SlideShare a Scribd company logo
1. PERSONAL DETAILS
Full Name
FARZAD TAHMASEBI
Date of Birth :
14rd
Jun 1989
Nationality :Ir
anian
Marital Status
:Single
Language :
Persian, English
Email: Shipdesigner2020@yahoo.com
Mobile Phone: +989106442677
1-Physics&mathematic Diploma alhadi high school 2006
2-Achieved BS in Nautical Engineering from Khoramshahr Nautical science University 2006-2010
Training courses
1-technical inspection engineering course from University of Isfahan for aperiod of two months
2-pitting corrosion ,painting inspection course for a period of 2 months
3-Welding inspection course for a period of one month
4-WPS procedure writing
5-Ships Machinery inspection course in Iranian shipping institute for 3 months
6-ISO and ISM inspection course in Iranian classification society (ICS)
7-obtain certificate for inspectionn of existing , newly built ships issuing towage certificate from KR Korean and ICS
8- Centrifuge pumps repair training course for two months
9-Ship designing course utilizing the soft ware -ship constructor 2008
10-designing courses to make power board control panel,distribution panel pumps winches panels.
11-Designing coursess to make ships piping including : bilge, ballast, fuel, oil, fresh water, salt water, sewage treatment
piping.
Good command in the following soft wares:
1-Ship and piping design utilizing ship constructor 2008 and extracting workshop drawing, assembling drawing,
approval drawing.
2-modeling vessel in Autoship software and making stability booklet, sounding and tanks capacity charts,modeling
vessels in Auto structure
3-modeling vessels utilizing maxsurf and analizing hydrostatically and hydro mechanically, modeling with workshop soft
ware
4-excellent command in Auto cad2015 (2 and 3d modeling )
cvform2-160615043719.doc
Page 1 of 3
5-Excellent command in Auto desk 3d plant
6-Excellent command in MS Project to prepare the time tables for the projects
7-Excellent command in office soft ware including word,excel.;Powerpoint,etc.
8-ship designing and extract work shop drawings
Career back grounds
1-DPA for the ships capacity over 500 in in Darya Delan Karoon maritime transportation company
2-supervising the designing team of Autonomous surface vessel (Opatan shahid mosavi ship building company 2006-
2007
3-working as a mechanical and construction expert in DENIZ ship building company.with following responsibilities-
a) prepare the As built drawing s of structure and mechanical parts of LADIS Tug boat
b) Prepare the as built structure ,mechanical electrical,stability booklet sounding tables and fire control & safety
plan ,fire fighting plan for AMIR Landing craft.
c) Prepare the as built plan of the structure drawings Engine foundation and piping drawings for M/V ZEYTON.
d) prepare structure ,workshop plan for a 36 meter tug boat prepare WPS and welding booklet
e) prepare structural plan for the fiber glass Lench.
f) prepare stability book let for M/V LADIS
g) prepare the as built drawings of thr fishing vessel SAMER ,also the project manager of the the change of the vessel
from fishing vessel to tug boat.
h)preparation of the safety plan and fire control for the MV?Zeytoon,Ladis,Tug boat Bardia and M/V Nader
ICS responsibility and jobs qualification
Iranian classification society inspector,expert in material confirmations Maritime inspections head in ICS Khusistan
branch deputy for the Khorramshahr inspections.
1)Inspection of more than 300existing vessels and carrying out Machinery ,Occasional ,Annual,Renewal,Docking
Surveys for them as requested
2-New Built Vessels :
a)M/V Mostafa(1),structural,mechanical,final electrical and sea trial inspections
b)Landing Craft Jame Jam 5 ,final structure,electrical,mechanical.inclinnig test,sea trial(Hat,Sat,fat)
c-The same activity as mentioned for above vessels carried out for the below vessels:
d)-Landing craft Fereshteh(2)
e)-M/V Michaeil
f)-29meter tug boats Avesta,5,6,7,8
g)-24meter crew boats (2 numbers)
h)-Avesta accomodation barge
i)-3000tons barges 2 numbers
j)- Majid 110
Sanat va Daryaship buildings company
Technical deputy
1-vessels in Khorramshahr building and preparations
2-In below projects:
a)-building 7 numbers of 29 meter tug boats.
b)- “ “ 2 “” “” “3000 tons flat barges
c)- “” “” “ “” “” 24 meters long crew boat
d) –Fabrication of Accomodation barge
e)-Fabrication of Sea Resturant
f)-fabrication of 2 sets of top lift launching and recovery
g)-fabrication of delta flipper anchors. And zinc anod
h)-Lavan island port ramp was repaired and recommissioned (Belonged to IOOC)
Dolphin Ship Building and offshore company
1-served as Quality control manager for below projects:
cvform2-160615043719.doc
Page 2 of 3
a)-Major over haul and repair of cutter suction Zolfaghar (Beaver 1200) ,the major repair
Hydraulic systems Diesels and replacement of complete hydraulic systems, suction pump diesels,
and the suction pump itself
b)-designing a steel made ramp for Bandare Jask enabling small crafts passengers boats to make
fast to it dimensions (30*20*2.7 meters(
3(Shahid Rajaee port two sets of STS Gantry container cranes Major items replacement and and
repairs and washing up and painting including
-Trolley Electro motors replacement.
-Replacement of Trolley wheels
-Replacement of Trim Pulleys
-Replacement of trolley an spreader pulleys
-Replacement of Electro motor for Hoist system
-Replace ment of of hoist system gear box and and internal and external couplings
-Replacement of Festoon cables
-Fire alarm installation
-Procurement and replacement of Gantry Cranes Elevators
-Replacement of TSL jacks
-Replacement of Rubber mounting
4(Project for dis mantling, dry docking, Moss cleaning , sand blasting, repair and painting of
two mooring buoys and reinstalling them back to sea on their associated place.in the Shaheed
Rajaee port Basin
5-(Manager for major over haul and repairs of two sets of piston drive compressors for
precision tools of IOOC in increasing pressure gas post.
6-(Designer to fabricate tts for two 17 meters long fiber glass boats for Iranian Termial oil
company
7-(fabricating port pantoon for chahbahar port 3 numbers with dimentions(L20M,B3 M,D
2M(
8-(Designing Sea Ambulance boat for Khark terminal
cvform2-160615043719.doc
Page 3 of 3

