Phone: (805) 341-7094
E-mail:
amichaelbarbera@sbcglobal.net
DSA Cert. #: 3430
Michael Barbera
Objective To provide expert DSA Project Inspection, Project / Construction
Management and Constructability review as a Certified DSA Class 1
Project Inspector.
General
Introduction  30+ years of construction experience in both structural and general
building inspection, all-around “hands on” trade experience,
resulting in a broad, experienced-based knowledge of all aspects of
the construction and inspection process.
 Involved in and completed projects ranging between $2 million to
$200 million.
 Expert in plan reading, constructability reviews, and all applicable
Building Codes
 Strong communication, supervision and management skills to
effectively serve in a “liaison” capacity between Owners,
School/College Districts, Design Professionals, Contractors, and
Local Authorities.
 Computer-skilled for performing all facets of electronic
documentation, networking and data-bases to perform of all
administrative duties required of a professional General Building
Inspector, DSA Project Inspector, Project/Construction Manager.
 Possess a current and complete library of all required building
codes, referenced standards and office equipment to properly
manage all documents and contracts during execution of any
project.
Professional
Experience
DSA CLASS 1 PROJECT INSPECTOR
 2015-Present: Beverly Hills Unified School District Beverly Hills, CA
 Currently serving as DSA Class 1 Project inspector for interim housing
projects, site utilities, Structural, Fire Life Safety and ADA upgrades at
multiple School campuses. See “DSA Experience” below for listings.
 1999 – 2013 Las Virgenes Unified School District Calabasas, CA
 Served as Division of State Architect Project Inspector for all general
building inspection on all facilities.
 Provided consultation for the Las Virgenes School District and
Construction Managers review and advisement for Construction Change
Orders, project documentation, project scheduling, and risk
management.
 Implemented coordination of all LEA Lab Testing, Fire/Life Safety, Health
Dept. Inspections, with Local Authorities having Jurisdiction.
 Provided complete constructability reviews for all projects in the pre-
construction phases.
 Presided over all visits and meetings with Division of State Architect
District Engineers and Representatives.
DSA COORDINATOR / SENIOR SUPERINTENDENT
 2013-2015 Served as DSA Coordinator/Sr. Superintendent for S. C.
Anderson, Inc. on the Rancho Campana High School and Performing
Arts Theater Project for Oxnard High School Unified School District.
Project Cost: $56 Million
 Ensuring DSA and Code compliance requirements on the project during
construction.
 Performing quality control and pre-inspections of all facets of work prior to
formal DSA inspection on the project.
 Coordinating with the Designers in Responsible Charge, all shop drawing
reviews and technical requirements for the project.
 Performing reviews on all Requests for Information and coordinating
responses with the Designers in Responsible Charge.
 Managing the CPM and Look-Ahead Schedules.
 Liaison to the City of Camarillo, Utility Providers and Public Works
departments for new Public Roads and Cal-trans drainage culvert
structures.
PROJECT MANAGER
 2010-2013 Team Concept Development Services, Inc. Performed all
facets of construction project management; from single vendor
agreements, to complete General Contracts and Lease/Lease-Back
contracts.
 Assisted in managing the District’s “Measure G” Construction Bond
construction performance, budget and LEED Administration coordination.
 Served as the Senior Division of State Architect Class 1 Project Inspector
for all construction projects and supervision of all other DSA Project
Inspectors as part of the Team Concept Program Management services
to Las Virgenes Unified School District.
 Procured, managed and coordinated all professional services contracts
for Measure G Bond construction projects and construction-related
services.
 Coordinated District Facilities, Accounting and Maintenance Departments
pertaining to all tasks and training required to complete successful
contracts and new building deliverables to the District.
CONSTRUCTABILITY REVIEW
 2016-Present: El Rodeo K-8 Seismic Upgrades and Modernization #03-
116868. Historic Rehabilitation project. Currently providing pre-DSA
approval constructability review of all construction documents in preparation
for the alterations, rehabilitation and Modernization Bldgs. A,B,C,D,& E;
Construction of 2-Lunch Shelters & Related Site Work; Rehabilitation of 4-
Buildings A,B,C, & D. Cost: $54 Million.
