SlideShare a Scribd company logo
RICHARD MOEWE, CCM
Construction Manager Infrastructure & Civil
Richard brings over 35 years of experience delivering preconstruction and field
execution of CM as the person-in-charge of constructing public agency projects
ranging from $100mil to $1bill. Richard’s project experience is unusually broad using
all types of project delivery methods including DBB and DBC and Self Perform. He is
most known for his high experience level in both office and field management.
Saudi Arabia North-South Rail , Freight and Commuter Rail project – Richard
initially served as the Senior Construction Manager for 900 km of the 2400 km long combined
freight/commuter project, the biggest in the world. He
represented the Saudi ownership in all matters to the design-
builder. He exercised final signature authority for all as-built
drawings and all official correspondence.Richard eventually was
put in charge of general handover of the entire line including
commuter stations and maintenance facilities. His
employment contract ended in the spring of 2014. Value Added: Richard
created/implemented a closeout process to address an ongoing three year delay in
acceptance. He worked side-by-side in the trailer with the Design-Builder to complete the work
using staff from three field offices. Most importantly, Richard improved desert labor camp
conditions. Employer: Systra – Canstar- Louis Berger joint venture
Chicago Transit, CTA Red Line Rehab, Chicago, IL –
Richard led the normal field CM but also ran constructability
reviews (including a full schedule and maximum cost estimate)
to match FTA standards. Richard assembled and ran a team of
twenty office staff and inspectors to complete design and
perform construction of $300M commuter rail line with
ballasted track down the center of a major IDOT highway with platforms, signal upgrade and
substations that was built under continuous train/highway operation and very restrictive site
access. Value Added: Solved median access by running the trains onto the paved asphalt
traffic lanes thus reducing service outages. Initiated platform extension approach to allow
platform reconstruction under service. Employer: Turner Construction.
Chicago Transit, CTA Brown Line Rehab, Chicago, IL – Richard led preconstruction
and constructability reviews (including a full schedule and maximum cost estimate) to match
FTA standards. Richard helped win the award then perform preconstruction CM deliverables
until a field CM was appointed; This project ran simultaneously with the Red Line CM above. He
helped prepare bid packages for stations on a fast-track basis. This is a $500M commuter rail
line rehab that was both at elevated and street level. It included new track, stations, platforms
and signals and third-rail power systems built under continuous operation. Value Added:
The Agency rejected the first general bids due to lack of competition. Richard carved-up the
scope to create set-aside and stations packages. He initially produced all the FTA Grant
deliverables in less than four weeks. Employer: Turner Construction.
RICHARD P MOEWE, CCM
Education
MBA/Finance /University of Southern
California
BS/Construction Engineering/Cal Poly San
Luis Obispo
Professional Registrations
CMAA Certified Construction
Manager
Licensed General Contractor California
(inactive)
LEED Green Associate (inactive)
OSHA 30hr Certification
USN Seabees Veteran
Member Board of Directors CMAA
Pacific Northwest Chapter
____________________________
Previous Employers
HNTB
SYSTRA CANRAIL Saudi JV
Hill International
URS New York
STV Company
Turner Construction Company
AMEC North America
Fluor Daniel Inc.
AMEC North America – As Vice President, Richard led development of a national transit
marketing plan and was the proposal manager for both of the successful Chicago Transit
Agency projects listed above. Employer AMEC.
Federal Transit Administration, Program Management Oversight, NY – Richard
assigned teams from his office to investigate problem areas with all of the
Capital Programs for the NY subway system with Federal funding. He
reported to the FTA and worked at an executive level with the agencies.
Richard was in overall charge for oversight (PMOC) monitoring all the Capital Programs and
