SlideShare a Scribd company logo
1






 Duties included:
- INTERCHANGE AND ROADS SOUTH DHAHRAN HOME OWNERSHIP- {SDHOP} -ARAMCO PROJECT -
KINGDOM OF SAUDI ARABIA
 Duties included:
- Construction of Under Pass Intersection of Palestine Street & Al-hamra Street with King Abdul Aziz Road,
Jeddah King Abdul-Aziz Tunnel Project, Jeddah, Saudi Arabia.
Construction of Under Pass Intersections: ABU BAKAR INTERSECTION#1&PRINCE MUTEB INTERSECTION#2,
Najran Project Tunnel, Saudi Arabia, Najran
Previous Duties & Responsibilities: Technical Coordinationwithgovernment andservice agenciesto relocation
all utilities obstruct with our tunnel, review the tender design after finish insure soil investigation, follow schedule
planning, shop drawing, follow all the construction submittal QA/QC plan, HSE Plan, Manpower-Equipment List,
Inspection & Material Inspection Request, Method statement & Construction Sequence for consultant, follow all
Construction activities at site, weeklyconstruction meetingwith the client and consultant, dailyconstructionmeeting
with my team, weekly meeting with our project manager and our project staff.
EMPLOYMENT HISTORY
IT Knowledge
Windows,MSOffice,
Primavera,
AutoCAD.
LANGUAGES
Arabic, English.
REFERENCES
Shall be provided upon request.
Jun, 21, 1965
+966 581950004
En_m_algabry@hotmail.com
.
Seeking a challenging career at a local/multi-national or International organization, where there is scope for
demonstration for myskills in Management, Civil Engineering & Construction. To be an active team member who
contributed in development of the projects performed by this team, complete my career in the field to achieve
myself and join a successful team adds to my career.
Result oriented, proactive and industrious professional with extensive hands on experience in the areas of
Management, Civil Engineering & Construction. Thirty years of work inthe implementation of engineering projects
Distinctive and Private Construction in the field of 



 Reinforcement Concrete bridgesandtunnels, Systemprecast pre-stressedpost tensioned& Cast inthe
site with & without pre-stressedpost tensioned, Steel bridges, Steel Structures.

 Establishment andmaintenance ofHighwayRoads andinternal Roads.
 Infrastructure and public utilities representedinthe establishment of water Plants and Sewage, structural
and Mechanical department, constructionandSinking Shaft;constructionelevatedwater tower tanks
(budget tanks) bysystemof slipForm and heavyLiftingof Rft. Concrete slabs.
 Regressionlinesto sewage without opencut, technologypipe jacking methodfor Pre -cast concrete pipes,
Pedestriantunnelsunder rail andhighways, concrete Phrases.
.
OBJECTIVE
CORE COMPETENCIES
Egyptian
SITE MANAGER at Contracting & Construction Enterprises - CCE
INTERCHANGE AND ROADS SOUTH DHAHRAN HOME OWNERSHIP-{SDHOP}-
ARAMCO PROJECT- KINGDOM OF SAUDI ARABIA- Contract No. 6600037520
linkedin.com/in/mohamed-elgabery-37bba653
Mohamed Elgabery
Site Manager
Contracting & Construction
Enterprises - CCE
KSA -(Sep 2016 – Present)
ConstructionManager
China Civil Engineering
Construction Corporation
Branch in K.S.A. {CCECC}
KSA -(Feb 2014 – Aug 2016)
2
 Duties included:
- CONSTRUCTION OF BRIDGE PROJECTS
Construction ofUnder Pass and Over Pass Intersectionof Prince MitebStreet withOthmanStreet andPrince Naïf
Street, Dammam.
 Duties included:
- Bridge, Intersectionof king Fahdstreet withPalestine street, Jeddah, Saudi Arabia
- Resident Engineer withSaudi Consolidated Engineering Company, Khatib& Alami, Project Treatment plant sewage
western Mecca, Saudi Arabia
- Sector Manager of Tunnels withDr.Ahmed Abdul Warith& Partners office,
Project to extendthe network of sewage at northof Jeddah.
- ConstructionManager withAlRajhi Alliance for HaramainHighSpeed Rail LinkAL ARRAB CO.
Project HARAMAIN HIGH SPEEDRAIL LINKPROJECT - AIR BASE INTERCHANGE
{HHR-A2-AF-Ol}. (For the Bridges ofArea2 & Area3)
- ConstructionManager withADVANCEDGLOBAL CONSTRUCTION CO.
Project Constructionof Bridge Projects, King Abdul Aziz International Airport – Jeddah.
 Duties included:
- Water and Sewage {Plants & pipes}of new Cairo City -
- Elevatedwater Tower Tanks Byslipform andheavyLifting Method
- Regressionlines to sewage without opencut, technologypipe jacking methodfor Pre -cast concrete pipes.
- Pedestrian tunnels under rail and highways, concrete Phrases.
 Duties included:
- Establishment andmaintenance of HighwayRoads andinternal Roads.
- Medina, Saudi Arabia
 Duties included:
- The Returnandirrigation project, {pumpstation - ejectionline - purificationstation}.
- Alexandria the immediate solution project {Ejectment lines, Tunnelswithpipe jacking method}.
ConstructionManager
ADVANCED CONSTRUCTION CO.
KSA (Jan 2013 – Jan 2014)
ConstructionManager
AL-ASWAD EST. For Trading &
Contracting
KSA (May 2005 – Dec 2012)
Continued
.
ConstructionManager
Egyptian Arab Company for
Contracting
EGY (Nov 1997 – Apr 2005)
ConstructionManager
Bonais Co. For Trading &
Contracting
KSA (Mar 1994 – Oct 1997)
Site Engineer
Egyptian Arab Company for
Contracting
EGY (Aug 1987 – Feb 1994)
3
 Bachelor`s Degree, Civil Engineering,
 Faculty of Engineering
 Cairo University, July – 1987
 Reinforced Concrete Project
 Civil Engineering
 Construction
 Bridges & Tunnels
 Highways – Roads
 Infrastructure
 Deep Foundation
 Utilities
 Water Plants and Sewage
 Elevated tanks
 Regression lines
 Primavera
 PMP
EDUCATION
SKILLS
Continued
.
Safety issues

