Dr. S. K. Burman -Founder
  1884-Calcutta
  Fourth largest FMCG – India
  Revenues of US$910 Million
  Market Capitalization of
  US$4 Billion (Rs 20,000 Crore)

  Building on a legacy of quality
  and experience of over 125
  years, Dabur operates in key
  consumer products categories
  like    Hair     Care,    Oral
  Care,    Health   Care,   Skin
  Care, Home Care & Foods.




                   RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                    OF MANAGEMENT &                1
                        TECHNOLOGY,GREATER NOIDA
DABUR NEPAL PVT LTD
  “Inventory and Logistics”




   DNPL,RAMPUR TOKANI,BARA,NEPAL


                        RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                         OF MANAGEMENT &                              2
                                                                BY: RASHMI VERMA
                             TECHNOLOGY,GREATER NOIDA
BASIC INFORMATION

ESTABLISHED                 1992
CEO                         Mr. Udyan Ganguly
NO. OF EMPLOYEES            811
BUSINESS NATURE             Manufacturing and exporting Dabur products
PRODUCTS                    Health care: Dabur Chyawanprash, Dabur
                            Honey, Dabur Hajmola, Dabur Glucose.

                            Personal Care: Gulabari, Dabur Amla Hair Oil,
                            Vatika Hair Oil, Vatika Shampoo, Dabur lal Dant
                            Manjan, Dabur Red Toothpaste

                            Foods: Real Juices, Real Active Juices,
                            Hommade Cooking Paste
ANNUAL TURNOVER             52142.18 lacs
TOTAL ASSETS                23784.33 lacs
WEBSITE             RASHMI VERMA IBR 5006,ISHAN INSTITUTE
                               http://www.dabur.com/nepal
1/3/2012                     OF MANAGEMENT &                              3
                         TECHNOLOGY,GREATER NOIDA
VISION
   “Dedicated to health and well-being of every
                    household”


                  MISSION
  “To become the leader in the natural foods &
               beverage industry”

                RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                 OF MANAGEMENT &                4
                     TECHNOLOGY,GREATER NOIDA
19 YEARS OF CELEBRATION
                                                          Gets certificate of
                                                          Hazard Analysis &
                                                          Critical Control
                                                Increased Point                         2011
          Setup factory.        Won best        turnover                        2009
          Started with the      exporter        by 19%
                                                                        2006
          prod. Of oil,dant     award
          manjan & other                                       2004
          herbal products                          2002                             First FMCG
                                                                                SAP industry to
                                       1998
                                                                                    launches its
                              1994                                                  first-ever
                 1992                                                               online
                                                             Best
                                                                                    shopping
                                                             manufacturing
                                                                                    portal
Estd.in                 Bought 300                           & marketing
 1989
                        acres plot in                        company
                        Banepa for
                        Nursery RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                                    OF MANAGEMENT &                               5
                                        TECHNOLOGY,GREATER NOIDA
Organizational Structure
                                     CEO

      HEAD OF                                      HEAD OF
      SALES &                                     OPERATION
     MARKETING

                 SALES
                                              FINANCE              DGM-
                MANAGER
                                            CONTROLLER          CPPD & CSCC

                MARKETING
                                                           NURSEY
                MANAGER
                                                          OPERATION
                                                            HEAD
           MANAGER HR


                 CPPD= Corporate Procurement and INSTITUTE Department
                             RASHMI VERMA IBR 5006,ISHAN Planning
1/3/2012                              OF MANAGEMENT &                         6
                 CSCC= Central Supply Chain Cell NOIDA
                                  TECHNOLOGY,GREATER
LOGISTIC
           INVENTORY                   AND
                                                                   S




             STORE                                                FLOW



RECIEV                                       PROCUR                          REPLAC
  E                     ISSUE
                                              EMENT                          EMENT



             KEEPIN                                            DISTRIBUTIO
               G                                                    N


                       RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                        OF MANAGEMENT &                                  7
                            TECHNOLOGY,GREATER NOIDA
What is INVENTORY?
   Layman Language


                                              Stock of Goods

                     In Manufacturing Concern, it includes:




 Raw            Packing               Work in                      Finished   Maintenance
                                                                                Repairs
Material        Material              Progress                      Goods      Operating
 (RM)            (PM)                  (WIP)                         (FG)       (MRO)


                           RASHMI VERMA IBR 5006,ISHAN INSTITUTE
  1/3/2012                          OF MANAGEMENT &                                 8
                                TECHNOLOGY,GREATER NOIDA
What is INVENTORY MANAGEMENT?

