After working for 11 months as an outsource, I have transferred to WORTHINGTON-ARITAS Pressure
Vessel Co. , the joint venture between Worthington Industries and Aritas Pressure Vessel Co. , as
"Stress and Optimization Engineer". My current position involves the use of ANSYS for finite element
analyses of various types of cryogenic pressure vessels.
Following types of analyses are employed heavily during design and optimization process;
- Linear-elastic structural analyses
- Non-linear (geometric, contact, material) structural analyses
- Modal and response spectrum analyses for structural dynamics
- Steady state thermal analyses
- Parametric analyses for optimization purposes
Major projects that I have been involved are;
40 ft. Cryogenic ISO-Container for LNG (ASME, ADR)
- Structural development and detail design
- Thermal stress analysis of piping at annular space
FISKERSTRAND 125m³ Marine LNG Storage and Fuel System
(Classification Society: DNV)
- Overall structural development, detail design and determination of loads acting on the structure as
per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS.
- Thermal stress analysis of piping system at annular space, TCS and bunkering station.
- Non-linear buckling assessment of the Jacket with initial imperfection as per
“DNV-RP-C208- Determination of Structural Capacity by Non-linear FE analysis Methods” and
comparison of results with eigenvalue buckling in order to meet mutual agreement with DNV to
increase design speed with use of eigenvalue buckling.
- Fatigue Evaluation and optimization of relevant components of the vessel as per
“DNV-RP-C203- Fatigue Design of Offshore Steel Structures” (Supports at annular space, saddles
etc.)
- Thermal Analysis and structural assessment of the vessel at operating conditions and at cryogenic
fluid leakage condition.
- Follow up of the approval process with DNV – Norway.
BOREAL TRANSPORT 70m³ Marine LNG Storage and Fuel System
(Classification Society: DNV)
- Overall structural development, detail design and determination of loads acting on the structure as
per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS.
- Thermal stress analysis of piping system at annular space, TCS and bunkering station.
- Fatigue Evaluation and optimization of relevant components of the vessel as per
“DNV-RP-C203- Fatigue Design of Offshore Steel Structures” (Supports at annular space, saddles
etc.)
- Thermal Analysis and structural assessment of the vessel at operating conditions and at cryogenic
fluid leakage conditions.
- Follow up of the approval process with DNV – Norway.
GAZCON 8m³ Marine LIN Storage and inert gas system
(Classification Society: DNV)
- Overall structural development, detail design and determination of loads acting on the structure as
per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS.
- Thermal stress analysis of piping system at annular space and connection points.
- Fatigue Evaluation and optimization of relevant components of the vessel as per
“DNV-RP-C203- Fatigue Design of Offshore Steel Structures” (Supports at annular space, saddles
etc.)
- Thermal Analysis and structural assessment of the vessel at operating conditions and at cryogenic
fluid leakage conditions.
- Follow up of the approval process with DNV – Norway.
CRYOSTAR – Cryogenic Pump Test bench
- Design of internal supports and various structural parts
- Thermal Analysis / Structural analysis of the system and individual components
CRYOGENIC Semi-Trailers with Various Capacities
(LNG, LIN, LAR, LOX, LCO2)
- Structural assessment of the previous designs and introduction of new design improvement
- Structural evaluation as per ADR 2013
- Structural analysis / pipe stress analysis of the first cryogenic trailer that is approved by TSE (Turkish
Standards Institute)
ROLLS ROYCE MARINE 395m³ Marine LNG Storage and Fuel System
(Classification Society: DNV)
- Thermal stress analysis of TCS piping after introduction of the new cryogenic feeder pump to the
existing system.
- Design calculations / stress and fatigue analysis of the vessel for the cryogenic submerged pump
and determination of loads as per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA
calculation for ULS and FLS.
ITER PROJECT (TOKOMAK Concept) – 300m³ LIN Storage
- Design of structural details
- Structural analysis of various load conditions
- Seismic analysis of the structure as per EN 1998-1 and EN 1998 -4 (Response Spectrum
Analysis)
WARTSILA 200m³ Marine LNG Storage and Fuel System
(Classification Society: Bureau Veritas) (On-going Project)
- Preliminary structural development of the storage system
- Mechanical calculations of the vessel
SNC LAVALLIN – STORNOWAY Renard Diamond Mine Project
Vaporizer Unit of the Power Plant
- Assisted preliminary concept design
- Preparation of preliminary thermodynamic calculations
- Attended HAZOP meeting for risk analysis of the vaporizer and black start-up unit.
Besides the projects that are listed above I had the privilege of contributing to various projects for Air
Liquide, Air Products, Linde, SIAD (Yamal Project) etc.
For design and evaluation purposes, following standards/codes are employed;
- DNV Steel Vessel Rules Pt.5 Ch.5 – Liquefied Gas Carriers
- DNV Steel Vessel Rules Pt.4 Ch.7 – Pressure Vessels
- DNV Steel Vessel Rules Pt.6 Ch.13 – Gas Fuelled Ship Installations
- DNV-RP-C203- Fatigue Design of Offshore Steel Structures
- DNV-RP-C208- Determination of Structural Capacity by Non-linear FE analysis Methods
- IGC Code
- IGF Code
- EN 13458-2
- EN 13445-3
- ADR 2013
- ASME Sec. 8 Div.1

