1. Moataz Mohamed Ghanem
Technical Supervisor -Projects_ EMAAR RETAIL Group
Education, Training & Certifications:
- 2015-05 : Project Management Professional -PMPcertified by Emaar
- 2014 : Preparatory Master
- 2010-07 : B.Sc. Engineering, Department of Architecture, Mansoura University
- 2010 : Graduation project is International Airport Grade Excellent (91%).
2011 : Governmental Competition to solve Mansoura Traffic Problems – First Prize
- 2005 : High School_Talat Harb School Egypt Grade (98%).
- 2015 : UAE Auto Driving License.
- 2012 : Member of Saudi Council of Engineers, KSA.
- 2011 : Professional Architect License from Jeddah Municipality, KSA
- 2010 : Egyptian Engineers Syndicate. Egypt
Languages
- Arabic, English.
Computer Skill
- 3Ds studio max _ modeling _ rendering VRAY,Mental Ray.
- AutoCAD – Architectural.
- Autodesk Revit - Architectural2013.
- Adobe Photoshop
- Google Sketch up
- Ecotect
- Microsoft Office Applications
- Movie Maker
Professional Experience
Summary:
- 5 Years of insightful construction and architectural experience across multi-lateral projects (Commercial
buildings, Educational Buildings, Mixed Use Buildings, Transportation Buildings, Retail L&E Projects,
Residential Building, Offices and Interior fit-outs and modification works inside commercial spaces) with lean
enhancement of roles and responsibilities. I am a globally competent and confident young professional with
lots of positive attitude and determination towards my work. My Interpersonal skills are flexible to be a pro-
active part of any work culture and any team of a global organization. I strongly believe that Attitude,
Knowledge and skill is essential for success of any work.
Current Job Responsibilities
- Conceptual Design, preparing the initial sketches,ideas and reviewing the concept architecture
- Drawings, Perspectives etc.
- Preparing and reviewing the schematic drawings.
- Reviewing the MEP drawings.
- Calculating and reviewing the POQs - and the specifications of raw materials.
- Determined the final finish materials with the methods of installation and maintenance.
- Quality Control Testing..
On Site
- Monitoring the progress of the projects with required progress coordinating methods
- Supervising and controlling the workflow and also following the correct order of each step for implementation
of the project on time.
- Materials quality testing.
- Monitoring the storing way,the installation and the final output.
- Project delivery on time as per proposed time frame.
2. 1) Technical Supervisor
- EMAAR RETAIL Group – Dubai – UAE
June 2014 – Present
Projects:
- DUBAI ICE RINK Enhancement Project. Aug 2014 – Feb 2015
- NJOI - DMM Entertainment Zone. Dec 2014 – March 2015
- KIDZANIA – Develop and Establish New Pavilions. June 2014 – Present.
- Sega Republic – Retail Projects and Sega Slider Projects. Sep 2014 – Dec 2014
Scope ofWork:
- Concept Design and Preparing the Architecture Design Drawings – Design Review – Review of Project
Documents and contracts – Monitor and control of all projects – Preparation of technical permits- Approval of
technical documents and drawings – Project Planning & Scheduling-Supervisions of site activities – Site
Progress Monitoring – Monthly Reports .
Work Summary:
- Develop KPI’s to measure the performance of Consultants, contractors,to ensure that best quality of services
is delivered to Emaar.
- Develop Policies; control Procedures and protocols to ensure the deliverables in conformance to the standards
and end user requirements
- Review and prepare of Architectural provisions, Flooring design and theming redesign, Materials
specifications and detailed schedule of reinforcements to ensure integrity in proposed drawings.
- Develop Inspection-Testing Plan (ITP’s) and QA Manuals.
- Develop reports to the project manager and administering the updates with the document control team.
- To co-ordinate meeting among Emaar Management, Consultants and Contractor.
- Control Project Documents, Drawings and issue approvals, permits related to the project.
- Monitor and control of the project progress without closing the facility operations.
- Establish and administer the Quality Control system for all project documentation.
- Regularly communicate project status to executive and operations management team.
Projects:
- AQUARIUM – RetailProjects and Entrance Enhancement. March 2014 – Present.
- REEL CINEMAS – Retail Projects and Refurbishment Projects. April 2014 – Present.
Scope ofWork:
- Design Review – Review of Project Documents and contracts- Monitor and control of all projects-Preparation
of technical permits- Approval of technical documents and drawings- Project Planning & Scheduling-
Supervisions.
Work Summary:
- Prepare and review of Architectural provisions, Facade design and interiors redesign, Materials specifications
and detailed schedule of reinforcements to ensure integrity in proposed drawings.
- Integrate project plans with other major initiatives. Work with project team to identify and resolve problems.
- Prepare detailed Project Plans for the works program, and coordinate the work of all site operations.
- Develop site studies and operations conditions statement to prepare the prepare plan for managing the project
activities on site on parallel with operations.
- Develop reports to the project manager and administering the updates with the document control team
- Develop KPI’s to measure the performance of Consultants, contractors,to ensure that best quality of services
is delivered to Emaar.
3. 2) Senior Architect
- Al-Assaf Consultants Engineering, Jeddah, KSA.
Oct 2010 – April 2014.
Projects:
- Commercial Building – Mini Mall, TAHLYA Hotel
- Residential Building – More than 60 Residential Building _ Villas and Apartments etc.
- Educational Building – Local Primary School
- Retail – Tea Garden Café,AlSHIAKA Show Rooms
- Offices – Development of Ministry of Labor – KSA
Scope:
- Concept Design and Preparing the Architecture Design Drawings – Obtaining a license for the construction of
Municipal, Permits Tourism Authority of _ first class, All Project Presentations.. Project Planning &
Scheduling-Supervisions of site activities- Stakeholder management – Project Control measurements
Work Summary
- Prepare and design of main architectural concept proposals and coordinating the meeting between the
management and owners, stakeholder.
- Prepare all architecture drawings, Exterior and interiors, Determine Materials specifications and detailed
schedule.
- Develop detailed work plans, schedule, project estimates, resource plans, and status reports
- Prepare the governmental documents and reports requested by governmental institutes for extracting the
authorization Licenses.
- Check the daily activities at the office and site progress and solving critical issues related to the work
activities
- Reviewing the POQs and contractors quotations and materials selection.
- To update work progress to the project manager and MIS system on a daily basis.
- Preparing the monthly reports and collating information from the team. Preparing reports as required for the
project
Core Competency Area:
- Insightful knowledge on Design, Perspectives Rendering, Urban planning, Presentations and Control of all
interior fit-outs construction projects.
- Knowledge on tools and techniques of project control measures,Resource control techniques.
- Knowledge of classification of all architecture work activities within global Standards.
- Knowledge of the best Architecture engineering practices and principles across the globe.
- Administration and control of Project documents (TDR) and Records.
- Excellent Presentation and Communication Skills to any level of authority.
Personal Profile
- Name : Moataz Mohamed Ghanem
- Nationality : Egyptian
- Date of Birth : 25.05.1988
- Marital Status : Married
- Mobile phone : +971 558542106
- Mail : moataz.ghanem@gmail.com
- Passport No : A02507843
- Current Location : Dubai