1
SCHOOL OF ARCHITECTURE, BUILDING AND
DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
Management Science (MGT 60203)
Lecturer: Ms. Tay Shir Men
GROUP MEMBERS
Name Student ID
Calvin Wong Kim Ming 0323642
Chiang Lin Chew 0322923
Ong Chia Hong 0318458
Table of Content
2
No. Content Page(s)
1.0 Task 1
1. Company Background
2. Vision Statement
3. Mission Statement
4. Our Goal
-Long Term Goals
-Mid Term Goals
-Short Term Goals
5. Organization Chart of MTL Construction
Sdn. Bhd.
6. Job Responsibilities for Each Position Job
3-9
2.0 Task 2
1. Management Trainees Recruitment
2. Interview Activities
3. Interview Questions
4. Development Plan
10-15
3.0 Task 3
1. Definition of Information Management
and Information Technology
2. Cloud Computing
3. Building Information Modeling (BIM)
16-18
4.0 References 19
Task 1
3
1.0 Company Background
MTL Construction Sdn. Bhd. is a construction company set up in year 2017 by 3
members who are Calvin Wong Kim Ming, Chiang Lin Chew and Ong Chia Hong that who
are experienced in construction industry for over 10 years. MTL Construction Sdn. Bhd. is a
construction company that we start up with RM1 million as capital.
MTL Construction Sdn. Bhd. is a construction company expertise in industrialized
building system. It was founded upon the passion to deliver our clients’ aspiration on their
project. As a company specialize industrialized building system, MTL’s brand and reputation
are built on our delivery, expertise in IBS. With our expertise and experience we are able to
tailor fully-integrated and cost-effective solutions for our clients, delivering effective design
and build services.
MTL Construction Sdn. Bhd. has a total number 20 full time staffs in offices and over
120 employees on the site. Driven by our vision of Striving for Excellence in areas of our
expertise and powered by a brunch of experienced and dynamic team, MTL soars even higher
in the years to come.
2.0 VISION STATEMENT
4
A vision statement defines the optimal desired future state the mental picture of
what an organization wants to achieve over and provides guidance and
inspiration as to what an organization is focused on achieving in five, ten, or
more years.
“Striving for Excellence in areas of our expertise.”
Vision is the ultimate goal of an organization. We continue a commitment to
excellence by striving for quality in every project regardless of size, budget or
timeline. As we aim to be one of the top construction company in Malaysia, our
services will expand to provide the best services to our clients.
3.0 MISSION STATEMENT
Mission statements are statements that defines plans and directions to achieve
the vision. Mission statement may consist of one or more statements. A good
mission statement provides answer to reasons behind the existence of a
company and what the company wants to achieve in a shorter period of time as
compared to a vision. It is a statement that expresses how an organization
achieve the vision, which is the ultimate goal of the organization.
1. To achieve ISO (International Standard Operation) company.
2. We convey a dynamic team with an ongoing passion to deliver high
quality and outstanding of work on time within budget on client’s total
satisfaction.
3. Producequality employees with high work and ethnic values.
4. Commit to safety. MTL Construction Sdn. Bhd. requires that all practical
efforts be taken to provide a work environment that is free from
recognized safety and health hazards.
4.0 OUR GOALS
LONG TERM GOALS
1. To be one of the top competitive company in the construction industry
5
2. To develop a reputation of top quality service
3. To become top employer in Malaysia
MIDTERM GOALS
1. To be certified as ISO (International Standard Operation) company
2. To be recognize in the construction industry
SHORT TERM GOALS
1. Introduce and increase the use of IBS ( Industrialized Building System) in
construction industry
2. Make sure all employees achieve the basics of quality, experience
positive attitudes, flexibility, transparency and timeliness
3. To strategically grow in revenue at a rate of 19% per year
4. To achieve safety and quality consciousnessin every project.
5.0 ORGANISATION CHART
6
6.0 JOB RESPONSIBILITIES FOR EACH POSITION
Managing Director
1. Secure project opportunities
2. Maintain and improve public relations
Managing
director
Accounta
nt
Project
Manage
r
Human
Resource
Project
Engineer
Quantity
Surveyor
Site
Supervisor/
Foreman
Assista
nt
Quantit
C & S
Engine
er
M & E
Engine
er
7
3. Coordinates and correspond with developers or clients
4. Manages the organization and staffs
5. Provides assistance to staff
Project Manager
1. Monitor all running projects of the company
2. Organize project team and assign responsibilities to his supporting
managers or personnel for the performance of works and verification
activities
3. Documentation of records of all running projects
4. Coordinate and correspond with client-appointed consultants Coordinate
with project engineer and quantity surveyor of the organization Report
updates to managing director
5. Establish and controlthe overall project budget
6. Conducttechnical and contractual reviews to ensure that the works is
being executed in accordancewith contract document
7. Review periodically the performance of the works and subcontractor
Accountant
1. Monitor and controlover financial issues of the organization
2. Control expenses and budget of the company
3. Authorize holding and releasing of money of the organization
4. Prepares asset, liability, and capital account entries by compiling and
analyzing account information.
