A Graduate Engineer with 14 Years of Professional Experience both in Plant Piping
and Cross country Pipe Lines of Oil and Gas Industry, Power Plants, Water Treatment
Plants, Sewage Treatment Plants, Piping Platform skids, RDS (Remote degassing
stations), Water Injection Clusters, Oil Production Wells, Hydro Test Activities, HSE
Management, Safety Coordination and Pre-Commissioning Activities based on Project
Division requirement.
Bachelor of Mechanical Engineering from ULYANOVSK STATE TECHNICAL
UNIVERSITY OF RUSSIA – RUSSIAN UNIVERSITY
1) Plant Piping Fabrication@ Fab shop/Site, Site Erection, Testing and Pre-
Commissioning
2) Modular Structure Assembly and Erection – Ranging from 12 Ton ~ 48 Ton
3) Static and Rotary Equipment Erection and Testing
4) Planning and Scheduling
5) Well versed with ASME Piping Standards and API standards for Material Selection
and for Execution of Job.
6) Good exposure in Pressure design of Process Piping and Component as per ASME
B 31.3 [Straight Pipe, Flanges, Elbows and Miter bends, Reinforced branch
connections, Blanks, Blind flanges, Expansion joints].
TECHNICAL EXPERTISE:
EDUCATIONALQUALIFICATION:
TRAINING COMPETED:
JOB PROFILE:
H2s safety training - Abu Dhabi
Onshore Safety Task Training - Abu Dhabi
Central Rigging Training - Abu Dhabi
Total Safety Task Instruction Training - Saudi Arabia
Industrial Leadership Management Training - Saudi Arabia
Pre-Commissioning Training – Mauritania
1) Preparation and reporting all the Critical and Relevant project data’s to
Construction Manager to track and achieve project Major Milestones.
2) Preparation and getting approvals of necessary documentation from Client like
Method Statements, Procedures according to Standards and Project Quality
Specifications.
3) Preparation of Constructability studies according to site lay-outs.
4) Preparation of Construction schedules along with Planning in establishing the
Level – V schedule.
5) Daily site activities planning according weekly and monthly forecast.
6) Execution of job in direct co-ordination with Supervisory staff and ensuring that
job has been executed in compliance of work scope, specification and standards
7) Preparation of Summaries of actual man-hours against the budgeted man-hours to
Cost Dept. to evaluate the variation.
8) Inspecting the Edge Preparation of the Joints in terms of WEP (weld edge
preparation), Inspection of the Raw materials like, pipes, knee brackets, hangers as
per given specification (ASME B-31.3).
9) Stage wise Inspection of various activities in the shop floor.
10)Supervising contractor’s work plan for project.
11)Technical support for onsite modification of pipes.
CURRENT JOB PROFILE / RESPOSIBILITIES
CURRENT EMPLOYMENT:
Track Record
CURRENT EMPLOYER:
COMPANY NAME : CONSOLIDATED CONTRACTORS INTL COMPANY
POSITION TITLE : SECTION PIPING ENGINEER
SPECIALISATION : PIPING
INDUSTURY : PETROCHEMICAL
POSITION : SECTION PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY
LOCATION : SAUDI ARABIA JUBAIL
PROJECT NAME : SADARA HYDROGEN PEROXIDE PLANT
DURATION : DECEMBER 2013 TO TILL DATE
Overall Supervision of including such as:
1) HSE, House Keeping, piping prefabrication including pipe supports, piping
erections including pipe supports, spool pieces control, check and monitor
tools, equipment and welding consumables, check and monitor preservation,
pipe internal cleaning for small bore and large bore, including jacket pipes for
storage tanks for H2SO4 (trains 4 and 5);
2) Schedule monitoring for manpower mobilization welding Dia-inch, No. of
spools and Pipe Supports
3) Piping internal inspection witness for large bore piping
4) Check if the latest construction drawings are used
5) Consult Engineering problems
6) Check and consult spools delivery in site
7) Check work front and coordinate with other disciplines
8) Request scaffolding construction
9) Ensure work permits (confined space welding, grinding, erection, work for high
level, etc)
10) Check flange alignment related to rotating equipment and static equipment
nozzle
11) Follow Up of punch work
12) Prepare daily and weekly reports
POSITION : SITE PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY, UAE
LOCATION : SOUTH AFRICA - MOURTANIA
PROJECT NAME : TASIAST EXPENSION PROJECT
DURATION : FEBRUARY 2013 TO NOVEMBER 2013
Overall supervision for:
1) Managing construction activities carried out by contractors, ensuring the scope of
work is achieved in accordance with contract requirement and time frame, and
compliance with specifications and standard established
2) Coordinating the activities of subordinated supervisors ensuring that the project
steps are respected
3) Ensuring that contractor’s duties are performed by competent and experienced
personnel and in sufficient number to achieve objectives
4) Coordination of fabrication for 20 temporary bridges
5) Painting pipes and supports in workshop
6) Work organization of Site area site, such as:
a. Assembly two towers crane
b. Bringing a permanent crane type COBELCO - 250 tones
c. Bringing also four hydraulic crane type GROWE & TADANO by 100 tons, 80
tons, 55 tons, and 30 tons.
