SlideShare a Scribd company logo
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
Name : MUSTAFA KAMEL MOHAMED EL-ZEINY
Birth Date : May 04, 1952 Cairo
Nationality : Egyptian
Marital Status : Married
Religion : Muslim
Languages : English, Arabic – The Mother Tongue
Latest Job Title : Senior Project Coordinator at
Abu Dhabi Company for Onshore Oil Operations (ADCO),
Terminals and Pipelines Asset- Fujairah Terminal
Address : Abu Dhabi, Al NAHYAN CAMP Villa 27 P.O 45124
Address (Egypt) : Rehab City, Group no. 62, Building no. 9, flat no.2
New Cairo – Egypt
Mobile Phone no. UAE +971-504120107, Egypt +2-0100-7420456,
E-mail Address : mustafa_zeiny@hotmail.com ,
mustafa.el.zeiny@gmail.com
Educational Qualification : B.Sc. In Mechanical Engineering, 1976 (Helwan University)
2/18/2017 Page: 1/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
Summary of Experience
More than 30 years as Senior Piping/ Mechanical Engineer and Senior Project Engineering
Coordinator in Oil and Gas Industry and Oil Storage and Export Terminals in the fields of
Engineering, Procurement, and Construction Supervision for On-shore Projects.
Extensive Experience in the Review of Project Design Documents/ Drawings, providing
Technical Support and coordinate all Project Activities/Milestones with Project
PMC/Contractor/Engineering Consultants from FEED Stage until commissioning.
Participation and providing support in all ADCO Share Holders Health Check and Project
Startup Review Sessions carried out for Fujairah ADCOP Project as well as all Project
Engineering & HSE Review Sessions such as HAZOP, PHSER, etc...
Extensive Experience in Piping Design in accordance with international Standards such as API,
ASME/ANSI, ASTM, and NFPA Standards.
Extensive Experience in Design of Piping layouts, Isometric Drawings, Material take off, Pipe
Supports and Stress Analysis Calculation.
Experience in Fixed/Floating Roof Tanks Design in accordance with API Standard 650
Preparation of Terms of Reference (TOR) for Conceptual, Basic, FEED, and Detailed
Engineering.
Consultant Bid Technical Evaluation and Clarifications.
Extensive Experience in Procurement Technical Services.
Preparation of Enquiry Packages and Material Requisitions for Process Equipment and Piping
Material including Technical Specifications and Data Sheets.
Bid Technical Evaluation, Clarifications for Vendor Quotations
Experience in Construction Supervision, preparation of Piping Spool Sheets and Work Shop
Drawings
Management of Engineering Staffs in Multinational and International Environments
Conversant with ARAMCO, ADCO& SHELL DEP Specifications
2/18/2017 Page: 2/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
Computer Skills including the following Software’s:-
CAESAR II for Piping Stress Analysis Calculation.
PIPENET for Flow Analysis (Pipe Sizing and Pressure Drop Calculation).
Microsoft Office.
Summary of Main Positions.
1) From July,2007 till July 2016 for Abu Dhabi Company for Onshore Oil Operations
(ADCO) as Senior Mechanical/Piping Engineer and as Senior Project Engineering
Coordinator for ADCOP Project at Fujairah.
2) From July 2005 until June 2007 for Abu Dhabi Company for Onshore Oil Operations
(ADCO) as Senior Project Coordinator at ADCO JDA Terminal.
3) From July, 2003 till July, 2005 for Abu Dhabi Company for Onshore Oil Operations
(ADCO) as Senior Mechanical Engineer in the Engineering & Major Projects
Department.
4) From December 2002 until July 2003 for Pan Emirates Engineering Ltd. Abu Dhabi as
Mechanical/Piping Head of Department.
5) For Consolidated Contractors Company (CCC), Saudi Arabia for 3 years as Project
Chief Office Engineer Managing the Engineering Staff on the Field.
6) For Petroleum Projects and Technical Consultation Company (PETROJET), EPC,
Egypt for 14 years as Piping Design Dept. Head, Senior Piping Material Engineer,
Senior Piping Design Engineer, and Piping Construction Engineer.
2/18/2017 Page: 3/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
Experience History:
From July 2005 to July 2016 for Abu Dhabi Company for Onshore Oil Operations (ADCO)
As Senior Project Coordinator at ADCO Terminal/Pipelines Asset Supporting
technically all Major Projects in Fujairah & Jebel Dhanna Terminals/Tank Farms
Main duties as follow:-
1. Review of all Project Design Documents/ Drawings including P&ID, GA, Piping
Layout, Major Equipment including tank and Pump Data Sheets/Specifications.
2. Provide Technical Support and coordinate all Project Activities/Milestones with
Project PMC/Contractor/Engineering Consultants from FEED Stage until
commissioning.
3. Participation in all Project Engineering / HSE Review Sessions such as
HAZID/HAZOP/PHSER etc.
4. Participation in all Project 3D Model Review Sessions
5. Participation and providing support in all ADCO Share Holders Health Check and
Project Startup Review Sessions carried out for Fujairah ADCOP Project
Main Projects: -
1) ADCOP Project including new Fujairah Terminal/Tank Farm, 48” CS Pipeline of 404
KM and Main/Intermediate Pumping Stations at Habshan and Sweihan
2) FEED Engineering for Fujairah Four Additional Tanks at Fujairah Terminal
3) JDA Farm Facilities Upgrade Project at Jebel Dhanna Terminal
4) Refurbishment of One Million Barrel Floating Roof Tanks at Jebel Dhanna Terminal
5) FEED Engineering for Jebel Dhanna Tank Farm Extension (Two Additional Floating
From June, 2003 to July 2005 for Abu Dhabi Company for Onshore Oil Operations
(ADCO) As Senior Mechanical Engineer in the Engineering & Major Projects Department
2/18/2017 Page: 4/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
Supporting technically all Major Projects in Jebel Dhanna Terminal and Tank Farm (the
Main Oil Export Terminal in Abu Dhabi)
Main duties as follow:-