 2013 / 2014 Rancho Campana High School #03-114964. Oxnard HS
Unified School District. Provided constructability review and DSA
compliance overview of all plans, specifications, Addenda and
construction documents for the new High School Campus. Served as
consultant to S.C. Anderson, Inc., the General Contractor awarded the
contract. The new High School, set on 27 acres, has nine buildings; the
most intricate being a fully functional Performing Arts Center, complete
with state of the art theatrical components, rigging, galleries and
AV/Lighting Systems. The design also incorporates CHPS “green”
building principals, by using radiant floor heating and outside air
circulation for cooling, to utilize the most effective energy use year-round.
REGISTERED DEPUTY BUILDING INSPECTOR
1986 – 1999 City of Los Angeles
 Licensed by the City of Los Angeles Department of Building and Safety.
Obtained and held all Deputy Inspection licenses for structural
inspection: Masonry, Concrete, Welding, Shot-crete, Post-tension
Concrete, Spray-applied Fire Proofing, Epoxy Injection, and Drilled-in-
Anchor inspection.
DSA Experience  2016-Present: #03-116835: El Rodeo Make Ready Project.
Construction of Temporary Stairs at Bldg. E, Temp. ADA Egress Ramp,
Permanent Reinforced Concrete ADA Switchback ramp and retaining
walls. Also includes guardrail systems and emergency egress system
installations. This project is in preparation for the $54 million dollar
Modernization of the entire historical campus. Cost to date: $600
Thousand.
 2016-Present: #03-117054: Beverly Vista Structural Deck Repair
and Waterproofing System. Beverly Hills Unified School District.
Original scope to replace topping slab was modified by CCD 02,
whereat the structural deck revealed cracking and rebar without
proper cover. The required re-design of topping being slab dowelled
to the existing structural slab and steel beams. Cost to date:
$1.1Million
 2016-Present: #03-116822: Beverly Vista Athletic Field
Expansion. Beverly Hills Unified School District. SVA Architects.
Alterations to and replacement and expansion of Existing Artificial
Turf Athletic Fields.. Included ADA upgrades to meet current code
requirements. Also included misc. site improvements, underground
utilities and seal coat /striping over (E) playground asphalt paving.
Cost to date: $1.2 million.
 2015-Present: #03-116462: El Rodeo K-8 Portable Cottages.
Beverly Hills Unified School District. HMC Architects. This interim
housing project scope is to prepare a portion of the existing site,
install new utilities and place 40 Relocatable Buildings to be used as
an interim campus while the school undergoes a complete seismic
upgrade and modernization. Cost to date: $3.1Milion
 2015-Present: #03-116426: Beverly Hills HS Interim Housing
Project. Beverly Hills Unified School District. DLR Architects. This
interim housing project scope is to prepare a portion of the existing
site, install new utilities and place 46 Relocatable Buildings to be
used as an interim campus while the school undergoes a complete
seismic upgrade and modernization. Cost to date: $5.5Million.
 2013-2015: #03-114964: Rancho Campana High School and
Performing Arts Project. Oxnard High School Unified School
District. HMC Architects. Provided Constructability services of the
completed DSA Construction Documents prior to construction. Then
served as DSA Coordinator/Sr. Project Superintendent for the actual
construction of the campus. Project Scope included overseeing
construction of 7-classroom buildings, 1-Central Kitchen,1- 780 seat,
multistory Performing Arts Theater Building and 2- new public
streets, complete with Cal-trans culvert drainage infrastructure, SCE
lighting and new main Electrical services. $58 Million
 2010 – 2013: #03-112713, #03-112714,: Agoura High School and
Calabasas High School Performing Arts Education Centers. Las
Virgenes USD. John Sergio Fisher &Associates. These World-
Class Performing Arts Centers were started simultaneously and
constructed on parallel construction schedules. Served as Senior
Project Manager and District Program Manager Representative for
Team Concept Development Services, the Owner’s Authorized
Representative for these projects. Provided pre-construction
constructability reviews, complete oversight for all contract
deliverables, scheduling, and documentation. Also provided
management of the Division of State Architect project administration
process for State Project Certification, and LEED Administration
coordination for the Project. Project Cost: $37 Million
 2008 – 2010: #111521 Lindero Canyon Middle School
Renovation. Las Virgenes USD. WLC Architects. Demolition of
40% of existing campus buildings to make way for construction of
new 2-story campus buildings, existing building alterations and
complete renovation of the entire site utility infrastructure with Team
Concept Development Services Construction Program Manager for
the Las Virgenes Unified School District. Performed complete
constructability review, project management assistance, and
officially assigned as the Division of State Architect Approved Class
1 Project Inspector for the project. Project Cost: $29 Million.
 2007-2008: #03-110279: Agoura High School 2-story Modular
classrooms and site utility installation. Las Virgenes USD. DC
Architects. Performed complete constructability review, project
management assistance, and officially assigned as the Division of
State Architect Approved Class 1 Project Inspector for the project.
