Building Safety Act background
Grenfell Tower
A fire broke out at Grenfell Tower on 14th
June 2017. Tragically 72 people lost their
lives and a further 70 were injured.
© 2024 Association for Project Management 2
Following the fire, the Independent Review of Building Regulations and Fire
Safety was commissioned
The output from the review underlined the need for significant change in the
way buildings are regulated
Their recommendations formed the framework for the Building Safety Act,
which received Royal Assent on 28th April 2022.
What is the Building Safety Act?
The Building Safety Act
Is a very significant piece of legislation that
changes how buildings are constructed and
maintained in England. It affects all levels of
industry and looks to change the culture to
make people and organisations more
accountable, focussing on the functional
requirements of the building and building
safety, rather than cost and time
© 2024 Association for Project Management 3
• Applies to ALL buildings and includes additional requirements for High
Risk Buildings
• A High risk building is defined as at least 18 metres in height or at least 7
storeys and contains at least 2 residential units or is a hospital or care
home.
• The Act
• Creates the Building Safety Regulator, National regulator for construction products,
new homes ombudsman
• Defines new roles– Duty holders, Accountable persons/Principle Accountable
persons,
• Creates new systems/regulations- Building control, competence, gateways, golden
thread, mandatory and voluntary occurrence reporting
• Changes some existing legislation
Building Safety Regulator
The role of the Building Safety Regulator is
to :
Oversee the safety and performance of all
buildings, as well as having a special focus
on high risk buildings. It will promote
competence and organisational capability
within the sector and lead the enforcement
of the new regulatory framework
© 2024 Association for Project Management 4
• The Regulator has powers of enforcement under the Act and the ability to
prosecute offences committed under the Act, which carry a term of
imprisonment of up to two years, a fine, or both.
• Supported by a number of Committees set up under the Building Safety
Act, including the Industry Competence Committee
• Role of the Industry Competence Committee is to monitor industry
competence and facilitate its improvement, publish guidance on industry
competence and advice to the Building Safety Regulator and industry on
competence.
Competence
One of the areas highlighted in the Building
a Safer Future final report was that
competence across industry was patchy
and competence levels needed to be raised
and assured
© 2024 Association for Project Management 5
• Led to a focus on competence within the Building Safety Act
• It is a legal requirement for ALL individuals carrying out design, construction and
refurbishment work to be competent in their roles and not carry out work they are not
competent to do
• There is a legal requirement on anyone who appoints an individual or organisation to
ensure they are competent in their role
• .Organisations have a legal duty to ensure those employed by them are competent or
are supervised by someone who is competent
Competence Steering Group
Competence Steering Group
As part of the Industry Response to Grenfell,
the Competence Steering Group was
established to develop and improve
competence across the built environment
industry.
This was set up under CIC, the group has now
been renamed to the Industry Competence
Steering Group (ICSG) and is a standing
working group of the Industry Competence
Committee, a statutory committee of the
Building Safety Regulator
© 2024 Association for Project Management 6
• To support this work, 12 working groups were set up to develop
competence in the relevant professions
• WG1 – engineers
• WG2 – installers
• WG3 – Fire engineers
• WG4 – Fire risk assessors
• WG5 – Fire Safety enforcement officers
• WG6 – Building standards
• WG7 – Building designers
• WG8 – Building safety managers
• WG9 – Site supervisors
• WG10 – Project managers
• WG11 – Procurement professionals
• WG12 Construction Products
How do project managers demonstrate their competence?
© 2024 Association for Project Management 7
For those working on HRBs and complex projects
Dates Evidence for competence
October 2023-
September
2025
• competence can be demonstrated to the regulator via achieving
Chartered status with APM, RICS (PM pathway) or CIOB and
demonstrating relevant experience in the built environment.
September
2025 –
September
2027
• competence can be demonstrated to the regulator via achieving
certification against the competence framework for project managers in
the built environment in England via APM, CIOB or RICS or achieving
Chartered status with APM, RICS (PM pathway) or CIOB and
demonstrating relevant experience in the built environment
From
September
2027
• competence can be demonstrated to the regulator via achieving
certification against the framework for competence of project managers
in the built environment in England via APM, CIOB or RICS
Relevant experience is defined as: To ensure the project manager is competent in managing the scope, complexity and risk profile specific to HRBs, the project manager needs to demonstrate at
least 12 months experience of managing project(s) in an HRB environment; this experience could be supervised .
To ensure the project manager is competent in managing the scope, complexity and risk profile specific to complex projects, the project manager needs to demonstrate at least 12 months
experience of managing project(s) in a complex project environment; this experience could be supervised .