More Related Content

Viewers also liked

Innovative mech rob
Innovative mech robInnovative mech rob
Innovative mech rob
Alonso A. Orellana
 
CVFORM2
CVFORM2CVFORM2
Collect (Hinkley RD)
Collect (Hinkley RD)Collect (Hinkley RD)
Collect (Hinkley RD)
Jess Aires
 
Ali Shahbaz: Executive Director Of Housekeeping..
 Ali Shahbaz: Executive Director Of Housekeeping.. Ali Shahbaz: Executive Director Of Housekeeping..
Ali Shahbaz: Executive Director Of Housekeeping..
Ali Shahbaz Gujjar
 
IbrahimS- PR&IT-cv2016
IbrahimS- PR&IT-cv2016IbrahimS- PR&IT-cv2016
IbrahimS- PR&IT-cv2016
Ibrahim Shah
 
Ali Shahbaz: Executive Director Of Housekeeping
 Ali Shahbaz: Executive Director Of Housekeeping Ali Shahbaz: Executive Director Of Housekeeping
Ali Shahbaz: Executive Director Of Housekeeping
Ali Shahbaz Gujjar
 
Jacquard loom
Jacquard loomJacquard loom
Jacquard loom
Jotish Roy (BUBT)
 
Managing "sickies"
Managing "sickies"Managing "sickies"
Managing "sickies"
Dave Robb
 
ISO-certification
ISO-certificationISO-certification
ISO-certification
Jotish Roy (BUBT)
 