More Related Content

What's hot

Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490
Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490
Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490Dai Hung
 
registro de pozoz
registro de pozozregistro de pozoz
registro de pozozopulento22
 
Pratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINALPratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINALPratik Rao
 
Introduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids CoureseIntroduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids CoureseRamez Abdalla, M.Sc
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)James Craig
 
Well Test Design and Analysis
Well Test Design and Analysis Well Test Design and Analysis
Well Test Design and Analysis petroEDGE
 
Q913 rfp w1 lec 2
Q913 rfp w1 lec 2Q913 rfp w1 lec 2
Q913 rfp w1 lec 2AFATous
 
Q913 rfp w1 lec 4
Q913 rfp w1 lec 4Q913 rfp w1 lec 4
Q913 rfp w1 lec 4AFATous
 
Some projects VIRO Arnhem
Some projects VIRO ArnhemSome projects VIRO Arnhem
Some projects VIRO ArnhemRoel Tang
 
FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...
FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...
FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...capvidia
 
Q921 re1 lec2 v1
Q921 re1 lec2 v1Q921 re1 lec2 v1
Q921 re1 lec2 v1AFATous
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide PresentationNick Picone
 
Group Project- An extract from original report
Group Project- An extract from original reportGroup Project- An extract from original report
Group Project- An extract from original reportMukesh Mathew
 
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculationsQ913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculationsAFATous
 
Loadtestinghandbook
LoadtestinghandbookLoadtestinghandbook
Loadtestinghandbook920728035348
 
Q921 rfp lec3
Q921 rfp lec3Q921 rfp lec3
Q921 rfp lec3AFATous
 

What's hot (20)

Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490
Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490
Integrated hydrodynamic and structural analysis webinar presentation tcm4 601490
 
registro de pozoz
registro de pozozregistro de pozoz
registro de pozoz
 
Pratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINALPratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINAL
 
Introduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids CoureseIntroduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids Courese
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)
 
Well Test Design and Analysis
Well Test Design and Analysis Well Test Design and Analysis
Well Test Design and Analysis
 
BGJ-CV-2015
BGJ-CV-2015BGJ-CV-2015
BGJ-CV-2015
 
Q913 rfp w1 lec 2
Q913 rfp w1 lec 2Q913 rfp w1 lec 2
Q913 rfp w1 lec 2
 
My Work
My WorkMy Work
My Work
 
Q913 rfp w1 lec 4
Q913 rfp w1 lec 4Q913 rfp w1 lec 4
Q913 rfp w1 lec 4
 
Well test procedures manual
Well test procedures manualWell test procedures manual
Well test procedures manual
 
ISO/FDIS 20519
ISO/FDIS 20519ISO/FDIS 20519
ISO/FDIS 20519
 
Some projects VIRO Arnhem
Some projects VIRO ArnhemSome projects VIRO Arnhem
Some projects VIRO Arnhem
 
FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...
FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...
FlowVision CFD - Verification Calculations as per CFD FlowVision Code for Sod...
 
Q921 re1 lec2 v1
Q921 re1 lec2 v1Q921 re1 lec2 v1
Q921 re1 lec2 v1
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide Presentation
 
Group Project- An extract from original report
Group Project- An extract from original reportGroup Project- An extract from original report
Group Project- An extract from original report
 
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculationsQ913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
 
Loadtestinghandbook
LoadtestinghandbookLoadtestinghandbook
Loadtestinghandbook
 
Q921 rfp lec3
Q921 rfp lec3Q921 rfp lec3
Q921 rfp lec3
 

Viewers also liked

FEA Project-Pressure Vessel & Heat Loss Analysis
FEA Project-Pressure Vessel & Heat Loss AnalysisFEA Project-Pressure Vessel & Heat Loss Analysis
FEA Project-Pressure Vessel & Heat Loss AnalysisMostafa Fakharifar
 
"Star Hour" 9th form
"Star Hour" 9th form"Star Hour" 9th form
"Star Hour" 9th formOlga Andreeva
 
Assignment brief
Assignment briefAssignment brief
Assignment briefJamie16234
 
3D Image Sheet_REV 0_Portfolio
3D Image Sheet_REV 0_Portfolio3D Image Sheet_REV 0_Portfolio
3D Image Sheet_REV 0_PortfolioColin Cooney
 
