Diploma 1st Sem.
CIVIL
Building construction
Unite -3
Construction :
Object created by constructing works, connected to ground,
performed from building products with common installations and
equipment, or integrated complex with facility or equipment as
well as technical - technological units or solo installations
connected to the ground. Or units connected to the ground but was
not made by construction works, if they change the purpose of the
land
Construction works :
Performing constructional and other works (preparation, land, and
structural, installation, finishing and mounting of construction
products, plant or equipment) with which new buildings are built,
existing buildings are reconstructed, removed or maintained.
Constructing/Building:Means the process of designing,
constructing, usage and removal of the construction (building),
everything that is related to the constructing of the new buildings
can be applied in an appropiate way to reconstructing, maintance
and removal of the old buildings.
Construction site :Is a place,land or buildings (including
other areas that are temporarily occupied ) needed to execute the
construction works or the application of appropriate building
technology and security, on which to build, reconstruct, remove or
perform maintenance work building
Basic information to be collected are the
following:
•technical-economic documentation of agreed work
•geographic and topographic conditions,
•meteorological and climatic conditions,
•geological and geotechnical conditions,
•hydrological conditions,
•ability to supply water, energy, etc.
•ability to supply material
•traffic, and conditions for delivery of materials, machinery, etc.
•opportunity for employment of labor force,
•property-legal relations,
•capacity of eventual subcontractors, suppliers, transportation
•companies,
•cost of resources to be used in the region in which to build, etc.
Site geography
• The exact geographical location of site,
• The nearest villages, centers of possible supply (construction
materials, handicraft workshops and repair shops, banks, post
offices, the building materials industry, quarries, gravel pits, desire.
stations, ports, airports, pumps for liquid fuels, etc.)
• Economic description of cities, towns and other centers that
gravitate future construction, as documentation and background
should submit: geographical maps and distances specified in relation
to the site.
• Configuration of site has a big influence on the organization of the
site, or the disposition of various plants, design and development of
access roads, the internal communication at the site, the interior
horizontal and vertical transport to the site and the whole works.
• Since the topography of ground depends on what will be applied to
the disposition of the site, which transport vehicles to use and how
much transportation will cost.
Geological and geotechnical conditions
• When performing work on the building below the ground surface
occurs some problems related to groundwater (groundwater
elevation, vibration levels at various time periods, the strength of
underground springs, etc.).
• Geological complex of ground, geomechanical and geotechnical
properties of soil layers on the basis of appropriate tests, and
geological sections, geological map of the area generally should
exist within the architectural- constructive phase of the project of
the building, but contractor has all these elements to check before
building.
• Determining the existence of groundwater, and their regime is of
great importance to the process of organizing works at zero cycle
facilities, as well as for predicting the equipment and installations
for water pumping, fencing construction pit, concreting under
water, etc., which has great importance for, among other things,
calculating and determining the cost of these works.
Meteorological and climatic conditions
Climatic conditions at the site are reflected in two ways:
• the creation of special conditions for life and work, or the
hygienic and technical conditions, and the impact on the
organization and the construction technique.
• The human activity, climate has a direct effect especially when
the works are carried out in the open. It has an impact on the
performance of workers and the effect of work generally.
Unfavorable climatic conditions create special, difficult living
and working conditions of workers on site and reflect on the state
of health, and should be anticipated and calculate all necessary
safeguards for the health and maintaining good working
condition of workers.
Meteorological and climatic conditions
• Climatic conditions are decisive for the annual fund of working
time, it is essential that information about climate and weather
conditions to be collected for a longer period of observation.
• Such information may be obtained from Hydro-Meteorological
Institute. data on rainfall and its distribution throughout the year,
with rainfall greater than 1 mm and 10 mm, as well as data on
relative humidity. on temperature, average annual, highest and
lowest, and the number of days with temperatures below 0 C or
lower than -5 C. information about the dominant winds, their
direction, intensity and duration. Strong winds can cause major
problems at work and in certain areas and to stop work
completely. Strong winds have an influence on the stability of the
scaffolding, formwork and roof, high pumps, etc.
Meteorological and climatic conditions
• Climatic conditions are decisive for the annual fund of working
time, it is essential that information about climate and weather
conditions to be collected for a longer period of observation.
• Such information may be obtained from Hydro-Meteorological
Institute. data on rainfall and its distribution throughout the year,
with rainfall greater than 1 mm and 10 mm, as well as data on
relative humidity. on temperature, average annual, highest and
lowest, and the number of days with temperatures below 0 C or
lower than -5 C. information about the dominant winds, their
direction, intensity and duration. Strong winds can cause major
problems at work and in certain areas and to stop work
completely. Strong winds have an influence on the stability of the
scaffolding, formwork and roof, high pumps, etc.
Site hydrology
• When it comes to the performance of buildings in the vicinity of
surface water, rivers, lakes, canals, must be familiar with the
water regime because it has a direct impact on the groundwater
regime.
• Based on the collected data should find the optimal technological
solution and make a study of evacuation from the building of
underground water tanks - wide excavation
Site organization – phase 1
• In the first phase of works is formed and performed:
– Traffic and site access
– Fence site and input (s)
– Earthworks on the site, digging pits
– Building site road (part of)
– Interim and secondary buildings on the site (part of)
– Energy and installation needed on site (part of)
Classification of buildings
National building classification –national building code(NBC)
NO GROUP TYPE OF BUILDINGS
1 A RESIDENTIOL
A-1 lodging house
A-2 Family private dwelling
A-3 dormitories
A-4 apartments
A-5 hotels
2 B EDUCATIONAL
3 C INSTITUTIONAL
C-1 hospital
C-2 Penal institution
4 D ASSEMBLY BUILDINGS
5 E BUSINESS BUILDINGS
6 F MERCANTIALE BUILDING
NO GROU
P
TYPE OF BUILDINGS
7 G INDUSTRIYAL BUILDINGS
8 H STORAGE BUILDINGS
Classification OF building STRUCTURE
1. LOAD BEARING
STRUCTURE
these type of structure adopted
at places, where hard strata
available at shallow depths.
the load transfer to slab or roof
and floors are transmitted
through wall as firm soil.
upper story wall thickness less
then lower story
reduces building carpet area
2-3 story constructed these thye
structure
RCC FRAMED
STRUCTURES
• they are consist of a cross-
beams main beams, columns ,
plinth, footings
• there are all element rigid-joins
constructed .
• Its subjected to external loads,
• Compresive ,tensile ,torsion
DESIGN LOAD
1. DEAD LOAD
it consists of self weight of different parts of the
building like floor ,roof, walls, plaster, door, windows.
unit weight KN/m3
RCC- 25
PCC- 24
2. LIVE LOAD
live load consists of moving or variable loads due to
people or occupants their furniture ,temporary story,
machinery.
DESIGN LOAD
3. WIND LOADS
P=K.V2 p=wind pressure
k= coefficient. of size of structure
v= wind velocity
4. EARTHQUAKE LOADS
acts in horizontal direction .
earthquake force =m.∞
m= w/g
M=mass of buildings G=gravitational acceleration
∞= acceleration of earthquake
Different type of foundation
FOUNDATION
shallow foundation deep foundation
D<B D>B
spread pile
Combined coffer
dams
Strap
Raft
grillage
Component Parts of a Building
The basic requirements a building should satisfy in design
and performance are:
•It must be strong enough to withstand the loads coming on
it including the self-weight, live load, wind load and
earthquake load.
•It must not deflect under the loads.
•It must give comfort and convenience to the inhabitants.
BUILDING
COMPONENTS
A building broadly consists of three
parts:
•Foundation
•Plinth
•Superstructure
1 Foundation
•The foundation is the most critical part of any structure and most of
the failures are probably due to faulty foundations.
•Hence, it is highly essential to secure good foundation to maintain
the stability of the structure.
•A good foundation must remain in position without sliding,
bending, overturning or failing in any other manner.
The foundation of any structure should
be laid much below the surface of the
ground in order to attain the following:
•To secure a good natural bed.
•To protect the foundation courses from
atmospheric influences.
•To increase the stability of the structure
against overturning due to wind uplift.
The primary function of the foundation is to transmit the anticipated
loads safely to the soil below.
The foundation in a building structure is supposed to satisfy the
following basic requirements in their design and construction:
•To distribute the total load coming on the structure over a large
bearing area so as to prevent it from any movement.
•To load the bearing surface or area at a uniform rate so as to prevent it
from any movement.
•To prevent the lateral escape or movement of the supporting material
or alternatively to ensure the stability of the structure against sliding.
•To secure a level or firm natural bed upon which to lay the course of
masonry and also support the structure.
•To increase the stability of the structure as a whole to prevent it from
overturning or sliding against the disturbing forces such as wind, rain
and frost.
Plinth
This is the portion of the structure between the surface of the