Презентация Innominis: Adventus
Презентация Innominis: AdventusПрезентация Innominis: Adventus
Презентация Innominis: Adventus
AlexCrossIT
 
Nhat nam can ban 1
Nhat nam can ban 1Nhat nam can ban 1
Nhat nam can ban 1
sonphamvctv
 
Demonitization of Rs 500 & 1000 notes from Indian Economy
Demonitization of Rs 500 & 1000 notes from Indian EconomyDemonitization of Rs 500 & 1000 notes from Indian Economy
Demonitization of Rs 500 & 1000 notes from Indian Economy
Right Horizons
 

Viewers also liked (12)

Innovative mech rob
Innovative mech robInnovative mech rob
Innovative mech rob
 
CVFORM2
CVFORM2CVFORM2
CVFORM2
 
Collect (Hinkley RD)
Collect (Hinkley RD)Collect (Hinkley RD)
Collect (Hinkley RD)
 
Ali Shahbaz: Executive Director Of Housekeeping..
 Ali Shahbaz: Executive Director Of Housekeeping.. Ali Shahbaz: Executive Director Of Housekeeping..
Ali Shahbaz: Executive Director Of Housekeeping..
 
IbrahimS- PR&IT-cv2016
IbrahimS- PR&IT-cv2016IbrahimS- PR&IT-cv2016
IbrahimS- PR&IT-cv2016
 
Ali Shahbaz: Executive Director Of Housekeeping
 Ali Shahbaz: Executive Director Of Housekeeping Ali Shahbaz: Executive Director Of Housekeeping
Ali Shahbaz: Executive Director Of Housekeeping
 
Jacquard loom
Jacquard loomJacquard loom
Jacquard loom
 
Managing "sickies"
Managing "sickies"Managing "sickies"
Managing "sickies"
 
ISO-certification
ISO-certificationISO-certification
ISO-certification
 
Презентация Innominis: Adventus
Презентация Innominis: AdventusПрезентация Innominis: Adventus
Презентация Innominis: Adventus
 
Nhat nam can ban 1
Nhat nam can ban 1Nhat nam can ban 1
Nhat nam can ban 1
 
Demonitization of Rs 500 & 1000 notes from Indian Economy
Demonitization of Rs 500 & 1000 notes from Indian EconomyDemonitization of Rs 500 & 1000 notes from Indian Economy
Demonitization of Rs 500 & 1000 notes from Indian Economy
 

Similar to Cvform2

Abdelraheim Mohamed-1
Abdelraheim Mohamed-1Abdelraheim Mohamed-1
Abdelraheim Mohamed-1
Abdelraheim Mohamed
 
9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry
Alexandrą Maŋafu
 
Ficha A4Vicus eng
Ficha A4Vicus engFicha A4Vicus eng
Rushikesh CV
Rushikesh CVRushikesh CV
Rushikesh CV
RUSHIKESH SAPDHARE
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0
Ibrahim Anwer
 
MOC Presentation
MOC PresentationMOC Presentation
MOC Presentation
Capt. O.M.Bugge
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 
Psn resume
Psn   resume Psn   resume
Psn resume
PramodShankarNair
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
Hazem Ouda
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
Hassan Halhoul
 
English Version, Book of coasts, ports and offshore structures engineering
English Version, Book of coasts, ports and offshore structures engineeringEnglish Version, Book of coasts, ports and offshore structures engineering
English Version, Book of coasts, ports and offshore structures engineering
Kabir Sadeghi
 
English Version of Book of coasts, ports and offshore structures engineering
English Version of Book of coasts, ports and offshore structures engineeringEnglish Version of Book of coasts, ports and offshore structures engineering
English Version of Book of coasts, ports and offshore structures engineering
Kabir Sadeghi
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
Hassan Halhoul
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
mamdouh azab
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
daniel cobar
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
Yaser Hatem
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
Ali Alobaidy
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
shone john
 
