• The "Storm water Management And Road Tunnel" or "SMART
Tunnel", is a storm drainage and road structure in Kuala Lumpur,
Malaysia, and a major national project in the country.
• The 9.7 km (6.0 mi) tunnel is the longest storm water tunnel in South
East Asia and second longest in Asia. . It is the longest multi-purpose
tunnel in the world
• The main objective of this tunnel is to solve the problem of flash floods
in Kuala Lumpur and also to reduce traffic jams during rush hour.
• There are two components of this tunnel, the storm water tunnel and
motorway tunnel.
ROUTE
It begins at Kampung
Berembang lake near
Klang River at Ampang
and ends at Taman Desa
lake near Kerayong River
at Salak South.
HISTORY
• In 2001 the Government sought proposals for a solution that would
allow a typical flood of three to six hours’ duration to occur without
flooding the city center. A tunnel that would allow floods to bypass the
center was one way of achieving this, providing it was coupled with
temporary storage facilities to keep flows downstream of Kuala
Lumpur within the capacity of the river channel.
• A group led by Gamuda engaged SSP, a large Malaysian consultant
engineering firm, and Mott MacDonald UK to develop proposals for a
tunnel with holding ponds at upstream and downstream ends of the
tunnel.
• Construction of the tunnel began in 25 November 2003.
CONSTRUCTION
OF SMART
TUNNEL
CONSTRUCTION
• Two Tunnel Boring Machines (TBM) from Germany manufactured by
Herrenknecht were used, including "Tuah" on north side and
"Gemilang" on south side.
• Gusztáv Klados was the senior project manager of the project.
• The motorway sections on the SMART system was officially opened at
3:00PM, 14 May 2007.
• Meanwhile, the storm water sections on the SMART system began
operations at the end of January 2007.
• As of 18 July 2010 the SMART system has prevented seven potentially
disastrous flash floods in the city center.
How the
SMART Tunnel
works?
• The first mode, under normal
conditions where there is no
storm, no flood water will be
diverted into the system.
Mode 1:
No storm,
low
rainfall
• When the second mode is activated,
flood water is diverted into the
bypass tunnel underneath the
motorway tunnel. The motorway
section is still open to traffic at this
stage
Mode 2:
Moderate
storm
• When the third mode is in operation, the
motorway will be closed to all traffic. After
making sure all vehicles have exited the
motorway, automated water-tight gates will
be opened to allow flood waters to pass
through. The motorway will be reopened to
traffic within 48 hours of closure.
Mode 3:
Major
storm
TECHNICAL
SPECIFICATIONS
OF SMART
TUNNEL
The north bound entrance of SMARTTunnel on the
Kuala Lumpur-Seremban Expressway.
Stormwater tunnel
• Construction cost: US$ 514.6 million
• Stormwater tunnel length: 9.7 km (6.0 mi)
• Diameter: 13.2 m (43.3 ft.) (outer diameter)
• Tunneling method: Tunnel Boring Machine (TBM)
• TBM type: Slurry shield
Slurry Shield TBM
• Slurry shields are TBM fitted with a
full face cutter head which provides
face support by pressurizing boring
fluid inside the cutter head chamber.
• These machines are most suited for
tunnels through unstable material
subjected to high groundwater pressure
or water inflow that must be stopped by
supporting the face with a boring fluid
subjected to pressure.
Motorway tunnel
• Motorway tunnel length: 4 km (2.5 mi)
• Structure type: Double Deck
• Ingress and egress: 1.5 km (0.93 mi) at Jalan Sultan Ismail and Jalan
Imbi
• Length: 1.4 km (0.87 mi) at Jalan Tun Razak
• Links: 1.6 km (0.99 mi) at Kuala Lumpur-Seremban Expressway
Links: City Centre near Kg. Pandan Roundabout KL-Seremban
Expressway near Sungai Besi Airport
FEATURES OF SMART TUNNEL
• Longest tunnel in Malaysia.
• 9.7 km (6.03 miles) stormwater by-pass tunnel.
• 4 km (2.49 miles) double-deck motorway within stormwater tunnel.
• The motorway tunnel is suitable for light vehicles only. Motorcycles
and heavy vehicles are not allowed.
• Ingress and egress connections to the motorway tunnel linking the
southern gateway to the city center.
FEATURES OF SMART TUNNEL (cont.)
• Holding basin complete with diversion and tunnel intake structures.
• Storage reservoir and a twin-box culvert to release flood discharge.
• State-of-the-art operations control room equipped with the latest
systems in operations management, surveillance and maintenance of
the SMART system.
• Custom-made fire engine units consisting of two modified Toyota
Hiluxes, parked at two different locations for quick access to the tunnel
in case of fire on both carriageways.
CCTV
monitoring of
SMART Tunnel
TOLLS
CLASS TYPE OF VEHICLES Rate
(in Malaysian ringgit (RM))
1 Private cars RM 3.00
2 Taxis RM 3.00
 SMART Tunnel toll plaza has now fully Electronic Toll
Collections (ETC)
 As part of an initiative to facilitate faster transaction at the
SMART Tunnel Toll Plaza, all toll transactions at this toll plaza
on the SMART Tunnel has now conducted electronically via
Touch 'n Go cards or SmartTAGs starting 9 September 2015.
FM Radio channels available in the tunnel
Radio Frequencies
Nasional FM 87.7 MHz
KL FM 97.2 MHz
Radio Klasik FM 95.3 MHz
Hot FM 97.6 MHz
Fly FM 95.8 MHz
hitz.fm 92.9 MHz
Traxx FM 90.3 MHz
BFM 89.9 89.9 MHz

