A Portfolio showing my career path Until 1/1/2020, It was demanded by an Hr manager from me and here it is just packed to her. I'm sharing it to everyone for the sake of sharing and also if anyone want to make a portfolio like this just contact me on whatsapp or my email
+201143346363
mahmoud3adel.aamer@gmail.com
Examples of work of Muhammad Ahsun, MSc Structural Engineer with extensive experience in structural design. Below is the short description.
I have been involved to perform the structural engineering works such that analyzing, detail designing, reinforced concrete detailing, structural steel detailing,production of drawings for several projects with Gulf Consult Kuwait. I have used commercial software such that ETABS, SAFE, SAP2000 to perform the structural analysis. I have co-ordinated with architects and other service discipline for completion of the project works.
Some of the project I have worked on:
Kuwait International Airport
Kuwait Cancer Cancer
The Scientific Center Kuwait
South Regional Roads
Kuwait National Guards Building
Kuwait Police Hospital
Examples of work of Oleg Kilchevskiy, MSc qualified Structural Engineer with extensive experience in structural design, project management and construction management, including Arctic conditions; business-minded engineer, with interests in many areas of engineering, technology, natural and social sciences and a strong focus on systems engineering.
Presenting a glimpse into my work in the field of civil engineering. The projects showcased here includes live projects from clients with residential, commercial and municipal requirements.
This Document will take you in a visit to a Construction Site to teach you a lot of Constructional Information about:
- Walls
- Columns
- Pools Systems
- Stairs
- Isolation
CONSTRUCTION OF DISTRICT CONTROL BUILDING, CENTRAL STORE BUILDING & 33/11KV POWER SUBSTATION CONTROL ROOM AT CHAPRA,BIHAR
An Internship Report submitted in partial fulfilment of the
requirements for the degree
of
B.Tech (Civil Engineering)
by
VIJAY KUMAR SINGH
13BCL0001
VIT UNIVERSITY
VELLORE – 632 014, TAMILNADU
Examples of work of Muhammad Ahsun, MSc Structural Engineer with extensive experience in structural design. Below is the short description.
I have been involved to perform the structural engineering works such that analyzing, detail designing, reinforced concrete detailing, structural steel detailing,production of drawings for several projects with Gulf Consult Kuwait. I have used commercial software such that ETABS, SAFE, SAP2000 to perform the structural analysis. I have co-ordinated with architects and other service discipline for completion of the project works.
Some of the project I have worked on:
Kuwait International Airport
Kuwait Cancer Cancer
The Scientific Center Kuwait
South Regional Roads
Kuwait National Guards Building
Kuwait Police Hospital
Examples of work of Oleg Kilchevskiy, MSc qualified Structural Engineer with extensive experience in structural design, project management and construction management, including Arctic conditions; business-minded engineer, with interests in many areas of engineering, technology, natural and social sciences and a strong focus on systems engineering.
Presenting a glimpse into my work in the field of civil engineering. The projects showcased here includes live projects from clients with residential, commercial and municipal requirements.
This Document will take you in a visit to a Construction Site to teach you a lot of Constructional Information about:
- Walls
- Columns
- Pools Systems
- Stairs
- Isolation
CONSTRUCTION OF DISTRICT CONTROL BUILDING, CENTRAL STORE BUILDING & 33/11KV POWER SUBSTATION CONTROL ROOM AT CHAPRA,BIHAR
An Internship Report submitted in partial fulfilment of the
requirements for the degree
of
B.Tech (Civil Engineering)
by
VIJAY KUMAR SINGH
13BCL0001
VIT UNIVERSITY
VELLORE – 632 014, TAMILNADU
Sea Port Construction, Project Execution PlanDavid H Moloney
Details of how a Sea Port is constructed, and how the progress, safety and quality will be monitored and controlled. Also the measures to ensure that the site is environmentally friendly.
1. PROJECTS EXECUTED: OIL & GAS AS WELL AS BUILDING CONSTRUCTION PROJECTS ( AS A SUPERVISOR CIVIL)
1- Acting as a link between Civil Engineers and the Foreman & charge hand.
2- Execution of storm water trench, hot oil trench, electrical trench, post padding by sand for all pipelines, grade slab, paving, shim plate installation, anchor bolt installation in various foundations, pedestal casting and installation,
Manhole casting and installation, grouting of vessels and sewer pipe, fencing foundation casting and its installation.
3- Conducting Tool Box Talk on everyday basis on starting work Activity at site.
4- I can take permit of any work as per client specified specification and requirements.
5- I can execute any work in safe and in well-disciplined manners to give better output towards to achieve organization goals.
6- I can also execute more than 5 activities at a time on site by providing better output.
7- Assisting the site Foreman and charge hand in all site civil construction activities from foundation up to final finishing stage 8- Supervising all construction activities and providing technical inputs for construction and coordination with the site management.
9- Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output.
10- Checking the physical and chemical composition of materials such as concrete, brick, Block, Cement, aggregates (fine as well as coarse), Steel and plywood.
11- Calculation of materials for construction works at site.
12- Giving detailed notes on daily progress report to me superior about every day work.
13- Preparation of BBS, Supervision and Execution of Entire Civil works like Excavation, Backfilling, Compaction, Surface protection, Form work, Rebar work, Concreting Masonry work, Block work, plastering, Water proofing work Painting, Plumbing, Tiling and Flooring work.
• Well pad development and installation of foundation for pipelines.
STRUCTURE ENGINEER
BEng Civil Engineering; 2 years and 6 months work experience.
Specialized in RC frame structure design.