surrounding ground and the surface of the floor immediately above
the ground. The thickness of the plinth wall depends upon the
weight of the superstructure and the width of the foundation
concrete. The minimum height of the plinth is usually kept as not
less than 4.5 cm.
The plinth wall should satisfy the following requirements in a
building structure in its design and construction:
•To transmit the load of the superstructure to the foundation.
•To act as a retaining wall so as to keep the filling in position below
the raised floor or the building.
•To protect the building from dampness or moisture.
•To enhance the architectural appearance of the building.
Superstructure
The primary function of the wall is to enclose or divide space. Piers are
usually in the form of a thickened section of a wall, placed at intervals
along the wall to take concentrated vertical loads or to provide lateral
support to the wall.
A load-bearing wall should satisfy the following requirements:
•Strength: A wall should be strong enough to take up the loads safely.
The loads coming in the wall include its own weight, weight by
superimposed loads and bilateral pressures like wind.
•Stability: It should be stable against overturning by lateral forces and
buckling caused by excessive slenderness.
•Heat Insulation: It should be possible for walls to attain insulation
against heat.
•Sound Insulation: The walls should be made of such materials and by
such technique so as to insulate the building against sound.
•Privacy and Security: The walls should provide sufficient privacy and
afford security against theft.
Floors
The main function of a floor is to provide support for occupants,
furniture and equipment of a building, and the function of providing
different floors is to divide the building into different levels for creating
more accommodation within the limited space .
A floor should satisfy the following requirements:
•Strength and Stability: All the floors, whether basement, ground or
upper should be strong enough to support the floor covering and other
superimposed loads.
•Durability and Damp Prevention: The floors provide a clean, smooth,
impervious, durable and wear-resisting surface.
•Heat Insulation: Insulation against heat should be provided in case of
ground and basement floors, especially when suspended and ventilated
timber floors are used.
•Sound Insulation and Fire Resistance: The insulation against sound and
fire should be provided in the case of upper floors as they act as
horizontal barriers for the passage of sound and fire in a vertical
direction.
Doors and windows
The main function of doors in a building is to serve as a connecting link
between internal parts and to allow free movement to the outside of the
building. Windows are generally provided for proper ventilation and lighting
and their number should be determined according to the requirements.
Doors and windows should satisfy the following requirements:
•Weather Resistance: They should be strong enough to resist the adverse effects
of weather.
•Sound and Thermal Insulation: They should be capable of being made air tight
to achieve insulation against sound and heat.
•Damp Prevention and Termite Prevention: They should not be affected by white
ants and the moisture penetration as this will reduce the strength and
durability.
•Fire Resistance and Durability: They should offer fire resistance and should be
durable.
•Privacy and Security: They should offer sufficient privacy without
inconvenience or trouble and security against theft.
Sills, lintels and weather shades
•Window sills are provided between the bottom of the window frame
and the wall below to protect the top of the wall from wear and tear.
The openings are provided in the wall of a building to accommodate
the doors and windows.
•The actual frame of a door or window is not strong enough to
support the weight of the wall above the opening and a separate
structural element is, therefore, introduced between the top of the
window frame and the wall coming over it.
•This is known as the lintel. Weather shades are generally combined
with lintels of windows to protect them from the weathering agencies.
Roofs
A roof is the uppermost part of a building whose main function is to enclose the
space and to protect the same from the effects of weather elements. A good roof is
just as essential as a safe foundation.
A roof should satisfy the following requirements:
•Strength and Stability: The roof structure should be strong and stable enough to take
up the anticipated loads safely.
•Weather Resistance: The roof covering should have adequate resistance to resist the
effects of weather elements.
•Heat Insulation: The roof should provide adequate insulation against heat.
•Sound Insulation: The roof should have adequate insulation against sound from
external sources.
•Fire Resistance: The roof should offer an adequate degree of fire resistance in order
to give protection against the spread of fire from any adjacent buildings and to
prevent early collapse of the roof. The form of construction should also be such that
the spread of fire from its source to other parts of the building by way of roof cannot
occur.
•Day Lighting: The roof provides daylight in buildings with large floor area.
Steps and stairs
A step usually consists of a tread and riser supported by strings.
A stair is a structure consisting of a number of steps leading from one
floor to another.
Steps and stairs should satisfy the following requirements:
•Strength and Stability: The stairs should be designed like floors such
that they are strong and stable enough to carry the anticipated loads
safely due to the weight of the people using them and also the weight
of the furniture or equipment being carried up or down through them.
•Sound Insulation: The stairs should have adequate insulation against
sound from external sources.
•Weather Resistance: The stairs if exposed to open air should offer
sufficient resistance to weather elements such as rain and heat.
•Comfort: The proper design of steps and proper location of stairs in a
building offer several advantages such as comfort and efficiency in
vertical movement, natural light and ventilation and safety in
emergency.
Finishes for walls
Finishes of several types such as pointing, plastering, painting
and distempering and decorative colour washing are applied on
the walls.
The main functions of these finishes are as follows:
•They protect the structure, particularly the exposed surfaces,
from the effects of weather.
•They provide a true, even and smooth finished surface and
also improve the aesthetic appearance of the structure as a
whole.
They cover up the unsound and porous materials used in the
construction
Masonry is generally a highly durable form of construction.
However, the materials used, the quality of the mortar and
workmanship, and the pattern in which the units are assembled can
significantly affect the durability of the over all masonry
construction.
Masonry
GENERAL PRINCIPLES IN BRICK MASONRY
•The bricks used should be hard, well burnt and tough with uniform
colour, shape and size.
•The bricks should be laid on their beds with the frogs pointing
upwards.
•The courses should be truly horizontal and should have truly vertical
joints.
•Use of brickbats should be avoided to the maximum possible extent.
•Generally, the height of the brick masonry construction in a day is
limited to 1.5 m.
•In order to ensure continuous bond, the walls should be stopped with
a toothed end at the end of each stage of construction.
•Finished brickwork should be cured for at least 2-3 weeks where
lime mortar is used and for 1-2 weeks where cement mortar is used.
TYPES OF BRICK MASONRY WALLS AND STRUCTURES
Spanning Openings in Brick Walls
• Brick walls must be supported above openings for windows or doors,
using reinforced concrete lintels, reinforced brick,or steel angles
• A corbel is an ancient structural device of limited spanning capability,
that may be used for small openings in brick walls, for beam brackets,
and for ornamental provisions.
• Arches can be used instead of lintels to span large openings in walls-
Different forms of arches can be built: Segmental Arch, Jack Arch,
Tudor Arch, Elliptical Arch, Roman Arch (cylindrical shape), Goethic
Arch, Parabolic - Arch Terminologies: Intados, Extrados, Soffit,
Spring line, Skewback, Crown, Span, Rise
TYPES OF BRICK MASONRY WALLS AND
STRUCTURES
Reinforced Brick Masonry:
• A reinforced brick masonry wall in constructed with two wythes of
brick, 2” to 4” apart, placing the reinforced steel in the cavity and
filling the cavity with grout. Grout is a mixture of Portland cement,
aggregate and water. Grout must be filled enough to flow readily into
the narrow cavity and fill it completely - Two methods are used in
building reinforced brick walls: Low-lift method: Height of grout
filling is not more than 4 feet - Wythes are held together by galvanized
steel wire ties at 24” c/c horizontally and 16” c/c vertically - High-lift
method: Wall is grouted, one story at a time - Clean out holes are left
at the bottom to drive out the debri (from mortar in brick masonry)
down with water through the holes - Finally the clean out holes are
sealed with a brick and mortar joint
•Masonry is commonly used for the walls of buildings, retaining
walls and monuments.
•Brick and concrete block are the most common types of
masonry in use in industrialized nations and may be either
weight-bearing or a veneer.
•Concrete blocks, especially those with hollow cores, offer
various possibilities in masonry construction. They generally
provide great compressive strength, and are best suited to
structures with light transverse loading when the cores remain
unfilled. Filling some or all of the cores with concrete or
concrete with steel reinforcement (typically rebar) offers much
greater tensile and lateral strength to structures
Applications
•Brick floor.
• Earth floor.
• Cement concrete floor.
• Mosaic floor.
• Tile floor.
• Marble floor.
• Wooden floor.
 TYPES OF FLOORS
FLOORING
MATERIALS FOR FLOORING
•The materials used for Ground floor
•construction are:
•Stones.
• Bricks.
• Concrete.
• Marble.
•Chips.
• Asphalt.
FACTORS AFFECTING SELECTION OF FLOORS
1- INITIAL COST
• The cost of floor covering is the most important thing.
• The expensive types of floor coverings are marble and
teerrazzo (chips).
• Tiles and asphalt are less expensive whereas concrete and
brick are the cheapest and are commonly used.
2- APPEARANCE
• Co lour, texture and architectural beauty are the factors taken
into consideration.
3- DURABILITY