d. Bringing the Diesel welding machines (40 pcs.) and all the cables and tools
for welders, including also 40 portable welding machines.
e. Bringing the tools container and all the tools and devices for piping group.
f. Bringing the site store container to store spools and site consumables
EXPERIENCE: 1
JOB RESPONSIBILITIES
JOB RESPONSIBILITIES
EXPERIENCE:3
JOB RESPONSIBILITIES
EXPERIENCE: 2
EXPERIENCE: 3
JOB RESPONSIBILITIES
POSITION : SITE PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY
LOCATION : UAE – ABUDHABI
PROJECT NAME : BAB TAMAMA G PROJECT (HABSHAN OIL FIELD)
INDUSTRY : OIL AND GAS
DURATION : AUGUST 2011 TO NOVEMBER 2012
Worked as a Field Piping Engineer in Remote Degassing Stations, Oil Production
Wells, Remote De-Gassing Manifolds, Water Injection Clusters and Water Injection
wells for crude oil production.
POSITION : SITE PIPING ENGINEER
COMPANY : M/S. BLACK CAT WLL
LOCATION : QATER
PROJECT NAME : EPIC OF SMOKELESS FLARE & AUTOMATIC BLOW DOWN
YSTEM
INDUSTRY : OIL AND GAS
DURATION : DECEMBER 2009 TO JUNE 2011
1) Worked as a Site Piping Engineer - Smokeless Flare Project. Executed and
completed the Seal Gas Drum Piping, High Pressure Compressor Piping, Vessels
Piping, Main Pipe Racks Piping and Lube oil skid Piping.
2) Planning, Execution and co-ordination with Management, etc.
PREVIOUS EXPERIENCE: 4
PREVIOUS EXPERIENCE: 5
JOB RESPONSIBILITIES
JOB RESPONSIBILITIES
POSITION : SITE PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY
LOCATION : SAUDI ARABIA - JUBAIL
PROJECT NAME : KHURSANIYAH GAS PROJECT
INDUSTRY : OIL AND GAS
DURATION : OCTOBER 2008 TO OCTOBER 2009
1) My responsibilities include Supervision of Fabrication and Erection of Spools of
Utilities Service and Process Piping
2) Co-ordination with Pre-Commissioning Group
3) Planning and Scheduling, Progress Monitoring, Preparation of As-Built Drawing
according to the site conditions
4) Working in line with the company’s HSE and Quality policy.
POSITION : SR. MECHANICAL ENGINEER.
COMPANY : TOYO ENGINEERING INDIA LTD.,
LOCATION : HALDIA, WEST BENGAL
PROJECT NAME : HALDIA PETROCHEMICALS LTD., REVAMP SUPER MAX
PROJECT
INDUSTRY : OIL AND GAS
DURATION : MAY 2007 TO SEPTEMBER 2008
1) Piping and Heater – Furnace and Piping of Naphtha Cracker Unit
2) Erection and Alignment of structure, module, radiant coil, TLE, Steam drum, ID
fans, cross over, jump over, peep door burner works and
3) LTCS, CS and Alloy steel HP, MP, and LP Piping in Furnace and Naphtha Unit
Piping.