1)1) Review, comment and Approve consultant Engineering DeliverablesReview, comment and Approve consultant Engineering Deliverables such assuch as
Project Specifications / Data Sheets., Piping / Mechanical Drawings, MaterialProject Specifications / Data Sheets., Piping / Mechanical Drawings, Material
Requisitions and Engineering Calculations.Requisitions and Engineering Calculations.
2)2) Preparing Scope of Works / Terms of Reference for new Projects.Preparing Scope of Works / Terms of Reference for new Projects.
3)3) Prepare engineering works for PMRF”s (Plant Modification Request Forms)Prepare engineering works for PMRF”s (Plant Modification Request Forms)
including Drawings, Specifications, Data Sheets and Bill of Material.including Drawings, Specifications, Data Sheets and Bill of Material.
4) Consultant/ Contractor Bid Tech. Evaluation.
5)5) Technical Support during Project Construction, Answering Clarification raised byTechnical Support during Project Construction, Answering Clarification raised by
Operations /Contractors during Construction Phase.Operations /Contractors during Construction Phase.
6)6) Vendor Bid Technical Evaluation/ Clarification for Project Material such as PipingVendor Bid Technical Evaluation/ Clarification for Project Material such as Piping
Material, Valves, mechanical/ Process equipment, i.e. Pumps, Compressors, TankMaterial, Valves, mechanical/ Process equipment, i.e. Pumps, Compressors, Tank
Seals, Mixers, Roof Drain System and fixed Foam SystemSeals, Mixers, Roof Drain System and fixed Foam System
Main Projects: -
1) Tank Farm Facilities ( Oil Piping, Fire water System, Closed Drain System ) Upgrade
Project at Jebel Dhanna Terminal
2) Refurbishment of One Million Barrel Floating Roof Tanks at Jebel Dhanna Terminal
3) Preparation of Terms of Reference for Conceptual and for Basic/ FEED Engineering
for Jebel Dhanna Tank Farm Extension (Two Additional Floating Roof Tanks of One
Million Barrel) including facilities ; Filling / Loading Lines, Fire Water Main and
Closed Drain System.
From January, 2003 to June, 2003 for Pan Emirates Engineering Ltd., Abu Dhabi
As Piping/Mechanical Head of Department.
Main duties as follow:-
1. Piping & Mechanical Detailed Engineering
2. Preparation of PC Tender Documents and Construction Packages
2/18/2017 Page: 5/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
Main Projects: -
4) Installation of Side Entry Mixes on new 30” Nozzles for GASCO Tanks 6D-151A/B
5) Shah Infill Wells Project (Sy-040, Sy-041, Sy-042, Sy, &043) for Abu Dhabi
Company for Onshore Oil Operations (ADCO).
6) Asab Artificial Lift (Wells (Sb-052, Sb-107&Sb-135) for Abu Dhabi Company for
Onshore Oil Operations (ADCO).
From March 2001 to December 2002 for Private Consulting Engineering, work in Oil and
Gas industry in Egypt
From December, 1999 To February, 2001 for CCC( EPC Company) as a Chief Office
Engineer in Hawiyah Gas Plant Project , Saudi Arabia managing Engineering Section
on Field for the Following Duties:-
1) Piping Isometric Detailing, Spooling, and Reporting of B.O.M. using Taliso / Talisman
Programs.
2) Piping, Pipe Supports Equipment, Structural Steel Material Control, and Release to
Fabrication Shop and Field.
3) Issue for Fabrication Spool Sheets and Workshop Drawings for Pipe Supports and
Structural Modification.
4) Pipe Supports and Structural Steel Material Procurement for CCC Scope of Supply
According to Project Technical Specifications and Armco Standards.
5) Control of Field Erection Material and Release for Construction using Talisman Program.
6) Preparation of Field Valve Testing lists Providing Hydro test Requirements for each Valve
According to Project Specification and Applicable Codes and Release Valves for Testing
as per Project Requirements and Aramco Standards.
7) Engineering changes and revisions control and issuance of modifications to Fabrication
Shop and Site.
8) Control and checking of field RFI’s and Issuance of RFI’s for Engineering mismatches
between P&ID, GAs, ISOs Drawings, Project Specification, and Aramco Standards.
2/18/2017 Page: 6/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
9) Splitting and Issuing of Test Packs for Project Testing Systems, Control and Updating
Test Packs for all modifications.
10) Issue As-built drawings for all disciplines.
♦ From December, 1997 to November, 1999 for CCC as a Chief Office Engineer in
Yanpet Ethylene Expansion Project in Yanbu, Saudi Arabia leading the Engineering
Department on Field for the following duties:-
1) Piping Isometrics Checking, Spooling using TALISO Program.
2) Preparing detailed Workshop drawings for Pipe Supports and Issue Material Requisition
for Standard Pipe Supports.
3) Piping & Pipe Support Material Control using Talisman Program.
4) Issue Piping Spools and Pipe Supports for Fabrication and Erection.
5) Split Project Turnover System to Test Systems and Issuance of Test Packs to QC Dept.
6) Checking Project Engineering Documents such as P&ID, Line List, and ISO’s and GAD.
7) Control and Issue RFI’s for Engineering and Site Problems.
8) Get Approval for Accepted Material Substitutions to Increase Fabrication / Erection
Progress.
9) Control Project Specifications and Spec Waiver Issues.
10) Creating ISO Drawings, Specifying Branch Connection for Pipe Rack SFR’s.
11) Field As-Building P&ID’s and Isometrics.
♦ From August 1996 until December 1997 for Petrolem Projects and TechnicalPetrolem Projects and Technical
Consultation Company (PETROJET)Consultation Company (PETROJET), EPC,EPC, Egypt as a Project Office Engineer in
Ammonia / Urea Fertilizer Abu Qir III (Mech.) Project in Alexandria.
Duties as follows:
1) Project Contract and Correspondence
2/18/2017 Page: 7/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
2) Project Technical Documentation