Project Cost: $4.5 Million.
 2005 – 2007: # 03-106005: Yerba Buena Elementary School New
Campus buildings, site utility infrastructure and prestressed
concrete bridge structure per Cal-trans HS 20-44 specifications.
Las Virgenes USD. WLC Architects. Provided a complete
constructability review, project management assistance, and
officially assigned as the Division of State Architect Approved Class
1 Project Inspector for the project. Project Cost: $21 Million.
 2004 – 2005: #03-104716: A.C. Stelle Middle School. New campus
construction. Las Virgenes Unified School District. DSA Approved
Class 1 Project Inspector for final F/L/S, Access and administrated
the “Close of Project”. Project Cost: $27 Million.
Private Sector
Experience
 2002 – 2004: #03-105324: Sumac Elementary School New
Multipurpose Bldg. And Main Campus Remodel. Las Virgenes
Unified School District. ONXY Architects. DSA Approved Class 1
Project Inspector and District Construction Dept. Representative.
Project Cost: $4.8 Million
 2000 – 2001: #03-104970: Sumac Elementary School Site
Utilities and Relocatable Classrooms. ONYX Architects. Las
Virgenes Unified School District. DSA Approved Project Inspector.
Project Cost: $ 800,000.00
 2000 – 2001:#03-104951: Lupin Hill Elementary School Main
Building Remodel and Modernization. Las Virgenes Unified
School District. Grist Associates Architects. DSA Approved Project
Inspector and District Construction Dept. Field Representative.
Project Cost: $2.8 Million.
 1999 – 2000: #03-101924: White Oak Elementary School New
Multipurpose Building and Admin. Bldg. Modernization. Las
Virgenes USD. Leidenfrost-Horowitz Architects. DSA Approved
Assistant Project Inspector and DSA Approved Masonry Inspector.
Project Cost: $2.7 Million
 1999-2000: #03-101353: Chaparral Elementary School,
A.E.Wright Middle School and #03-101597: Agoura High School
Modernizations. Las Virgenes Unified School District. DSA
Approved Assistant Project Inspector and DSA Approved Masonry
Inspector. Project Cost: $2.9 Million.
 1998 – 1999: Los Angeles County Assessor’s Office Building.
Approved Registered Deputy Building Inspector for all structural
inspections and testing: Reinforced Concrete, Structural Masonry,
Structural Welding and Bolting, Spray-Applied Fire Proofing.
 1996 – 1998: Northridge Mall North Wing Expansion. Approved
Resident Registered Deputy Building Inspector and “City Liaison” to
the City of Los Angeles Department of Building and Safety Principal
and Senior Building Inspectors. Performed all structural inspections
in all disciplines, and supervised additional Deputy Inspectors during
the prosecution of their inspections.
 1995 – 1996: Department of Parks and Recreations Downey Park
Pool Facility and Gymnasium. Registered Deputy Building Inspector
assigned to inspect all Reinforced Masonry and Epoxy/Mechanical
Anchors.
 1994 – 1995: Northridge Mall Earthquake Reconstruction Project.
Approved as the Resident Lead Registered Deputy Building
Inspector and “City Liaison” to the City of Los Angeles Department
of Building and Safety Principal and Senior Building Inspectors, and
City Council Members. Performed structural inspections in all
disciplines, and supervised the team of Deputy Inspectors during the
prosecution of their inspections.
Current
Accreditations
Division of State Architect Class 1 Project Inspector
National Electrical Code Certification and Inspection Training.
Accreditation
History
Division of State Architect Masonry Inspector, I.C.C. Certifications in
Structural Steel Welding/ High-strength Bolting, Reinforced and Post-
Tensioned Concrete, Reinforced Masonry, Pneumatically placed
concrete, Spray-applied Fire Proofing systems.