4) Preparation of As Built Drawing
5) Material Reconciliation.
PREVIOUS EXPERIENCE: 6
POSITION : SITE PIPING ENGINEER
COMPANY : ENGINEERS INDIA LTD.,
LOCATION : DHABOL -PANVEL PIPE LINE
MDPL MUNDRA-DELHI PIPE LINE
DURATION : APRIL 01, 2006 TO APRIL 30, 2007.
My responsibilities includes inspection forloweringcoating,tie-inwelding,trenching, back filling,
of pipe lines & bill certification. Multipurpose Line and 30” Gas Line, As a Site Piping Engineer.
POSITION : SITE PIPING ENGINEER
COMPAN : S K CONSTRUCTION
LOCATION : ESSAR OIL REFINERY PROJECT
DURATION : MAY 2005 to MARCH 2006.
My responsibilities include supervision of Project construction activities- Unit and Rack piping of
CDU, VDU, SGU and FCCU.
POSITION : PIPING ENGINEER
COMPANY : RANDHAWA CONSTRUCTION COMPANY
WORKING LOCATION: RELIANCE REFINERY PROJECT JAMNAGAR, GUJARAT
INDUSTRY : OIL AND GAS
DURATION OF WORK: AUGUST 2002 TO MARCH 2005.
Grass root project as a Piping Engineer.
My responsibilities include supervisionof ProjectConstruction, Piping, andEquipment Fabrication
& Erection activities in FCCU.
POSITION : PIPING ENGINEER
COMPANY : NAWAZ CONSTRUCTION COMPANY
LOCATION : RELIANCE REFINERY PROJECT JAMNAGAR, GUJARAT
INDUSTRY : OIL AND GAS
DURATION : FEBRUARY 2000 TO JUNE 2002
Grass root project as a Piping Engineer.
PREVIOUS EXPERIENCE: 7
PREVIOUS EXPERIENCE: 8
PREVIOUS EXPERIENCE: 9
My responsibilities include supervision of Rack Piping, fabrication & Erection in CRUDE-1
SOFTWARE SKILLS:
Piping Drafting: - Auto CAD
Declaration:
I hereby confirm that the information given above is true to best of my knowledge
Place: JUBAIL SAUDI ARABIA Yours Faithfully,
Manish Kumar Ray

Manish Ray - CV

  • 1.
    Marital Status Married LanguageKnown English, Hindi, Russian Passport number F6063989 Nationality Indian Saudi driving licenses no 2358357669 SUMMARY OF EXPERIANCE: MANISH KUMAR RAY Astha Tara Mansion Flat # - 1/3 Polytechnic Road Dist- Dhanbad -826001 State - Jharkhand Mobile: 0091-8936859552 Mobile: 0091-8986722698 Mobile: 00966 -582268695 E-mail manish.toyo@gmail.com A Graduate Engineer with 14 Years of Professional Experience both in Plant Piping and Cross country Pipe Lines of Oil and Gas Industry, Power Plants, Water Treatment Plants, Sewage Treatment Plants, Piping Platform skids, RDS (Remote degassing stations), Water Injection Clusters, Oil Production Wells, Hydro Test Activities, HSE Management, Safety Coordination and Pre-Commissioning Activities based on Project Division requirement. Bachelor of Mechanical Engineering from ULYANOVSK STATE TECHNICAL UNIVERSITY OF RUSSIA – RUSSIAN UNIVERSITY 1) Plant Piping Fabrication@ Fab shop/Site, Site Erection, Testing and Pre- Commissioning 2) Modular Structure Assembly and Erection – Ranging from 12 Ton ~ 48 Ton 3) Static and Rotary Equipment Erection and Testing 4) Planning and Scheduling 5) Well versed with ASME Piping Standards and API standards for Material Selection and for Execution of Job. 6) Good exposure in Pressure design of Process Piping and Component as per ASME B 31.3 [Straight Pipe, Flanges, Elbows and Miter bends, Reinforced branch connections, Blanks, Blind flanges, Expansion joints]. TECHNICAL EXPERTISE: EDUCATIONALQUALIFICATION:
  • 2.