5. Maintains accounting controls by preparing and recommending policies
and procedures
6. Maintains customer confidence and protects operations by keeping
financial information confidential
7. Secures financial information by completing database backups
Human Resource
1. Recruit and manage employees
2. Manages payroll of staffs
3. Obtain work permit and medical insurance of labor
4. Ensure sufficient manpower of the organization
5. Maintains the work structure by updating job requirements and job
descriptions for all positions
8
6. Maintains management guidelines by preparing, updating, and
recommending human resource policies and procedures
7. Maintains historical human resource records by designing a filing and
retrieval system, keeping past and current records
8. Maintains human resource staff by recruiting, selecting, orienting, and
training employees
9. Maintains human resource staff job results by counselling and
disciplining employees, planning, monitoring, and appraising job results.
Project Engineer
1. Solves technical issues on site
2. Refers to project manager for Architect Instructions (AI) and -Engineer
3. Instructions (EI)
4. Correspond to technical issues
5. Monitor work progress on technical constructions
C&S Engineer (Civil and Structural Engineer)
1. Monitors civil and structural works
2. Resolves issues over civil and structural works
3. Correspond with project engineer
M&E Engineer (Mechanical and Electrical Engineer)
1. Monitors electrical conduit and piping work
2. Solves issues over mechanical and electrical work
3. Ensure laying of electrical conduit and pipes work are on time for
brickwork or concrete work
4. Correspond with project engineer
Quantity Surveyor
1. Calculate project costand prepare tender documents
2. Monitor total work progress
3. Submission of work progress to claim payment
4. Undertaking costanalysis for repair and maintenance project work
5. Assisting in establishing a client's requirements and undertaking
feasibility studies
6. Performing risk, value management and costcontrol
7. Advising on procurement strategy
9
Site Supervisor/ Foreman
1. Supervise work on site
2. Conductwork on site based on Architect Instructions (AI) and Engineer
3. Instructions (EI)
4. Distribution of work and labors
5. Reportand update project engineer and quantity surveyor
6. Quality Assurance (QA) and Quality Control(QC) of the structure
7. To ensure service and repair targets are met.
8. To ensure financial targets are met within own sphere of
responsibility,maintaining minimal stockof parts, authorizing orders up
to the prescribed limit
9. Foremen may have to give progress reports and tours to customers
10.To monitor work progress, and pursue as necessary
11.To ensure the efficient and effective use of staff, workshop facilities and
equipment
Task 2
1.0 Management Trainees Recruitment
As a start to our development plan for the company, MTL Construction Sdn.
Bhd. wishes to hire 3 different management trainees into the company.
1) Accountant
Responsibilities:-
1. Prepares asset, liability, and capital account entries by compiling and
analyzing account information.
2. Handle financial transactions within the company by entering account
10
information’s.
3. Summarizing current financial status.
4. Suggests ways to reduce cost, increasing company revenue and profit.
5. Preparing balance sheet, profit and loss statement, and other reports.
6. Suggesting company policies regarding the company’s accounts.
7. Maintaining financial security of the company.
8. Prepares payments by verifying documentation, and requesting
disbursements.
Requirement:-
1. Must have a qualification of diploma/degree in account/finance
management or higher.
2. Have at least 2-3 years working experiences in relevant field.
3. Able to use Microsoft software or any other useful accounting software.
4. Able to speak English, Chinese and Malay fluently.
2) Site Supervisor
Responsibilities:-
1. Supervise and monitor the employees working on site.
2. Manages subcontractors bylocating, evaluating, and selecting
subcontractors
3. Fully capable of meeting construction budget by monitoring project
expenditures; identifying variances; implementing corrective actions;
providing non-project annual operating and capital budget information.
4. Supervise the progress of the site according to the schedule.
5. Meets operational standards by contributing construction information to
strategic plans and reviews; implementing production, productivity,
quality, and customer-service standards;resolving problems on site.
11
6. Able to suggest improvements to the construction management systems.
7. Accomplishes construction project results by defining project purpose
and scope;calculating resources required; establishing standards and
protocols.
Requirement:-
1. Must have a qualification of diploma in building/ degree in construction
management or higher.