3) Project Quantity Surveying, Cost Control and Preparing Monthly Invoices.
4) Piping Isometric Workshop Drawings.
5) Project Work Progress Calculations.
6) Project Material Control and Material Procurement.
♦ From 1989 till August 1996 for Petrolem Projects and Technical ConsultationPetrolem Projects and Technical Consultation
Company (PETROJET)Company (PETROJET), EPC,EPC, Egypt ,Head Office (Cairo) as
Piping Design Dept. head.
Main duties as follows:
1) Process Piping Systems Engineering including Pipe Sizing, Pump Head, and NPSH
calculation using PIPENET Software.
2) Piping Detailed Engineering including Piping Arrangement Plans and Piping Isometric
Drawings.
3) Piping Stress Analysis Calculations using CAESAR II Software.
4) Preparation of Project Bill of Material
5) Preparation of Project Material Specifications for Process Equipment, Piping Material,
Valves, Pumps, Plates, etc. According to International Codes API, ASME, ANSI, ASTM,
etc...
6) Material Inquiry Technical Packages preparation.
7) Vendor Bid Technical Evaluation/ Clarification.
Main Projects: -
1) Expansion of SUMED Storage Capacity at SIDI KRIR Terminal (Alex.)
Duration: November 1994 to August 1996
Duties Include the Following: -
2/18/2017 Page: 8/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
• Engineering and Supply of 6 X 120,000 M³ New Crude Oil Floating Roof Tanks
and related 48” Process Piping Network (about 6km) and Hydraulic Operated Ball
and Gate Valves.
• Engineering and Supply of New Boosting Pump Station with Total Capacity 3 X
4600 M³/HR.
• Engineering and Supply of Fire Fighting System (24” Main Ring).
• Engineering and Supply of 12” Oily Sewer System including Oily Sewer Pumps.
• Engineering and Supply of 20” Surface Drainage System.
• Engineering and Supply of 2” Hydraulic Oil System.
2) Extension of ASSUIT Refinery Storage Capacity
Duration: 1992 to 1994
Duties Include the Following:
• Supply of New 15,000 M³ Kerosene Fixed Roof Tank.
• Supply of New 5,000 M³ Naphtha Floating Roof Tank.
• Supply of New Cooling Tower.
• Supply of New LPG Cigar Tank.
• Engineering and Supply of Related Process Piping Networks including Pump
Stations.
• Engineering and Supply of Fire Fighting System (24” Loop).
• Engineering and Supply of Sewer System.
3) Extension of ASSUIT Refinery Storage Capacity
Duration: 1991 to 1992
Duties Include the Following:
• Supply of New 55,000 M³ Crude Oil Floating Roof Tank.
• Supply of two New 33,000 M³ Fuel Oil Fixed Roof Tanks.
2/18/2017 Page: 9/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
• Engineering and Supply of Process Piping Networks including Pump Stations.
• Engineering and Supply of Fire Fighting System (24” Loop).
• Engineering and Supply of Sewer System.
• Engineering and Supply of Steam and Steam Tracing Lines for Fuel Oil Lines.
4) Upgrade of SUMED Storage Capacity at SUMED Terminals SIDI KRIR (Alex.) and
EIN SOKHNA. (SUEZ)
Duration: 1989 to 1991
Duties Include the Following:
• Engineering and Supply of 4 X 100,000 M³ New Crude Oil Floating Roof Tanks and
Related 48” Process Piping Network and Hydraulic Operated Ball and Gate Vales.
• Engineering and Supply of Fire Fighting System (24” Main Ring).
• Engineering and Supply of 12” Oily Sewer System.
• Engineering and Supply of 20” Surface Drainage System.
• Engineering and Supply of 2” Hydraulic Oil System.
♦ From 1987 until 1989 for PETROJET Head Office (Cairo) as a Piping Material Engineer
in Tech. Sector.
Duties as follows:
1) Develop of Project Materials Specifications for Equipment, Pumps, Pipes, Piping
Fittings, Valves, Plates, etc. According to International Codes API, ASME, ANSI,
ASTM, etc...
2) Develop of Technical Packages for Material Enquiries and Purchase Orders for
Petrochemical projects.
3) Vendor Bid Tech. Evaluation/ Clarification.
4) Tendering and Cost Estimate.
Main Projects: -
2/18/2017 Page: 10/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
1) Upgrade of SUMED Storage Capacity at SUMED Terminals SIDI KRIR (Alex.) and
EIN SOKHNA (SUEZ)
2) Green Beach and EL-Zahraa Tourist Villages Supply of PVC and Galvanized Piping
Valves for Water Pumping System.
3) GPC Platforms Material for Two Platforms including Pipes for Piles, Jackets, Decks,
Sheet Plates and Sections approximately 1800 ton.
From 1986 until 1987 for PETROJET (EPC Company) Head Office (Cairo) as Piping
Design Engineer
Duties as follows: -
1) Process Piping Systems Engineering including Pipe Sizing, Pump Head, and NPSH
Calculations.
2) Piping Detailed Engineering including Piping Arrangement Plans and Piping Isometric
Drawings.
3) Piping Stress Analysis Calculations.
4)Specifying Project Materials and Equipment like Pipe, Piping Fittings, Valves, Pumps,
Boilers, Plates, etc.
5)Material Inquiries Issue.
6)Vendor Bid Tech. Evaluation/ Clarifications
Main Projects: -
ASSUIT Cement Factory Fuel Oil Facilities, Barge Unloading Facilities for Fuel Oil,
Unloading Pump Station, Steam Boilers, Water Treatment Plant, Transfer Pump Station,
and 12Km 12” Insulated Pipeline to Cement Factory.
♦ From 1984 until 1986 for PETROJET as Piping Construction Engineer in SUCO ZEIT
Bay Project.
Worked as Piping Construction Engineer for the following duties:-
2/18/2017 Page: 11/12
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY
CURRICULUM-VITAE
1) Fabrication of piping spools according to isometric drawings and Fabrication of Pipe
Supports
2) Erection of piping spools according to P&ID, ISO’s and GAD
¨ From 1980 till 1984 for SEBHA Construction Co. in Libya as a Construction Supervision
Engineer for the Following Projects, which have been executed by European subcontractors: -
1)Fuel Tanks and Related Piping System
2)SEBHA Tourist Hotel Mechanical works
From 1976 until 1980 in Military Service
2/18/2017 Page: 12/12
CV updated  February 2017
CV updated  February 2017