• Resistance to wear and tear is an important factor for a floor covering.
• Resistance to temperature changes, humidity, disintegration and decay has
alsoto be taken into account.
• Tiles, marble and concrete floor covering offer good resistance to these
factors. Wherever heavy floor traffic is not anticipated bricks and wood
blocks can be used.
4- CLEAN LINESS OF FLOOR
• A floor should be non absorbent and capable of being easily cleaned.
• All joints should be simple so that they can be made water tight as possible.
• Glass strips used for making panels, should not be more than 16 sq. ft. i.e.
(4`x4`).
5- DAMPNESS
• Moisture should not penetrate in the floor.
• They should be completely water tight.
• Wood, Rubber are not suitable in damp places,
whereas tiles, bricks, concrete and Terrazzo is
suitable for use on flooring which are subjected to
dampness.
6- INDENTATIOIN
• Marks, depression due to furniture legs or ladies
shoes should not make any impression on the floor.
7- NOISELESSNESS
• This is not an important factor for ground floor constructions,
but it should be noiseless when traveled over.
• Rubber coverings and cork covering are most suitable.
8- MAINTENANCE
• For keeping floor in perfect condition it is necessary to clean,
repair and apply any other treatment from time to time.
• Marble and concrete floors require less repair whereas wood
blocks, need frequent maintenance.
• Concrete surfaces can not be repaired easily while tiles can be
replaced quickly.
CONSTRUCTION OF FLOORS
1- BRICK FLOORING
• Brick flooring is commonly used.
• The filling over which this floor is to be laid should be well
compacted.
• The level of the flooring being known, the filling is excavated
the desired depth.
• Generally two types of beds are provided.
• In the first type, after excavation the surface is leveled and a
layer of 3// sand is spread over which a course of bricks is laid.
• In the second type, a lean cement concrete (P.C.C), one part of
cement, 6 parts of sand and 18 parts of aggregates of 10 to15
cms in thickness is laid on the compacted bed.
• Flat brick flooring is laid into1:6 C/S mortar over a bed of ¾
// thick cement sand mortar.
• Bricks on edge flooring are laid into1:6 C/S mortar over a bed
of ¾ // thick C/S mortar.
2- CEMENT CONCRETE FLOORING
• This type of floors are most commonly used both in residential
and commercial buildings.
• The two components of a concrete floor are Base & Wearing
surface (top surface).
• The flooring can be constructed either monolithic or non-
monolithic.
• In monolithic floors, a base layer is laid and then immediately
a concrete topping is provided and in non-monolithic the
topping is laid after the base has set.
DISADVANTAGES OF MONOLITHIC
FLOORS
• The topping is likely to get damaged due to subsequent
building operations.
• It is likely to develop hair-like cracks on account of small
settlements which may occur in the base course immediately
after it is laid.
• When the surface of the topping gets damaged, it is very
difficult to repair it.
• The progress is slow since the topping can be laid only after the
base course has sufficiently set to allow the workmen to lay the
top layer.
CEMENT CONCRETE FLOOR
DETAILS
• Topping is laid in panels over a base thickness which varies 1//
to 3//.
• If the thickness is 1-1/2// then it can be laid in single layer and
if it is exceeding then it is laid in double layer.
• To avoid cracks due to shrinkage, the area of a panel is
restricted to 4/ x 4/ (i.e. 16 sq. ft.).
3. MOSAIC OR TERRAZO FLOORING
• The base for terrazzo floor is of plain cement concrete (1:2:4).
• The topping shall not be less than 3/8// thick and shall be laid with a
bottom layer of cement concrete (1:2:4).
• The total thickness of topping of cement concrete should mot be less
than 1-3/8//.
• Normally 2// thickness is used, 1-1/2// concrete (1:2:4) and ½// mosaic.
• The mosaic topping shall consist of one part of cement (including15%
to30% marble powder) and two parts of marble chips.
• The mosaic topping shall be laid while the bottom concrete is still
fresh preferably on the next day or after 24 hours to have better
bond.
• The surface should be rough to get better bonding.
4. TILE FLOORING
• Tiles of various shapes, sizes, thicknesses, color and surface
finishes are manufactured for used as surface covering for
floors.
• Floorings tiles are set on the concrete base with mortar.
• Special bedding made up of asphalt or portland cement is
available for use over concrete base.
• The concrete bedding is generally 5// thick and is laid evenly
with a slight rough surface at the top.
• After a period of 2 to3 days, a mortar layers of 1:1 mix is
spread on the concrete bed and the tiles are set evenly with a
thin a thin paste of cement applied to their sides.
• They are slightly topped till the cement comes out through the
joints to the top surface.
• This extra cement is wiped off and the joints are cleaned.
• After2 to3 days, these joints are rubbed to chip off all the
projecting edges or surfaces.
• The whole surface is then polished with a very soft
carborundum stone.
• Finally the surface is washed with soap. If the tiles have glazed
surfaces then this rubbing process is not suitable.
5. GLASS FLOOR
• Glass floors are used wherever it is desired to admit light into
the basements through the upper floor.
• The glass blocks are fitted within the frames of various
thicknesses to transmit light at an angle to the farther areas in a
room.
• Structural glass is available in the from of tiles or slabs and its
thickness ranges from 12 to 30 millimeters.
• The framework is spaced closed apart so the glass can
withstand loads coming over it. Glass flooring is not commonly
used.
6. ASPHALT FLOORING
• Asphalt mastic is a mixture of fine aggregates (sand), natural or
artificial asphalt and coarse aggregates.
• It can be mixed hot and laid in continuous sheets or pressed into
blocks which can be used as flooring.
• It can also be mixed with a mineral oil and asbestos and applied
cold.
• While heating, the asphalt is stirred thoroughly so that the layer at
the bottom may not get burnt, when the whole quantity is fused,
sand or aggregates equal to twice the volume of asphalt is added
gently and mixed thoroughly. This mixture is then ready for
laying.
7. WOODEN FLOORING
• This type of floor construction is not extensively used but is
popular for special purpose floors, e.g. in auditorium, hospitals.
• Wooden flooring should have a concrete base or should rest on
joists spanning across walls which are constructed at suitable
interval.
• For the fixing of wooden floors on concrete slabs, longitudinal
railing strips are provided.
ROOFS
The covering provided over the top of an enclosure made for a
building to keep out the sun, rain, wind and to protect the
interior from exposure to the weather is known as roof.
• A roof usually consists of frame work provided with a suitable
covering at its top.
• A good roof is as essential as a safe foundation of a building.
• Roofs must, therefore, be well designed and constructed to meet
the requirements of different climates and covering materials
locally available.
• The form of construction of a roof is governed by the plan of a
building, span, the type of covering material locally available and
the architectural appearance required.
• The roof covering to be provided should be economical and most
suitable according to the nature of the building.
CLASSIFICAION
• Sloping, pent or pitched roofs
• Flat or terrace roofs
(Sloping roofs are suitable for the area where rainfall and
snowfall are heavy, whereas, flat roofs are suitable for the area
where rainfall is meager i.e. of low intensity, and there is no
snowfall)
• Shelled roofs
• Domes
1. Shed Roof:- A slopping roof having slope only in one direction
is called a Shed Roof. This is the simplest type of sloping roof
and is used for smaller spans.
2. Gable Roof:- A sloping roof having slope in two directions is
called a Gable Roof. This type of sloping roof is used for larger
span.
3. Hipped Roof:- A sloping roof having slope in four directions is
called Hipped Or Hip Roof. This type of sloping roof is mostly
used for buildings in hilly area.
4. Gambrel Roof:- A sloping roof having slope in two directions
with a break in the slope is known as Gambrel Roof. This type
of sloping roof is mostly used for buildings in hilly area.
5. Mansord roof:- A sloping roof having slope in four
directions with a break in slope is known as Mansard
Roof
6. Saw tooth or north light roof:- A sloping roof
having glazing fixed on the steep sloping sides of the
roof is called Saw Tooth Or North Light Roof. This is
generally used in factories where more light is
required.
IMPORTANT TECHNICAL TERMS
Ridge:- The highest point or line of a sloping roof where the two
opposite slopes meet is known as ridge.
Ridge piece:- A horizontal piece of timber which runs the highest
level (bridge) of a sloping roof is called ridge piece.
Eaves:- The lowest edges of the surfaces of a sloping roof are called
eaves.
Eave’s board:- A wooden board fixed along the eaves at the end of
common rafters is known as eaves board or facia board. Gutter
is usually supported at eaves board.
Jack rafter:- The short common rafters which run from a hip rafter
to the eave of a sloping roof are called jack rafters.
Common rafters:- The members supporting the battens or
boardings under the covering of a sloping roof are known as
common rafters.
Gable:- The end of a sloping roof finished in a vertical triangle is
called gabled end or gable.
Barge:- The finished edge of slating or tiling over-hanging a gable
wall is called barge.
Barge board:- Wooden planks fixed to the ends of the common
rafters projecting beyond the gabled end of a sloping roof is
called a barge board.
Purlins:- The wooden or steel members laid horizontally to support
the common rafters of a sloping roof are called purlins.
Cleats:- The pieces of timber or angle-iron which are nailed or
screwed (for timber), riveted or welded (for angle-iron) on the
trusses, to support the purlins are known as cleats.
Battens:- The pieces of wood which are directly nailed to the
common rafters are called battens. The roof coverings are
directly laid over battens.
Pitch:- The inclination of the side of a slopping roof to the
horizontal surface is called pitch of the roof. It is usually
expressed as the ratio of the rise to the span or in degrees.
Truss:- A frame work of members arranged in triangles is called a
truss.
• Reference Books:
1) Elements of civil engineering by Rakesh Ranjan
2) Elements of civil engineering by B.C.Punamia
3) Basic Civil Engineering by L.G.Kulkarni

