8/9/2014 Dealing with Construction Permits in Malaysia - Doing Business - World BankGroup
http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealing-with-construction-permits 1/2
Below is a detailed summary of the procedures, time and costs to build a warehouse in Malaysia. This
includes obtaining necessary licenses and permits, completing required notifications and inspections and
obtaining utility connections.
This information was collected as part of the Doing Business project, which measures and compares
regulations relevant to the life cycle of a small- to medium-sized domestic business in 189 economies.
The most recent round of data collection was completed in June 2013. Read the methodology.
Compare Malaysia to 188 other economies.
STANDARDIZED COMPANY
Estimated Warehouse Value: MYR
2,000,000
City: Kuala Lumpur
More Information
Learn more about this economy
Read the methodology for this topic
View the rankings
No. Procedure
Time to
Complete
Associated
Costs
1 Submit and obtain Development Approval through OSC
Builders can now apply for construction permits through OSC 1Submission (single entry). OSC will then refer the
submissions to the Planning Department, Building Department, Engineering Department, Fire Department, Sewerage
Agency, Water Agency and the Telecommunication Operators.
OSC will issue the development approval (Planning aprrovals, Building approvals, Engineering approvals, Fire safety plan
endorsements, water approvals, sewerage works approvals and Telecommunications approvals) to the builder. While all
forms can be obtained online at jprb.dbkl.gov.my/Pentadbir/MuatTurunBorangOSC/MTBorang11.asp, the filing has still to be
done in person at the OSC.
Builder will submit and obtain approval through OSC for the following documents:
• Planning plan
• Building plan
• Engineering plan (earthwork, road & drainage plan, road excavation permit & street lighting plan)
• Landscape plan
• Water supply plan
• Sewerage plan
• Infrastructure communication plan
• Fire safety plan
Estimated Processing Costs
1. Planning plan = MYR 500.00
2. Building plan= MYR 1,300.
3. Engineering plan = MYR 100.00
4. Water supply plan = MYR 1,000.00
1. Submission to Local Authority through OSC
2. Obtain Development Order (DO) from Planning Department
3. Obtain Water Approval
4. Obtain Sewerage Approval
5. Obtain Fire Safety (Arch) Comment
6. Obtain Earthwork Approval
7. Obtain Road and Drainage Approval
8. Obtain Landscape Approval
9. Obtain Street Lighting Approval
10. Obtain MSMA and SPAH Approvals
11. Obtain Building Plan Approval
12. Obtain Fire Safety (M&E) Approval
Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC)
61 days MYR
2,900
2 Submit pre-construction notifications to OSC
Under OSC 1Submission, all notifications are submitted via OSC. OSC will then distribute notifications to the relevant
agencies such as:
• Building Department (B Form - notification to start building work)
• Engineering Department (B Form - notification to start earthwork)
• Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work)
Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC)
1 day no charge
3 Request final utilities inspections through OSC
Under OSC 1Submission, the builder has to request for inspections via OSC. OSC will arrange and coordinate inspections
and connections schedule with relevant agencies
1. TELCO connection = MYR495.00
2. Water connection = MYR 30.00
3. Fire safety inspection = MYR 111.00
Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC)
1 day MYR 636
EXPLORE ECONOMY DATA
8/9/2014 Dealing with Construction Permits in Malaysia - Doing Business - World BankGroup
http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealing-with-construction-permits 2/2
Home Data Malaysia Dealing with Construction Permits
THE WORLD BANK GROUP IBRD IDA IFC MIGA ICSID
© 2014 The World Bank, All Rights Reserved. Legal Home Contact Us
4 Receive Road and Drainage Final Inspection
Once the road and drainage works has been completed, the builder will request the Road and Drainage clearance letter from
the Engineering Department of CHKL. The builder has to submit a construction report notification and by signing form G 17,
the Engineer certifies that all works were carried out according to regulations. Form G17 will be filed along with Form F
(Certificate of Completion and Compliance (CCC) via OSC to the Engineering Department.
Agency: Sewerage Certifying Agency (IWK)
1 day no charge
5 Obtain Road and Drainage Clearance Letter
A date for the inspection will be set-up prior to the issuance of clearance letter for the road and drainage work
Agency: Sewerage Certifying Agency (IWK)
12 days no charge
6 Receive Sewage Final Inspection
The Sewerage Certifying Agency (IWK) will carry out an inspection of the sewerage system and issue to the builder a
clearance letter for sewerage.
Agency: Sewerage Certifying Agency (IWK)
1 day no charge
7 Obtain Sewage Clearance Letter
Once the inspection has been carried out, a clearance letter is issued to the Builder. This clearance letter will allow the
Engineer to issue the Certificate of Completion and compliance (CCC).
Agency: Sewerage Certifying Agency (IWK)
12 days no charge
8 Receive Fire Safety Final Inspection
Fire and Rescue Department will carry out fire safety inspection
Agency: Fire and Rescue Department
1 day no charge
9 Obtain Fire Safety Final Letter
Fire and Rescue Department will issue to the builder the clearance letter for fire safety
Agency: Fire Department
12 days no charge
* 10 Receive Water Inspection
Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe.
Agency: Water Authority SYABAS
1 day no charge
11 Submit Water Test and Commissioning (T&C) Report
Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe.
Agency: Water Authority SYABAS
11 days no charge
* 12 Obtain Water Clearance Letter
The Water Authority SYABAS will issue a clearance letter to the builder and install the water meter at the same time for water
connection.
Agency: Water Authority SYABAS
1 day MYR
1,000
13 Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC)
The Builder’s Principal Submitting Person (professional|architect) will issue Certificate of Completion and compliance (Form
F - CCC) to the Builder/Owner and 2 copies of the CCC will be filed at the OSC for the Building Department (JRBB) and the
Board of Architects/Engineers (LAM/LJM).
Agency: Building Department and Board of Architect via OSC.
1 day no charge
14 Obtain Water Connection
Agency: Water Authority SYABAS
1 day no charge
* 15 Obtain Telco Connection
Agency: Telekom Malaysia (Telco)
15 days no charge
* Takes place simultaneously with another procedure.