More Related Content

What's hot

Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
Wissam Shehab
 
23-09-2014u3
23-09-2014u323-09-2014u3
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin Infrastructure,Housing,water,Industrial
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
raja mohamed Hidayath
 
Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin-EPC Project Manager 2014 Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin Infrastructure,Housing,water,Industrial
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
NANDLAL PRASAD
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
Akhtar Rasul
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
Mahmoud Fareed alsheick Hussain
 
CV F 2016
CV  F 2016CV  F 2016
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
?????? ????? Naveed Asif
 
CV
CVCV
MCV
MCVMCV
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
Arun (kurup)
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
muhammad safdar
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
Ali.M Maruoof
 
CV-04-14
CV-04-14CV-04-14
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
Mohammed Al Ghazawi
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016
hee siek fung
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
Vasilis Karagkounakis
 

What's hot (19)

Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
23-09-2014u3
23-09-2014u323-09-2014u3
23-09-2014u3
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin-EPC Project Manager 2014 Khalaf Hassanin-EPC Project Manager 2014
Khalaf Hassanin-EPC Project Manager 2014
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
CV F 2016
CV  F 2016CV  F 2016
CV F 2016
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
CV
CVCV
CV
 
MCV
MCVMCV
MCV
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
CV-04-14
CV-04-14CV-04-14
CV-04-14
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
 

Similar to Cv mohamed al-jabri - 2018

Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
ramy galal
 
003_work profile_3
003_work profile_3003_work profile_3
003_work profile_3
raja shahid raza
 
Cv mp1 l.up - copy
Cv mp1 l.up - copyCv mp1 l.up - copy
Cv mp1 l.up - copy
Arafa Riad
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
Muhammad Amjad
 
Yehia Helmy - CV
Yehia Helmy - CVYehia Helmy - CV
Yehia Helmy - CV
yehia helmy
 
CV - Mouhamad al Mouallem
CV - Mouhamad al MouallemCV - Mouhamad al Mouallem
CV - Mouhamad al Mouallem
Mouhamad Almouallem
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
Ahmad M. Sarabi
 
cv1
cv1cv1
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
amr mahrous
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
baraa Mohammad
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
AHMED SAKR
 
Cv 01
Cv 01Cv 01
Basheer Ahmed
Basheer Ahmed Basheer Ahmed
Basheer Ahmed
Basheer Nahiyoon
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
mohamed ezz
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
Ali Fakhir
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Noor Wali Khan
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
Osama Abdulrahman
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
Jundee Mar Tejedo
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
Nazir Ahmed
 

Similar to Cv mohamed al-jabri - 2018 (20)

Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
 
003_work profile_3
003_work profile_3003_work profile_3
003_work profile_3
 
Cv mp1 l.up - copy
Cv mp1 l.up - copyCv mp1 l.up - copy
Cv mp1 l.up - copy
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
Yehia Helmy - CV
Yehia Helmy - CVYehia Helmy - CV
Yehia Helmy - CV
 