2. At least have 2-4 years working experiences in relevant industry field.
3. Experienced in Structural and building M&E works.
4. Capable of reading architectural drawings
5. Able to distribute manpower and resources wisely.
6. Good leadership and communication skills and can work independently.
7. Able to speak English, Chinese and Malay fluently.
3) Project Engineer
Responsibilities:-
1. Develop project objectives by reviewing project proposals and plans;
conferring with management.
2. Deciding on project responsibilities by identifying project phases and
elements.
3. Determines project specifications by studying productdesign, customer
requirements, and performance standards; completing technical studies;
preparing costestimates.
4. Confirms productperformance by designing and conducting tests.
5. Determines project schedule by studying project plan and specifications;
calculating time requirements; sequencing project elements.
6. Controls project plan by reviewing design, specifications, and plan and
schedule changes.
12
7. Prepares project status reports by collecting, analysing, and summarizing
information and trends.
Requirement:-
1. Must have a qualification of diploma/ degree or higher in project
management or civil/mechanical engineering.
2. At least have 3-5 years working experiences in relevant industry field.
3. Capable of using engineering software eg. CAD
4. Familiar in the manufacturing methods and procedures.
5. Good documentation and design skills.
6. Good leadership and communication skills and can work independently.
7. Able to speak English, Chinese and Malay fluently.
2.0 INTERVIEW ACTIVITIES
Practical Tasks
This assessment will test how the candidates will make critical decision in a
group when given a task to solve. The task may or may not be related to the job
description. As a group, each member will work together to figure out a solution
to the task given. It involves each member participating in the discussionby
contributing to their own opinions. This activity is to determine each member’s
ability to communicate and work as a team. Furthermore, this assessmentalso
assesses creative potential of the interviewees.
Case Studies
In this group interview task, each group would receive a brief based on a
scenario which the interviewees would face as an employee for the company.
13
The brief will outline certain problems for the interviewees to solve as a team.
This activity discerns the analytic, creativity and problem-solving skills of the
members. As such, it can also assess their attention to details and time
management skills. Furthermore, it reviews the confidence of the candidates to
be able to defend and justify their respective answers.
Face to face interview
Face to face interviews are oldest and most reliable way of collecting data on
the interviewees. It allows an interviewer to directly communicate with the
respondent in accordancewith the prepared questionnaire. This enables
interviewer to acquire factual information, attitude, preferences and other
information during the conversation with the respondent.
3.0 INTERVIEW QUESTIONS
I. PERSONALQUESTIONS
Purpose:To have a rough impression on the personbeing interviewed.
Sample:
1. Tell me about yourself.
2. Describe your current or most recent position.
3. What is your reason for leaving your current position?
4. How long have you been looking for a new job?
5. How did you prepare for this interview?
II. MATURITY AND JUDGEMENT
Purpose:To determine an individual’s maturity level and ability to render
rational judgements.
Sample:
1. What is the most important decision you have made recently?
2. If you were to start a career over, what would you do differently?
3. If you were given a bribe to overlook an issue, would you do it and why?
14
4. Are you willing to work outside of your comfort zone?
III. RESPONSIBILITY
Purpose:To determine an applicant’s willingness to acceptresponsibility and to
be accountable for his or her actions that they have taken.
Sample:
1. Describe a project or assignment which you were required to complete
from start to finish.
2. What were your responsibilities in your last job?
IV. RELATIONSHIPS
Purpose:To determine whether the applicant has the mean of working with
other people.
Sample:
1. When you have entered a new workplace in the past, describe how you
have gone about meeting and developing relationships with your new co-
workers, supervisors, and reporting staff.
2. What kinds of people you have difficulty working with?
3. Describe a conflict you were involved in at work. How did you resolve
the conflict? What happened next with that co-worker or team?
V. SELF AWARENESS AND DEVELOPMENT
Purpose:To ascertain whether the interviewee is self-aware and whether they
strive to improve themselves.
Sample:
1. What are your strength and weakness?
2. What personal goal you have set for yourself?
3. Describe your personal and professionalgrowth throughout the jobs or
roles you have up taken.
4. Where do you see yourself in 5 years?
3.0 DevelopmentPlan
Performance-BasedEmployee DevelopmentPlan
A performance-based employee development plan uses the annual
15
performance appraisal of an employee to review their previous
accomplishments, capabilities in order to establish goals for the next
upcoming year. These goals can be company related such as increasing
productivity, or personal goals that are designed to improve an employee’s
skills or education. An example would be, when a department manager
instructs their employee to complete an education classes based on their
skill within the next 6 months. As a result, that goal can improve the
employee’s skills to prepare him or her for future roles within the company.
Another way to constructa goal from the performance-based employee
development plan is to build upon the skills the employee already has to
challenge him to improve for the next step in his career.