     It is a purpose to ensure availability of materials in sufficient
     quantity as and when required and also to minimize investment
     in inventories.




                        RASHMI VERMA IBR 5006,ISHAN INSTITUTE
 1/3/2012                        OF MANAGEMENT &                     9
                             TECHNOLOGY,GREATER NOIDA
Inventory Planning and Control

     Planning on what
                                         Forecasting              Controlling
     inventory to stock
                                          inventory                inventory
    and how to acquire
                                           demand                    levels
             it




                      Feedback measurements
                     to revise plans and forecast


                          RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                           OF MANAGEMENT &                              10
                               TECHNOLOGY,GREATER NOIDA
STORAGE OF INVENTORY

                                       FACTORS               POLICIES
 The term storage refers
 to the physical act of                                        LIFO
                                            TYPE
 storing the materials in
 a Storehouse on:
 •Pallets                                  UTILITY              FIFO
 •Shelves
 •Racks                                 TEMPRATURE
 •Boxes                                                          SEFO
 •Almirah etc.                         STORE LAYOUT


                     RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                      OF MANAGEMENT &                           11
                          TECHNOLOGY,GREATER NOIDA
REASONS TO HOLD INVENTORY

      To meet unexpected demand

      To smooth seasonal or cyclic demand

      To meet variation in customer demand

      To make strategic purchase

      To hedge against price increases

       To guard against unexpected events- like
       strikes, shortage, bad weather, etc
                        RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                         OF MANAGEMENT &                12
                             TECHNOLOGY,GREATER NOIDA
What is LOGISTICS?
   “Logistics means having
    the right thing, at the
   right place, at the right
            time.”


     “ The procurement,
  maintenance, distribution,
     and replacement of
  personnel and material.”


                     RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                      OF MANAGEMENT &                13
                          TECHNOLOGY,GREATER NOIDA
Objectives of Logistics System
                                 Right
                                Product

             Right                                       Right
           Condition                                   Quantities




           Right Cost /
                                                      Right Places
              Price


1/3/2012
                              Right Time
                     RASHMI VERMA IBR 5006,ISHAN INSTITUTE
                              OF MANAGEMENT &                        14
                          TECHNOLOGY,GREATER NOIDA
FUNCTIONS
Products are
ordered, billed/invoiced, handled, packaged, packed, wrapped, bundled, sorted, crated, and
braced.

Products are assembled and stored, warehoused, loaded, unloaded, shelved, displayed and
cross docked.



Products are shipped by air, railways, waterways, pipelines, and containers.



Products are exported, imported, documented marked and consolidated.



Products are traced, tracked, recycled and disposed.
                              RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                               OF MANAGEMENT &                                  15
                                   TECHNOLOGY,GREATER NOIDA
INVENTORY position in LOGISTICS

                                                                      RM+PM+PC+FG

                                                                 Finished
                 Raw material
                                                                  goods




   Purchase of                              Work in                              Finished
  Raw material                              progress                           goods in field




                         RASHMI VERMA IBR 5006,ISHAN INSTITUTE
  1/3/2012                        OF MANAGEMENT &                                    16
                              TECHNOLOGY,GREATER NOIDA
OBJECTIVE OF THE Summer
       internship in dabur Nepal




              RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012               OF MANAGEMENT &                17
                   TECHNOLOGY,GREATER NOIDA
OVERALL OPERATION
Flowchart
       Rolling
     Production
        Plan
                                                                  Accepted


      Material                      Quality
    Requirement                   Inspection
       Plan                                                       Rejected



      Purchase                       Goods
     Requisition                    Received

                   Purchase
                    order RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                               OF MANAGEMENT &                       Contd…
                                                                                  19
                                   TECHNOLOGY,GREATER NOIDA
Goods
            Accepted                                             Finished
                                                                  Goods



             Stock
           Valuation
                                                                  Quality
                                                                Inspection
                                    Production
                                      Plan &
           Production                 Process
              Plan



            Picklist                  Issue of                    Dispatch
           Generation                 Material
                        RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                         OF MANAGEMENT &                             20
                             TECHNOLOGY,GREATER NOIDA
RPP-Rolling Production Plan
• The Rolling Production Plan/Schedule gives
  production, planning, purchasing, and top
  management the information needed to plan
  and control the manufacturing operation.
• It sets the quantity of each end item to be
  completed in each week of a short-range
  planning horizon.
• It is a plan for future production of end items.
                  RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                   OF MANAGEMENT &                21
                       TECHNOLOGY,GREATER NOIDA
MRP-Material Requirement Planning
Material requirements planning is a production planning and inventory
control system used to manage manufacturing processes.