projects at the regional transit agencies of NYCT, LIRR, NJT and Metro North Commuter Rail.
Value Added: Instigated the use of project management plans per ISO 9000
on all oversight projects. Led effort to emphasize completion of the tunnels
ventilation projects held up for delivery due to disputes. Employer: Fluor
Daniel Inc.
Illinois Tollway Authority, Highway – Richard served as onsite Chief Field Resident
Engineer for final design and construction of three
simultaneous contracts building three new toll plazas on
existing mainline IDOT highway over twelve miles in length.
Work included inspection of utilities, tunnels and substations
and facilities and mainline pavement and major bridge
reconstruction. Closeout of this project was accomplished
faster than any such project on record at the Authority. Value Added: Turned around this
highly troubled project that was set to be terminated by the client upon arrival. He met a three
week client deadline to improve the field situation and closed it out faster than any of the other
separate concurrent projects. Employer: STV
World Trade Center Redevelopment, New York, NY –. Richard managed and
reorganized the fifty person cost department and exercised
final signature authority recommending client approval for all
change orders based on comprehensive understanding of all
site projects. As Department Lead Cost
Engineering/Estimating Director, Richard reported directly to
the Port Authority Senior Director for the redevelopment of the
entire site. Value Added: Through reorganization of the
department, Richard discovered extremely large overruns not being reported between the
separate project budgets which greatly improved the Governor’s report underway. He revised
the entire cost flow reporting system with a program still in place today. Employer: URS Corp.
WTC recovery Previously, Richard was temporarily assigned as a deputy projectmanager for
one quarter of the World Trade Center site recovery immediately after 911. Employer: AMEC
MTACC, Seven Line Tunnel Extension, New York – As Deputy CM for the final design
and pre-construction of TBM subway tunnels and blasted
station caverns, Richard co-developed project management
plans and acted as coordinator with the major private
developers of the buildings above. Value Added:
Created a CCM –QA plan that is still in general use as a
boilerplate for all NY-Capital projects today. He revised the
RICHARD P MOEWE, CCM
subterranean escalators to meet the high-rise developer requirements. He obtained AMTRAK
approval for shielding above their tracks. Employer: Lemley Proprietorship.
Deutsche Bank Demolition, WTC – Claims Manager for the Lower Manhattan
Construction Coordination Center which coordinated all the many projects underway in lower
Manhattan after 911, Richard assembled and recommended action for over twenty active
claims related to demolition of this high rise office building on the World Trade Center site as
well as coordinated staging of its demolition with the WTC construction team. Value Added:
Successfully assembled and recommended actions for separate disputes under a critical
deadline with the client due to suspended site construction items by the contractor. Employer:
URS Corp.
Landmark Restoration of NYC Police Precinct Facility – Richard was in charge of an
“at risk” contract of $50M. Richard negotiated the general contract with the client then
awarded subsequent subcontracts and conducted field CM activity thereafter. Value Added:
Created a site workaround plan to accommodate late offsite delivery of electricity. He
eliminated the need to relocate a large pressure gas line in Central Park thus achieving
schedule recovery and major budget relief. Employer: URS Corp.
Enclosed Mall Mixed Use Developments: Owners representative in PPP partnership
with municipalities and stakeholders to redevelop urban
centers typically near one million square feet in size. Richard
hired all engineers and contractors as the owner
representative in all matters. Employer: Trizec-Hahn, May
Centers. Value Added: Became regional VP for Western
Region properties.
RICHARD P MOEWE, CCM
Cell: 203-810-9298
rmoewe2014@gmail.com
rmoewe@aol.com
RICHARD P MOEWE, CCM