Task 3
1.0 Definition of Information Management and Information
Technology
Information, in today’s world, consists of both electronic and physical
information. Information management (IM) is the collection and management of
information from one or more sources and the distribution of that information to
one or more audiences where an organization has control over the structure,
processing and delivery of information. On the other hand, Information
technology is defined as a set of methodologies, tools and processes that are
associated with equipment that are meant to collect, process and present
information.
2.0Cloud Computing
Definition:-
Cloud computing or simply known as “The Cloud” is a type of computing that
relies on sharing computer resources instead of traditionally having local servers
or personal devices to handle delivering on-demand computing resources. The
cloud is comprised of different services such as servers, storage and application
that are delivered to an individual or an organization’s computer via the
internet.
Benefits to the company
16
The benefits of cloud computing to our company are that it greatly increases the
efficiency and speed of collaboration within the company. This is because we
can now instantly share any ongoing projects that multiple people collaborating
on thus increasing the employee’s productivity drastically. An example would
be if there were ongoing overseas project, our employee’s station in the other
country could upload the ongoing progress of the project of to the cloud so that
the relevant employee’s working on it could quickly be updated. As a result,
this could reduce the amount of time needed to complete the project and also
provide our employees with a more flexible work practice as an employee can
also continue their projects at home or anywhere else. Another reason is that it
could help reduce the need of an in-house server to store all the company’s data.
This can help us reduce the costof maintaining a server or even eliminating the
need of a server as all the data would be stored in the cloud. By paying a small
monthly subscription fee to a cloud storage service we can eliminate the costof
maintaining a server for the company. By using cloud storage, we can also
guarantee the safety of our data as there is little to no chance of the cloud
system shutting down or breaking down and losing all of our data.
3.0Building Information Modelling (BIM)
There are a variety of information and information management systems in the
market and we had chosen Building Information Modeling (BIM) as our
primary information management system. Building Information Modeling
(BIM) is an intelligent 5D model - based process that gives architecture,
engineering, and construction (AEC) professionals the insight and tools to more
efficiently plan, design, construct, and manage buildings and infrastructure.
BIM is information modelling and information management in a team
environment, all the team members should be working to the same standards as
one another. BIM is a technology that everyone can understand a building
through the use of a digital model which draws on a range of data assembled
collaboratively, before during and after construction. BIM technology supports
architects throughout the design process.It gains more insight earlier in the
process to optimize designs for clients’ requirements.The reason why our
company chooseto use BIM on our organization because it helps to
improve the understanding of building operation and to make adaptations,
renovations, additions and alterations to the building faster and less costthan
17
through traditional processes.By using BIM in our organization, it creates
efficiencies and it helps to reduce the need for regathering and reformatting
information. This may help to increase in the speed and accuracy of transmitted
information, reduction of costs associated with a lack of interoperability,
automation of checking and analysis and unprecedented supportof operation
and maintenance activities and also making changes in the field. This result that
we get to become more proficient, the opportunities to improve productivity are
more pronounced. Productivity gain is one of the major advantages of using
BIM, it will gain through its ability to minimize project, foster communication
and coordination, identify errors early, reduce costand also improve quality of
work. BIM give a collaborative working platform which is what Modern
Method of Construction (MMC) hinges upon. This all has conceivably wide-
achieving suggestions for the reception of offsite advancements. The outline can
be finalized more comprehensively and prior, decreasing and eliminating the
requirement for sudden changes amid development. At the point when this
becomes routine, the loss from adaptability customarily viewed as a noteworthy
issue with the offsite technique is no more drawn as an issue. In addition, using
standardized formats and single integrated displaying process empowers much
more noteworthy coordination of programming, outlining, and specifying the
construction process.
18
References
1) Bayyari, M. (2017). List of BIM Software & Providers. The BIM Hub.
Retrieved 3 July 2017, from https://thebimhub.com/2015/08/17/list-ofbim-
software-providers/#.WV1CF4SGPIU
2) How do I construct an employee development plan? | Monster.co.uk.
(2017). Monster Hiring Resource Center. Retrieved 29 June 2017, from
https://hiring.monster.co.uk/hr/hr-best-practices/workforcemanagement/
employee-performance-management/how-do-i-constructan-
employee-development-plan.aspx
3) Staff, I. (2017). 5 Steps to Creating Employee Development Plans That
Work. Insperity. Retrieved 1 July 2017, from
http://www.insperity.com/blog/5-steps-to-creating-employeedevelopment-
plans-that-truly-work/
4) Use These Interview Questions About Interpersonal Skills to Assess
Applicants. (2017). The Balance. Retrieved 3 July 2017, from
https://www.thebalance.com/interpersonal-skills-interview-questions-
1919383
5) What Is BIM | Building Information Modeling | Autodesk.