More Related Content

What's hot

Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
shoaib mustafa
 
RESUME_080615_FLUOR
RESUME_080615_FLUORRESUME_080615_FLUOR
RESUME_080615_FLUOR
CARLOS BONILLA
 
Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016
Adjabi Mohamed El Hadi
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
Manish Ray
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
Husin Asran
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy Kakollu
 
Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
Alexander Zakharov
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
bharath kumar
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
Subhash Dhiman
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
Rajasekar ramamurthy
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
Pintu Darji
 
Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
Shabeer Mohammed
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
Nasir Mahmood
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
Amr Yousry CEng MIMechE, Msc., ASME Member
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
Hashim Vayalilakath
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
Nazir Ahmed
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
Siva Prakasam Parthiban
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
ashwin mahale
 

What's hot (20)

Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
RESUME_080615_FLUOR
RESUME_080615_FLUORRESUME_080615_FLUOR
RESUME_080615_FLUOR
 
Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 

Viewers also liked

A.Alhammami updated cv 20-11-2014
A.Alhammami updated cv 20-11-2014A.Alhammami updated cv 20-11-2014
A.Alhammami updated cv 20-11-2014
Abdulla Al Hammami
 
Matt Kiker 2017 Resume For Oil and Gas 11 17 16
Matt Kiker 2017 Resume For Oil and Gas  11 17 16Matt Kiker 2017 Resume For Oil and Gas  11 17 16
Matt Kiker 2017 Resume For Oil and Gas 11 17 16
Matthew Kiker
 
Jawid update cv Jan 2017
Jawid update cv Jan  2017Jawid update cv Jan  2017
Jawid update cv Jan 2017
Capt Jawid HIS Survey
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
Adnan Rehmat
 
Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
Arshad Aziz
 
Resume of anant (canadian citizen living in saudi arabia) updated on 21st ...
Resume of anant (canadian citizen living in saudi arabia)   updated on 21st  ...Resume of anant (canadian citizen living in saudi arabia)   updated on 21st  ...
Resume of anant (canadian citizen living in saudi arabia) updated on 21st ...
anantjha
 
Document Controller - Resume
Document Controller - ResumeDocument Controller - Resume
Document Controller - Resume
Maqbool Ansari
 
my CV
my CVmy CV
Yasser Kutbi CV-2016
Yasser Kutbi CV-2016Yasser Kutbi CV-2016
Yasser Kutbi CV-2016
Yasser Kutbi
 