More Related Content

What's hot

PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaul Blaetz
 
Jr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioJr. Civil Engineer Portfolio
Jr. Civil Engineer Portfolio
Mahmoud Abubkr
 
Riyadh Metro Line-6
Riyadh Metro Line-6Riyadh Metro Line-6
Riyadh Metro Line-6Falco Ziehl
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
Teresa Elliott
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016Raed Ramahi
 
Project Manager [PMP] Reference Projects
Project Manager [PMP] Reference Projects Project Manager [PMP] Reference Projects
Project Manager [PMP] Reference Projects
Maged Habashy
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCarmen Squires
 
"News and Views" newsletter
"News and Views" newsletter"News and Views" newsletter
"News and Views" newsletter
Maribel Castillo
 
T.Y. Lin International Corporate Brochure
T.Y. Lin International Corporate BrochureT.Y. Lin International Corporate Brochure
T.Y. Lin International Corporate Brochure
Maribel Castillo
 
Roles and Responsibilities in various projects
Roles and Responsibilities in various projectsRoles and Responsibilities in various projects
Roles and Responsibilities in various projectsHassan Taghavi, P. Eng.
 
2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions 2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions
Teresa Elliott
 
Khalid_Sarhan_resume
Khalid_Sarhan_resumeKhalid_Sarhan_resume
Khalid_Sarhan_resumekhalid sarhan
 
Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)
Jorge C. Palma
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
iain_cameron
 

What's hot (20)

PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Jr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioJr. Civil Engineer Portfolio
Jr. Civil Engineer Portfolio
 
Riyadh Metro Line-6
Riyadh Metro Line-6Riyadh Metro Line-6
Riyadh Metro Line-6
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
 
Project Manager [PMP] Reference Projects
Project Manager [PMP] Reference Projects Project Manager [PMP] Reference Projects
Project Manager [PMP] Reference Projects
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILL
 
"News and Views" newsletter
"News and Views" newsletter"News and Views" newsletter
"News and Views" newsletter
 
Summery
SummerySummery
Summery
 
T.Y. Lin International Corporate Brochure
T.Y. Lin International Corporate BrochureT.Y. Lin International Corporate Brochure
T.Y. Lin International Corporate Brochure
 
CV Template mohamed1
CV Template mohamed1CV Template mohamed1
CV Template mohamed1
 
Roles and Responsibilities in various projects
Roles and Responsibilities in various projectsRoles and Responsibilities in various projects
Roles and Responsibilities in various projects
 
2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions 2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions
 
En c.v
En c.v En c.v
En c.v
 
Siemer_June 2016_updated
Siemer_June 2016_updatedSiemer_June 2016_updated
Siemer_June 2016_updated
 
Khalid_Sarhan_resume
Khalid_Sarhan_resumeKhalid_Sarhan_resume
Khalid_Sarhan_resume
 
AGC Presentation_Final_12.6.11(2)
AGC Presentation_Final_12.6.11(2)AGC Presentation_Final_12.6.11(2)
AGC Presentation_Final_12.6.11(2)
 
Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 

Viewers also liked

10 security problems unique to it
10 security problems unique to it10 security problems unique to it
10 security problems unique to it
IT-Toolkits.org
 
First eStandards conference Healthcare Executives Panel: Domingos Pereira
First eStandards conference Healthcare Executives Panel: Domingos PereiraFirst eStandards conference Healthcare Executives Panel: Domingos Pereira
First eStandards conference Healthcare Executives Panel: Domingos Pereira
chronaki
 
Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...
Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...
Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...
jangeissler
 
15_RenovationBringsLife_tm_er
15_RenovationBringsLife_tm_er15_RenovationBringsLife_tm_er
15_RenovationBringsLife_tm_erTerrence McCarthy
 
Extraordinario vianey guadalupe aguayo cuevas
Extraordinario vianey guadalupe aguayo cuevasExtraordinario vianey guadalupe aguayo cuevas
Extraordinario vianey guadalupe aguayo cuevas
Vianey Guadalupe Aguayo Cuevas
 
Sociale media voor specifieke doelgroepen 15 11-2011
Sociale media voor specifieke doelgroepen 15 11-2011Sociale media voor specifieke doelgroepen 15 11-2011
Sociale media voor specifieke doelgroepen 15 11-2011B Walburgh Schmidt
 
Sluzby pro verejnou spravu_MCTRITON
Sluzby pro verejnou spravu_MCTRITONSluzby pro verejnou spravu_MCTRITON
Sluzby pro verejnou spravu_MCTRITONMarek PAVLÍK
 