More Related Content

What's hot

Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAmanogna gwen
 
Typical road structure cross section details
Typical road structure cross section detailsTypical road structure cross section details
Typical road structure cross section detailsAglaia Connect
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueductsanthosh2121
 
Bridge
Bridge Bridge
Bridge illpa
 
Chenab River Bridge
Chenab River BridgeChenab River Bridge
Chenab River BridgeHitesh Sahu
 
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTHYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTKavin Raval
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its typeYash Patel
 
DESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREDESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREbabji syed
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 
Intake structures
Intake structures Intake structures
Intake structures Sachin PatiL
 
water supply scheme
water supply schemewater supply scheme
water supply schemesunil9666
 
Traffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTraffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTHECITYALLIANCE
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineeringKHUSHBU SHAH
 

What's hot (20)

Smart tunnel
Smart  tunnelSmart  tunnel
Smart tunnel
 
Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADA
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Typical road structure cross section details
Typical road structure cross section detailsTypical road structure cross section details
Typical road structure cross section details
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueduct
 
Bridge
Bridge Bridge
Bridge
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Chenab River Bridge
Chenab River BridgeChenab River Bridge
Chenab River Bridge
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTHYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
Different types of bridges or innovative bridges in india
Different types of bridges or innovative bridges in indiaDifferent types of bridges or innovative bridges in india
Different types of bridges or innovative bridges in india
 
DESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREDESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDURE
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Intake structures
Intake structures Intake structures
Intake structures
 
Demiryolu Terminolojisi
Demiryolu Terminolojisi Demiryolu Terminolojisi
Demiryolu Terminolojisi
 
types of canal
types of canaltypes of canal
types of canal
 
water supply scheme
water supply schemewater supply scheme
water supply scheme
 
Traffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTraffic Intersection Points Of Conflict
Traffic Intersection Points Of Conflict
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 

Viewers also liked

Diploma(civil) sem i boce_unit 1_civil engineering materials a
Diploma(civil) sem i boce_unit 1_civil engineering materials aDiploma(civil) sem i boce_unit 1_civil engineering materials a
Diploma(civil) sem i boce_unit 1_civil engineering materials aRai University
 
Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)Darshiini Vig
 
Basic component of buildings
Basic component of buildingsBasic component of buildings
Basic component of buildingsSanjib Sengupta
 
Five key differences between epoxy and polyurethane floors
Five key differences between epoxy and polyurethane floorsFive key differences between epoxy and polyurethane floors
Five key differences between epoxy and polyurethane floorsAkis Apostolopoulos
 
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1imtheking2088
 
Unit 3.building construction
Unit 3.building constructionUnit 3.building construction
Unit 3.building constructionChirag Bhanagale
 
Plastic as a soil stabilizer by yashwanth sagar
Plastic as a soil stabilizer by yashwanth sagarPlastic as a soil stabilizer by yashwanth sagar
Plastic as a soil stabilizer by yashwanth sagaryashwanth9611
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
 
Plastic as a soil stabilizer
Plastic as a soil stabilizerPlastic as a soil stabilizer
Plastic as a soil stabilizerShoaib Wani
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)Safiullah Khan
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSreemajadwani
 

Viewers also liked (20)

Diploma(civil) sem i boce_unit 1_civil engineering materials a
Diploma(civil) sem i boce_unit 1_civil engineering materials aDiploma(civil) sem i boce_unit 1_civil engineering materials a
Diploma(civil) sem i boce_unit 1_civil engineering materials a
 
Kerala BuildingTax Act 1975
Kerala BuildingTax Act 1975Kerala BuildingTax Act 1975
Kerala BuildingTax Act 1975
 
Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)
 
Basic component of buildings
Basic component of buildingsBasic component of buildings
Basic component of buildings
 
CURRICULUM VITAE-10
CURRICULUM VITAE-10CURRICULUM VITAE-10
CURRICULUM VITAE-10
 
Five key differences between epoxy and polyurethane floors
Five key differences between epoxy and polyurethane floorsFive key differences between epoxy and polyurethane floors
Five key differences between epoxy and polyurethane floors
 
Floors and flooring
Floors and flooringFloors and flooring
Floors and flooring
 
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
 
Unit 3.building construction
Unit 3.building constructionUnit 3.building construction
Unit 3.building construction
 
Plastic as a soil stabilizer by yashwanth sagar
Plastic as a soil stabilizer by yashwanth sagarPlastic as a soil stabilizer by yashwanth sagar
Plastic as a soil stabilizer by yashwanth sagar
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
Cement
CementCement
Cement
 
Plastic as a soil stabilizer
Plastic as a soil stabilizerPlastic as a soil stabilizer
Plastic as a soil stabilizer
 
Timber floor
Timber floorTimber floor
Timber floor
 
10 flooring
10 flooring10 flooring
10 flooring
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
FLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGSFLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGS
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
 
Levelling
LevellingLevelling
Levelling
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 

Similar to Diploma(civil) sem i boce_unit 3_building construction a

Unit 3.building construction
Unit 3.building constructionUnit 3.building construction
Unit 3.building constructionChirag Bhanagale
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction siteHamdija Velagic
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGCESatvirSingh1
 
Introduction to Civil Engineering 22ESC141 - Module 1.pptx
Introduction to Civil Engineering 22ESC141  - Module 1.pptxIntroduction to Civil Engineering 22ESC141  - Module 1.pptx
Introduction to Civil Engineering 22ESC141 - Module 1.pptxAdarshaMR1
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industryYamini K
 
Constructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportConstructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportDivyesh Mungara
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdfRanadita
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingIRJET Journal
 
