design case study
GENERALI            A.G.S.P.A office fit out at Rolex Towers, Dubai
client profile
• a major international player in Insurance & financial products.
• experienced in handling new fit outs and refurbishments.
• present in more than 60 countries
• over 500 international companies
• over 85,000 employees
• over 70 millions clients worldwide
• the Group's own sales network employs more than 100,000
  people
• more than € 400 billion worth of assets
• a property portfolio worth more than € 24 billion
project facts
•   Area of fit out: 665 m2
•   Headcount: 60 staff (11.08 m2/head)
•   Cost of fit out: 3.2 mio (aed 4812/m2)
•   Pre contract period-(phase 1): 1.5 months-July 2010
•   Execution period: 1.5 months
•   Pre contract period (phase 2): 0.5 month Jan 2011
•   Execution period: 3 months aprx – May 2011
•   Rectification period: 3 months aprx- June 2011
•   Overall timeline: July 2010-June 2011
•   Competition: Not much
•   Scope of work: Turn key design and build
•   ARI capability experience: well versed
•   Design team: Chaitali, Faruk
•   Sales team: Hameed, Roy
•   Engg team: Vijay Kadam, Asad
•   Client team: Mr.Girish Kulkarni-GM, Mr.Shaji
site




       wing    lobby




       lobby   wing
site




  wing     wing 2




  window   detail
entrance lobby
entrance lobby
reception
reception
meeting room
meeting room
board room
board room
training room
break out room
private offices
open office
open office
open office
challenges

•   Density & too many space requirements
•   Site parameters
•   Client aspirations of look and feel
•   ARI Product mix & availability
•   Authority approvals
•   Internal co-ordination
pre contract process

•   Space planning
•   Concept design intent
•   Estimation-fit out and furniture
•   Commercial bid
•   Contract administration
space plan-phase 1
visualizations
space plan-phase 2
various plans
visualizations
furniture
post contract and pre execution
process

•   Team formation
•   Project planning
•   Landlord submissions
•   Authority approvals
•   Shop drawings-group companies & vendors
•   Procurements-fit out & furniture
shop drawings
execution process
•   Project schedule
•   Qualitative supervision
•   Client co-ordination
•   Changes & variations
post execution process

•   Rectifications
•   Design solutions to changes & problems
•   Final submittals & certifications
•   Commercial closure
design solutions
design solutions
design solutions
key learnings

•   Space utilization
•   Client communication-channels & assimilation
•   Blind spots in the recipe
•   Value engineering & product mix
•   Vendor control
•   QA/QC
•   Passive preparations
•   Rectifications & solutions
•   Client behavior & relative evolution
thank you..!
• Hope you leave wiser about design projects
• Become more sympathetic and symbiotic with designers,
  estimators & clients
• Listen better to clients and convey designers &
  estimators about aspirations of the project
• Devise the internal control for effective co-ordination
  within ARI departments & group companies
• Eliminate blind spots & rude surprises
• Be astute at problem solving, people skills & think lateral
• Control losses and make better profits with a happy
  client.

Design Case Study Generali

  • 1.
    design case study GENERALI A.G.S.P.A office fit out at Rolex Towers, Dubai
  • 2.
    client profile • amajor international player in Insurance & financial products. • experienced in handling new fit outs and refurbishments. • present in more than 60 countries • over 500 international companies • over 85,000 employees • over 70 millions clients worldwide • the Group's own sales network employs more than 100,000 people • more than € 400 billion worth of assets • a property portfolio worth more than € 24 billion
  • 3.
    project facts • Area of fit out: 665 m2 • Headcount: 60 staff (11.08 m2/head) • Cost of fit out: 3.2 mio (aed 4812/m2) • Pre contract period-(phase 1): 1.5 months-July 2010 • Execution period: 1.5 months • Pre contract period (phase 2): 0.5 month Jan 2011 • Execution period: 3 months aprx – May 2011 • Rectification period: 3 months aprx- June 2011 • Overall timeline: July 2010-June 2011 • Competition: Not much • Scope of work: Turn key design and build • ARI capability experience: well versed • Design team: Chaitali, Faruk • Sales team: Hameed, Roy • Engg team: Vijay Kadam, Asad • Client team: Mr.Girish Kulkarni-GM, Mr.Shaji
  • 4.
    site wing lobby lobby wing
  • 5.
    site wing wing 2 window detail
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
    challenges • Density & too many space requirements • Site parameters • Client aspirations of look and feel • ARI Product mix & availability • Authority approvals • Internal co-ordination
  • 21.
    pre contract process • Space planning • Concept design intent • Estimation-fit out and furniture • Commercial bid • Contract administration
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
    post contract andpre execution process • Team formation • Project planning • Landlord submissions • Authority approvals • Shop drawings-group companies & vendors • Procurements-fit out & furniture
  • 29.
  • 30.
    execution process • Project schedule • Qualitative supervision • Client co-ordination • Changes & variations
  • 31.
    post execution process • Rectifications • Design solutions to changes & problems • Final submittals & certifications • Commercial closure
  • 32.
  • 33.
  • 34.
  • 35.
    key learnings • Space utilization • Client communication-channels & assimilation • Blind spots in the recipe • Value engineering & product mix • Vendor control • QA/QC • Passive preparations • Rectifications & solutions • Client behavior & relative evolution
  • 36.
    thank you..! • Hopeyou leave wiser about design projects • Become more sympathetic and symbiotic with designers, estimators & clients • Listen better to clients and convey designers & estimators about aspirations of the project • Devise the internal control for effective co-ordination within ARI departments & group companies • Eliminate blind spots & rude surprises • Be astute at problem solving, people skills & think lateral • Control losses and make better profits with a happy client.