More Related Content

Similar to Discussing the new Competence Framework for project managers in the built environment webinar, 29 February 2024

An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копияLAZOVOY
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorLAZOVOY
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Evbex
 
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSTUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSProf Handley Mpoki Mafwenga
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Steelhenge
 
Infrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppInfrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppChhabiYadav2
 
The building consultancy booklet
The building consultancy bookletThe building consultancy booklet
The building consultancy bookletEdwin Leting
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Nimonik
 
investor Ready Energy Efficiency
investor Ready Energy Efficiency investor Ready Energy Efficiency
investor Ready Energy Efficiency Steven Fawkes
 
Ensure Your Commercial Builders Meet Key Safety and Compliance Standards
Ensure Your Commercial Builders Meet Key Safety and Compliance StandardsEnsure Your Commercial Builders Meet Key Safety and Compliance Standards
Ensure Your Commercial Builders Meet Key Safety and Compliance StandardsEtharcarter
 
Green Economy Presentation 2015
Green Economy Presentation 2015 Green Economy Presentation 2015
Green Economy Presentation 2015 Brian Bernal
 
Achieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdfAchieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdfPMIUKChapter
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 CourAbramMartino96
 
brochure template (Autosaved)
brochure template (Autosaved)brochure template (Autosaved)
brochure template (Autosaved)Russell Myers
 
Lecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfLecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfMairaNoor4
 

Similar to Discussing the new Competence Framework for project managers in the built environment webinar, 29 February 2024 (20)

An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копия
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sector
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021
 
Dawn Thompson
Dawn ThompsonDawn Thompson
Dawn Thompson
 
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSTUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
 
PPA.pptx
PPA.pptxPPA.pptx
PPA.pptx
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
 
Infrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppInfrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in ppp
 
The building consultancy booklet
The building consultancy bookletThe building consultancy booklet
The building consultancy booklet
 
Project Assurance at Sellafield Ltd, 17 May 2016
Project Assurance at Sellafield Ltd, 17 May 2016Project Assurance at Sellafield Ltd, 17 May 2016
Project Assurance at Sellafield Ltd, 17 May 2016
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
 
investor Ready Energy Efficiency
investor Ready Energy Efficiency investor Ready Energy Efficiency
investor Ready Energy Efficiency
 
Ensure Your Commercial Builders Meet Key Safety and Compliance Standards
Ensure Your Commercial Builders Meet Key Safety and Compliance StandardsEnsure Your Commercial Builders Meet Key Safety and Compliance Standards
Ensure Your Commercial Builders Meet Key Safety and Compliance Standards
 
Robert Wilson - CV 2015 A
Robert Wilson -  CV 2015 ARobert Wilson -  CV 2015 A
Robert Wilson - CV 2015 A
 
Green Economy Presentation 2015
Green Economy Presentation 2015 Green Economy Presentation 2015
Green Economy Presentation 2015
 
Achieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdfAchieving measurable performance improvement.pdf
Achieving measurable performance improvement.pdf
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
 
brochure template (Autosaved)
brochure template (Autosaved)brochure template (Autosaved)
brochure template (Autosaved)
 
Nps.Cv 2009
Nps.Cv 2009Nps.Cv 2009
Nps.Cv 2009
 
Lecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfLecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdf
 

More from Association for Project Management

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 

More from Association for Project Management (20)

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 
Sustainability in Project Management – what you need to know
Sustainability in Project Management – what you need to knowSustainability in Project Management – what you need to know
Sustainability in Project Management – what you need to know
 

Recently uploaded

Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 

Recently uploaded (20)

Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 

Discussing the new Competence Framework for project managers in the built environment webinar, 29 February 2024