Cv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gasCv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gas
Bevan Lane
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
Sajid Akhtar
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
Roy Encallado
 
Curriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FIN
Curriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FINCurriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FIN
Curriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FIN
Albert J Faul
 
Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016
Maitham Al Miskeen
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
Rameshchandra Prajapati
 
My updated CV January 2015
My updated CV January  2015My updated CV January  2015
My updated CV January 2015
Joson Fernando
 

Viewers also liked (16)

A.Alhammami updated cv 20-11-2014
A.Alhammami updated cv 20-11-2014A.Alhammami updated cv 20-11-2014
A.Alhammami updated cv 20-11-2014
 
Matt Kiker 2017 Resume For Oil and Gas 11 17 16
Matt Kiker 2017 Resume For Oil and Gas  11 17 16Matt Kiker 2017 Resume For Oil and Gas  11 17 16
Matt Kiker 2017 Resume For Oil and Gas 11 17 16
 
Jawid update cv Jan 2017
Jawid update cv Jan  2017Jawid update cv Jan  2017
Jawid update cv Jan 2017
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
 
Resume of anant (canadian citizen living in saudi arabia) updated on 21st ...
Resume of anant (canadian citizen living in saudi arabia)   updated on 21st  ...Resume of anant (canadian citizen living in saudi arabia)   updated on 21st  ...
Resume of anant (canadian citizen living in saudi arabia) updated on 21st ...
 
Document Controller - Resume
Document Controller - ResumeDocument Controller - Resume
Document Controller - Resume
 
my CV
my CVmy CV
my CV
 
Yasser Kutbi CV-2016
Yasser Kutbi CV-2016Yasser Kutbi CV-2016
Yasser Kutbi CV-2016
 
Cv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gasCv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gas
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
Curriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FIN
Curriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FINCurriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FIN
Curriculum Vitae of Albert J. Faul QHSSE_ Saudi Arabia 2016FIN
 
Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 
My updated CV January 2015
My updated CV January  2015My updated CV January  2015
My updated CV January 2015
 

Similar to CV updated February 2017

tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
Ahmed Tayssir
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
Toni AZAR
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
Juber Loharia
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
Poornima Tandur
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
arie hidayati jumari marjono
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
Mostafa Omar
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
Mohamed Hashim
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
Antar Salama
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
manthrala subbarao
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
MohamedZidan85
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
PRADIP SAHA,CEng MIGEM
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
Ahmed Youssef
 
Manimaran
ManimaranManimaran
Manimaran
Manimaran M
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
Ahmed Kamal
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
Dave Beveridge
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
Salah Mohamed
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
Dineshkumar Shah
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
Shakir Abd
 
CV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEERCV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEER
Rio Afriyoldi
 

Similar to CV updated February 2017 (20)

tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Manimaran
ManimaranManimaran
Manimaran
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
CV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEERCV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEER
 