1st eStandards conference: next steps for standardization in large scale eHea...
1st eStandards conference: next steps for standardization in large scale eHea...1st eStandards conference: next steps for standardization in large scale eHea...
1st eStandards conference: next steps for standardization in large scale eHea...
Dr. Kai Heitmann
 
First eStandards conference Healthcare Executives Panel Introduction
First eStandards conference Healthcare Executives Panel IntroductionFirst eStandards conference Healthcare Executives Panel Introduction
First eStandards conference Healthcare Executives Panel Introduction
chronaki
 
Socialization
SocializationSocialization
Socialization
fauzma123
 
миронов юра службы г.канаш
миронов юра службы г.канашмиронов юра службы г.канаш
миронов юра службы г.канашCadets Chuvashiya
 
Cross-border Healthcare in the EU - Prospects and challenges for the Health T...
Cross-border Healthcare in the EU - Prospects and challenges for the Health T...Cross-border Healthcare in the EU - Prospects and challenges for the Health T...
Cross-border Healthcare in the EU - Prospects and challenges for the Health T...Stella I. Tsartsara
 
SoftwareEngineer
SoftwareEngineerSoftwareEngineer
SoftwareEngineerTodd Nguyen
 
Investors Group
Investors GroupInvestors Group
Investors Group
Melanie Hammond
 

Viewers also liked (16)

10 security problems unique to it
10 security problems unique to it10 security problems unique to it
10 security problems unique to it
 
First eStandards conference Healthcare Executives Panel: Domingos Pereira
First eStandards conference Healthcare Executives Panel: Domingos PereiraFirst eStandards conference Healthcare Executives Panel: Domingos Pereira
First eStandards conference Healthcare Executives Panel: Domingos Pereira
 
Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...
Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...
Launch auf the European Cancer Patients Bill of Rights: Addressing the unequ...
 
Mahmoud Shaban C.V
Mahmoud Shaban C.VMahmoud Shaban C.V
Mahmoud Shaban C.V
 
15_RenovationBringsLife_tm_er
15_RenovationBringsLife_tm_er15_RenovationBringsLife_tm_er
15_RenovationBringsLife_tm_er
 
Extraordinario vianey guadalupe aguayo cuevas
Extraordinario vianey guadalupe aguayo cuevasExtraordinario vianey guadalupe aguayo cuevas
Extraordinario vianey guadalupe aguayo cuevas
 
Laura PALs course
Laura PALs courseLaura PALs course
Laura PALs course
 
Sociale media voor specifieke doelgroepen 15 11-2011
Sociale media voor specifieke doelgroepen 15 11-2011Sociale media voor specifieke doelgroepen 15 11-2011
Sociale media voor specifieke doelgroepen 15 11-2011
 
Sluzby pro verejnou spravu_MCTRITON
Sluzby pro verejnou spravu_MCTRITONSluzby pro verejnou spravu_MCTRITON
Sluzby pro verejnou spravu_MCTRITON
 
1st eStandards conference: next steps for standardization in large scale eHea...
1st eStandards conference: next steps for standardization in large scale eHea...1st eStandards conference: next steps for standardization in large scale eHea...
1st eStandards conference: next steps for standardization in large scale eHea...
 
First eStandards conference Healthcare Executives Panel Introduction
First eStandards conference Healthcare Executives Panel IntroductionFirst eStandards conference Healthcare Executives Panel Introduction
First eStandards conference Healthcare Executives Panel Introduction
 
Socialization
SocializationSocialization
Socialization
 
миронов юра службы г.канаш
миронов юра службы г.канашмиронов юра службы г.канаш
миронов юра службы г.канаш
 
Cross-border Healthcare in the EU - Prospects and challenges for the Health T...
Cross-border Healthcare in the EU - Prospects and challenges for the Health T...Cross-border Healthcare in the EU - Prospects and challenges for the Health T...
Cross-border Healthcare in the EU - Prospects and challenges for the Health T...
 