Structural analysis with software (SAFE, ETABS, PROKON & AUTODESK ROBOT) - 2D & 3D drawing with AutoCAD & REVIT.
Good knowledge of QUICKBOOK, MS OFFICE & MS PROJECT.
Able to design base isolated structures.
Designed 36 projects included commercial, residential & private villas.
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
Sea Port Construction, Project Execution PlanDavid H Moloney
Details of how a Sea Port is constructed, and how the progress, safety and quality will be monitored and controlled. Also the measures to ensure that the site is environmentally friendly.
1. PROJECTS EXECUTED: OIL & GAS AS WELL AS BUILDING CONSTRUCTION PROJECTS ( AS A SUPERVISOR CIVIL)
1- Acting as a link between Civil Engineers and the Foreman & charge hand.
2- Execution of storm water trench, hot oil trench, electrical trench, post padding by sand for all pipelines, grade slab, paving, shim plate installation, anchor bolt installation in various foundations, pedestal casting and installation,
Manhole casting and installation, grouting of vessels and sewer pipe, fencing foundation casting and its installation.
3- Conducting Tool Box Talk on everyday basis on starting work Activity at site.
4- I can take permit of any work as per client specified specification and requirements.
5- I can execute any work in safe and in well-disciplined manners to give better output towards to achieve organization goals.
6- I can also execute more than 5 activities at a time on site by providing better output.
7- Assisting the site Foreman and charge hand in all site civil construction activities from foundation up to final finishing stage 8- Supervising all construction activities and providing technical inputs for construction and coordination with the site management.
9- Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output.
10- Checking the physical and chemical composition of materials such as concrete, brick, Block, Cement, aggregates (fine as well as coarse), Steel and plywood.
11- Calculation of materials for construction works at site.
12- Giving detailed notes on daily progress report to me superior about every day work.
13- Preparation of BBS, Supervision and Execution of Entire Civil works like Excavation, Backfilling, Compaction, Surface protection, Form work, Rebar work, Concreting Masonry work, Block work, plastering, Water proofing work Painting, Plumbing, Tiling and Flooring work.
• Well pad development and installation of foundation for pipelines.
STRUCTURE ENGINEER
BEng Civil Engineering; 2 years and 6 months work experience.
Specialized in RC frame structure design.
Structural analysis with software (SAFE, ETABS, PROKON & AUTODESK ROBOT) - 2D & 3D drawing with AutoCAD & REVIT.
Good knowledge of QUICKBOOK, MS OFFICE & MS PROJECT.
Able to design base isolated structures.
Designed 36 projects included commercial, residential & private villas.
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
My specialty is Project Controls. I have 10+ years of intense and diverse experience and training in many facets of project management, financial planning and have excellent communication skills that complement my experience. Some highlights of my career are :
• Project Planning & Scheduling
• Progress Monitoring
• Performance Reporting
• Change Management – Time & Cost
• Bidding and Proposals Management
• Technical Writing- Plans, Method Statements etc.
Detail oriented and adaptable Planning Engineer Seeking a challenging position in the
construction, oil and gas fields where I can gather as much experience and knowledge as
possible, gain the capability to produce innovative structural solutions and utilize this
knowledge to the benefit of my career.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
4. Greater Cairo Metro Line 3 – Phase 4B
Planning Engineer
The Arab Contractors bridges sector
Gesr El-Suez
Projects..
Cost: 5.9 Billion EGP
Commencement Date: 8/6/2016
Duration: 34 Months
Contractors:
Owner: NAT
Consultants:
INFORMATION
5. Greater Cairo Metro Line 3 – Phase 4B
Planning Engineer
The Arab Contractors bridges sector
Gesr El-Suez
Just After graduation, I had the chance to join one of the Leading contracting
Companies in the Mena Region as a Planning Engineer and among a very
dedicated team of Engineers at Greater Cairo Metro Line 3 Phase 4B.
Projects..
My duties as a planning Engineer working directly under the general project
director, gave me a direct supervision and connection to the employees in
different managerial levels, and even with workers/labors in the Site of work.
6. Greater Cairo Metro Line 3 – Phase 4B
Planning Engineer
The Arab Contractors bridges sector
Gesr El-Suez
Projects..
I was responsible for updating, monitoring & controlling Project time schedule,
giving monthly and weekly progress reports to the direct manager.
Examples of the Weekly presentation to show the progress of each part on
metro line:
8. 62,000 Feddan of Land Restoration & Grading
Technical Office Engineer
Armed Forces Engineering Authority
(Beni-suef / Al-Minya)
Projects..
INFORMATION
Contractors: +40 Local Contractors
Owner: NSPO
Consultant: Armed Forces Engineering Authority
N.B:AFast-Track
Under-goingproject
9. Graduation Project
Construction Project Management
Royal City Mall – Sheikh Zayed City
Grade: Excellent
As a graduation Project, It was required to Study and implement the PMBOK 5th
Edition Principles and Knowledge Areas to Control and Monitor the Time, Cost,
and Resources through this Project and within the assigned contract . And here’s
a brief description and executed outputs of what’d been achieved.
Scope: Civil Works (Shoring, excavation, replacement, waterproofing, backfilling, concrete
and steel skeletons for all buildings including claddings), SOG (slab on grade), Architectural
Works, MEP (Mechanical, Electrical &Plumbing) Works, Landscape and Infrastructure
Works, internal roads, fence including steel gates and Security Kiosk Works for the Project
including relevant miscellaneous.
Time: 5 June 2017 – 5 June 2019 (24 months)
Cost: 400,000,000 L.E