CV updated February 2017

  • 1. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Name : MUSTAFA KAMEL MOHAMED EL-ZEINY Birth Date : May 04, 1952 Cairo Nationality : Egyptian Marital Status : Married Religion : Muslim Languages : English, Arabic – The Mother Tongue Latest Job Title : Senior Project Coordinator at Abu Dhabi Company for Onshore Oil Operations (ADCO), Terminals and Pipelines Asset- Fujairah Terminal Address : Abu Dhabi, Al NAHYAN CAMP Villa 27 P.O 45124 Address (Egypt) : Rehab City, Group no. 62, Building no. 9, flat no.2 New Cairo – Egypt Mobile Phone no. UAE +971-504120107, Egypt +2-0100-7420456, E-mail Address : mustafa_zeiny@hotmail.com , mustafa.el.zeiny@gmail.com Educational Qualification : B.Sc. In Mechanical Engineering, 1976 (Helwan University) 2/18/2017 Page: 1/12
  • 2. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Summary of Experience More than 30 years as Senior Piping/ Mechanical Engineer and Senior Project Engineering Coordinator in Oil and Gas Industry and Oil Storage and Export Terminals in the fields of Engineering, Procurement, and Construction Supervision for On-shore Projects. Extensive Experience in the Review of Project Design Documents/ Drawings, providing Technical Support and coordinate all Project Activities/Milestones with Project PMC/Contractor/Engineering Consultants from FEED Stage until commissioning. Participation and providing support in all ADCO Share Holders Health Check and Project Startup Review Sessions carried out for Fujairah ADCOP Project as well as all Project Engineering & HSE Review Sessions such as HAZOP, PHSER, etc... Extensive Experience in Piping Design in accordance with international Standards such as API, ASME/ANSI, ASTM, and NFPA Standards. Extensive Experience in Design of Piping layouts, Isometric Drawings, Material take off, Pipe Supports and Stress Analysis Calculation. Experience in Fixed/Floating Roof Tanks Design in accordance with API Standard 650 Preparation of Terms of Reference (TOR) for Conceptual, Basic, FEED, and Detailed Engineering. Consultant Bid Technical Evaluation and Clarifications. Extensive Experience in Procurement Technical Services. Preparation of Enquiry Packages and Material Requisitions for Process Equipment and Piping Material including Technical Specifications and Data Sheets. Bid Technical Evaluation, Clarifications for Vendor Quotations Experience in Construction Supervision, preparation of Piping Spool Sheets and Work Shop Drawings Management of Engineering Staffs in Multinational and International Environments Conversant with ARAMCO, ADCO& SHELL DEP Specifications 2/18/2017 Page: 2/12
  • 3. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Computer Skills including the following Software’s:- CAESAR II for Piping Stress Analysis Calculation. PIPENET for Flow Analysis (Pipe Sizing and Pressure Drop Calculation). Microsoft Office. Summary of Main Positions. 1) From July,2007 till July 2016 for Abu Dhabi Company for Onshore Oil Operations (ADCO) as Senior Mechanical/Piping Engineer and as Senior Project Engineering Coordinator for ADCOP Project at Fujairah. 2) From July 2005 until June 2007 for Abu Dhabi Company for Onshore Oil Operations (ADCO) as Senior Project Coordinator at ADCO JDA Terminal. 3) From July, 2003 till July, 2005 for Abu Dhabi Company for Onshore Oil Operations (ADCO) as Senior Mechanical Engineer in the Engineering & Major Projects Department. 4) From December 2002 until July 2003 for Pan Emirates Engineering Ltd. Abu Dhabi as Mechanical/Piping Head of Department. 5) For Consolidated Contractors Company (CCC), Saudi Arabia for 3 years as Project Chief Office Engineer Managing the Engineering Staff on the Field. 6) For Petroleum Projects and Technical Consultation Company (PETROJET), EPC, Egypt for 14 years as Piping Design Dept. Head, Senior Piping Material Engineer, Senior Piping Design Engineer, and Piping Construction Engineer. 2/18/2017 Page: 3/12
  • 4. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Experience History: From July 2005 to July 2016 for Abu Dhabi Company for Onshore Oil Operations (ADCO) As Senior Project Coordinator at ADCO Terminal/Pipelines Asset Supporting technically all Major Projects in Fujairah & Jebel Dhanna Terminals/Tank Farms Main duties as follow:- 1. Review of all Project Design Documents/ Drawings including P&ID, GA, Piping Layout, Major Equipment including tank and Pump Data Sheets/Specifications. 2. Provide Technical Support and coordinate all Project Activities/Milestones with Project PMC/Contractor/Engineering Consultants from FEED Stage until commissioning. 3. Participation in all Project Engineering / HSE Review Sessions such as HAZID/HAZOP/PHSER etc. 4. Participation in all Project 3D Model Review Sessions 5. Participation and providing support in all ADCO Share Holders Health Check and Project Startup Review Sessions carried out for Fujairah ADCOP Project Main Projects: - 1) ADCOP Project including new Fujairah Terminal/Tank Farm, 48” CS Pipeline of 404 KM and Main/Intermediate Pumping Stations at Habshan and Sweihan 2) FEED Engineering for Fujairah Four Additional Tanks at Fujairah Terminal 3) JDA Farm Facilities Upgrade Project at Jebel Dhanna Terminal 4) Refurbishment of One Million Barrel Floating Roof Tanks at Jebel Dhanna Terminal 5) FEED Engineering for Jebel Dhanna Tank Farm Extension (Two Additional Floating From June, 2003 to July 2005 for Abu Dhabi Company for Onshore Oil Operations (ADCO) As Senior Mechanical Engineer in the Engineering & Major Projects Department 2/18/2017 Page: 4/12