More Related Content

What's hot

Underwater construction
Underwater construction Underwater construction
Underwater construction Pranay Kumar
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryIEI GSC
 
Underground construction
Underground constructionUnderground construction
Underground constructionAglaia Connect
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro railkarthik1923
 
Rbte Drainage system in tunnel
 Rbte Drainage system in tunnel Rbte Drainage system in tunnel
Rbte Drainage system in tunnelSukhvinder Singh
 
Study of Bridge Bearings
Study of Bridge BearingsStudy of Bridge Bearings
Study of Bridge BearingsAyushHajare
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONHamsui Harold
 
Rmc plant
Rmc plantRmc plant
Rmc plantKp Ahm
 
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMDeepak Verma
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...
Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...
Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...Ganesh Raut
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
 
Pullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineeringPullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineeringMohammed Layth
 

What's hot (20)

Underwater construction
Underwater construction Underwater construction
Underwater construction
 
Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industry
 
Underground construction
Underground constructionUnderground construction
Underground construction
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Rbte Drainage system in tunnel
 Rbte Drainage system in tunnel Rbte Drainage system in tunnel
Rbte Drainage system in tunnel
 
DE GTU Floating bridge
DE GTU Floating bridge DE GTU Floating bridge
DE GTU Floating bridge
 
Pumped Concrete
Pumped Concrete Pumped Concrete
Pumped Concrete
 
Study of Bridge Bearings
Study of Bridge BearingsStudy of Bridge Bearings
Study of Bridge Bearings
 
Methods of concreting
Methods of concretingMethods of concreting
Methods of concreting
 
Road patten
Road pattenRoad patten
Road patten
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTION
 
Rmc plant
Rmc plantRmc plant
Rmc plant
 
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEM
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...
Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...
Industrial Visit report of Dam prepared by _Er. Ganesh Raut_ Sewri Engineerin...
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Pullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineeringPullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineering
 

Viewers also liked

Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.Faisal Rasool
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slidesDoreen Yeo
 
innovative railway track surveying with sensors and controlled by wireless co...
innovative railway track surveying with sensors and controlled by wireless co...innovative railway track surveying with sensors and controlled by wireless co...
innovative railway track surveying with sensors and controlled by wireless co...kalaimathi mathiyazhagan
 
Nature of Entrepreneurship
Nature of EntrepreneurshipNature of Entrepreneurship
Nature of EntrepreneurshipXophia Montawal
 
Drainage system
Drainage systemDrainage system
Drainage systemNikhil Jp
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

Viewers also liked (10)

Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
SMART TUNNEL
SMART TUNNELSMART TUNNEL
SMART TUNNEL
 
innovative railway track surveying with sensors and controlled by wireless co...
innovative railway track surveying with sensors and controlled by wireless co...innovative railway track surveying with sensors and controlled by wireless co...
innovative railway track surveying with sensors and controlled by wireless co...
 