An MRP system is intended to simultaneously meet three objectives:

Ensure materials are available for production and products are available
for delivery to customers.

Maintain the lowest possible level of inventory.

Plan manufacturing activities, delivery schedules and purchasing
activities.
                        RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                         OF MANAGEMENT &                           22
                             TECHNOLOGY,GREATER NOIDA
MRP is a tool to deal with these problems
                                       What items are
                                         required?




                                                             How many
                      In what
                                                                are
                    proportion?
                                                             required?




                                        When are they
                                         required?




BOM(Bill Of Materials): It is a list of the raw materials, sub-assemblies,
intermediate assemblies, sub-components, components, parts and the quantities
of each needed to manufacture an end product.INSTITUTE
                          RASHMI VERMA IBR 5006,ISHAN
1/3/2012                              OF MANAGEMENT &                     23
                                  TECHNOLOGY,GREATER NOIDA
Purchase Requisition
    Purchase Requisition or Purchase Request
    is a precise document generated by an internal
    organization to notify the purchasing
    department of items it needs to order, their
    quantity, and the time frame. It may also
    contain the authorization to proceed with the
    purchase.
     It is also called Purchase Order Request.

                 RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                  OF MANAGEMENT &                24
                      TECHNOLOGY,GREATER NOIDA
Purchase Order

   A purchase order (PO) is a
   commercial document issued
   by a buyer to a seller,indicating
   types, quantities, and agreed
   prices for products or services
   the seller will provide to the
   buyer. Sending a purchase
   order to a supplier constitutes a
   legal offer to buy products or
   services.

                       RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                        OF MANAGEMENT &                25
                            TECHNOLOGY,GREATER NOIDA
Dispatch of goods( Vendor end)
•   Goods detail confirmation.
•   Payment mode confirmation.
•   Date ,Time and Transport mode confirmation.
•   Delivery point confirmation.
•   Fulfillment of Legal obligation as per terms.



                  RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                   OF MANAGEMENT &                26
                       TECHNOLOGY,GREATER NOIDA
In case of import
                Custom Transit Declaration
                       Pragyapan Patra
                              Invoice
                          Packing List
                    Certificate of Origin
                       Performa Invoice
                        Letter of credit
                         Bill of Lading
                Insurance policy certificate
                      Quality Certificate
           G.R. Copy(transporter/ vehicle detail)
                RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                 OF MANAGEMENT &                27
                     TECHNOLOGY,GREATER NOIDA
Materials reached at factory gate

• Driver/Transporter submits the custom papers and relevant
  document at the factory gate.
• Documents are verified and informed to store department.
    - Gate entry no. assigned
    - Stamping
    - Date, time ,vehicle no.
    - MAN (material arrival note)
    - Supervisor sign.
• Document send to VAT department for entry.


                   RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                    OF MANAGEMENT &                28
                        TECHNOLOGY,GREATER NOIDA
Unloading of materials at store
• Weight slip - RM-weighing process
              - PM- counting process
• Movement of truck to unloading point
• Quality clearance (any damage- insurance
  claim)
• Unloading done with the help of manpower and
  forklift.
• SOP (Standard Operation Procedure)
   - for standard unloading, stacking and storage
                RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                 OF MANAGEMENT &                29
                     TECHNOLOGY,GREATER NOIDA
GRN- Material inventoried


                       •   Date( all relevant)
     Goods             •   PAN no./PP no.
                       •   Vendor detail
   Received            •   Transport detail
                       •   Quantity detail
     Note              •   Match the invoice description
                       •   POST the detail
    (MIGO)             •   Document no. is generated

                 RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                  OF MANAGEMENT &                  30
                      TECHNOLOGY,GREATER NOIDA
Quality Control/Inspection
             Quality Control is a system of routine technical activities , to
             measure and control the quality of the inventory as it is being
                             developed. It is designed to:


            Provide routine and consistent checks to ensure data integrity,
                           correctness, and completeness.