  • 5. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Supporting technically all Major Projects in Jebel Dhanna Terminal and Tank Farm (the Main Oil Export Terminal in Abu Dhabi) Main duties as follow:- 1)1) Review, comment and Approve consultant Engineering DeliverablesReview, comment and Approve consultant Engineering Deliverables such assuch as Project Specifications / Data Sheets., Piping / Mechanical Drawings, MaterialProject Specifications / Data Sheets., Piping / Mechanical Drawings, Material Requisitions and Engineering Calculations.Requisitions and Engineering Calculations. 2)2) Preparing Scope of Works / Terms of Reference for new Projects.Preparing Scope of Works / Terms of Reference for new Projects. 3)3) Prepare engineering works for PMRF”s (Plant Modification Request Forms)Prepare engineering works for PMRF”s (Plant Modification Request Forms) including Drawings, Specifications, Data Sheets and Bill of Material.including Drawings, Specifications, Data Sheets and Bill of Material. 4) Consultant/ Contractor Bid Tech. Evaluation. 5)5) Technical Support during Project Construction, Answering Clarification raised byTechnical Support during Project Construction, Answering Clarification raised by Operations /Contractors during Construction Phase.Operations /Contractors during Construction Phase. 6)6) Vendor Bid Technical Evaluation/ Clarification for Project Material such as PipingVendor Bid Technical Evaluation/ Clarification for Project Material such as Piping Material, Valves, mechanical/ Process equipment, i.e. Pumps, Compressors, TankMaterial, Valves, mechanical/ Process equipment, i.e. Pumps, Compressors, Tank Seals, Mixers, Roof Drain System and fixed Foam SystemSeals, Mixers, Roof Drain System and fixed Foam System Main Projects: - 1) Tank Farm Facilities ( Oil Piping, Fire water System, Closed Drain System ) Upgrade Project at Jebel Dhanna Terminal 2) Refurbishment of One Million Barrel Floating Roof Tanks at Jebel Dhanna Terminal 3) Preparation of Terms of Reference for Conceptual and for Basic/ FEED Engineering for Jebel Dhanna Tank Farm Extension (Two Additional Floating Roof Tanks of One Million Barrel) including facilities ; Filling / Loading Lines, Fire Water Main and Closed Drain System. From January, 2003 to June, 2003 for Pan Emirates Engineering Ltd., Abu Dhabi As Piping/Mechanical Head of Department. Main duties as follow:- 1. Piping & Mechanical Detailed Engineering 2. Preparation of PC Tender Documents and Construction Packages 2/18/2017 Page: 5/12
  • 6. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Main Projects: - 4) Installation of Side Entry Mixes on new 30” Nozzles for GASCO Tanks 6D-151A/B 5) Shah Infill Wells Project (Sy-040, Sy-041, Sy-042, Sy, &043) for Abu Dhabi Company for Onshore Oil Operations (ADCO). 6) Asab Artificial Lift (Wells (Sb-052, Sb-107&Sb-135) for Abu Dhabi Company for Onshore Oil Operations (ADCO). From March 2001 to December 2002 for Private Consulting Engineering, work in Oil and Gas industry in Egypt From December, 1999 To February, 2001 for CCC( EPC Company) as a Chief Office Engineer in Hawiyah Gas Plant Project , Saudi Arabia managing Engineering Section on Field for the Following Duties:- 1) Piping Isometric Detailing, Spooling, and Reporting of B.O.M. using Taliso / Talisman Programs. 2) Piping, Pipe Supports Equipment, Structural Steel Material Control, and Release to Fabrication Shop and Field. 3) Issue for Fabrication Spool Sheets and Workshop Drawings for Pipe Supports and Structural Modification. 4) Pipe Supports and Structural Steel Material Procurement for CCC Scope of Supply According to Project Technical Specifications and Armco Standards. 5) Control of Field Erection Material and Release for Construction using Talisman Program. 6) Preparation of Field Valve Testing lists Providing Hydro test Requirements for each Valve According to Project Specification and Applicable Codes and Release Valves for Testing as per Project Requirements and Aramco Standards. 7) Engineering changes and revisions control and issuance of modifications to Fabrication Shop and Site. 8) Control and checking of field RFI’s and Issuance of RFI’s for Engineering mismatches between P&ID, GAs, ISOs Drawings, Project Specification, and Aramco Standards. 2/18/2017 Page: 6/12
  • 7. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE 9) Splitting and Issuing of Test Packs for Project Testing Systems, Control and Updating Test Packs for all modifications. 10) Issue As-built drawings for all disciplines. ♦ From December, 1997 to November, 1999 for CCC as a Chief Office Engineer in Yanpet Ethylene Expansion Project in Yanbu, Saudi Arabia leading the Engineering Department on Field for the following duties:- 1) Piping Isometrics Checking, Spooling using TALISO Program. 2) Preparing detailed Workshop drawings for Pipe Supports and Issue Material Requisition for Standard Pipe Supports. 3) Piping & Pipe Support Material Control using Talisman Program. 4) Issue Piping Spools and Pipe Supports for Fabrication and Erection. 5) Split Project Turnover System to Test Systems and Issuance of Test Packs to QC Dept. 6) Checking Project Engineering Documents such as P&ID, Line List, and ISO’s and GAD. 7) Control and Issue RFI’s for Engineering and Site Problems. 8) Get Approval for Accepted Material Substitutions to Increase Fabrication / Erection Progress. 9) Control Project Specifications and Spec Waiver Issues. 10) Creating ISO Drawings, Specifying Branch Connection for Pipe Rack SFR’s. 11) Field As-Building P&ID’s and Isometrics. ♦ From August 1996 until December 1997 for Petrolem Projects and TechnicalPetrolem Projects and Technical Consultation Company (PETROJET)Consultation Company (PETROJET), EPC,EPC, Egypt as a Project Office Engineer in Ammonia / Urea Fertilizer Abu Qir III (Mech.) Project in Alexandria. Duties as follows: 1) Project Contract and Correspondence 2/18/2017 Page: 7/12