2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdf2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdfssuserce0bdc
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresAyan Sengupta
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptSOUMITRAMUDI
 
Introduction to Underground Structures _ Building Structures
Introduction to Underground Structures _ Building StructuresIntroduction to Underground Structures _ Building Structures
Introduction to Underground Structures _ Building Structureshegdenisarga23
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4ahsanrabbani
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxFawadMalik32
 

Similar to Diploma(civil) sem i boce_unit 3_building construction a (20)

Unit 3.building construction
Unit 3.building constructionUnit 3.building construction
Unit 3.building construction
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction site
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
 
Techniques behind demolition of structures
Techniques behind demolition of structuresTechniques behind demolition of structures
Techniques behind demolition of structures
 
Introduction to Civil Engineering 22ESC141 - Module 1.pptx
Introduction to Civil Engineering 22ESC141  - Module 1.pptxIntroduction to Civil Engineering 22ESC141  - Module 1.pptx
Introduction to Civil Engineering 22ESC141 - Module 1.pptx
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 
Civil Diploma Industrial Training Report
Civil Diploma Industrial Training ReportCivil Diploma Industrial Training Report
Civil Diploma Industrial Training Report
 
Constructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportConstructionmethodologyandprojectmanagementreport
Constructionmethodologyandprojectmanagementreport
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
 
OP YADAV PROJECT
OP YADAV PROJECTOP YADAV PROJECT
OP YADAV PROJECT
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdf2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdf
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structures
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
Introduction to Underground Structures _ Building Structures
Introduction to Underground Structures _ Building StructuresIntroduction to Underground Structures _ Building Structures
Introduction to Underground Structures _ Building Structures
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptx
 

More from Rai University

Brochure Rai University
Brochure Rai University Brochure Rai University
Brochure Rai University Rai University
 
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,Rai University
 
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02Rai University
 
Bsc agri 2 pae u-4.3 public expenditure
Bsc agri  2 pae  u-4.3 public expenditureBsc agri  2 pae  u-4.3 public expenditure
Bsc agri 2 pae u-4.3 public expenditureRai University
 
Bsc agri 2 pae u-4.2 public finance
Bsc agri  2 pae  u-4.2 public financeBsc agri  2 pae  u-4.2 public finance
Bsc agri 2 pae u-4.2 public financeRai University
 
Bsc agri 2 pae u-4.1 introduction
Bsc agri  2 pae  u-4.1 introductionBsc agri  2 pae  u-4.1 introduction
Bsc agri 2 pae u-4.1 introductionRai University
 
Bsc agri 2 pae u-3.3 inflation
Bsc agri  2 pae  u-3.3  inflationBsc agri  2 pae  u-3.3  inflation
Bsc agri 2 pae u-3.3 inflationRai University
 
Bsc agri 2 pae u-3.2 introduction to macro economics
Bsc agri  2 pae  u-3.2 introduction to macro economicsBsc agri  2 pae  u-3.2 introduction to macro economics
Bsc agri 2 pae u-3.2 introduction to macro economicsRai University
 
Bsc agri 2 pae u-3.1 marketstructure
Bsc agri  2 pae  u-3.1 marketstructureBsc agri  2 pae  u-3.1 marketstructure
Bsc agri 2 pae u-3.1 marketstructureRai University
 
Bsc agri 2 pae u-3 perfect-competition
Bsc agri  2 pae  u-3 perfect-competitionBsc agri  2 pae  u-3 perfect-competition
Bsc agri 2 pae u-3 perfect-competitionRai University
 

More from Rai University (20)

Brochure Rai University
Brochure Rai University Brochure Rai University
Brochure Rai University
 
Mm unit 4point2
Mm unit 4point2Mm unit 4point2
Mm unit 4point2
 
Mm unit 4point1
Mm unit 4point1Mm unit 4point1
Mm unit 4point1
 
Mm unit 4point3
Mm unit 4point3Mm unit 4point3
Mm unit 4point3
 
Mm unit 3point2
Mm unit 3point2Mm unit 3point2
Mm unit 3point2
 
Mm unit 3point1
Mm unit 3point1Mm unit 3point1
Mm unit 3point1
 
Mm unit 2point2
Mm unit 2point2Mm unit 2point2
Mm unit 2point2
 
Mm unit 2 point 1
Mm unit 2 point 1Mm unit 2 point 1
Mm unit 2 point 1
 
Mm unit 1point3
Mm unit 1point3Mm unit 1point3
Mm unit 1point3
 
Mm unit 1point2
Mm unit 1point2Mm unit 1point2
Mm unit 1point2
 
Mm unit 1point1
Mm unit 1point1Mm unit 1point1
Mm unit 1point1
 
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
 
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
 
Bsc agri 2 pae u-4.3 public expenditure
Bsc agri  2 pae  u-4.3 public expenditureBsc agri  2 pae  u-4.3 public expenditure
Bsc agri 2 pae u-4.3 public expenditure
 
Bsc agri 2 pae u-4.2 public finance
Bsc agri  2 pae  u-4.2 public financeBsc agri  2 pae  u-4.2 public finance
Bsc agri 2 pae u-4.2 public finance
 
Bsc agri 2 pae u-4.1 introduction
Bsc agri  2 pae  u-4.1 introductionBsc agri  2 pae  u-4.1 introduction
Bsc agri 2 pae u-4.1 introduction
 
Bsc agri 2 pae u-3.3 inflation
Bsc agri  2 pae  u-3.3  inflationBsc agri  2 pae  u-3.3  inflation
Bsc agri 2 pae u-3.3 inflation
 
Bsc agri 2 pae u-3.2 introduction to macro economics
Bsc agri  2 pae  u-3.2 introduction to macro economicsBsc agri  2 pae  u-3.2 introduction to macro economics
Bsc agri 2 pae u-3.2 introduction to macro economics
 
Bsc agri 2 pae u-3.1 marketstructure
Bsc agri  2 pae  u-3.1 marketstructureBsc agri  2 pae  u-3.1 marketstructure
Bsc agri 2 pae u-3.1 marketstructure
 
Bsc agri 2 pae u-3 perfect-competition
Bsc agri  2 pae  u-3 perfect-competitionBsc agri  2 pae  u-3 perfect-competition
Bsc agri 2 pae u-3 perfect-competition
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Diploma(civil) sem i boce_unit 3_building construction a

