2
Constructed Landscape: Project 2Constructed Landscape: Project 2
Constructed Landscape: Project 2
Erik Ong
 
english 2 assignment
english 2 assignmentenglish 2 assignment
english 2 assignment
Erik Ong
 
Social Pyscology-assignment 2:
Social Pyscology-assignment 2:Social Pyscology-assignment 2:
Social Pyscology-assignment 2:
Erik Ong
 
Psycology final project
Psycology final projectPsycology final project
Psycology final project
Erik Ong
 
Social physcology essay
Social physcology essaySocial physcology essay
Social physcology essay
Erik Ong
 
EPC Mural Art
EPC Mural ArtEPC Mural Art
EPC Mural Art
Erik Ong
 
Account assignment
Account assignmentAccount assignment
Account assignment
Erik Ong
 
Research report
Research reportResearch report
Research report
Erik Ong
 
Ong chia hong city report
Ong chia hong city reportOng chia hong city report
Ong chia hong city report
Erik Ong
 

More from Erik Ong (20)

Management science
Management scienceManagement science
Management science
 
Bubble deck & hollow core slab
Bubble deck & hollow core slabBubble deck & hollow core slab
Bubble deck & hollow core slab
 
BS 2
BS 2BS 2
BS 2
 
Site surveying report (theodolite)
Site surveying report (theodolite)Site surveying report (theodolite)
Site surveying report (theodolite)
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
 
ITD: Project 3
ITD: Project 3ITD: Project 3
ITD: Project 3
 
ITD: Project 2
ITD: Project 2ITD: Project 2
ITD: Project 2
 
CL Project 2B
CL Project 2BCL Project 2B
CL Project 2B
 
Constructed Landscape: Project 2a II
Constructed Landscape: Project 2a IIConstructed Landscape: Project 2a II
Constructed Landscape: Project 2a II
 
Constructed Landscape: Project 2
Constructed Landscape: Project 2Constructed Landscape: Project 2
Constructed Landscape: Project 2
 
english 2 assignment
english 2 assignmentenglish 2 assignment
english 2 assignment
 
Social Pyscology-assignment 2:
Social Pyscology-assignment 2:Social Pyscology-assignment 2:
Social Pyscology-assignment 2:
 
Psycology final project
Psycology final projectPsycology final project
Psycology final project
 
Social physcology essay
Social physcology essaySocial physcology essay
Social physcology essay
 
EPC Mural Art
EPC Mural ArtEPC Mural Art
EPC Mural Art
 
Account assignment
Account assignmentAccount assignment
Account assignment
 
Research report
Research reportResearch report
Research report
 
Ong chia hong city report
Ong chia hong city reportOng chia hong city report
Ong chia hong city report
 

Recently uploaded

20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website
Pixlogix Infotech
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIEnchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Vladimir Iglovikov, Ph.D.
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
Rohit Gautam
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Zilliz
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 

Recently uploaded (20)

20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIEnchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 