SoftwareEngineer
SoftwareEngineerSoftwareEngineer
SoftwareEngineer
 
Investors Group
Investors GroupInvestors Group
Investors Group
 

Similar to CV-04-14

CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
Faheem Ijaz Janjua, PMP
 
South road superway project intelligent traffic system works
South road superway project intelligent traffic system worksSouth road superway project intelligent traffic system works
South road superway project intelligent traffic system works
Solution For Construction
 
CV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhCV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhMaher Abu-Mallouh
 
Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
Ausrine Rakauskaite
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015Phil Morris
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerageKhalid Pervez
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Robert McCray
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDFKarim Ashry
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Ross Ullman
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultransConsultrans, S.A.
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)AHMED SAKR
 

Similar to CV-04-14 (20)

CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
South road superway project intelligent traffic system works
South road superway project intelligent traffic system worksSouth road superway project intelligent traffic system works
South road superway project intelligent traffic system works
 
CV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhCV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu Mallouh
 
MARTIN Daniel CV
MARTIN Daniel CVMARTIN Daniel CV
MARTIN Daniel CV
 
JDG CV_160413
JDG CV_160413JDG CV_160413
JDG CV_160413
 
Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
 
150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 

CV-04-14

  • 1. RICHARD MOEWE, CCM Construction Manager Infrastructure & Civil Richard brings over 35 years of experience delivering preconstruction and field execution of CM as the person-in-charge of constructing public agency projects ranging from $100mil to $1bill. Richard’s project experience is unusually broad using all types of project delivery methods including DBB and DBC and Self Perform. He is most known for his high experience level in both office and field management. Saudi Arabia North-South Rail , Freight and Commuter Rail project – Richard initially served as the Senior Construction Manager for 900 km of the 2400 km long combined freight/commuter project, the biggest in the world. He represented the Saudi ownership in all matters to the design- builder. He exercised final signature authority for all as-built drawings and all official correspondence.Richard eventually was put in charge of general handover of the entire line including commuter stations and maintenance facilities. His employment contract ended in the spring of 2014. Value Added: Richard created/implemented a closeout process to address an ongoing three year delay in acceptance. He worked side-by-side in the trailer with the Design-Builder to complete the work using staff from three field offices. Most importantly, Richard improved desert labor camp conditions. Employer: Systra – Canstar- Louis Berger joint venture Chicago Transit, CTA Red Line Rehab, Chicago, IL – Richard led the normal field CM but also ran constructability reviews (including a full schedule and maximum cost estimate) to match FTA standards. Richard assembled and ran a team of twenty office staff and inspectors to complete design and perform construction of $300M commuter rail line with ballasted track down the center of a major IDOT highway with platforms, signal upgrade and substations that was built under continuous train/highway operation and very restrictive site access. Value Added: Solved median access by running the trains onto the paved asphalt traffic lanes thus reducing service outages. Initiated platform extension approach to allow platform reconstruction under service. Employer: Turner Construction. Chicago Transit, CTA Brown Line Rehab, Chicago, IL – Richard led preconstruction and constructability reviews (including a full schedule and maximum cost estimate) to match FTA standards. Richard helped win the award then perform preconstruction CM deliverables until a field CM was appointed; This project ran simultaneously with the Red Line CM above. He helped prepare bid packages for stations on a fast-track basis. This is a $500M commuter rail line rehab that was both at elevated and street level. It included new track, stations, platforms and signals and third-rail power systems built under continuous operation. Value Added: The Agency rejected the first general bids due to lack of competition. Richard carved-up the scope to create set-aside and stations packages. He initially produced all the FTA Grant deliverables in less than four weeks. Employer: Turner Construction. RICHARD P MOEWE, CCM Education MBA/Finance /University of Southern California BS/Construction Engineering/Cal Poly San Luis Obispo Professional Registrations CMAA Certified Construction Manager Licensed General Contractor California (inactive) LEED Green Associate (inactive) OSHA 30hr Certification USN Seabees Veteran Member Board of Directors CMAA Pacific Northwest Chapter ____________________________ Previous Employers HNTB SYSTRA CANRAIL Saudi JV Hill International URS New York STV Company Turner Construction Company AMEC North America Fluor Daniel Inc.