(2017). Autodesk.com. Retrieved 3 July 2017, from
https://www.autodesk.com/solutions/bim
19

Management science

  • 1.
    1 SCHOOL OF ARCHITECTURE,BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) Management Science (MGT 60203) Lecturer: Ms. Tay Shir Men GROUP MEMBERS Name Student ID Calvin Wong Kim Ming 0323642 Chiang Lin Chew 0322923 Ong Chia Hong 0318458 Table of Content
  • 2.
    2 No. Content Page(s) 1.0Task 1 1. Company Background 2. Vision Statement 3. Mission Statement 4. Our Goal -Long Term Goals -Mid Term Goals -Short Term Goals 5. Organization Chart of MTL Construction Sdn. Bhd. 6. Job Responsibilities for Each Position Job 3-9 2.0 Task 2 1. Management Trainees Recruitment 2. Interview Activities 3. Interview Questions 4. Development Plan 10-15 3.0 Task 3 1. Definition of Information Management and Information Technology 2. Cloud Computing 3. Building Information Modeling (BIM) 16-18 4.0 References 19 Task 1
  • 3.
    3 1.0 Company Background MTLConstruction Sdn. Bhd. is a construction company set up in year 2017 by 3 members who are Calvin Wong Kim Ming, Chiang Lin Chew and Ong Chia Hong that who are experienced in construction industry for over 10 years. MTL Construction Sdn. Bhd. is a construction company that we start up with RM1 million as capital. MTL Construction Sdn. Bhd. is a construction company expertise in industrialized building system. It was founded upon the passion to deliver our clients’ aspiration on their project. As a company specialize industrialized building system, MTL’s brand and reputation are built on our delivery, expertise in IBS. With our expertise and experience we are able to tailor fully-integrated and cost-effective solutions for our clients, delivering effective design and build services. MTL Construction Sdn. Bhd. has a total number 20 full time staffs in offices and over 120 employees on the site. Driven by our vision of Striving for Excellence in areas of our expertise and powered by a brunch of experienced and dynamic team, MTL soars even higher in the years to come. 2.0 VISION STATEMENT
  • 4.
    4 A vision statementdefines the optimal desired future state the mental picture of what an organization wants to achieve over and provides guidance and inspiration as to what an organization is focused on achieving in five, ten, or more years. “Striving for Excellence in areas of our expertise.” Vision is the ultimate goal of an organization. We continue a commitment to excellence by striving for quality in every project regardless of size, budget or timeline. As we aim to be one of the top construction company in Malaysia, our services will expand to provide the best services to our clients. 3.0 MISSION STATEMENT Mission statements are statements that defines plans and directions to achieve the vision. Mission statement may consist of one or more statements. A good mission statement provides answer to reasons behind the existence of a company and what the company wants to achieve in a shorter period of time as compared to a vision. It is a statement that expresses how an organization achieve the vision, which is the ultimate goal of the organization. 1. To achieve ISO (International Standard Operation) company. 2. We convey a dynamic team with an ongoing passion to deliver high quality and outstanding of work on time within budget on client’s total satisfaction. 3. Producequality employees with high work and ethnic values. 4. Commit to safety. MTL Construction Sdn. Bhd. requires that all practical efforts be taken to provide a work environment that is free from recognized safety and health hazards. 4.0 OUR GOALS LONG TERM GOALS 1. To be one of the top competitive company in the construction industry
  • 5.
    5 2. To developa reputation of top quality service 3. To become top employer in Malaysia MIDTERM GOALS 1. To be certified as ISO (International Standard Operation) company 2. To be recognize in the construction industry SHORT TERM GOALS 1. Introduce and increase the use of IBS ( Industrialized Building System) in construction industry 2. Make sure all employees achieve the basics of quality, experience positive attitudes, flexibility, transparency and timeliness 3. To strategically grow in revenue at a rate of 19% per year 4. To achieve safety and quality consciousnessin every project. 5.0 ORGANISATION CHART
  • 6.
    6 6.0 JOB RESPONSIBILITIESFOR EACH POSITION Managing Director 1. Secure project opportunities 2. Maintain and improve public relations Managing director Accounta nt Project Manage r Human Resource Project Engineer Quantity Surveyor Site Supervisor/ Foreman Assista nt Quantit C & S Engine er M & E Engine er
  • 7.