References W.T. Liu, Division of State Architect District Structural Engineer: (213)
897-0388
*Additional References and Letters of Recommendation upon
request.

Michael Barbera Resume 1.6-na

  • 1.
    Phone: (805) 341-7094 E-mail: amichaelbarbera@sbcglobal.net DSACert. #: 3430 Michael Barbera Objective To provide expert DSA Project Inspection, Project / Construction Management and Constructability review as a Certified DSA Class 1 Project Inspector. General Introduction  30+ years of construction experience in both structural and general building inspection, all-around “hands on” trade experience, resulting in a broad, experienced-based knowledge of all aspects of the construction and inspection process.  Involved in and completed projects ranging between $2 million to $200 million.  Expert in plan reading, constructability reviews, and all applicable Building Codes  Strong communication, supervision and management skills to effectively serve in a “liaison” capacity between Owners, School/College Districts, Design Professionals, Contractors, and Local Authorities.  Computer-skilled for performing all facets of electronic documentation, networking and data-bases to perform of all administrative duties required of a professional General Building Inspector, DSA Project Inspector, Project/Construction Manager.  Possess a current and complete library of all required building codes, referenced standards and office equipment to properly manage all documents and contracts during execution of any project. Professional Experience DSA CLASS 1 PROJECT INSPECTOR  2015-Present: Beverly Hills Unified School District Beverly Hills, CA  Currently serving as DSA Class 1 Project inspector for interim housing projects, site utilities, Structural, Fire Life Safety and ADA upgrades at multiple School campuses. See “DSA Experience” below for listings.  1999 – 2013 Las Virgenes Unified School District Calabasas, CA  Served as Division of State Architect Project Inspector for all general building inspection on all facilities.  Provided consultation for the Las Virgenes School District and Construction Managers review and advisement for Construction Change Orders, project documentation, project scheduling, and risk management.  Implemented coordination of all LEA Lab Testing, Fire/Life Safety, Health Dept. Inspections, with Local Authorities having Jurisdiction.  Provided complete constructability reviews for all projects in the pre- construction phases.  Presided over all visits and meetings with Division of State Architect District Engineers and Representatives.
  • 2.
    DSA COORDINATOR /SENIOR SUPERINTENDENT  2013-2015 Served as DSA Coordinator/Sr. Superintendent for S. C. Anderson, Inc. on the Rancho Campana High School and Performing Arts Theater Project for Oxnard High School Unified School District. Project Cost: $56 Million  Ensuring DSA and Code compliance requirements on the project during construction.  Performing quality control and pre-inspections of all facets of work prior to formal DSA inspection on the project.  Coordinating with the Designers in Responsible Charge, all shop drawing reviews and technical requirements for the project.  Performing reviews on all Requests for Information and coordinating responses with the Designers in Responsible Charge.  Managing the CPM and Look-Ahead Schedules.  Liaison to the City of Camarillo, Utility Providers and Public Works departments for new Public Roads and Cal-trans drainage culvert structures. PROJECT MANAGER  2010-2013 Team Concept Development Services, Inc. Performed all facets of construction project management; from single vendor agreements, to complete General Contracts and Lease/Lease-Back contracts.  Assisted in managing the District’s “Measure G” Construction Bond construction performance, budget and LEED Administration coordination.  Served as the Senior Division of State Architect Class 1 Project Inspector for all construction projects and supervision of all other DSA Project Inspectors as part of the Team Concept Program Management services to Las Virgenes Unified School District.  Procured, managed and coordinated all professional services contracts for Measure G Bond construction projects and construction-related services.  Coordinated District Facilities, Accounting and Maintenance Departments pertaining to all tasks and training required to complete successful contracts and new building deliverables to the District. CONSTRUCTABILITY REVIEW  2016-Present: El Rodeo K-8 Seismic Upgrades and Modernization #03- 116868. Historic Rehabilitation project. Currently providing pre-DSA approval constructability review of all construction documents in preparation for the alterations, rehabilitation and Modernization Bldgs. A,B,C,D,& E; Construction of 2-Lunch Shelters & Related Site Work; Rehabilitation of 4- Buildings A,B,C, & D. Cost: $54 Million.  2013 / 2014 Rancho Campana High School #03-114964. Oxnard HS Unified School District. Provided constructability review and DSA compliance overview of all plans, specifications, Addenda and construction documents for the new High School Campus. Served as consultant to S.C. Anderson, Inc., the General Contractor awarded the contract. The new High School, set on 27 acres, has nine buildings; the most intricate being a fully functional Performing Arts Center, complete with state of the art theatrical components, rigging, galleries and
  • 3.