CV - Mouhamad al Mouallem
CV - Mouhamad al MouallemCV - Mouhamad al Mouallem
CV - Mouhamad al Mouallem
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
cv1
cv1cv1
cv1
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
Cv 01
Cv 01Cv 01
Cv 01
 
Basheer Ahmed
Basheer Ahmed Basheer Ahmed
Basheer Ahmed
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 

More from Mohamed Elgabery

Certification
CertificationCertification
Certification
Mohamed Elgabery
 
Rici
RiciRici
Certificate 3
Certificate 3Certificate 3
Certificate 3
Mohamed Elgabery
 
Certification 2
Certification 2Certification 2
Certification 2
Mohamed Elgabery
 
Certificate 1
Certificate 1Certificate 1
Certificate 1
Mohamed Elgabery
 
Termination of the contract with advanced construction co
Termination of the contract with advanced construction coTermination of the contract with advanced construction co
Termination of the contract with advanced construction coMohamed Elgabery
 
approval of Eastern Province Municipality
approval of Eastern Province Municipalityapproval of Eastern Province Municipality
approval of Eastern Province MunicipalityMohamed Elgabery
 
minutes of construction meeting
minutes of construction meetingminutes of construction meeting
minutes of construction meetingMohamed Elgabery
 
مدير مشروع الأندلس
مدير مشروع الأندلسمدير مشروع الأندلس
مدير مشروع الأندلسMohamed Elgabery
 
CCECC-KAT-LET-0051-Organization Chart&CV's_AAN
CCECC-KAT-LET-0051-Organization Chart&CV's_AANCCECC-KAT-LET-0051-Organization Chart&CV's_AAN
CCECC-KAT-LET-0051-Organization Chart&CV's_AANMohamed Elgabery
 

More from Mohamed Elgabery (14)

Certification
CertificationCertification
Certification
 
Rici
RiciRici
Rici
 
Certificate 3
Certificate 3Certificate 3
Certificate 3
 
Certification 2
Certification 2Certification 2
Certification 2
 
Certificate 1
Certificate 1Certificate 1
Certificate 1
 
Al Rajhi Alliance
Al Rajhi AllianceAl Rajhi Alliance
Al Rajhi Alliance
 
Termination of the contract with advanced construction co
Termination of the contract with advanced construction coTermination of the contract with advanced construction co
Termination of the contract with advanced construction co
 
approval of Eastern Province Municipality
approval of Eastern Province Municipalityapproval of Eastern Province Municipality
approval of Eastern Province Municipality
 
minutes of construction meeting
minutes of construction meetingminutes of construction meeting
minutes of construction meeting
 
Coordination Meeting
Coordination MeetingCoordination Meeting
Coordination Meeting
 
SIGNITURE
SIGNITURESIGNITURE
SIGNITURE
 
مدير مشروع الأندلس
مدير مشروع الأندلسمدير مشروع الأندلس
مدير مشروع الأندلس
 
CCECC-KAT-LET-0051-Organization Chart&CV's_AAN
CCECC-KAT-LET-0051-Organization Chart&CV's_AANCCECC-KAT-LET-0051-Organization Chart&CV's_AAN
CCECC-KAT-LET-0051-Organization Chart&CV's_AAN
 
SAPL 0274R Reply
SAPL 0274R ReplySAPL 0274R Reply
SAPL 0274R Reply
 

Recently uploaded

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 

Recently uploaded (20)