    7 3. Coordinates andcorrespond with developers or clients 4. Manages the organization and staffs 5. Provides assistance to staff Project Manager 1. Monitor all running projects of the company 2. Organize project team and assign responsibilities to his supporting managers or personnel for the performance of works and verification activities 3. Documentation of records of all running projects 4. Coordinate and correspond with client-appointed consultants Coordinate with project engineer and quantity surveyor of the organization Report updates to managing director 5. Establish and controlthe overall project budget 6. Conducttechnical and contractual reviews to ensure that the works is being executed in accordancewith contract document 7. Review periodically the performance of the works and subcontractor Accountant 1. Monitor and controlover financial issues of the organization 2. Control expenses and budget of the company 3. Authorize holding and releasing of money of the organization 4. Prepares asset, liability, and capital account entries by compiling and analyzing account information. 5. Maintains accounting controls by preparing and recommending policies and procedures 6. Maintains customer confidence and protects operations by keeping financial information confidential 7. Secures financial information by completing database backups Human Resource 1. Recruit and manage employees 2. Manages payroll of staffs 3. Obtain work permit and medical insurance of labor 4. Ensure sufficient manpower of the organization 5. Maintains the work structure by updating job requirements and job descriptions for all positions
  • 8.
    8 6. Maintains managementguidelines by preparing, updating, and recommending human resource policies and procedures 7. Maintains historical human resource records by designing a filing and retrieval system, keeping past and current records 8. Maintains human resource staff by recruiting, selecting, orienting, and training employees 9. Maintains human resource staff job results by counselling and disciplining employees, planning, monitoring, and appraising job results. Project Engineer 1. Solves technical issues on site 2. Refers to project manager for Architect Instructions (AI) and -Engineer 3. Instructions (EI) 4. Correspond to technical issues 5. Monitor work progress on technical constructions C&S Engineer (Civil and Structural Engineer) 1. Monitors civil and structural works 2. Resolves issues over civil and structural works 3. Correspond with project engineer M&E Engineer (Mechanical and Electrical Engineer) 1. Monitors electrical conduit and piping work 2. Solves issues over mechanical and electrical work 3. Ensure laying of electrical conduit and pipes work are on time for brickwork or concrete work 4. Correspond with project engineer Quantity Surveyor 1. Calculate project costand prepare tender documents 2. Monitor total work progress 3. Submission of work progress to claim payment 4. Undertaking costanalysis for repair and maintenance project work 5. Assisting in establishing a client's requirements and undertaking feasibility studies 6. Performing risk, value management and costcontrol 7. Advising on procurement strategy
  • 9.
    9 Site Supervisor/ Foreman 1.Supervise work on site 2. Conductwork on site based on Architect Instructions (AI) and Engineer 3. Instructions (EI) 4. Distribution of work and labors 5. Reportand update project engineer and quantity surveyor 6. Quality Assurance (QA) and Quality Control(QC) of the structure 7. To ensure service and repair targets are met. 8. To ensure financial targets are met within own sphere of responsibility,maintaining minimal stockof parts, authorizing orders up to the prescribed limit 9. Foremen may have to give progress reports and tours to customers 10.To monitor work progress, and pursue as necessary 11.To ensure the efficient and effective use of staff, workshop facilities and equipment Task 2 1.0 Management Trainees Recruitment As a start to our development plan for the company, MTL Construction Sdn. Bhd. wishes to hire 3 different management trainees into the company. 1) Accountant Responsibilities:- 1. Prepares asset, liability, and capital account entries by compiling and analyzing account information. 2. Handle financial transactions within the company by entering account
  • 10.
    10 information’s. 3. Summarizing currentfinancial status. 4. Suggests ways to reduce cost, increasing company revenue and profit. 5. Preparing balance sheet, profit and loss statement, and other reports. 6. Suggesting company policies regarding the company’s accounts. 7. Maintaining financial security of the company. 8. Prepares payments by verifying documentation, and requesting disbursements. Requirement:- 1. Must have a qualification of diploma/degree in account/finance management or higher. 2. Have at least 2-3 years working experiences in relevant field. 3. Able to use Microsoft software or any other useful accounting software. 4. Able to speak English, Chinese and Malay fluently. 2) Site Supervisor Responsibilities:- 1. Supervise and monitor the employees working on site. 2. Manages subcontractors bylocating, evaluating, and selecting subcontractors 3. Fully capable of meeting construction budget by monitoring project expenditures; identifying variances; implementing corrective actions; providing non-project annual operating and capital budget information. 4. Supervise the progress of the site according to the schedule. 5. Meets operational standards by contributing construction information to strategic plans and reviews; implementing production, productivity, quality, and customer-service standards;resolving problems on site.
  • 11.