More Related Content

What's hot

Job site notice jsn
Job site notice jsnJob site notice jsn
Job site notice jsn
Ahmed Sakr
 
gas pipe line project report.
gas pipe line project report.gas pipe line project report.
gas pipe line project report.
Hagi Sahib
 
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESDETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
Navya Jayakumar
 
Harsh
HarshHarsh
Harsh
CHAYANKT
 
EZZAT SHAHEEN CV.compressed
EZZAT SHAHEEN  CV.compressedEZZAT SHAHEEN  CV.compressed
EZZAT SHAHEEN CV.compressedEzzat Aljourdi
 
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Nitin Kadam
 
hectorRuedaPCCSPOWER POINT
hectorRuedaPCCSPOWER POINThectorRuedaPCCSPOWER POINT
hectorRuedaPCCSPOWER POINTHector Rueda
 
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
REDceo.net
 
Prjm project management
Prjm project managementPrjm project management
Prjm project management
Rakesh Kumar
 

What's hot (18)

SRIHARI-RESUME
SRIHARI-RESUMESRIHARI-RESUME
SRIHARI-RESUME
 
WAB Profile 20160425
WAB Profile 20160425WAB Profile 20160425
WAB Profile 20160425
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
CV
CVCV
CV
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
SPACEMAKER KSA
SPACEMAKER KSASPACEMAKER KSA
SPACEMAKER KSA
 
june'15
june'15june'15
june'15
 
Job site notice jsn
Job site notice jsnJob site notice jsn
Job site notice jsn
 
gas pipe line project report.
gas pipe line project report.gas pipe line project report.
gas pipe line project report.
 
Monthly Cost Report May 15
Monthly Cost Report May 15Monthly Cost Report May 15
Monthly Cost Report May 15
 
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESDETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
 
Harsh
HarshHarsh
Harsh
 
EZZAT SHAHEEN CV.compressed
EZZAT SHAHEEN  CV.compressedEZZAT SHAHEEN  CV.compressed
EZZAT SHAHEEN CV.compressed
 
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
 
hectorRuedaPCCSPOWER POINT
hectorRuedaPCCSPOWER POINThectorRuedaPCCSPOWER POINT
hectorRuedaPCCSPOWER POINT
 
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
 
Prjm project management
Prjm project managementPrjm project management
Prjm project management
 