Nature of Entrepreneurship
Nature of EntrepreneurshipNature of Entrepreneurship
Nature of Entrepreneurship
 
Nano concrete ppt
Nano concrete  pptNano concrete  ppt
Nano concrete ppt
 
Nano concrete ppt3
Nano concrete ppt3Nano concrete ppt3
Nano concrete ppt3
 
Storm water drainage
Storm water drainageStorm water drainage
Storm water drainage
 
Drainage system
Drainage systemDrainage system
Drainage system
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similar to Smart tunnel

SMART (Stormwater Management And Road Tunnel) (1).pptx
SMART (Stormwater Management And Road Tunnel) (1).pptxSMART (Stormwater Management And Road Tunnel) (1).pptx
SMART (Stormwater Management And Road Tunnel) (1).pptxAngChernXing
 
MRT TRANSPORTATION
MRT TRANSPORTATION MRT TRANSPORTATION
MRT TRANSPORTATION Shadina Shah
 
IRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET Journal
 
Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment XinYee Khoo
 
Sustainable Stormwater Management
Sustainable Stormwater Management Sustainable Stormwater Management
Sustainable Stormwater Management Shane Ah
 
USBRL Railway Project Presentation
USBRL Railway Project PresentationUSBRL Railway Project Presentation
USBRL Railway Project PresentationSunil Kumar Meena
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System Yousef Abujubba
 
Kolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptxKolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptximsuraj2309
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design AnalysisDanish Ryan
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPPSaad Raja
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresBimenpreet Kaur
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia LogisticsYAU MEE LIM
 
Kashmirrailproject
KashmirrailprojectKashmirrailproject
Kashmirrailprojectpankaj kumar
 
NHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdfNHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdfShujaMehdi3
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSKona Mahesh
 

Similar to Smart tunnel (20)

Smart tunnel
Smart  tunnelSmart  tunnel
Smart tunnel
 
SMART (Stormwater Management And Road Tunnel) (1).pptx
SMART (Stormwater Management And Road Tunnel) (1).pptxSMART (Stormwater Management And Road Tunnel) (1).pptx
SMART (Stormwater Management And Road Tunnel) (1).pptx
 
MRT TRANSPORTATION
MRT TRANSPORTATION MRT TRANSPORTATION
MRT TRANSPORTATION
 
348
348348
348
 
IRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road Tunnel
 
BS ASSIGNMENT
BS ASSIGNMENTBS ASSIGNMENT
BS ASSIGNMENT
 
Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment
 
Sustainable Stormwater Management
Sustainable Stormwater Management Sustainable Stormwater Management
Sustainable Stormwater Management
 
USBRL Railway Project Presentation
USBRL Railway Project PresentationUSBRL Railway Project Presentation
USBRL Railway Project Presentation
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System
 
Kolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptxKolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptx
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design Analysis
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
Urban presentation
Urban presentationUrban presentation
Urban presentation
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
 
Kashmirrailproject
KashmirrailprojectKashmirrailproject
Kashmirrailproject
 
NHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdfNHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdf
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMS
 

Recently uploaded

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 

Recently uploaded (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Smart tunnel