Weone Engineering Consultancy
Weone Engineering ConsultancyWeone Engineering Consultancy
Weone Engineering Consultancy
Fayaz Memon
 
Summary of Experience
Summary of ExperienceSummary of Experience
Summary of Experience
Burak Çelepöven
 

Similar to Cvform2 (20)

Abdelraheim Mohamed-1
Abdelraheim Mohamed-1Abdelraheim Mohamed-1
Abdelraheim Mohamed-1
 
9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry
 
Ficha A4Vicus eng
Ficha A4Vicus engFicha A4Vicus eng
Ficha A4Vicus eng
 
Rushikesh CV
Rushikesh CVRushikesh CV
Rushikesh CV
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0
 
MOC Presentation
MOC PresentationMOC Presentation
MOC Presentation
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Psn resume
Psn   resume Psn   resume
Psn resume
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
English Version, Book of coasts, ports and offshore structures engineering
English Version, Book of coasts, ports and offshore structures engineeringEnglish Version, Book of coasts, ports and offshore structures engineering
English Version, Book of coasts, ports and offshore structures engineering
 
English Version of Book of coasts, ports and offshore structures engineering
English Version of Book of coasts, ports and offshore structures engineeringEnglish Version of Book of coasts, ports and offshore structures engineering
English Version of Book of coasts, ports and offshore structures engineering
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
 
Weone Engineering Consultancy
Weone Engineering ConsultancyWeone Engineering Consultancy
Weone Engineering Consultancy
 
Summary of Experience
Summary of ExperienceSummary of Experience
Summary of Experience
 

Recently uploaded

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 

Recently uploaded (20)