Similar to Dealing with construction permits in malaysia doing business - world bank group

Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Hurdles to acquiring rajuk and cda permits
Hurdles to acquiring rajuk and cda permitsHurdles to acquiring rajuk and cda permits
Hurdles to acquiring rajuk and cda permits
M S Siddiqui
 
OW_13092023_EN_www.pdf
OW_13092023_EN_www.pdfOW_13092023_EN_www.pdf
OW_13092023_EN_www.pdf
Baltic Wind
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
hassanyoussef26
 
OW_13092023_EN_www.pptx
OW_13092023_EN_www.pptxOW_13092023_EN_www.pptx
OW_13092023_EN_www.pptx
Baltic Wind
 
Ici final project
Ici final projectIci final project
Ici final projectkongzc
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
Clement Seong
 

Similar to Dealing with construction permits in malaysia doing business - world bank group (20)

Authorities ici
Authorities iciAuthorities ici
Authorities ici
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
Ici final project
Ici final projectIci final project
Ici final project
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Hurdles to acquiring rajuk and cda permits
Hurdles to acquiring rajuk and cda permitsHurdles to acquiring rajuk and cda permits
Hurdles to acquiring rajuk and cda permits
 
OW_13092023_EN_www.pdf
OW_13092023_EN_www.pdfOW_13092023_EN_www.pdf
OW_13092023_EN_www.pdf
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
Engr. Abo ElSoud CV-2017
Engr.  Abo ElSoud CV-2017Engr.  Abo ElSoud CV-2017
Engr. Abo ElSoud CV-2017
 
OW_13092023_EN_www.pptx
OW_13092023_EN_www.pptxOW_13092023_EN_www.pptx
OW_13092023_EN_www.pptx
 
Ici final project
Ici final projectIci final project
Ici final project
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
Plexux holding
Plexux holdingPlexux holding
Plexux holding
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 

More from Jaclyn Hwang

Taylor's university buddhist club
Taylor's university buddhist clubTaylor's university buddhist club
Taylor's university buddhist club
Jaclyn Hwang
 
Social psychology tutorial exercise
Social psychology tutorial exerciseSocial psychology tutorial exercise
Social psychology tutorial exercise
Jaclyn Hwang
 
SOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGE
SOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGESOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGE
SOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGE
Jaclyn Hwang
 
SOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UP
SOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UPSOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UP
SOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UP
Jaclyn Hwang
 
SOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNALSOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNAL
Jaclyn Hwang
 
SOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNALSOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNAL
Jaclyn Hwang
 
Cash flow statement exercise 2
Cash flow statement exercise 2Cash flow statement exercise 2
Cash flow statement exercise 2
Jaclyn Hwang
 
Trial balance sheet exercise 5
Trial balance sheet exercise 5Trial balance sheet exercise 5
Trial balance sheet exercise 5
Jaclyn Hwang
 
break even analysis
break even analysis break even analysis
break even analysis
Jaclyn Hwang
 
P & l statement
P & l statementP & l statement
P & l statement
Jaclyn Hwang
 
EPC oral presentation part b
EPC oral presentation part bEPC oral presentation part b
EPC oral presentation part b
Jaclyn Hwang
 
Oral presentation part a EPC TULOU
Oral presentation part a EPC TULOUOral presentation part a EPC TULOU
Oral presentation part a EPC TULOU
Jaclyn Hwang
 
Business plan presentation
Business plan presentationBusiness plan presentation
Business plan presentation
Jaclyn Hwang
 
Final busreport
Final busreportFinal busreport
Final busreport
Jaclyn Hwang
 
Final assignment principles of economics
Final assignment principles of economicsFinal assignment principles of economics
Final assignment principles of economics
Jaclyn Hwang
 
Basic Accounting Financial analysis report
Basic Accounting Financial analysis reportBasic Accounting Financial analysis report
Basic Accounting Financial analysis report
Jaclyn Hwang
 
English 2 Final report
English 2 Final reportEnglish 2 Final report
English 2 Final report
Jaclyn Hwang
 
english final assignment
english final assignmentenglish final assignment
english final assignment
Jaclyn Hwang
 
Photos of the physical model
Photos of the physical modelPhotos of the physical model
Photos of the physical modelJaclyn Hwang
 