  • 3. Construction : Object created by constructing works, connected to ground, performed from building products with common installations and equipment, or integrated complex with facility or equipment as well as technical - technological units or solo installations connected to the ground. Or units connected to the ground but was not made by construction works, if they change the purpose of the land Construction works : Performing constructional and other works (preparation, land, and structural, installation, finishing and mounting of construction products, plant or equipment) with which new buildings are built, existing buildings are reconstructed, removed or maintained.
  • 4. Constructing/Building:Means the process of designing, constructing, usage and removal of the construction (building), everything that is related to the constructing of the new buildings can be applied in an appropiate way to reconstructing, maintance and removal of the old buildings. Construction site :Is a place,land or buildings (including other areas that are temporarily occupied ) needed to execute the construction works or the application of appropriate building technology and security, on which to build, reconstruct, remove or perform maintenance work building
  • 5. Basic information to be collected are the following: •technical-economic documentation of agreed work •geographic and topographic conditions, •meteorological and climatic conditions, •geological and geotechnical conditions, •hydrological conditions, •ability to supply water, energy, etc. •ability to supply material •traffic, and conditions for delivery of materials, machinery, etc. •opportunity for employment of labor force, •property-legal relations, •capacity of eventual subcontractors, suppliers, transportation •companies, •cost of resources to be used in the region in which to build, etc.
  • 6. Site geography • The exact geographical location of site, • The nearest villages, centers of possible supply (construction materials, handicraft workshops and repair shops, banks, post offices, the building materials industry, quarries, gravel pits, desire. stations, ports, airports, pumps for liquid fuels, etc.) • Economic description of cities, towns and other centers that gravitate future construction, as documentation and background should submit: geographical maps and distances specified in relation to the site. • Configuration of site has a big influence on the organization of the site, or the disposition of various plants, design and development of access roads, the internal communication at the site, the interior horizontal and vertical transport to the site and the whole works. • Since the topography of ground depends on what will be applied to the disposition of the site, which transport vehicles to use and how much transportation will cost.
  • 7. Geological and geotechnical conditions • When performing work on the building below the ground surface occurs some problems related to groundwater (groundwater elevation, vibration levels at various time periods, the strength of underground springs, etc.). • Geological complex of ground, geomechanical and geotechnical properties of soil layers on the basis of appropriate tests, and geological sections, geological map of the area generally should exist within the architectural- constructive phase of the project of the building, but contractor has all these elements to check before building. • Determining the existence of groundwater, and their regime is of great importance to the process of organizing works at zero cycle facilities, as well as for predicting the equipment and installations for water pumping, fencing construction pit, concreting under water, etc., which has great importance for, among other things, calculating and determining the cost of these works.
  • 8. Meteorological and climatic conditions Climatic conditions at the site are reflected in two ways: • the creation of special conditions for life and work, or the hygienic and technical conditions, and the impact on the organization and the construction technique. • The human activity, climate has a direct effect especially when the works are carried out in the open. It has an impact on the performance of workers and the effect of work generally. Unfavorable climatic conditions create special, difficult living and working conditions of workers on site and reflect on the state of health, and should be anticipated and calculate all necessary safeguards for the health and maintaining good working condition of workers.
  • 9. Meteorological and climatic conditions • Climatic conditions are decisive for the annual fund of working time, it is essential that information about climate and weather conditions to be collected for a longer period of observation. • Such information may be obtained from Hydro-Meteorological Institute. data on rainfall and its distribution throughout the year, with rainfall greater than 1 mm and 10 mm, as well as data on relative humidity. on temperature, average annual, highest and lowest, and the number of days with temperatures below 0 C or lower than -5 C. information about the dominant winds, their direction, intensity and duration. Strong winds can cause major problems at work and in certain areas and to stop work completely. Strong winds have an influence on the stability of the scaffolding, formwork and roof, high pumps, etc.
  • 10. Meteorological and climatic conditions • Climatic conditions are decisive for the annual fund of working time, it is essential that information about climate and weather conditions to be collected for a longer period of observation. • Such information may be obtained from Hydro-Meteorological Institute. data on rainfall and its distribution throughout the year, with rainfall greater than 1 mm and 10 mm, as well as data on relative humidity. on temperature, average annual, highest and lowest, and the number of days with temperatures below 0 C or lower than -5 C. information about the dominant winds, their direction, intensity and duration. Strong winds can cause major problems at work and in certain areas and to stop work completely. Strong winds have an influence on the stability of the scaffolding, formwork and roof, high pumps, etc.
  • 11. Site hydrology • When it comes to the performance of buildings in the vicinity of surface water, rivers, lakes, canals, must be familiar with the water regime because it has a direct impact on the groundwater regime. • Based on the collected data should find the optimal technological solution and make a study of evacuation from the building of underground water tanks - wide excavation
  • 12. Site organization – phase 1 • In the first phase of works is formed and performed: – Traffic and site access – Fence site and input (s) – Earthworks on the site, digging pits – Building site road (part of) – Interim and secondary buildings on the site (part of) – Energy and installation needed on site (part of)
  • 13. Classification of buildings National building classification –national building code(NBC) NO GROUP TYPE OF BUILDINGS 1 A RESIDENTIOL A-1 lodging house A-2 Family private dwelling A-3 dormitories A-4 apartments A-5 hotels 2 B EDUCATIONAL 3 C INSTITUTIONAL C-1 hospital C-2 Penal institution 4 D ASSEMBLY BUILDINGS 5 E BUSINESS BUILDINGS 6 F MERCANTIALE BUILDING
  • 14. NO GROU P TYPE OF BUILDINGS 7 G INDUSTRIYAL BUILDINGS 8 H STORAGE BUILDINGS
  • 15. Classification OF building STRUCTURE 1. LOAD BEARING STRUCTURE these type of structure adopted at places, where hard strata available at shallow depths. the load transfer to slab or roof and floors are transmitted through wall as firm soil. upper story wall thickness less then lower story reduces building carpet area 2-3 story constructed these thye structure
  • 16. RCC FRAMED STRUCTURES • they are consist of a cross- beams main beams, columns , plinth, footings • there are all element rigid-joins constructed . • Its subjected to external loads, • Compresive ,tensile ,torsion
  • 17. DESIGN LOAD 1. DEAD LOAD it consists of self weight of different parts of the building like floor ,roof, walls, plaster, door, windows. unit weight KN/m3 RCC- 25 PCC- 24 2. LIVE LOAD live load consists of moving or variable loads due to people or occupants their furniture ,temporary story, machinery.
  • 18. DESIGN LOAD 3. WIND LOADS P=K.V2 p=wind pressure k= coefficient. of size of structure v= wind velocity 4. EARTHQUAKE LOADS acts in horizontal direction . earthquake force =m.∞ m= w/g M=mass of buildings G=gravitational acceleration ∞= acceleration of earthquake
  • 19. Different type of foundation FOUNDATION shallow foundation deep foundation D<B D>B spread pile Combined coffer dams Strap Raft grillage
  • 20. Component Parts of a Building The basic requirements a building should satisfy in design and performance are: •It must be strong enough to withstand the loads coming on it including the self-weight, live load, wind load and earthquake load. •It must not deflect under the loads. •It must give comfort and convenience to the inhabitants. BUILDING COMPONENTS A building broadly consists of three parts: •Foundation •Plinth •Superstructure
  • 21. 1 Foundation •The foundation is the most critical part of any structure and most of the failures are probably due to faulty foundations. •Hence, it is highly essential to secure good foundation to maintain the stability of the structure. •A good foundation must remain in position without sliding, bending, overturning or failing in any other manner. The foundation of any structure should be laid much below the surface of the ground in order to attain the following: •To secure a good natural bed. •To protect the foundation courses from atmospheric influences. •To increase the stability of the structure against overturning due to wind uplift.
  • 22. The primary function of the foundation is to transmit the anticipated loads safely to the soil below. The foundation in a building structure is supposed to satisfy the following basic requirements in their design and construction: •To distribute the total load coming on the structure over a large bearing area so as to prevent it from any movement. •To load the bearing surface or area at a uniform rate so as to prevent it from any movement. •To prevent the lateral escape or movement of the supporting material or alternatively to ensure the stability of the structure against sliding. •To secure a level or firm natural bed upon which to lay the course of masonry and also support the structure. •To increase the stability of the structure as a whole to prevent it from overturning or sliding against the disturbing forces such as wind, rain and frost.