                      Identify and address errors and omissions.



            Document and archive inventory material and record all Quality
                                 Control activities.
                          RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                           OF MANAGEMENT &                              31
                               TECHNOLOGY,GREATER NOIDA
Storage Of Inventory

After Quality Inspection, Inventory
moves from restricted area to
unrestricted area i.e.-ready to use
for production process.
           Segregation of storage on the basis of :
           • Storehouse type: Functional or Physical
           • Material type: RM/PM, chemical/non-
             chemical
           • Nature of material: Perishable/non-
             perishable , eatable/non-eatable
           • Temperature required for storage:
             Normal/Low

                         RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                          OF MANAGEMENT &                32
                              TECHNOLOGY,GREATER NOIDA
Issue of RM/PM to Production floor
• Generation of picklist/MIN (material issue
  note) by production department.
• MIN: An indent to store department by
  production department to issue material
  required for production.
• Store releases the material as per requirement
  (qty debited).
• Exception : MRN(material return note) &
              Excess Material Issue.
                RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                 OF MANAGEMENT &                33
                     TECHNOLOGY,GREATER NOIDA
Preparation and Transfer of FG


            RM /INPUT
           (as per BOM)

                                      PLANT                   PRODUCTION
                                                              PROCESS




                            BULK/OUTPUT                           PM       FG


                          RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                           OF MANAGEMENT &                              34
                               TECHNOLOGY,GREATER NOIDA
Preparation and Transfer of FG


            RM /INPUT
           (as per BOM)

                                      PLANT                   PRODUCTION
                                                              PROCESS




                            BULK/OUTPUT                           PM       FG


                          RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                           OF MANAGEMENT &                              35
                               TECHNOLOGY,GREATER NOIDA
Dispatch of Materials

                           Dispatch


           Local                                           Export




                   RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                    OF MANAGEMENT &                         36
                        TECHNOLOGY,GREATER NOIDA
PROCESS
         Goods
                            Dispatch Order                       Proposed
     Released From
                               Received                        Dispatch Plan
          QA




                                                               Invoicing And
     Truck Planning             Loading Of
                                                                Other Paper
     And Placement                Goods
                                                                   Work




            Custom                                                Goods
           Clearance             Goods In
                                                               Reaches Final
                                  Transit
     (Both Country)                                             Destination
                       RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                        OF MANAGEMENT &                                37
                            TECHNOLOGY,GREATER NOIDA
DOCUMENTS REQUIRED
                         Gate pass
                       Loading pass
                  Material loading pass
                     Performa invoice
                      Letter of credit
                    Quality certificate
                    Certificate of origin
                       Packaging list
                        Road permit
                     Insurance policy
                        Bill of entry
              Other relevant5006,ISHAN INSTITUTE
               RASHMI VERMA IBR custom papers
1/3/2012                OF MANAGEMENT &            38
                    TECHNOLOGY,GREATER NOIDA
Raw material
                                       (input)
                                                                      Logistics
                                                                      Services
                                      Storehouse
    Logistics Information &
     Infrastructure System




                                      Production                      Inventory
                                                                      management



                                    FG Warehouse

                                                                       Inventory
                                                                       management
                                         Dispatch
                                                                       & Logistics
                                                                       Services

                                        Customer
                              RASHMI VERMA IBR 5006,ISHAN INSTITUTE
                                                                                  Return39
1/3/2012                               OF MANAGEMENT &
                                   TECHNOLOGY,GREATER NOIDA
EXPERIENCE & LEARNING
I learned:
• Overall process/ the whole operation from
   scratch to end.
• Process of material procurement
• Storage of material
• Issue of materials for production
• Process of dispatch of finished goods
• Overall documentation process( Export and
   Import)
                RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012                 OF MANAGEMENT &                40
                     TECHNOLOGY,GREATER NOIDA
RASHMI VERMA IBR 5006,ISHAN INSTITUTE
1/3/2012            OF MANAGEMENT &                41
                TECHNOLOGY,GREATER NOIDA