The presentation board eneb final
The presentation board eneb finalThe presentation board eneb final
The presentation board eneb finalJaclyn Hwang
 

More from Jaclyn Hwang (20)

Taylor's university buddhist club
Taylor's university buddhist clubTaylor's university buddhist club
Taylor's university buddhist club
 
Social psychology tutorial exercise
Social psychology tutorial exerciseSocial psychology tutorial exercise
Social psychology tutorial exercise
 
SOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGE
SOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGESOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGE
SOCIAL PSYCHOLOGY ORAL PRESENTATION DESIGNED SPACE IMAGE
 
SOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UP
SOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UPSOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UP
SOCIAL PSYCHOLOGY FINAL ASSIGNMENT-GROUP PRESENTATION WRITE UP
 
SOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNALSOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY SECOND INDIVIDUAL JOURNAL
 
SOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNALSOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNAL
SOCIAL PSYCHOLOGY FIRST INDIVIDUAL JOURNAL
 
Cash flow statement exercise 2
Cash flow statement exercise 2Cash flow statement exercise 2
Cash flow statement exercise 2
 
Trial balance sheet exercise 5
Trial balance sheet exercise 5Trial balance sheet exercise 5
Trial balance sheet exercise 5
 
break even analysis
break even analysis break even analysis
break even analysis
 
P & l statement
P & l statementP & l statement
P & l statement
 
EPC oral presentation part b
EPC oral presentation part bEPC oral presentation part b
EPC oral presentation part b
 
Oral presentation part a EPC TULOU
Oral presentation part a EPC TULOUOral presentation part a EPC TULOU
Oral presentation part a EPC TULOU
 
Business plan presentation
Business plan presentationBusiness plan presentation
Business plan presentation
 
Final busreport
Final busreportFinal busreport
Final busreport
 
Final assignment principles of economics
Final assignment principles of economicsFinal assignment principles of economics
Final assignment principles of economics
 
Basic Accounting Financial analysis report
Basic Accounting Financial analysis reportBasic Accounting Financial analysis report
Basic Accounting Financial analysis report
 
English 2 Final report
English 2 Final reportEnglish 2 Final report
English 2 Final report
 
english final assignment
english final assignmentenglish final assignment
english final assignment
 
Photos of the physical model
Photos of the physical modelPhotos of the physical model
Photos of the physical model
 
The presentation board eneb final
The presentation board eneb finalThe presentation board eneb final
The presentation board eneb final
 