  • 1. Background to the Building Safety Act and changes to competence requirements February 2024
  • 2. Building Safety Act background Grenfell Tower A fire broke out at Grenfell Tower on 14th June 2017. Tragically 72 people lost their lives and a further 70 were injured. © 2024 Association for Project Management 2 Following the fire, the Independent Review of Building Regulations and Fire Safety was commissioned The output from the review underlined the need for significant change in the way buildings are regulated Their recommendations formed the framework for the Building Safety Act, which received Royal Assent on 28th April 2022.
  • 3. What is the Building Safety Act? The Building Safety Act Is a very significant piece of legislation that changes how buildings are constructed and maintained in England. It affects all levels of industry and looks to change the culture to make people and organisations more accountable, focussing on the functional requirements of the building and building safety, rather than cost and time © 2024 Association for Project Management 3 • Applies to ALL buildings and includes additional requirements for High Risk Buildings • A High risk building is defined as at least 18 metres in height or at least 7 storeys and contains at least 2 residential units or is a hospital or care home. • The Act • Creates the Building Safety Regulator, National regulator for construction products, new homes ombudsman • Defines new roles– Duty holders, Accountable persons/Principle Accountable persons, • Creates new systems/regulations- Building control, competence, gateways, golden thread, mandatory and voluntary occurrence reporting • Changes some existing legislation
  • 4. Building Safety Regulator The role of the Building Safety Regulator is to : Oversee the safety and performance of all buildings, as well as having a special focus on high risk buildings. It will promote competence and organisational capability within the sector and lead the enforcement of the new regulatory framework © 2024 Association for Project Management 4 • The Regulator has powers of enforcement under the Act and the ability to prosecute offences committed under the Act, which carry a term of imprisonment of up to two years, a fine, or both. • Supported by a number of Committees set up under the Building Safety Act, including the Industry Competence Committee • Role of the Industry Competence Committee is to monitor industry competence and facilitate its improvement, publish guidance on industry competence and advice to the Building Safety Regulator and industry on competence.
  • 5. Competence One of the areas highlighted in the Building a Safer Future final report was that competence across industry was patchy and competence levels needed to be raised and assured © 2024 Association for Project Management 5 • Led to a focus on competence within the Building Safety Act • It is a legal requirement for ALL individuals carrying out design, construction and refurbishment work to be competent in their roles and not carry out work they are not competent to do • There is a legal requirement on anyone who appoints an individual or organisation to ensure they are competent in their role • .Organisations have a legal duty to ensure those employed by them are competent or are supervised by someone who is competent
  • 6. Competence Steering Group Competence Steering Group As part of the Industry Response to Grenfell, the Competence Steering Group was established to develop and improve competence across the built environment industry. This was set up under CIC, the group has now been renamed to the Industry Competence Steering Group (ICSG) and is a standing working group of the Industry Competence Committee, a statutory committee of the Building Safety Regulator © 2024 Association for Project Management 6 • To support this work, 12 working groups were set up to develop competence in the relevant professions • WG1 – engineers • WG2 – installers • WG3 – Fire engineers • WG4 – Fire risk assessors • WG5 – Fire Safety enforcement officers • WG6 – Building standards • WG7 – Building designers • WG8 – Building safety managers • WG9 – Site supervisors • WG10 – Project managers • WG11 – Procurement professionals • WG12 Construction Products
  • 7. How do project managers demonstrate their competence? © 2024 Association for Project Management 7 For those working on HRBs and complex projects Dates Evidence for competence October 2023- September 2025 • competence can be demonstrated to the regulator via achieving Chartered status with APM, RICS (PM pathway) or CIOB and demonstrating relevant experience in the built environment. September 2025 – September 2027 • competence can be demonstrated to the regulator via achieving certification against the competence framework for project managers in the built environment in England via APM, CIOB or RICS or achieving Chartered status with APM, RICS (PM pathway) or CIOB and demonstrating relevant experience in the built environment From September 2027 • competence can be demonstrated to the regulator via achieving certification against the framework for competence of project managers in the built environment in England via APM, CIOB or RICS Relevant experience is defined as: To ensure the project manager is competent in managing the scope, complexity and risk profile specific to HRBs, the project manager needs to demonstrate at least 12 months experience of managing project(s) in an HRB environment; this experience could be supervised . To ensure the project manager is competent in managing the scope, complexity and risk profile specific to complex projects, the project manager needs to demonstrate at least 12 months experience of managing project(s) in a complex project environment; this experience could be supervised .