  • 23. Plinth This is the portion of the structure between the surface of the surrounding ground and the surface of the floor immediately above the ground. The thickness of the plinth wall depends upon the weight of the superstructure and the width of the foundation concrete. The minimum height of the plinth is usually kept as not less than 4.5 cm. The plinth wall should satisfy the following requirements in a building structure in its design and construction: •To transmit the load of the superstructure to the foundation. •To act as a retaining wall so as to keep the filling in position below the raised floor or the building. •To protect the building from dampness or moisture. •To enhance the architectural appearance of the building.
  • 24. Superstructure The primary function of the wall is to enclose or divide space. Piers are usually in the form of a thickened section of a wall, placed at intervals along the wall to take concentrated vertical loads or to provide lateral support to the wall. A load-bearing wall should satisfy the following requirements: •Strength: A wall should be strong enough to take up the loads safely. The loads coming in the wall include its own weight, weight by superimposed loads and bilateral pressures like wind. •Stability: It should be stable against overturning by lateral forces and buckling caused by excessive slenderness. •Heat Insulation: It should be possible for walls to attain insulation against heat. •Sound Insulation: The walls should be made of such materials and by such technique so as to insulate the building against sound. •Privacy and Security: The walls should provide sufficient privacy and afford security against theft.
  • 25. Floors The main function of a floor is to provide support for occupants, furniture and equipment of a building, and the function of providing different floors is to divide the building into different levels for creating more accommodation within the limited space . A floor should satisfy the following requirements: •Strength and Stability: All the floors, whether basement, ground or upper should be strong enough to support the floor covering and other superimposed loads. •Durability and Damp Prevention: The floors provide a clean, smooth, impervious, durable and wear-resisting surface. •Heat Insulation: Insulation against heat should be provided in case of ground and basement floors, especially when suspended and ventilated timber floors are used. •Sound Insulation and Fire Resistance: The insulation against sound and fire should be provided in the case of upper floors as they act as horizontal barriers for the passage of sound and fire in a vertical direction.
  • 26. Doors and windows The main function of doors in a building is to serve as a connecting link between internal parts and to allow free movement to the outside of the building. Windows are generally provided for proper ventilation and lighting and their number should be determined according to the requirements. Doors and windows should satisfy the following requirements: •Weather Resistance: They should be strong enough to resist the adverse effects of weather. •Sound and Thermal Insulation: They should be capable of being made air tight to achieve insulation against sound and heat. •Damp Prevention and Termite Prevention: They should not be affected by white ants and the moisture penetration as this will reduce the strength and durability. •Fire Resistance and Durability: They should offer fire resistance and should be durable. •Privacy and Security: They should offer sufficient privacy without inconvenience or trouble and security against theft.
  • 27. Sills, lintels and weather shades •Window sills are provided between the bottom of the window frame and the wall below to protect the top of the wall from wear and tear. The openings are provided in the wall of a building to accommodate the doors and windows. •The actual frame of a door or window is not strong enough to support the weight of the wall above the opening and a separate structural element is, therefore, introduced between the top of the window frame and the wall coming over it. •This is known as the lintel. Weather shades are generally combined with lintels of windows to protect them from the weathering agencies.
  • 28. Roofs A roof is the uppermost part of a building whose main function is to enclose the space and to protect the same from the effects of weather elements. A good roof is just as essential as a safe foundation. A roof should satisfy the following requirements: •Strength and Stability: The roof structure should be strong and stable enough to take up the anticipated loads safely. •Weather Resistance: The roof covering should have adequate resistance to resist the effects of weather elements. •Heat Insulation: The roof should provide adequate insulation against heat. •Sound Insulation: The roof should have adequate insulation against sound from external sources. •Fire Resistance: The roof should offer an adequate degree of fire resistance in order to give protection against the spread of fire from any adjacent buildings and to prevent early collapse of the roof. The form of construction should also be such that the spread of fire from its source to other parts of the building by way of roof cannot occur. •Day Lighting: The roof provides daylight in buildings with large floor area.
  • 29. Steps and stairs A step usually consists of a tread and riser supported by strings. A stair is a structure consisting of a number of steps leading from one floor to another. Steps and stairs should satisfy the following requirements: •Strength and Stability: The stairs should be designed like floors such that they are strong and stable enough to carry the anticipated loads safely due to the weight of the people using them and also the weight of the furniture or equipment being carried up or down through them. •Sound Insulation: The stairs should have adequate insulation against sound from external sources. •Weather Resistance: The stairs if exposed to open air should offer sufficient resistance to weather elements such as rain and heat. •Comfort: The proper design of steps and proper location of stairs in a building offer several advantages such as comfort and efficiency in vertical movement, natural light and ventilation and safety in emergency.
  • 30. Finishes for walls Finishes of several types such as pointing, plastering, painting and distempering and decorative colour washing are applied on the walls. The main functions of these finishes are as follows: •They protect the structure, particularly the exposed surfaces, from the effects of weather. •They provide a true, even and smooth finished surface and also improve the aesthetic appearance of the structure as a whole. They cover up the unsound and porous materials used in the construction
  • 31. Masonry is generally a highly durable form of construction. However, the materials used, the quality of the mortar and workmanship, and the pattern in which the units are assembled can significantly affect the durability of the over all masonry construction. Masonry
  • 32. GENERAL PRINCIPLES IN BRICK MASONRY •The bricks used should be hard, well burnt and tough with uniform colour, shape and size. •The bricks should be laid on their beds with the frogs pointing upwards. •The courses should be truly horizontal and should have truly vertical joints. •Use of brickbats should be avoided to the maximum possible extent. •Generally, the height of the brick masonry construction in a day is limited to 1.5 m. •In order to ensure continuous bond, the walls should be stopped with a toothed end at the end of each stage of construction. •Finished brickwork should be cured for at least 2-3 weeks where lime mortar is used and for 1-2 weeks where cement mortar is used.
  • 33. TYPES OF BRICK MASONRY WALLS AND STRUCTURES Spanning Openings in Brick Walls • Brick walls must be supported above openings for windows or doors, using reinforced concrete lintels, reinforced brick,or steel angles • A corbel is an ancient structural device of limited spanning capability, that may be used for small openings in brick walls, for beam brackets, and for ornamental provisions. • Arches can be used instead of lintels to span large openings in walls- Different forms of arches can be built: Segmental Arch, Jack Arch, Tudor Arch, Elliptical Arch, Roman Arch (cylindrical shape), Goethic Arch, Parabolic - Arch Terminologies: Intados, Extrados, Soffit, Spring line, Skewback, Crown, Span, Rise
  • 34. TYPES OF BRICK MASONRY WALLS AND STRUCTURES Reinforced Brick Masonry: • A reinforced brick masonry wall in constructed with two wythes of brick, 2” to 4” apart, placing the reinforced steel in the cavity and filling the cavity with grout. Grout is a mixture of Portland cement, aggregate and water. Grout must be filled enough to flow readily into the narrow cavity and fill it completely - Two methods are used in building reinforced brick walls: Low-lift method: Height of grout filling is not more than 4 feet - Wythes are held together by galvanized steel wire ties at 24” c/c horizontally and 16” c/c vertically - High-lift method: Wall is grouted, one story at a time - Clean out holes are left at the bottom to drive out the debri (from mortar in brick masonry) down with water through the holes - Finally the clean out holes are sealed with a brick and mortar joint
  • 35. •Masonry is commonly used for the walls of buildings, retaining walls and monuments. •Brick and concrete block are the most common types of masonry in use in industrialized nations and may be either weight-bearing or a veneer. •Concrete blocks, especially those with hollow cores, offer various possibilities in masonry construction. They generally provide great compressive strength, and are best suited to structures with light transverse loading when the cores remain unfilled. Filling some or all of the cores with concrete or concrete with steel reinforcement (typically rebar) offers much greater tensile and lateral strength to structures Applications
  • 36. •Brick floor. • Earth floor. • Cement concrete floor. • Mosaic floor. • Tile floor. • Marble floor. • Wooden floor.  TYPES OF FLOORS FLOORING
  • 37. MATERIALS FOR FLOORING •The materials used for Ground floor •construction are: •Stones. • Bricks. • Concrete. • Marble. •Chips. • Asphalt.
  • 38. FACTORS AFFECTING SELECTION OF FLOORS 1- INITIAL COST • The cost of floor covering is the most important thing. • The expensive types of floor coverings are marble and teerrazzo (chips). • Tiles and asphalt are less expensive whereas concrete and brick are the cheapest and are commonly used. 2- APPEARANCE • Co lour, texture and architectural beauty are the factors taken into consideration.