DABUR NEPAL ST PPT

  • 1.
    Dr. S. K.Burman -Founder 1884-Calcutta Fourth largest FMCG – India Revenues of US$910 Million Market Capitalization of US$4 Billion (Rs 20,000 Crore) Building on a legacy of quality and experience of over 125 years, Dabur operates in key consumer products categories like Hair Care, Oral Care, Health Care, Skin Care, Home Care & Foods. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 1 TECHNOLOGY,GREATER NOIDA
  • 2.
    DABUR NEPAL PVTLTD “Inventory and Logistics” DNPL,RAMPUR TOKANI,BARA,NEPAL RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 2 BY: RASHMI VERMA TECHNOLOGY,GREATER NOIDA
  • 3.
    BASIC INFORMATION ESTABLISHED 1992 CEO Mr. Udyan Ganguly NO. OF EMPLOYEES 811 BUSINESS NATURE Manufacturing and exporting Dabur products PRODUCTS Health care: Dabur Chyawanprash, Dabur Honey, Dabur Hajmola, Dabur Glucose. Personal Care: Gulabari, Dabur Amla Hair Oil, Vatika Hair Oil, Vatika Shampoo, Dabur lal Dant Manjan, Dabur Red Toothpaste Foods: Real Juices, Real Active Juices, Hommade Cooking Paste ANNUAL TURNOVER 52142.18 lacs TOTAL ASSETS 23784.33 lacs WEBSITE RASHMI VERMA IBR 5006,ISHAN INSTITUTE http://www.dabur.com/nepal 1/3/2012 OF MANAGEMENT & 3 TECHNOLOGY,GREATER NOIDA
  • 4.
    VISION “Dedicated to health and well-being of every household” MISSION “To become the leader in the natural foods & beverage industry” RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 4 TECHNOLOGY,GREATER NOIDA
  • 5.
    19 YEARS OFCELEBRATION Gets certificate of Hazard Analysis & Critical Control Increased Point 2011 Setup factory. Won best turnover 2009 Started with the exporter by 19% 2006 prod. Of oil,dant award manjan & other 2004 herbal products 2002 First FMCG SAP industry to 1998 launches its 1994 first-ever 1992 online Best shopping manufacturing portal Estd.in Bought 300 & marketing 1989 acres plot in company Banepa for Nursery RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 5 TECHNOLOGY,GREATER NOIDA
  • 6.
    Organizational Structure CEO HEAD OF HEAD OF SALES & OPERATION MARKETING SALES FINANCE DGM- MANAGER CONTROLLER CPPD & CSCC MARKETING NURSEY MANAGER OPERATION HEAD MANAGER HR CPPD= Corporate Procurement and INSTITUTE Department RASHMI VERMA IBR 5006,ISHAN Planning 1/3/2012 OF MANAGEMENT & 6 CSCC= Central Supply Chain Cell NOIDA TECHNOLOGY,GREATER
  • 7.
    LOGISTIC INVENTORY AND S STORE FLOW RECIEV PROCUR REPLAC E ISSUE EMENT EMENT KEEPIN DISTRIBUTIO G N RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 7 TECHNOLOGY,GREATER NOIDA
  • 8.
    What is INVENTORY? Layman Language Stock of Goods In Manufacturing Concern, it includes: Raw Packing Work in Finished Maintenance Repairs Material Material Progress Goods Operating (RM) (PM) (WIP) (FG) (MRO) RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 8 TECHNOLOGY,GREATER NOIDA
  • 9.
    What is INVENTORYMANAGEMENT? It is a purpose to ensure availability of materials in sufficient quantity as and when required and also to minimize investment in inventories. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 9 TECHNOLOGY,GREATER NOIDA
  • 10.
    Inventory Planning andControl Planning on what Forecasting Controlling inventory to stock inventory inventory and how to acquire demand levels it Feedback measurements to revise plans and forecast RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 10 TECHNOLOGY,GREATER NOIDA
  • 11.
    STORAGE OF INVENTORY FACTORS POLICIES The term storage refers to the physical act of LIFO TYPE storing the materials in a Storehouse on: •Pallets UTILITY FIFO •Shelves •Racks TEMPRATURE •Boxes SEFO •Almirah etc. STORE LAYOUT RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 11 TECHNOLOGY,GREATER NOIDA
  • 12.
    REASONS TO HOLDINVENTORY To meet unexpected demand To smooth seasonal or cyclic demand To meet variation in customer demand To make strategic purchase To hedge against price increases To guard against unexpected events- like strikes, shortage, bad weather, etc RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 12 TECHNOLOGY,GREATER NOIDA
  • 13.
    What is LOGISTICS? “Logistics means having the right thing, at the right place, at the right time.” “ The procurement, maintenance, distribution, and replacement of personnel and material.” RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 13 TECHNOLOGY,GREATER NOIDA
  • 14.