    AV/Lighting Systems. Thedesign also incorporates CHPS “green” building principals, by using radiant floor heating and outside air circulation for cooling, to utilize the most effective energy use year-round. REGISTERED DEPUTY BUILDING INSPECTOR 1986 – 1999 City of Los Angeles  Licensed by the City of Los Angeles Department of Building and Safety. Obtained and held all Deputy Inspection licenses for structural inspection: Masonry, Concrete, Welding, Shot-crete, Post-tension Concrete, Spray-applied Fire Proofing, Epoxy Injection, and Drilled-in- Anchor inspection. DSA Experience  2016-Present: #03-116835: El Rodeo Make Ready Project. Construction of Temporary Stairs at Bldg. E, Temp. ADA Egress Ramp, Permanent Reinforced Concrete ADA Switchback ramp and retaining walls. Also includes guardrail systems and emergency egress system installations. This project is in preparation for the $54 million dollar Modernization of the entire historical campus. Cost to date: $600 Thousand.  2016-Present: #03-117054: Beverly Vista Structural Deck Repair and Waterproofing System. Beverly Hills Unified School District. Original scope to replace topping slab was modified by CCD 02, whereat the structural deck revealed cracking and rebar without proper cover. The required re-design of topping being slab dowelled to the existing structural slab and steel beams. Cost to date: $1.1Million  2016-Present: #03-116822: Beverly Vista Athletic Field Expansion. Beverly Hills Unified School District. SVA Architects. Alterations to and replacement and expansion of Existing Artificial Turf Athletic Fields.. Included ADA upgrades to meet current code requirements. Also included misc. site improvements, underground utilities and seal coat /striping over (E) playground asphalt paving. Cost to date: $1.2 million.  2015-Present: #03-116462: El Rodeo K-8 Portable Cottages. Beverly Hills Unified School District. HMC Architects. This interim housing project scope is to prepare a portion of the existing site, install new utilities and place 40 Relocatable Buildings to be used as an interim campus while the school undergoes a complete seismic upgrade and modernization. Cost to date: $3.1Milion  2015-Present: #03-116426: Beverly Hills HS Interim Housing Project. Beverly Hills Unified School District. DLR Architects. This interim housing project scope is to prepare a portion of the existing site, install new utilities and place 46 Relocatable Buildings to be used as an interim campus while the school undergoes a complete seismic upgrade and modernization. Cost to date: $5.5Million.
  • 4.
     2013-2015: #03-114964:Rancho Campana High School and Performing Arts Project. Oxnard High School Unified School District. HMC Architects. Provided Constructability services of the completed DSA Construction Documents prior to construction. Then served as DSA Coordinator/Sr. Project Superintendent for the actual construction of the campus. Project Scope included overseeing construction of 7-classroom buildings, 1-Central Kitchen,1- 780 seat, multistory Performing Arts Theater Building and 2- new public streets, complete with Cal-trans culvert drainage infrastructure, SCE lighting and new main Electrical services. $58 Million  2010 – 2013: #03-112713, #03-112714,: Agoura High School and Calabasas High School Performing Arts Education Centers. Las Virgenes USD. John Sergio Fisher &Associates. These World- Class Performing Arts Centers were started simultaneously and constructed on parallel construction schedules. Served as Senior Project Manager and District Program Manager Representative for Team Concept Development Services, the Owner’s Authorized Representative for these projects. Provided pre-construction constructability reviews, complete oversight for all contract deliverables, scheduling, and documentation. Also provided management of the Division of State Architect project administration process for State Project Certification, and LEED Administration coordination for the Project. Project Cost: $37 Million  2008 – 2010: #111521 Lindero Canyon Middle School Renovation. Las Virgenes USD. WLC Architects. Demolition of 40% of existing campus buildings to make way for construction of new 2-story campus buildings, existing building alterations and complete renovation of the entire site utility infrastructure with Team Concept Development Services Construction Program Manager for the Las Virgenes Unified School District. Performed complete constructability review, project management assistance, and officially assigned as the Division of State Architect Approved Class 1 Project Inspector for the project. Project Cost: $29 Million.  2007-2008: #03-110279: Agoura High School 2-story Modular classrooms and site utility installation. Las Virgenes USD. DC Architects. Performed complete constructability review, project management assistance, and officially assigned as the Division of State Architect Approved Class 1 Project Inspector for the project. Project Cost: $4.5 Million.  2005 – 2007: # 03-106005: Yerba Buena Elementary School New Campus buildings, site utility infrastructure and prestressed concrete bridge structure per Cal-trans HS 20-44 specifications. Las Virgenes USD. WLC Architects. Provided a complete constructability review, project management assistance, and officially assigned as the Division of State Architect Approved Class 1 Project Inspector for the project. Project Cost: $21 Million.  2004 – 2005: #03-104716: A.C. Stelle Middle School. New campus construction. Las Virgenes Unified School District. DSA Approved Class 1 Project Inspector for final F/L/S, Access and administrated the “Close of Project”. Project Cost: $27 Million.