    11 6. Able tosuggest improvements to the construction management systems. 7. Accomplishes construction project results by defining project purpose and scope;calculating resources required; establishing standards and protocols. Requirement:- 1. Must have a qualification of diploma in building/ degree in construction management or higher. 2. At least have 2-4 years working experiences in relevant industry field. 3. Experienced in Structural and building M&E works. 4. Capable of reading architectural drawings 5. Able to distribute manpower and resources wisely. 6. Good leadership and communication skills and can work independently. 7. Able to speak English, Chinese and Malay fluently. 3) Project Engineer Responsibilities:- 1. Develop project objectives by reviewing project proposals and plans; conferring with management. 2. Deciding on project responsibilities by identifying project phases and elements. 3. Determines project specifications by studying productdesign, customer requirements, and performance standards; completing technical studies; preparing costestimates. 4. Confirms productperformance by designing and conducting tests. 5. Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements. 6. Controls project plan by reviewing design, specifications, and plan and schedule changes.
  • 12.
    12 7. Prepares projectstatus reports by collecting, analysing, and summarizing information and trends. Requirement:- 1. Must have a qualification of diploma/ degree or higher in project management or civil/mechanical engineering. 2. At least have 3-5 years working experiences in relevant industry field. 3. Capable of using engineering software eg. CAD 4. Familiar in the manufacturing methods and procedures. 5. Good documentation and design skills. 6. Good leadership and communication skills and can work independently. 7. Able to speak English, Chinese and Malay fluently. 2.0 INTERVIEW ACTIVITIES Practical Tasks This assessment will test how the candidates will make critical decision in a group when given a task to solve. The task may or may not be related to the job description. As a group, each member will work together to figure out a solution to the task given. It involves each member participating in the discussionby contributing to their own opinions. This activity is to determine each member’s ability to communicate and work as a team. Furthermore, this assessmentalso assesses creative potential of the interviewees. Case Studies In this group interview task, each group would receive a brief based on a scenario which the interviewees would face as an employee for the company.
  • 13.
    13 The brief willoutline certain problems for the interviewees to solve as a team. This activity discerns the analytic, creativity and problem-solving skills of the members. As such, it can also assess their attention to details and time management skills. Furthermore, it reviews the confidence of the candidates to be able to defend and justify their respective answers. Face to face interview Face to face interviews are oldest and most reliable way of collecting data on the interviewees. It allows an interviewer to directly communicate with the respondent in accordancewith the prepared questionnaire. This enables interviewer to acquire factual information, attitude, preferences and other information during the conversation with the respondent. 3.0 INTERVIEW QUESTIONS I. PERSONALQUESTIONS Purpose:To have a rough impression on the personbeing interviewed. Sample: 1. Tell me about yourself. 2. Describe your current or most recent position. 3. What is your reason for leaving your current position? 4. How long have you been looking for a new job? 5. How did you prepare for this interview? II. MATURITY AND JUDGEMENT Purpose:To determine an individual’s maturity level and ability to render rational judgements. Sample: 1. What is the most important decision you have made recently? 2. If you were to start a career over, what would you do differently? 3. If you were given a bribe to overlook an issue, would you do it and why?
  • 14.
    14 4. Are youwilling to work outside of your comfort zone? III. RESPONSIBILITY Purpose:To determine an applicant’s willingness to acceptresponsibility and to be accountable for his or her actions that they have taken. Sample: 1. Describe a project or assignment which you were required to complete from start to finish. 2. What were your responsibilities in your last job? IV. RELATIONSHIPS Purpose:To determine whether the applicant has the mean of working with other people. Sample: 1. When you have entered a new workplace in the past, describe how you have gone about meeting and developing relationships with your new co- workers, supervisors, and reporting staff. 2. What kinds of people you have difficulty working with? 3. Describe a conflict you were involved in at work. How did you resolve the conflict? What happened next with that co-worker or team? V. SELF AWARENESS AND DEVELOPMENT Purpose:To ascertain whether the interviewee is self-aware and whether they strive to improve themselves. Sample: 1. What are your strength and weakness? 2. What personal goal you have set for yourself? 3. Describe your personal and professionalgrowth throughout the jobs or roles you have up taken. 4. Where do you see yourself in 5 years? 3.0 DevelopmentPlan Performance-BasedEmployee DevelopmentPlan A performance-based employee development plan uses the annual
  • 15.