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 

Cvform2

  • 1. 1. PERSONAL DETAILS Full Name FARZAD TAHMASEBI Date of Birth : 14rd Jun 1989 Nationality :Ir anian Marital Status :Single Language : Persian, English Email: Shipdesigner2020@yahoo.com Mobile Phone: +989106442677 1-Physics&mathematic Diploma alhadi high school 2006 2-Achieved BS in Nautical Engineering from Khoramshahr Nautical science University 2006-2010 Training courses 1-technical inspection engineering course from University of Isfahan for aperiod of two months 2-pitting corrosion ,painting inspection course for a period of 2 months 3-Welding inspection course for a period of one month 4-WPS procedure writing 5-Ships Machinery inspection course in Iranian shipping institute for 3 months 6-ISO and ISM inspection course in Iranian classification society (ICS) 7-obtain certificate for inspectionn of existing , newly built ships issuing towage certificate from KR Korean and ICS 8- Centrifuge pumps repair training course for two months 9-Ship designing course utilizing the soft ware -ship constructor 2008 10-designing courses to make power board control panel,distribution panel pumps winches panels. 11-Designing coursess to make ships piping including : bilge, ballast, fuel, oil, fresh water, salt water, sewage treatment piping. Good command in the following soft wares: 1-Ship and piping design utilizing ship constructor 2008 and extracting workshop drawing, assembling drawing, approval drawing. 2-modeling vessel in Autoship software and making stability booklet, sounding and tanks capacity charts,modeling vessels in Auto structure 3-modeling vessels utilizing maxsurf and analizing hydrostatically and hydro mechanically, modeling with workshop soft ware 4-excellent command in Auto cad2015 (2 and 3d modeling ) cvform2-160615043719.doc Page 1 of 3
  • 2. 5-Excellent command in Auto desk 3d plant 6-Excellent command in MS Project to prepare the time tables for the projects 7-Excellent command in office soft ware including word,excel.;Powerpoint,etc. 8-ship designing and extract work shop drawings Career back grounds 1-DPA for the ships capacity over 500 in in Darya Delan Karoon maritime transportation company 2-supervising the designing team of Autonomous surface vessel (Opatan shahid mosavi ship building company 2006- 2007 3-working as a mechanical and construction expert in DENIZ ship building company.with following responsibilities- a) prepare the As built drawing s of structure and mechanical parts of LADIS Tug boat b) Prepare the as built structure ,mechanical electrical,stability booklet sounding tables and fire control & safety plan ,fire fighting plan for AMIR Landing craft. c) Prepare the as built plan of the structure drawings Engine foundation and piping drawings for M/V ZEYTON. d) prepare structure ,workshop plan for a 36 meter tug boat prepare WPS and welding booklet e) prepare structural plan for the fiber glass Lench. f) prepare stability book let for M/V LADIS g) prepare the as built drawings of thr fishing vessel SAMER ,also the project manager of the the change of the vessel from fishing vessel to tug boat. h)preparation of the safety plan and fire control for the MV?Zeytoon,Ladis,Tug boat Bardia and M/V Nader ICS responsibility and jobs qualification Iranian classification society inspector,expert in material confirmations Maritime inspections head in ICS Khusistan branch deputy for the Khorramshahr inspections. 1)Inspection of more than 300existing vessels and carrying out Machinery ,Occasional ,Annual,Renewal,Docking Surveys for them as requested 2-New Built Vessels : a)M/V Mostafa(1),structural,mechanical,final electrical and sea trial inspections b)Landing Craft Jame Jam 5 ,final structure,electrical,mechanical.inclinnig test,sea trial(Hat,Sat,fat) c-The same activity as mentioned for above vessels carried out for the below vessels: d)-Landing craft Fereshteh(2) e)-M/V Michaeil f)-29meter tug boats Avesta,5,6,7,8 g)-24meter crew boats (2 numbers) h)-Avesta accomodation barge i)-3000tons barges 2 numbers j)- Majid 110 Sanat va Daryaship buildings company Technical deputy 1-vessels in Khorramshahr building and preparations 2-In below projects: a)-building 7 numbers of 29 meter tug boats. b)- “ “ 2 “” “” “3000 tons flat barges c)- “” “” “ “” “” 24 meters long crew boat d) –Fabrication of Accomodation barge e)-Fabrication of Sea Resturant f)-fabrication of 2 sets of top lift launching and recovery g)-fabrication of delta flipper anchors. And zinc anod h)-Lavan island port ramp was repaired and recommissioned (Belonged to IOOC) Dolphin Ship Building and offshore company 1-served as Quality control manager for below projects: cvform2-160615043719.doc Page 2 of 3
  • 3. a)-Major over haul and repair of cutter suction Zolfaghar (Beaver 1200) ,the major repair Hydraulic systems Diesels and replacement of complete hydraulic systems, suction pump diesels, and the suction pump itself b)-designing a steel made ramp for Bandare Jask enabling small crafts passengers boats to make fast to it dimensions (30*20*2.7 meters( 3(Shahid Rajaee port two sets of STS Gantry container cranes Major items replacement and and repairs and washing up and painting including -Trolley Electro motors replacement. -Replacement of Trolley wheels -Replacement of Trim Pulleys -Replacement of trolley an spreader pulleys -Replacement of Electro motor for Hoist system -Replace ment of of hoist system gear box and and internal and external couplings -Replacement of Festoon cables -Fire alarm installation -Procurement and replacement of Gantry Cranes Elevators -Replacement of TSL jacks -Replacement of Rubber mounting 4(Project for dis mantling, dry docking, Moss cleaning , sand blasting, repair and painting of two mooring buoys and reinstalling them back to sea on their associated place.in the Shaheed Rajaee port Basin 5-(Manager for major over haul and repairs of two sets of piston drive compressors for precision tools of IOOC in increasing pressure gas post. 6-(Designer to fabricate tts for two 17 meters long fiber glass boats for Iranian Termial oil company 7-(fabricating port pantoon for chahbahar port 3 numbers with dimentions(L20M,B3 M,D 2M( 8-(Designing Sea Ambulance boat for Khark terminal cvform2-160615043719.doc Page 3 of 3