  • 1. SMART TUNNEL (Stormwater Management And RoadTunnel) PRESENTED BY : SAQIB MAHAL REG NO. : 14-CE-63 UET TAXILA
  • 3. SMART TUNNEL • The "Storm water Management And Road Tunnel" or "SMART Tunnel", is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. • The 9.7 km (6.0 mi) tunnel is the longest storm water tunnel in South East Asia and second longest in Asia. . It is the longest multi-purpose tunnel in the world • The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams during rush hour. • There are two components of this tunnel, the storm water tunnel and motorway tunnel.
  • 4. ROUTE It begins at Kampung Berembang lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South.
  • 5. HISTORY • In 2001 the Government sought proposals for a solution that would allow a typical flood of three to six hours’ duration to occur without flooding the city center. A tunnel that would allow floods to bypass the center was one way of achieving this, providing it was coupled with temporary storage facilities to keep flows downstream of Kuala Lumpur within the capacity of the river channel. • A group led by Gamuda engaged SSP, a large Malaysian consultant engineering firm, and Mott MacDonald UK to develop proposals for a tunnel with holding ponds at upstream and downstream ends of the tunnel. • Construction of the tunnel began in 25 November 2003.
  • 7. CONSTRUCTION • Two Tunnel Boring Machines (TBM) from Germany manufactured by Herrenknecht were used, including "Tuah" on north side and "Gemilang" on south side. • Gusztáv Klados was the senior project manager of the project. • The motorway sections on the SMART system was officially opened at 3:00PM, 14 May 2007. • Meanwhile, the storm water sections on the SMART system began operations at the end of January 2007. • As of 18 July 2010 the SMART system has prevented seven potentially disastrous flash floods in the city center.
  • 9. • The first mode, under normal conditions where there is no storm, no flood water will be diverted into the system. Mode 1: No storm, low rainfall
  • 10. • When the second mode is activated, flood water is diverted into the bypass tunnel underneath the motorway tunnel. The motorway section is still open to traffic at this stage Mode 2: Moderate storm
  • 11. • When the third mode is in operation, the motorway will be closed to all traffic. After making sure all vehicles have exited the motorway, automated water-tight gates will be opened to allow flood waters to pass through. The motorway will be reopened to traffic within 48 hours of closure. Mode 3: Major storm
  • 12. TECHNICAL SPECIFICATIONS OF SMART TUNNEL The north bound entrance of SMARTTunnel on the Kuala Lumpur-Seremban Expressway.
  • 13. Stormwater tunnel • Construction cost: US$ 514.6 million • Stormwater tunnel length: 9.7 km (6.0 mi) • Diameter: 13.2 m (43.3 ft.) (outer diameter) • Tunneling method: Tunnel Boring Machine (TBM) • TBM type: Slurry shield
  • 14. Slurry Shield TBM • Slurry shields are TBM fitted with a full face cutter head which provides face support by pressurizing boring fluid inside the cutter head chamber. • These machines are most suited for tunnels through unstable material subjected to high groundwater pressure or water inflow that must be stopped by supporting the face with a boring fluid subjected to pressure.
  • 15. Motorway tunnel • Motorway tunnel length: 4 km (2.5 mi) • Structure type: Double Deck • Ingress and egress: 1.5 km (0.93 mi) at Jalan Sultan Ismail and Jalan Imbi • Length: 1.4 km (0.87 mi) at Jalan Tun Razak • Links: 1.6 km (0.99 mi) at Kuala Lumpur-Seremban Expressway Links: City Centre near Kg. Pandan Roundabout KL-Seremban Expressway near Sungai Besi Airport
  • 16. FEATURES OF SMART TUNNEL • Longest tunnel in Malaysia. • 9.7 km (6.03 miles) stormwater by-pass tunnel. • 4 km (2.49 miles) double-deck motorway within stormwater tunnel. • The motorway tunnel is suitable for light vehicles only. Motorcycles and heavy vehicles are not allowed. • Ingress and egress connections to the motorway tunnel linking the southern gateway to the city center.
  • 17. FEATURES OF SMART TUNNEL (cont.) • Holding basin complete with diversion and tunnel intake structures. • Storage reservoir and a twin-box culvert to release flood discharge. • State-of-the-art operations control room equipped with the latest systems in operations management, surveillance and maintenance of the SMART system. • Custom-made fire engine units consisting of two modified Toyota Hiluxes, parked at two different locations for quick access to the tunnel in case of fire on both carriageways.
  • 19. TOLLS CLASS TYPE OF VEHICLES Rate (in Malaysian ringgit (RM)) 1 Private cars RM 3.00 2 Taxis RM 3.00  SMART Tunnel toll plaza has now fully Electronic Toll Collections (ETC)  As part of an initiative to facilitate faster transaction at the SMART Tunnel Toll Plaza, all toll transactions at this toll plaza on the SMART Tunnel has now conducted electronically via Touch 'n Go cards or SmartTAGs starting 9 September 2015.
  • 20. FM Radio channels available in the tunnel Radio Frequencies Nasional FM 87.7 MHz KL FM 97.2 MHz Radio Klasik FM 95.3 MHz Hot FM 97.6 MHz Fly FM 95.8 MHz hitz.fm 92.9 MHz Traxx FM 90.3 MHz BFM 89.9 89.9 MHz