    Objectives of LogisticsSystem Right Product Right Right Condition Quantities Right Cost / Right Places Price 1/3/2012 Right Time RASHMI VERMA IBR 5006,ISHAN INSTITUTE OF MANAGEMENT & 14 TECHNOLOGY,GREATER NOIDA
  • 15.
    FUNCTIONS Products are ordered, billed/invoiced,handled, packaged, packed, wrapped, bundled, sorted, crated, and braced. Products are assembled and stored, warehoused, loaded, unloaded, shelved, displayed and cross docked. Products are shipped by air, railways, waterways, pipelines, and containers. Products are exported, imported, documented marked and consolidated. Products are traced, tracked, recycled and disposed. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 15 TECHNOLOGY,GREATER NOIDA
  • 16.
    INVENTORY position inLOGISTICS RM+PM+PC+FG Finished Raw material goods Purchase of Work in Finished Raw material progress goods in field RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 16 TECHNOLOGY,GREATER NOIDA
  • 17.
    OBJECTIVE OF THESummer internship in dabur Nepal RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 17 TECHNOLOGY,GREATER NOIDA
  • 18.
  • 19.
    Flowchart Rolling Production Plan Accepted Material Quality Requirement Inspection Plan Rejected Purchase Goods Requisition Received Purchase order RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & Contd… 19 TECHNOLOGY,GREATER NOIDA
  • 20.
    Goods Accepted Finished Goods Stock Valuation Quality Inspection Production Plan & Production Process Plan Picklist Issue of Dispatch Generation Material RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 20 TECHNOLOGY,GREATER NOIDA
  • 21.
    RPP-Rolling Production Plan •The Rolling Production Plan/Schedule gives production, planning, purchasing, and top management the information needed to plan and control the manufacturing operation. • It sets the quantity of each end item to be completed in each week of a short-range planning horizon. • It is a plan for future production of end items. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 21 TECHNOLOGY,GREATER NOIDA
  • 22.
    MRP-Material Requirement Planning Materialrequirements planning is a production planning and inventory control system used to manage manufacturing processes. An MRP system is intended to simultaneously meet three objectives: Ensure materials are available for production and products are available for delivery to customers. Maintain the lowest possible level of inventory. Plan manufacturing activities, delivery schedules and purchasing activities. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 22 TECHNOLOGY,GREATER NOIDA
  • 23.
    MRP is atool to deal with these problems What items are required? How many In what are proportion? required? When are they required? BOM(Bill Of Materials): It is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, components, parts and the quantities of each needed to manufacture an end product.INSTITUTE RASHMI VERMA IBR 5006,ISHAN 1/3/2012 OF MANAGEMENT & 23 TECHNOLOGY,GREATER NOIDA
  • 24.
    Purchase Requisition Purchase Requisition or Purchase Request is a precise document generated by an internal organization to notify the purchasing department of items it needs to order, their quantity, and the time frame. It may also contain the authorization to proceed with the purchase. It is also called Purchase Order Request. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 24 TECHNOLOGY,GREATER NOIDA
  • 25.
    Purchase Order A purchase order (PO) is a commercial document issued by a buyer to a seller,indicating types, quantities, and agreed prices for products or services the seller will provide to the buyer. Sending a purchase order to a supplier constitutes a legal offer to buy products or services. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 25 TECHNOLOGY,GREATER NOIDA
  • 26.
    Dispatch of goods(Vendor end) • Goods detail confirmation. • Payment mode confirmation. • Date ,Time and Transport mode confirmation. • Delivery point confirmation. • Fulfillment of Legal obligation as per terms. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 26 TECHNOLOGY,GREATER NOIDA
  • 27.
    In case ofimport Custom Transit Declaration Pragyapan Patra Invoice Packing List Certificate of Origin Performa Invoice Letter of credit Bill of Lading Insurance policy certificate Quality Certificate G.R. Copy(transporter/ vehicle detail) RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 27 TECHNOLOGY,GREATER NOIDA
  • 28.