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 

Cv mohamed al-jabri - 2018

  • 1. 1        Duties included: - INTERCHANGE AND ROADS SOUTH DHAHRAN HOME OWNERSHIP- {SDHOP} -ARAMCO PROJECT - KINGDOM OF SAUDI ARABIA  Duties included: - Construction of Under Pass Intersection of Palestine Street & Al-hamra Street with King Abdul Aziz Road, Jeddah King Abdul-Aziz Tunnel Project, Jeddah, Saudi Arabia. Construction of Under Pass Intersections: ABU BAKAR INTERSECTION#1&PRINCE MUTEB INTERSECTION#2, Najran Project Tunnel, Saudi Arabia, Najran Previous Duties & Responsibilities: Technical Coordinationwithgovernment andservice agenciesto relocation all utilities obstruct with our tunnel, review the tender design after finish insure soil investigation, follow schedule planning, shop drawing, follow all the construction submittal QA/QC plan, HSE Plan, Manpower-Equipment List, Inspection & Material Inspection Request, Method statement & Construction Sequence for consultant, follow all Construction activities at site, weeklyconstruction meetingwith the client and consultant, dailyconstructionmeeting with my team, weekly meeting with our project manager and our project staff. EMPLOYMENT HISTORY IT Knowledge Windows,MSOffice, Primavera, AutoCAD. LANGUAGES Arabic, English. REFERENCES Shall be provided upon request. Jun, 21, 1965 +966 581950004 En_m_algabry@hotmail.com . Seeking a challenging career at a local/multi-national or International organization, where there is scope for demonstration for myskills in Management, Civil Engineering & Construction. To be an active team member who contributed in development of the projects performed by this team, complete my career in the field to achieve myself and join a successful team adds to my career. Result oriented, proactive and industrious professional with extensive hands on experience in the areas of Management, Civil Engineering & Construction. Thirty years of work inthe implementation of engineering projects Distinctive and Private Construction in the field of      Reinforcement Concrete bridgesandtunnels, Systemprecast pre-stressedpost tensioned& Cast inthe site with & without pre-stressedpost tensioned, Steel bridges, Steel Structures.   Establishment andmaintenance ofHighwayRoads andinternal Roads.  Infrastructure and public utilities representedinthe establishment of water Plants and Sewage, structural and Mechanical department, constructionandSinking Shaft;constructionelevatedwater tower tanks (budget tanks) bysystemof slipForm and heavyLiftingof Rft. Concrete slabs.  Regressionlinesto sewage without opencut, technologypipe jacking methodfor Pre -cast concrete pipes, Pedestriantunnelsunder rail andhighways, concrete Phrases. . OBJECTIVE CORE COMPETENCIES Egyptian SITE MANAGER at Contracting & Construction Enterprises - CCE INTERCHANGE AND ROADS SOUTH DHAHRAN HOME OWNERSHIP-{SDHOP}- ARAMCO PROJECT- KINGDOM OF SAUDI ARABIA- Contract No. 6600037520 linkedin.com/in/mohamed-elgabery-37bba653 Mohamed Elgabery Site Manager Contracting & Construction Enterprises - CCE KSA -(Sep 2016 – Present) ConstructionManager China Civil Engineering Construction Corporation Branch in K.S.A. {CCECC} KSA -(Feb 2014 – Aug 2016)
  • 2. 2  Duties included: - CONSTRUCTION OF BRIDGE PROJECTS Construction ofUnder Pass and Over Pass Intersectionof Prince MitebStreet withOthmanStreet andPrince Naïf Street, Dammam.  Duties included: - Bridge, Intersectionof king Fahdstreet withPalestine street, Jeddah, Saudi Arabia - Resident Engineer withSaudi Consolidated Engineering Company, Khatib& Alami, Project Treatment plant sewage western Mecca, Saudi Arabia - Sector Manager of Tunnels withDr.Ahmed Abdul Warith& Partners office, Project to extendthe network of sewage at northof Jeddah. - ConstructionManager withAlRajhi Alliance for HaramainHighSpeed Rail LinkAL ARRAB CO. Project HARAMAIN HIGH SPEEDRAIL LINKPROJECT - AIR BASE INTERCHANGE {HHR-A2-AF-Ol}. (For the Bridges ofArea2 & Area3) - ConstructionManager withADVANCEDGLOBAL CONSTRUCTION CO. Project Constructionof Bridge Projects, King Abdul Aziz International Airport – Jeddah.  Duties included: - Water and Sewage {Plants & pipes}of new Cairo City - - Elevatedwater Tower Tanks Byslipform andheavyLifting Method - Regressionlines to sewage without opencut, technologypipe jacking methodfor Pre -cast concrete pipes. - Pedestrian tunnels under rail and highways, concrete Phrases.  Duties included: - Establishment andmaintenance of HighwayRoads andinternal Roads. - Medina, Saudi Arabia  Duties included: - The Returnandirrigation project, {pumpstation - ejectionline - purificationstation}. - Alexandria the immediate solution project {Ejectment lines, Tunnelswithpipe jacking method}. ConstructionManager ADVANCED CONSTRUCTION CO. KSA (Jan 2013 – Jan 2014) ConstructionManager AL-ASWAD EST. For Trading & Contracting KSA (May 2005 – Dec 2012) Continued . ConstructionManager Egyptian Arab Company for Contracting EGY (Nov 1997 – Apr 2005) ConstructionManager Bonais Co. For Trading & Contracting KSA (Mar 1994 – Oct 1997) Site Engineer Egyptian Arab Company for Contracting EGY (Aug 1987 – Feb 1994)
  • 3. 3  Bachelor`s Degree, Civil Engineering,  Faculty of Engineering  Cairo University, July – 1987  Reinforced Concrete Project  Civil Engineering  Construction  Bridges & Tunnels  Highways – Roads  Infrastructure  Deep Foundation  Utilities  Water Plants and Sewage  Elevated tanks  Regression lines  Primavera  PMP EDUCATION SKILLS Continued . Safety issues