  • 5.
    Private Sector Experience  2002– 2004: #03-105324: Sumac Elementary School New Multipurpose Bldg. And Main Campus Remodel. Las Virgenes Unified School District. ONXY Architects. DSA Approved Class 1 Project Inspector and District Construction Dept. Representative. Project Cost: $4.8 Million  2000 – 2001: #03-104970: Sumac Elementary School Site Utilities and Relocatable Classrooms. ONYX Architects. Las Virgenes Unified School District. DSA Approved Project Inspector. Project Cost: $ 800,000.00  2000 – 2001:#03-104951: Lupin Hill Elementary School Main Building Remodel and Modernization. Las Virgenes Unified School District. Grist Associates Architects. DSA Approved Project Inspector and District Construction Dept. Field Representative. Project Cost: $2.8 Million.  1999 – 2000: #03-101924: White Oak Elementary School New Multipurpose Building and Admin. Bldg. Modernization. Las Virgenes USD. Leidenfrost-Horowitz Architects. DSA Approved Assistant Project Inspector and DSA Approved Masonry Inspector. Project Cost: $2.7 Million  1999-2000: #03-101353: Chaparral Elementary School, A.E.Wright Middle School and #03-101597: Agoura High School Modernizations. Las Virgenes Unified School District. DSA Approved Assistant Project Inspector and DSA Approved Masonry Inspector. Project Cost: $2.9 Million.  1998 – 1999: Los Angeles County Assessor’s Office Building. Approved Registered Deputy Building Inspector for all structural inspections and testing: Reinforced Concrete, Structural Masonry, Structural Welding and Bolting, Spray-Applied Fire Proofing.  1996 – 1998: Northridge Mall North Wing Expansion. Approved Resident Registered Deputy Building Inspector and “City Liaison” to the City of Los Angeles Department of Building and Safety Principal and Senior Building Inspectors. Performed all structural inspections in all disciplines, and supervised additional Deputy Inspectors during the prosecution of their inspections.  1995 – 1996: Department of Parks and Recreations Downey Park Pool Facility and Gymnasium. Registered Deputy Building Inspector assigned to inspect all Reinforced Masonry and Epoxy/Mechanical Anchors.  1994 – 1995: Northridge Mall Earthquake Reconstruction Project. Approved as the Resident Lead Registered Deputy Building Inspector and “City Liaison” to the City of Los Angeles Department of Building and Safety Principal and Senior Building Inspectors, and City Council Members. Performed structural inspections in all disciplines, and supervised the team of Deputy Inspectors during the prosecution of their inspections. Current Accreditations Division of State Architect Class 1 Project Inspector National Electrical Code Certification and Inspection Training.
  • 6.
    Accreditation History Division of StateArchitect Masonry Inspector, I.C.C. Certifications in Structural Steel Welding/ High-strength Bolting, Reinforced and Post- Tensioned Concrete, Reinforced Masonry, Pneumatically placed concrete, Spray-applied Fire Proofing systems. References W.T. Liu, Division of State Architect District Structural Engineer: (213) 897-0388 *Additional References and Letters of Recommendation upon request.