  • 2. AMEC North America – As Vice President, Richard led development of a national transit marketing plan and was the proposal manager for both of the successful Chicago Transit Agency projects listed above. Employer AMEC. Federal Transit Administration, Program Management Oversight, NY – Richard assigned teams from his office to investigate problem areas with all of the Capital Programs for the NY subway system with Federal funding. He reported to the FTA and worked at an executive level with the agencies. Richard was in overall charge for oversight (PMOC) monitoring all the Capital Programs and projects at the regional transit agencies of NYCT, LIRR, NJT and Metro North Commuter Rail. Value Added: Instigated the use of project management plans per ISO 9000 on all oversight projects. Led effort to emphasize completion of the tunnels ventilation projects held up for delivery due to disputes. Employer: Fluor Daniel Inc. Illinois Tollway Authority, Highway – Richard served as onsite Chief Field Resident Engineer for final design and construction of three simultaneous contracts building three new toll plazas on existing mainline IDOT highway over twelve miles in length. Work included inspection of utilities, tunnels and substations and facilities and mainline pavement and major bridge reconstruction. Closeout of this project was accomplished faster than any such project on record at the Authority. Value Added: Turned around this highly troubled project that was set to be terminated by the client upon arrival. He met a three week client deadline to improve the field situation and closed it out faster than any of the other separate concurrent projects. Employer: STV World Trade Center Redevelopment, New York, NY –. Richard managed and reorganized the fifty person cost department and exercised final signature authority recommending client approval for all change orders based on comprehensive understanding of all site projects. As Department Lead Cost Engineering/Estimating Director, Richard reported directly to the Port Authority Senior Director for the redevelopment of the entire site. Value Added: Through reorganization of the department, Richard discovered extremely large overruns not being reported between the separate project budgets which greatly improved the Governor’s report underway. He revised the entire cost flow reporting system with a program still in place today. Employer: URS Corp. WTC recovery Previously, Richard was temporarily assigned as a deputy projectmanager for one quarter of the World Trade Center site recovery immediately after 911. Employer: AMEC MTACC, Seven Line Tunnel Extension, New York – As Deputy CM for the final design and pre-construction of TBM subway tunnels and blasted station caverns, Richard co-developed project management plans and acted as coordinator with the major private developers of the buildings above. Value Added: Created a CCM –QA plan that is still in general use as a boilerplate for all NY-Capital projects today. He revised the RICHARD P MOEWE, CCM
  • 3. subterranean escalators to meet the high-rise developer requirements. He obtained AMTRAK approval for shielding above their tracks. Employer: Lemley Proprietorship. Deutsche Bank Demolition, WTC – Claims Manager for the Lower Manhattan Construction Coordination Center which coordinated all the many projects underway in lower Manhattan after 911, Richard assembled and recommended action for over twenty active claims related to demolition of this high rise office building on the World Trade Center site as well as coordinated staging of its demolition with the WTC construction team. Value Added: Successfully assembled and recommended actions for separate disputes under a critical deadline with the client due to suspended site construction items by the contractor. Employer: URS Corp. Landmark Restoration of NYC Police Precinct Facility – Richard was in charge of an “at risk” contract of $50M. Richard negotiated the general contract with the client then awarded subsequent subcontracts and conducted field CM activity thereafter. Value Added: Created a site workaround plan to accommodate late offsite delivery of electricity. He eliminated the need to relocate a large pressure gas line in Central Park thus achieving schedule recovery and major budget relief. Employer: URS Corp. Enclosed Mall Mixed Use Developments: Owners representative in PPP partnership with municipalities and stakeholders to redevelop urban centers typically near one million square feet in size. Richard hired all engineers and contractors as the owner representative in all matters. Employer: Trizec-Hahn, May Centers. Value Added: Became regional VP for Western Region properties. RICHARD P MOEWE, CCM Cell: 203-810-9298 rmoewe2014@gmail.com rmoewe@aol.com RICHARD P MOEWE, CCM