    15 performance appraisal ofan employee to review their previous accomplishments, capabilities in order to establish goals for the next upcoming year. These goals can be company related such as increasing productivity, or personal goals that are designed to improve an employee’s skills or education. An example would be, when a department manager instructs their employee to complete an education classes based on their skill within the next 6 months. As a result, that goal can improve the employee’s skills to prepare him or her for future roles within the company. Another way to constructa goal from the performance-based employee development plan is to build upon the skills the employee already has to challenge him to improve for the next step in his career. Task 3 1.0 Definition of Information Management and Information Technology Information, in today’s world, consists of both electronic and physical information. Information management (IM) is the collection and management of information from one or more sources and the distribution of that information to one or more audiences where an organization has control over the structure, processing and delivery of information. On the other hand, Information technology is defined as a set of methodologies, tools and processes that are associated with equipment that are meant to collect, process and present information. 2.0Cloud Computing Definition:- Cloud computing or simply known as “The Cloud” is a type of computing that relies on sharing computer resources instead of traditionally having local servers or personal devices to handle delivering on-demand computing resources. The cloud is comprised of different services such as servers, storage and application that are delivered to an individual or an organization’s computer via the internet. Benefits to the company
  • 16.
    16 The benefits ofcloud computing to our company are that it greatly increases the efficiency and speed of collaboration within the company. This is because we can now instantly share any ongoing projects that multiple people collaborating on thus increasing the employee’s productivity drastically. An example would be if there were ongoing overseas project, our employee’s station in the other country could upload the ongoing progress of the project of to the cloud so that the relevant employee’s working on it could quickly be updated. As a result, this could reduce the amount of time needed to complete the project and also provide our employees with a more flexible work practice as an employee can also continue their projects at home or anywhere else. Another reason is that it could help reduce the need of an in-house server to store all the company’s data. This can help us reduce the costof maintaining a server or even eliminating the need of a server as all the data would be stored in the cloud. By paying a small monthly subscription fee to a cloud storage service we can eliminate the costof maintaining a server for the company. By using cloud storage, we can also guarantee the safety of our data as there is little to no chance of the cloud system shutting down or breaking down and losing all of our data. 3.0Building Information Modelling (BIM) There are a variety of information and information management systems in the market and we had chosen Building Information Modeling (BIM) as our primary information management system. Building Information Modeling (BIM) is an intelligent 5D model - based process that gives architecture, engineering, and construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure. BIM is information modelling and information management in a team environment, all the team members should be working to the same standards as one another. BIM is a technology that everyone can understand a building through the use of a digital model which draws on a range of data assembled collaboratively, before during and after construction. BIM technology supports architects throughout the design process.It gains more insight earlier in the process to optimize designs for clients’ requirements.The reason why our company chooseto use BIM on our organization because it helps to improve the understanding of building operation and to make adaptations, renovations, additions and alterations to the building faster and less costthan
  • 17.
    17 through traditional processes.Byusing BIM in our organization, it creates efficiencies and it helps to reduce the need for regathering and reformatting information. This may help to increase in the speed and accuracy of transmitted information, reduction of costs associated with a lack of interoperability, automation of checking and analysis and unprecedented supportof operation and maintenance activities and also making changes in the field. This result that we get to become more proficient, the opportunities to improve productivity are more pronounced. Productivity gain is one of the major advantages of using BIM, it will gain through its ability to minimize project, foster communication and coordination, identify errors early, reduce costand also improve quality of work. BIM give a collaborative working platform which is what Modern Method of Construction (MMC) hinges upon. This all has conceivably wide- achieving suggestions for the reception of offsite advancements. The outline can be finalized more comprehensively and prior, decreasing and eliminating the requirement for sudden changes amid development. At the point when this becomes routine, the loss from adaptability customarily viewed as a noteworthy issue with the offsite technique is no more drawn as an issue. In addition, using standardized formats and single integrated displaying process empowers much more noteworthy coordination of programming, outlining, and specifying the construction process.
  • 18.
    18 References 1) Bayyari, M.(2017). List of BIM Software & Providers. The BIM Hub. Retrieved 3 July 2017, from https://thebimhub.com/2015/08/17/list-ofbim- software-providers/#.WV1CF4SGPIU 2) How do I construct an employee development plan? | Monster.co.uk. (2017). Monster Hiring Resource Center. Retrieved 29 June 2017, from https://hiring.monster.co.uk/hr/hr-best-practices/workforcemanagement/ employee-performance-management/how-do-i-constructan- employee-development-plan.aspx 3) Staff, I. (2017). 5 Steps to Creating Employee Development Plans That Work. Insperity. Retrieved 1 July 2017, from http://www.insperity.com/blog/5-steps-to-creating-employeedevelopment- plans-that-truly-work/ 4) Use These Interview Questions About Interpersonal Skills to Assess Applicants. (2017). The Balance. Retrieved 3 July 2017, from https://www.thebalance.com/interpersonal-skills-interview-questions- 1919383 5) What Is BIM | Building Information Modeling | Autodesk. (2017). Autodesk.com. Retrieved 3 July 2017, from https://www.autodesk.com/solutions/bim
  • 19.