Document 1

  • 1. Project Brief Introduction The project involves the construction of a new recreation area for Taylor’s University Lakeside Campus. The recreation area will be built on the area beside of the Syopz Mall at Taylor’s University campus. The recreation area is to be built as a park while can experience the view of the lake.
  • 2. Requirement in a Project  Project Requirement  Contract Requirement  Architecture Design Requirement  Electrical Requirement  Civil and Structural Design Requirement
  • 3. Project Objective The main objective is to build a park at Taylor’s University Lakeside Campus, next to the Syopz Mall. In doing so, the park needs to be able to respond to the aims of the client and should be able to embody and deliver the following elements and characteristics:  Experience o Provide a unique dining experience, o Customers enjoy a spectacular view as when they are walking around the park, o Spectacular view of the park.  Environmentally-friendly o Fully utilize the lake without disrupting the natural scenery, o Does not cause disturbances to the lake’s natural environment, o Create more green scenery.  Comfort o Provide comfort while giving a natural feel, o Provide more environment feeling.
  • 4. Project benefits  Provides a unique experience,  Enhances the beauty of the lake,  Increase more environment-friendly in the Taylor’s University,  Increase publicity of Taylor’s University Lakeside Campus. Stakeholders 1. Primary Users  Staff and students of Taylor’s University Lakeside Campus. 2. Authorities  Subang Jaya Town Council (MPSJ).  Taylor’s University Faculty Management.
  • 5. Authorization Approval No . Procedure Authority Time to complete 1 Submission to Local Authority Subang Jaya Town Council (MPSJ) July 2013-November 2013 2 Obtain Development Order Planning Department July 2013-November 2013 3 Obtain Water Approval SYABAS July 2013-November 2013 4 Obtain Hoarding & Signboard Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013 5 Obtain RORO Bin Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013 6 Obtain Landscape Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013 7 Obtain Building Plan Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013
  • 7. Types of Development On-Site Upgrading Preserving their location, character and social structure but improve basic service and physical environment. Land, lanes, road and open spaces are improved without changing layout or plot sizes. On-Site Reblocking Improving infrastructure and physical conditions in existing communities by making some adjustment to the layout of the houses and roads to install Sewers and drainage system walkway & roads yet ensure continuity of community On-Site Reconstructions Demolished and rebuilt on land either under a long term lease or after negotiated to buy the land. MPSJ( Majlis Pembandaran Subang Jaya) Application of plan approval  Application letter  Copy of landownership certified by Commissioner of Oath or Justice of Peace  Copies of valid document like power of attorney/sales and purchase agreement/tenancy agreement  Six set of building plans property arranged and folded in A4 size prepared by professional consultant
  • 8. General Information 1. Title of plan should have:  Types of Building  Total number of unit  Total number of floors  Name of owner and company  Address of Building owner  Lot number/ title number  Road/street name  Section name 2. Building plan should completed with following  Well defined location plan not more 1:1000 or more. Name of road should be shown on location plan.  Floor plan, vertical elevation plan (front rear and side), sections and roof plan with scale of 1:100 or 1:200 (according to building size) .  Drainage and sewage plan should be indicated clearly in the site plan.  Road layout plan, entrance road access and vehicle parking lots together with the traffic flow shown either in site plan or separately.  Indicate calculation on plot ratio, calculation of building floor area in accordance with usage such as office.
  • 9. 1) Consultant prepares plans and submits to DBKK 2) Plan checked for compliance of basic requirements for submission of plans 3A) If incomplete submit letter of non-compliance and return to consultant 3B) If complied, open file, calculate fee and send payment notice to consultant 4) Circulate plan to relevant department eg. Jabatan Bomba, Health Department and so on 5) Bomba and Medical comment about plan 6) Plan will be checked. If there is any complication or not straight forward, plan will be referred to building plans committee. 7A) If does not comply with requirements, letter requesting, revision will be prepared and sent to the consultant 7B) If complies with the requirement, approval letter will be prepared 8) Consultant will be contracted to collect building plan which has been endorsed with approval 9) Approval plan filed
  • 10. Brief goal  Pitch for an idea in written form.  Simpler the better but informative. Brief Structure  The Goal : Identity core nugget explains the goal.  The Idea : Version of one's 5 second pitch.  The Problem : Modified version of pitch, set-up provides framework for the idea.  The Audience : What's the idea for? If you are pitching directly to your customer in an appropriate way for their consumption  The Approach : Explain how the idea works  Challenges & Unknown: Questions that will be asked and missed out important stuff Design Brief Design brief is a written document which has to be translated spatially ad technically by an architect  Must be written prior to the appointment of an architect  Provide a clear framework for the development of a design that meets the needs and aspiration of the architectural service client
  • 11.  Good thorough brief will form the basis of the professional agreement the client will sign with the architect  Clarify on service, cost, timing and procedure -identify objective and main priority of the project Writing  Generic guidance and empirical evidence about space standards and performance requirement. Generic guidance should always tuned to the specific site  Existing building as qualitative reference Aim Design Brief Should Have  Mission &Vision  Objective  Performance requirement and measures. Practical requirement for the relationship between spaces, focusing on performance requirement instead of detail. Convenient to give a schedule of area.  Design criteria and principle of designs  Priority  Management decisions and responsibility  Time frame, limits about time scale  Limits about budget  As much factual information about the current condition of the building or site as it is available. It may be better to give a summary and include relevant drawings and document in appendix
  • 12. Writing Effective Brief Purpose of project brief  Give everyone started with a common understanding of goal  Gives direction and against those who test concept and execution as one moves through projects -provide clarity on why you're doing this project Writing the brief  Provide a list of requirement and include all relevant info specification  Size and location of design  Critical elements  Limitation Avoid prescribe solution. Be clear what project needs to achieve so designer can explore ideas. Benchmark in mind  Provide a list of things that you as a client wants to avoid. Budget  Provide budget prevent wasting time and resource when trying to maximize budget  Provide budget allow designer to know if project is going to be worthwhile
  • 13. Timeframe  Detailed schedule of the project and set realistic deadline for the completion of work  Take into account the various stage of the design project such as consultation, concept development production and delivering. Getting consultation permits  Submission to local authority through OSC Apply for pre-building approval at the one stop center of municipality of Kuala Lumpur. However, the builders need to visit agencies that provide the pre-approval in order to obtain information.  Obtain development order from planning department *planning permission issued by DO by PD of local authority authorities development of land. Permit is valid for 12 months, within which time construction begins.
  • 14. 1. 120 days for large scale project Consisting of complicated development plans, building or more than five levels, construction involving layout plans for a development area of more than 2acres or project affecting the popularity density and change of zone area. 2. 60 days for mid-scale project Fewer than 5 levels, fewer than 5,000 square feet or involving changes/addition/alteration made to available shops/housing unit. 3. 45 days for small-scale projects Involving addition/changes/ alteration to existing bungalow units, two storey units and terrace units and now bungalow units built accordance with approved layout plans only.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. BORANG B1 PENERIMAAN PERMOHONAN KELULUSAN PELAN BANGUNAN ( OSC ke Pemohon ) Rujukan : Tarikh: ……………………………… ……………………………… ……………………………… ( Pemohon ) Permohonan tuan untuk kelulusan Pelan Bangunan, rujukan…………………………………( PBT ) telah diterima bagi projek………………………………………………………………………………………………………… …. ………………………………………………………………………………………………………….……… ……… Sekian, terima kasih. ……………………………… ……………………………… ……………………………… ( OSC/ PBT ) Salinan kepada:  JKT  MIDA Kod Rujukan PBT :
  • 21. Kod Rujukan MIDA : BORANG B2 PERMOHONAN BAGI KELULUSAN PELAN BANGUNAN ( OSC ke Agensi Teknikal ) Rujukan : Tarikh: ………………………………. ………………………………. ( Agensi Teknikal ) Bersama-sama ini disertakan permohonan kelulusan Pelan Bangunan dari syarikat……………………………………………………………………untuk…………………………… …………. ……………………………………………………………………… ………………………………….. …………………………………………………………….. ……………………… Sila beri ulasan/ perakuan dalam tempoh 30 hari dari tarikh penerimaan ke pejabat ini untuk tindakan. Sekian, terima kasih. …………………………….. …………………………….. ( OSC/ PBT ) Salinan kepada : ………………………………….. ………………………………….. ( Pemohon ) Kod Rujukan PBT : Kod Rujukan MIDA :