  • 8. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE 2) Project Technical Documentation 3) Project Quantity Surveying, Cost Control and Preparing Monthly Invoices. 4) Piping Isometric Workshop Drawings. 5) Project Work Progress Calculations. 6) Project Material Control and Material Procurement. ♦ From 1989 till August 1996 for Petrolem Projects and Technical ConsultationPetrolem Projects and Technical Consultation Company (PETROJET)Company (PETROJET), EPC,EPC, Egypt ,Head Office (Cairo) as Piping Design Dept. head. Main duties as follows: 1) Process Piping Systems Engineering including Pipe Sizing, Pump Head, and NPSH calculation using PIPENET Software. 2) Piping Detailed Engineering including Piping Arrangement Plans and Piping Isometric Drawings. 3) Piping Stress Analysis Calculations using CAESAR II Software. 4) Preparation of Project Bill of Material 5) Preparation of Project Material Specifications for Process Equipment, Piping Material, Valves, Pumps, Plates, etc. According to International Codes API, ASME, ANSI, ASTM, etc... 6) Material Inquiry Technical Packages preparation. 7) Vendor Bid Technical Evaluation/ Clarification. Main Projects: - 1) Expansion of SUMED Storage Capacity at SIDI KRIR Terminal (Alex.) Duration: November 1994 to August 1996 Duties Include the Following: - 2/18/2017 Page: 8/12
  • 9. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE • Engineering and Supply of 6 X 120,000 M³ New Crude Oil Floating Roof Tanks and related 48” Process Piping Network (about 6km) and Hydraulic Operated Ball and Gate Valves. • Engineering and Supply of New Boosting Pump Station with Total Capacity 3 X 4600 M³/HR. • Engineering and Supply of Fire Fighting System (24” Main Ring). • Engineering and Supply of 12” Oily Sewer System including Oily Sewer Pumps. • Engineering and Supply of 20” Surface Drainage System. • Engineering and Supply of 2” Hydraulic Oil System. 2) Extension of ASSUIT Refinery Storage Capacity Duration: 1992 to 1994 Duties Include the Following: • Supply of New 15,000 M³ Kerosene Fixed Roof Tank. • Supply of New 5,000 M³ Naphtha Floating Roof Tank. • Supply of New Cooling Tower. • Supply of New LPG Cigar Tank. • Engineering and Supply of Related Process Piping Networks including Pump Stations. • Engineering and Supply of Fire Fighting System (24” Loop). • Engineering and Supply of Sewer System. 3) Extension of ASSUIT Refinery Storage Capacity Duration: 1991 to 1992 Duties Include the Following: • Supply of New 55,000 M³ Crude Oil Floating Roof Tank. • Supply of two New 33,000 M³ Fuel Oil Fixed Roof Tanks. 2/18/2017 Page: 9/12
  • 10. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE • Engineering and Supply of Process Piping Networks including Pump Stations. • Engineering and Supply of Fire Fighting System (24” Loop). • Engineering and Supply of Sewer System. • Engineering and Supply of Steam and Steam Tracing Lines for Fuel Oil Lines. 4) Upgrade of SUMED Storage Capacity at SUMED Terminals SIDI KRIR (Alex.) and EIN SOKHNA. (SUEZ) Duration: 1989 to 1991 Duties Include the Following: • Engineering and Supply of 4 X 100,000 M³ New Crude Oil Floating Roof Tanks and Related 48” Process Piping Network and Hydraulic Operated Ball and Gate Vales. • Engineering and Supply of Fire Fighting System (24” Main Ring). • Engineering and Supply of 12” Oily Sewer System. • Engineering and Supply of 20” Surface Drainage System. • Engineering and Supply of 2” Hydraulic Oil System. ♦ From 1987 until 1989 for PETROJET Head Office (Cairo) as a Piping Material Engineer in Tech. Sector. Duties as follows: 1) Develop of Project Materials Specifications for Equipment, Pumps, Pipes, Piping Fittings, Valves, Plates, etc. According to International Codes API, ASME, ANSI, ASTM, etc... 2) Develop of Technical Packages for Material Enquiries and Purchase Orders for Petrochemical projects. 3) Vendor Bid Tech. Evaluation/ Clarification. 4) Tendering and Cost Estimate. Main Projects: - 2/18/2017 Page: 10/12
  • 11. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE 1) Upgrade of SUMED Storage Capacity at SUMED Terminals SIDI KRIR (Alex.) and EIN SOKHNA (SUEZ) 2) Green Beach and EL-Zahraa Tourist Villages Supply of PVC and Galvanized Piping Valves for Water Pumping System. 3) GPC Platforms Material for Two Platforms including Pipes for Piles, Jackets, Decks, Sheet Plates and Sections approximately 1800 ton. From 1986 until 1987 for PETROJET (EPC Company) Head Office (Cairo) as Piping Design Engineer Duties as follows: - 1) Process Piping Systems Engineering including Pipe Sizing, Pump Head, and NPSH Calculations. 2) Piping Detailed Engineering including Piping Arrangement Plans and Piping Isometric Drawings. 3) Piping Stress Analysis Calculations. 4)Specifying Project Materials and Equipment like Pipe, Piping Fittings, Valves, Pumps, Boilers, Plates, etc. 5)Material Inquiries Issue. 6)Vendor Bid Tech. Evaluation/ Clarifications Main Projects: - ASSUIT Cement Factory Fuel Oil Facilities, Barge Unloading Facilities for Fuel Oil, Unloading Pump Station, Steam Boilers, Water Treatment Plant, Transfer Pump Station, and 12Km 12” Insulated Pipeline to Cement Factory. ♦ From 1984 until 1986 for PETROJET as Piping Construction Engineer in SUCO ZEIT Bay Project. Worked as Piping Construction Engineer for the following duties:- 2/18/2017 Page: 11/12
  • 12. ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE 1) Fabrication of piping spools according to isometric drawings and Fabrication of Pipe Supports 2) Erection of piping spools according to P&ID, ISO’s and GAD ¨ From 1980 till 1984 for SEBHA Construction Co. in Libya as a Construction Supervision Engineer for the Following Projects, which have been executed by European subcontractors: - 1)Fuel Tanks and Related Piping System 2)SEBHA Tourist Hotel Mechanical works From 1976 until 1980 in Military Service 2/18/2017 Page: 12/12