This document provides a design example for a three-span prestressed concrete girder bridge with a 50 ft wide roadway. It includes summaries of the superstructure design process, which involves deck design using the standard NMDOT detail, girder analysis and design using CONSPAN software, and bearing pad design. The substructure design process involves preliminary pier and abutment designs, including pier column and drilled shaft designs, and consideration of seismic design requirements. Load and Resistance Factor Design (LRFD) methods are used throughout the design example.