Presentation task1
Presentation task1Presentation task1
Presentation task1Jamie16234
 
FEA Coursework Report (Sven Cumner 11011794)
FEA Coursework Report (Sven Cumner 11011794)FEA Coursework Report (Sven Cumner 11011794)
FEA Coursework Report (Sven Cumner 11011794)Sven Cumner
 
Reality tv show research
Reality tv show researchReality tv show research
Reality tv show researchJamie16234
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselAnalyzeForSafety
 

Viewers also liked (15)

Analysis report volume3
Analysis report volume3Analysis report volume3
Analysis report volume3
 
FEA Project-Pressure Vessel & Heat Loss Analysis
FEA Project-Pressure Vessel & Heat Loss AnalysisFEA Project-Pressure Vessel & Heat Loss Analysis
FEA Project-Pressure Vessel & Heat Loss Analysis
 
Presentazione tesi guarino
Presentazione tesi guarinoPresentazione tesi guarino
Presentazione tesi guarino
 
"Star Hour" 9th form
"Star Hour" 9th form"Star Hour" 9th form
"Star Hour" 9th form
 
Assignment brief
Assignment briefAssignment brief
Assignment brief
 
Diapo nati 22
Diapo nati 22Diapo nati 22
Diapo nati 22
 
Del Piero
Del PieroDel Piero
Del Piero
 
3D Image Sheet_REV 0_Portfolio
3D Image Sheet_REV 0_Portfolio3D Image Sheet_REV 0_Portfolio
3D Image Sheet_REV 0_Portfolio
 
Unit 3task1
Unit 3task1Unit 3task1
Unit 3task1
 
Presentation task1
Presentation task1Presentation task1
Presentation task1
 
Thesis Defense Presentation
Thesis Defense PresentationThesis Defense Presentation
Thesis Defense Presentation
 
Yeastogram
YeastogramYeastogram
Yeastogram
 
FEA Coursework Report (Sven Cumner 11011794)
FEA Coursework Report (Sven Cumner 11011794)FEA Coursework Report (Sven Cumner 11011794)
FEA Coursework Report (Sven Cumner 11011794)
 
Reality tv show research
Reality tv show researchReality tv show research
Reality tv show research
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vessel
 

Similar to Summary of Experience

Ashish shrivastava engineering consultant
Ashish shrivastava engineering consultantAshish shrivastava engineering consultant
Ashish shrivastava engineering consultantAshishShrivastava83250
 
Transheat profile presentationnew
Transheat   profile presentationnewTransheat   profile presentationnew
Transheat profile presentationnewVeravalOnline Incl
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016Richard Hyatt
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industryAlexandrą Maŋafu
 
День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...
День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...
День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...НАЕК «Енергоатом»
 
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGECURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGEGeorge Aivaliotis
 
Engineering service
Engineering serviceEngineering service
Engineering servicewangzh2k
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
Engineering service
Engineering serviceEngineering service
Engineering servicewangzh2k
 

Similar to Summary of Experience (20)

Ashish shrivastava engineering consultant
Ashish shrivastava engineering consultantAshish shrivastava engineering consultant
Ashish shrivastava engineering consultant
 
CV Romeo Costescu
CV Romeo CostescuCV Romeo Costescu
CV Romeo Costescu
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Transheat profile presentationnew
Transheat   profile presentationnewTransheat   profile presentationnew
Transheat profile presentationnew
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
CV Jalaj Verma
CV Jalaj VermaCV Jalaj Verma
CV Jalaj Verma
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
 
9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry9 Essential services naval architects supply for the shipbuilding industry
9 Essential services naval architects supply for the shipbuilding industry
 
Ficha A4Vicus eng
Ficha A4Vicus engFicha A4Vicus eng
Ficha A4Vicus eng
 
CV_Rahul_Sharma
CV_Rahul_SharmaCV_Rahul_Sharma
CV_Rahul_Sharma
 
День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...
День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...
День атомної енергетики 2014. Стратегія управління важкими аваріями «Внутрішн...
 
Tangguh LNG Project
Tangguh LNG ProjectTangguh LNG Project
Tangguh LNG Project
 
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGECURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
 
Engineering service
Engineering serviceEngineering service
Engineering service
 
Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
Engineering service
Engineering serviceEngineering service
Engineering service
 