    Materials reached atfactory gate • Driver/Transporter submits the custom papers and relevant document at the factory gate. • Documents are verified and informed to store department. - Gate entry no. assigned - Stamping - Date, time ,vehicle no. - MAN (material arrival note) - Supervisor sign. • Document send to VAT department for entry. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 28 TECHNOLOGY,GREATER NOIDA
  • 29.
    Unloading of materialsat store • Weight slip - RM-weighing process - PM- counting process • Movement of truck to unloading point • Quality clearance (any damage- insurance claim) • Unloading done with the help of manpower and forklift. • SOP (Standard Operation Procedure) - for standard unloading, stacking and storage RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 29 TECHNOLOGY,GREATER NOIDA
  • 30.
    GRN- Material inventoried • Date( all relevant) Goods • PAN no./PP no. • Vendor detail Received • Transport detail • Quantity detail Note • Match the invoice description • POST the detail (MIGO) • Document no. is generated RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 30 TECHNOLOGY,GREATER NOIDA
  • 31.
    Quality Control/Inspection Quality Control is a system of routine technical activities , to measure and control the quality of the inventory as it is being developed. It is designed to: Provide routine and consistent checks to ensure data integrity, correctness, and completeness. Identify and address errors and omissions. Document and archive inventory material and record all Quality Control activities. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 31 TECHNOLOGY,GREATER NOIDA
  • 32.
    Storage Of Inventory AfterQuality Inspection, Inventory moves from restricted area to unrestricted area i.e.-ready to use for production process. Segregation of storage on the basis of : • Storehouse type: Functional or Physical • Material type: RM/PM, chemical/non- chemical • Nature of material: Perishable/non- perishable , eatable/non-eatable • Temperature required for storage: Normal/Low RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 32 TECHNOLOGY,GREATER NOIDA
  • 33.
    Issue of RM/PMto Production floor • Generation of picklist/MIN (material issue note) by production department. • MIN: An indent to store department by production department to issue material required for production. • Store releases the material as per requirement (qty debited). • Exception : MRN(material return note) & Excess Material Issue. RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 33 TECHNOLOGY,GREATER NOIDA
  • 34.
    Preparation and Transferof FG RM /INPUT (as per BOM) PLANT PRODUCTION PROCESS BULK/OUTPUT PM FG RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 34 TECHNOLOGY,GREATER NOIDA
  • 35.
    Preparation and Transferof FG RM /INPUT (as per BOM) PLANT PRODUCTION PROCESS BULK/OUTPUT PM FG RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 35 TECHNOLOGY,GREATER NOIDA
  • 36.
    Dispatch of Materials Dispatch Local Export RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 36 TECHNOLOGY,GREATER NOIDA
  • 37.
    PROCESS Goods Dispatch Order Proposed Released From Received Dispatch Plan QA Invoicing And Truck Planning Loading Of Other Paper And Placement Goods Work Custom Goods Clearance Goods In Reaches Final Transit (Both Country) Destination RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 37 TECHNOLOGY,GREATER NOIDA
  • 38.
    DOCUMENTS REQUIRED Gate pass Loading pass Material loading pass Performa invoice Letter of credit Quality certificate Certificate of origin Packaging list Road permit Insurance policy Bill of entry Other relevant5006,ISHAN INSTITUTE RASHMI VERMA IBR custom papers 1/3/2012 OF MANAGEMENT & 38 TECHNOLOGY,GREATER NOIDA
  • 39.
    Raw material (input) Logistics Services Storehouse Logistics Information & Infrastructure System Production Inventory management FG Warehouse Inventory management Dispatch & Logistics Services Customer RASHMI VERMA IBR 5006,ISHAN INSTITUTE Return39 1/3/2012 OF MANAGEMENT & TECHNOLOGY,GREATER NOIDA
  • 40.
    EXPERIENCE & LEARNING Ilearned: • Overall process/ the whole operation from scratch to end. • Process of material procurement • Storage of material • Issue of materials for production • Process of dispatch of finished goods • Overall documentation process( Export and Import) RASHMI VERMA IBR 5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 40 TECHNOLOGY,GREATER NOIDA
  • 41.
    RASHMI VERMA IBR5006,ISHAN INSTITUTE 1/3/2012 OF MANAGEMENT & 41 TECHNOLOGY,GREATER NOIDA