Dealing with construction permits in malaysia doing business - world bank group

  • 1. 8/9/2014 Dealing with Construction Permits in Malaysia - Doing Business - World BankGroup http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealing-with-construction-permits 1/2 Below is a detailed summary of the procedures, time and costs to build a warehouse in Malaysia. This includes obtaining necessary licenses and permits, completing required notifications and inspections and obtaining utility connections. This information was collected as part of the Doing Business project, which measures and compares regulations relevant to the life cycle of a small- to medium-sized domestic business in 189 economies. The most recent round of data collection was completed in June 2013. Read the methodology. Compare Malaysia to 188 other economies. STANDARDIZED COMPANY Estimated Warehouse Value: MYR 2,000,000 City: Kuala Lumpur More Information Learn more about this economy Read the methodology for this topic View the rankings No. Procedure Time to Complete Associated Costs 1 Submit and obtain Development Approval through OSC Builders can now apply for construction permits through OSC 1Submission (single entry). OSC will then refer the submissions to the Planning Department, Building Department, Engineering Department, Fire Department, Sewerage Agency, Water Agency and the Telecommunication Operators. OSC will issue the development approval (Planning aprrovals, Building approvals, Engineering approvals, Fire safety plan endorsements, water approvals, sewerage works approvals and Telecommunications approvals) to the builder. While all forms can be obtained online at jprb.dbkl.gov.my/Pentadbir/MuatTurunBorangOSC/MTBorang11.asp, the filing has still to be done in person at the OSC. Builder will submit and obtain approval through OSC for the following documents: • Planning plan • Building plan • Engineering plan (earthwork, road & drainage plan, road excavation permit & street lighting plan) • Landscape plan • Water supply plan • Sewerage plan • Infrastructure communication plan • Fire safety plan Estimated Processing Costs 1. Planning plan = MYR 500.00 2. Building plan= MYR 1,300. 3. Engineering plan = MYR 100.00 4. Water supply plan = MYR 1,000.00 1. Submission to Local Authority through OSC 2. Obtain Development Order (DO) from Planning Department 3. Obtain Water Approval 4. Obtain Sewerage Approval 5. Obtain Fire Safety (Arch) Comment 6. Obtain Earthwork Approval 7. Obtain Road and Drainage Approval 8. Obtain Landscape Approval 9. Obtain Street Lighting Approval 10. Obtain MSMA and SPAH Approvals 11. Obtain Building Plan Approval 12. Obtain Fire Safety (M&E) Approval Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC) 61 days MYR 2,900 2 Submit pre-construction notifications to OSC Under OSC 1Submission, all notifications are submitted via OSC. OSC will then distribute notifications to the relevant agencies such as: • Building Department (B Form - notification to start building work) • Engineering Department (B Form - notification to start earthwork) • Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work) Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC) 1 day no charge 3 Request final utilities inspections through OSC Under OSC 1Submission, the builder has to request for inspections via OSC. OSC will arrange and coordinate inspections and connections schedule with relevant agencies 1. TELCO connection = MYR495.00 2. Water connection = MYR 30.00 3. Fire safety inspection = MYR 111.00 Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC) 1 day MYR 636 EXPLORE ECONOMY DATA
  • 2. 8/9/2014 Dealing with Construction Permits in Malaysia - Doing Business - World BankGroup http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealing-with-construction-permits 2/2 Home Data Malaysia Dealing with Construction Permits THE WORLD BANK GROUP IBRD IDA IFC MIGA ICSID © 2014 The World Bank, All Rights Reserved. Legal Home Contact Us 4 Receive Road and Drainage Final Inspection Once the road and drainage works has been completed, the builder will request the Road and Drainage clearance letter from the Engineering Department of CHKL. The builder has to submit a construction report notification and by signing form G 17, the Engineer certifies that all works were carried out according to regulations. Form G17 will be filed along with Form F (Certificate of Completion and Compliance (CCC) via OSC to the Engineering Department. Agency: Sewerage Certifying Agency (IWK) 1 day no charge 5 Obtain Road and Drainage Clearance Letter A date for the inspection will be set-up prior to the issuance of clearance letter for the road and drainage work Agency: Sewerage Certifying Agency (IWK) 12 days no charge 6 Receive Sewage Final Inspection The Sewerage Certifying Agency (IWK) will carry out an inspection of the sewerage system and issue to the builder a clearance letter for sewerage. Agency: Sewerage Certifying Agency (IWK) 1 day no charge 7 Obtain Sewage Clearance Letter Once the inspection has been carried out, a clearance letter is issued to the Builder. This clearance letter will allow the Engineer to issue the Certificate of Completion and compliance (CCC). Agency: Sewerage Certifying Agency (IWK) 12 days no charge 8 Receive Fire Safety Final Inspection Fire and Rescue Department will carry out fire safety inspection Agency: Fire and Rescue Department 1 day no charge 9 Obtain Fire Safety Final Letter Fire and Rescue Department will issue to the builder the clearance letter for fire safety Agency: Fire Department 12 days no charge * 10 Receive Water Inspection Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe. Agency: Water Authority SYABAS 1 day no charge 11 Submit Water Test and Commissioning (T&C) Report Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe. Agency: Water Authority SYABAS 11 days no charge * 12 Obtain Water Clearance Letter The Water Authority SYABAS will issue a clearance letter to the builder and install the water meter at the same time for water connection. Agency: Water Authority SYABAS 1 day MYR 1,000 13 Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC) The Builder’s Principal Submitting Person (professional|architect) will issue Certificate of Completion and compliance (Form F - CCC) to the Builder/Owner and 2 copies of the CCC will be filed at the OSC for the Building Department (JRBB) and the Board of Architects/Engineers (LAM/LJM). Agency: Building Department and Board of Architect via OSC. 1 day no charge 14 Obtain Water Connection Agency: Water Authority SYABAS 1 day no charge * 15 Obtain Telco Connection Agency: Telekom Malaysia (Telco) 15 days no charge * Takes place simultaneously with another procedure.