Summary of Experience

  • 1. After working for 11 months as an outsource, I have transferred to WORTHINGTON-ARITAS Pressure Vessel Co. , the joint venture between Worthington Industries and Aritas Pressure Vessel Co. , as "Stress and Optimization Engineer". My current position involves the use of ANSYS for finite element analyses of various types of cryogenic pressure vessels. Following types of analyses are employed heavily during design and optimization process; - Linear-elastic structural analyses - Non-linear (geometric, contact, material) structural analyses - Modal and response spectrum analyses for structural dynamics - Steady state thermal analyses - Parametric analyses for optimization purposes Major projects that I have been involved are; 40 ft. Cryogenic ISO-Container for LNG (ASME, ADR) - Structural development and detail design - Thermal stress analysis of piping at annular space FISKERSTRAND 125m³ Marine LNG Storage and Fuel System (Classification Society: DNV) - Overall structural development, detail design and determination of loads acting on the structure as per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS. - Thermal stress analysis of piping system at annular space, TCS and bunkering station. - Non-linear buckling assessment of the Jacket with initial imperfection as per “DNV-RP-C208- Determination of Structural Capacity by Non-linear FE analysis Methods” and comparison of results with eigenvalue buckling in order to meet mutual agreement with DNV to increase design speed with use of eigenvalue buckling. - Fatigue Evaluation and optimization of relevant components of the vessel as per “DNV-RP-C203- Fatigue Design of Offshore Steel Structures” (Supports at annular space, saddles etc.) - Thermal Analysis and structural assessment of the vessel at operating conditions and at cryogenic fluid leakage condition. - Follow up of the approval process with DNV – Norway.
  • 2. BOREAL TRANSPORT 70m³ Marine LNG Storage and Fuel System (Classification Society: DNV) - Overall structural development, detail design and determination of loads acting on the structure as per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS. - Thermal stress analysis of piping system at annular space, TCS and bunkering station. - Fatigue Evaluation and optimization of relevant components of the vessel as per “DNV-RP-C203- Fatigue Design of Offshore Steel Structures” (Supports at annular space, saddles etc.) - Thermal Analysis and structural assessment of the vessel at operating conditions and at cryogenic fluid leakage conditions. - Follow up of the approval process with DNV – Norway. GAZCON 8m³ Marine LIN Storage and inert gas system (Classification Society: DNV) - Overall structural development, detail design and determination of loads acting on the structure as per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS. - Thermal stress analysis of piping system at annular space and connection points. - Fatigue Evaluation and optimization of relevant components of the vessel as per “DNV-RP-C203- Fatigue Design of Offshore Steel Structures” (Supports at annular space, saddles etc.) - Thermal Analysis and structural assessment of the vessel at operating conditions and at cryogenic fluid leakage conditions. - Follow up of the approval process with DNV – Norway. CRYOSTAR – Cryogenic Pump Test bench - Design of internal supports and various structural parts - Thermal Analysis / Structural analysis of the system and individual components
  • 3. CRYOGENIC Semi-Trailers with Various Capacities (LNG, LIN, LAR, LOX, LCO2) - Structural assessment of the previous designs and introduction of new design improvement - Structural evaluation as per ADR 2013 - Structural analysis / pipe stress analysis of the first cryogenic trailer that is approved by TSE (Turkish Standards Institute) ROLLS ROYCE MARINE 395m³ Marine LNG Storage and Fuel System (Classification Society: DNV) - Thermal stress analysis of TCS piping after introduction of the new cryogenic feeder pump to the existing system. - Design calculations / stress and fatigue analysis of the vessel for the cryogenic submerged pump and determination of loads as per DNV rules pt.5 ch.5, pt.4 ch.7, pt. 6 ch. 13 and IGC code. FEA calculation for ULS and FLS. ITER PROJECT (TOKOMAK Concept) – 300m³ LIN Storage - Design of structural details - Structural analysis of various load conditions - Seismic analysis of the structure as per EN 1998-1 and EN 1998 -4 (Response Spectrum Analysis) WARTSILA 200m³ Marine LNG Storage and Fuel System (Classification Society: Bureau Veritas) (On-going Project) - Preliminary structural development of the storage system - Mechanical calculations of the vessel
  • 4. SNC LAVALLIN – STORNOWAY Renard Diamond Mine Project Vaporizer Unit of the Power Plant - Assisted preliminary concept design - Preparation of preliminary thermodynamic calculations - Attended HAZOP meeting for risk analysis of the vaporizer and black start-up unit. Besides the projects that are listed above I had the privilege of contributing to various projects for Air Liquide, Air Products, Linde, SIAD (Yamal Project) etc. For design and evaluation purposes, following standards/codes are employed; - DNV Steel Vessel Rules Pt.5 Ch.5 – Liquefied Gas Carriers - DNV Steel Vessel Rules Pt.4 Ch.7 – Pressure Vessels - DNV Steel Vessel Rules Pt.6 Ch.13 – Gas Fuelled Ship Installations - DNV-RP-C203- Fatigue Design of Offshore Steel Structures - DNV-RP-C208- Determination of Structural Capacity by Non-linear FE analysis Methods - IGC Code - IGF Code - EN 13458-2 - EN 13445-3 - ADR 2013 - ASME Sec. 8 Div.1