  • 39. 3- DURABILITY • Resistance to wear and tear is an important factor for a floor covering. • Resistance to temperature changes, humidity, disintegration and decay has alsoto be taken into account. • Tiles, marble and concrete floor covering offer good resistance to these factors. Wherever heavy floor traffic is not anticipated bricks and wood blocks can be used. 4- CLEAN LINESS OF FLOOR • A floor should be non absorbent and capable of being easily cleaned. • All joints should be simple so that they can be made water tight as possible. • Glass strips used for making panels, should not be more than 16 sq. ft. i.e. (4`x4`).
  • 40. 5- DAMPNESS • Moisture should not penetrate in the floor. • They should be completely water tight. • Wood, Rubber are not suitable in damp places, whereas tiles, bricks, concrete and Terrazzo is suitable for use on flooring which are subjected to dampness. 6- INDENTATIOIN • Marks, depression due to furniture legs or ladies shoes should not make any impression on the floor.
  • 41. 7- NOISELESSNESS • This is not an important factor for ground floor constructions, but it should be noiseless when traveled over. • Rubber coverings and cork covering are most suitable. 8- MAINTENANCE • For keeping floor in perfect condition it is necessary to clean, repair and apply any other treatment from time to time. • Marble and concrete floors require less repair whereas wood blocks, need frequent maintenance. • Concrete surfaces can not be repaired easily while tiles can be replaced quickly.
  • 42. CONSTRUCTION OF FLOORS 1- BRICK FLOORING • Brick flooring is commonly used. • The filling over which this floor is to be laid should be well compacted. • The level of the flooring being known, the filling is excavated the desired depth. • Generally two types of beds are provided. • In the first type, after excavation the surface is leveled and a layer of 3// sand is spread over which a course of bricks is laid. • In the second type, a lean cement concrete (P.C.C), one part of cement, 6 parts of sand and 18 parts of aggregates of 10 to15 cms in thickness is laid on the compacted bed. • Flat brick flooring is laid into1:6 C/S mortar over a bed of ¾ // thick cement sand mortar. • Bricks on edge flooring are laid into1:6 C/S mortar over a bed of ¾ // thick C/S mortar.
  • 43. 2- CEMENT CONCRETE FLOORING • This type of floors are most commonly used both in residential and commercial buildings. • The two components of a concrete floor are Base & Wearing surface (top surface). • The flooring can be constructed either monolithic or non- monolithic. • In monolithic floors, a base layer is laid and then immediately a concrete topping is provided and in non-monolithic the topping is laid after the base has set.
  • 44. DISADVANTAGES OF MONOLITHIC FLOORS • The topping is likely to get damaged due to subsequent building operations. • It is likely to develop hair-like cracks on account of small settlements which may occur in the base course immediately after it is laid. • When the surface of the topping gets damaged, it is very difficult to repair it. • The progress is slow since the topping can be laid only after the base course has sufficiently set to allow the workmen to lay the top layer.
  • 45. CEMENT CONCRETE FLOOR DETAILS • Topping is laid in panels over a base thickness which varies 1// to 3//. • If the thickness is 1-1/2// then it can be laid in single layer and if it is exceeding then it is laid in double layer. • To avoid cracks due to shrinkage, the area of a panel is restricted to 4/ x 4/ (i.e. 16 sq. ft.).
  • 46. 3. MOSAIC OR TERRAZO FLOORING • The base for terrazzo floor is of plain cement concrete (1:2:4). • The topping shall not be less than 3/8// thick and shall be laid with a bottom layer of cement concrete (1:2:4). • The total thickness of topping of cement concrete should mot be less than 1-3/8//. • Normally 2// thickness is used, 1-1/2// concrete (1:2:4) and ½// mosaic. • The mosaic topping shall consist of one part of cement (including15% to30% marble powder) and two parts of marble chips. • The mosaic topping shall be laid while the bottom concrete is still fresh preferably on the next day or after 24 hours to have better bond. • The surface should be rough to get better bonding.
  • 47. 4. TILE FLOORING • Tiles of various shapes, sizes, thicknesses, color and surface finishes are manufactured for used as surface covering for floors. • Floorings tiles are set on the concrete base with mortar. • Special bedding made up of asphalt or portland cement is available for use over concrete base. • The concrete bedding is generally 5// thick and is laid evenly with a slight rough surface at the top. • After a period of 2 to3 days, a mortar layers of 1:1 mix is spread on the concrete bed and the tiles are set evenly with a thin a thin paste of cement applied to their sides.
  • 48. • They are slightly topped till the cement comes out through the joints to the top surface. • This extra cement is wiped off and the joints are cleaned. • After2 to3 days, these joints are rubbed to chip off all the projecting edges or surfaces. • The whole surface is then polished with a very soft carborundum stone. • Finally the surface is washed with soap. If the tiles have glazed surfaces then this rubbing process is not suitable.
  • 49. 5. GLASS FLOOR • Glass floors are used wherever it is desired to admit light into the basements through the upper floor. • The glass blocks are fitted within the frames of various thicknesses to transmit light at an angle to the farther areas in a room. • Structural glass is available in the from of tiles or slabs and its thickness ranges from 12 to 30 millimeters. • The framework is spaced closed apart so the glass can withstand loads coming over it. Glass flooring is not commonly used.
  • 50. 6. ASPHALT FLOORING • Asphalt mastic is a mixture of fine aggregates (sand), natural or artificial asphalt and coarse aggregates. • It can be mixed hot and laid in continuous sheets or pressed into blocks which can be used as flooring. • It can also be mixed with a mineral oil and asbestos and applied cold. • While heating, the asphalt is stirred thoroughly so that the layer at the bottom may not get burnt, when the whole quantity is fused, sand or aggregates equal to twice the volume of asphalt is added gently and mixed thoroughly. This mixture is then ready for laying.
  • 51. 7. WOODEN FLOORING • This type of floor construction is not extensively used but is popular for special purpose floors, e.g. in auditorium, hospitals. • Wooden flooring should have a concrete base or should rest on joists spanning across walls which are constructed at suitable interval. • For the fixing of wooden floors on concrete slabs, longitudinal railing strips are provided.
  • 52. ROOFS The covering provided over the top of an enclosure made for a building to keep out the sun, rain, wind and to protect the interior from exposure to the weather is known as roof.
  • 53. • A roof usually consists of frame work provided with a suitable covering at its top. • A good roof is as essential as a safe foundation of a building. • Roofs must, therefore, be well designed and constructed to meet the requirements of different climates and covering materials locally available. • The form of construction of a roof is governed by the plan of a building, span, the type of covering material locally available and the architectural appearance required. • The roof covering to be provided should be economical and most suitable according to the nature of the building.
  • 54. CLASSIFICAION • Sloping, pent or pitched roofs • Flat or terrace roofs (Sloping roofs are suitable for the area where rainfall and snowfall are heavy, whereas, flat roofs are suitable for the area where rainfall is meager i.e. of low intensity, and there is no snowfall) • Shelled roofs • Domes
  • 55. 1. Shed Roof:- A slopping roof having slope only in one direction is called a Shed Roof. This is the simplest type of sloping roof and is used for smaller spans. 2. Gable Roof:- A sloping roof having slope in two directions is called a Gable Roof. This type of sloping roof is used for larger span. 3. Hipped Roof:- A sloping roof having slope in four directions is called Hipped Or Hip Roof. This type of sloping roof is mostly used for buildings in hilly area. 4. Gambrel Roof:- A sloping roof having slope in two directions with a break in the slope is known as Gambrel Roof. This type of sloping roof is mostly used for buildings in hilly area.
  • 56. 5. Mansord roof:- A sloping roof having slope in four directions with a break in slope is known as Mansard Roof 6. Saw tooth or north light roof:- A sloping roof having glazing fixed on the steep sloping sides of the roof is called Saw Tooth Or North Light Roof. This is generally used in factories where more light is required.
  • 57. IMPORTANT TECHNICAL TERMS Ridge:- The highest point or line of a sloping roof where the two opposite slopes meet is known as ridge. Ridge piece:- A horizontal piece of timber which runs the highest level (bridge) of a sloping roof is called ridge piece. Eaves:- The lowest edges of the surfaces of a sloping roof are called eaves. Eave’s board:- A wooden board fixed along the eaves at the end of common rafters is known as eaves board or facia board. Gutter is usually supported at eaves board.
  • 58. Jack rafter:- The short common rafters which run from a hip rafter to the eave of a sloping roof are called jack rafters. Common rafters:- The members supporting the battens or boardings under the covering of a sloping roof are known as common rafters. Gable:- The end of a sloping roof finished in a vertical triangle is called gabled end or gable. Barge:- The finished edge of slating or tiling over-hanging a gable wall is called barge. Barge board:- Wooden planks fixed to the ends of the common rafters projecting beyond the gabled end of a sloping roof is called a barge board.
  • 59. Purlins:- The wooden or steel members laid horizontally to support the common rafters of a sloping roof are called purlins. Cleats:- The pieces of timber or angle-iron which are nailed or screwed (for timber), riveted or welded (for angle-iron) on the trusses, to support the purlins are known as cleats. Battens:- The pieces of wood which are directly nailed to the common rafters are called battens. The roof coverings are directly laid over battens. Pitch:- The inclination of the side of a slopping roof to the horizontal surface is called pitch of the roof. It is usually expressed as the ratio of the rise to the span or in degrees. Truss:- A frame work of members arranged in triangles is called a truss.
  • 60. • Reference Books: 1) Elements of civil engineering by Rakesh Ranjan 2) Elements of civil engineering by B.C.Punamia 3) Basic Civil Engineering by L.G.Kulkarni