    TRAINING COMPETED: JOB PROFILE: H2ssafety training - Abu Dhabi Onshore Safety Task Training - Abu Dhabi Central Rigging Training - Abu Dhabi Total Safety Task Instruction Training - Saudi Arabia Industrial Leadership Management Training - Saudi Arabia Pre-Commissioning Training – Mauritania 1) Preparation and reporting all the Critical and Relevant project data’s to Construction Manager to track and achieve project Major Milestones. 2) Preparation and getting approvals of necessary documentation from Client like Method Statements, Procedures according to Standards and Project Quality Specifications. 3) Preparation of Constructability studies according to site lay-outs. 4) Preparation of Construction schedules along with Planning in establishing the Level – V schedule. 5) Daily site activities planning according weekly and monthly forecast. 6) Execution of job in direct co-ordination with Supervisory staff and ensuring that job has been executed in compliance of work scope, specification and standards 7) Preparation of Summaries of actual man-hours against the budgeted man-hours to Cost Dept. to evaluate the variation. 8) Inspecting the Edge Preparation of the Joints in terms of WEP (weld edge preparation), Inspection of the Raw materials like, pipes, knee brackets, hangers as per given specification (ASME B-31.3). 9) Stage wise Inspection of various activities in the shop floor. 10)Supervising contractor’s work plan for project. 11)Technical support for onsite modification of pipes.
  • 3.
    CURRENT JOB PROFILE/ RESPOSIBILITIES CURRENT EMPLOYMENT: Track Record CURRENT EMPLOYER: COMPANY NAME : CONSOLIDATED CONTRACTORS INTL COMPANY POSITION TITLE : SECTION PIPING ENGINEER SPECIALISATION : PIPING INDUSTURY : PETROCHEMICAL POSITION : SECTION PIPING ENGINEER COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY LOCATION : SAUDI ARABIA JUBAIL PROJECT NAME : SADARA HYDROGEN PEROXIDE PLANT DURATION : DECEMBER 2013 TO TILL DATE Overall Supervision of including such as: 1) HSE, House Keeping, piping prefabrication including pipe supports, piping erections including pipe supports, spool pieces control, check and monitor tools, equipment and welding consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore, including jacket pipes for storage tanks for H2SO4 (trains 4 and 5); 2) Schedule monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe Supports 3) Piping internal inspection witness for large bore piping 4) Check if the latest construction drawings are used 5) Consult Engineering problems 6) Check and consult spools delivery in site 7) Check work front and coordinate with other disciplines 8) Request scaffolding construction 9) Ensure work permits (confined space welding, grinding, erection, work for high level, etc) 10) Check flange alignment related to rotating equipment and static equipment nozzle 11) Follow Up of punch work 12) Prepare daily and weekly reports
  • 4.
    POSITION : SITEPIPING ENGINEER COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY, UAE LOCATION : SOUTH AFRICA - MOURTANIA PROJECT NAME : TASIAST EXPENSION PROJECT DURATION : FEBRUARY 2013 TO NOVEMBER 2013 Overall supervision for: 1) Managing construction activities carried out by contractors, ensuring the scope of work is achieved in accordance with contract requirement and time frame, and compliance with specifications and standard established 2) Coordinating the activities of subordinated supervisors ensuring that the project steps are respected 3) Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient number to achieve objectives 4) Coordination of fabrication for 20 temporary bridges 5) Painting pipes and supports in workshop 6) Work organization of Site area site, such as: a. Assembly two towers crane b. Bringing a permanent crane type COBELCO - 250 tones c. Bringing also four hydraulic crane type GROWE & TADANO by 100 tons, 80 tons, 55 tons, and 30 tons. d. Bringing the Diesel welding machines (40 pcs.) and all the cables and tools for welders, including also 40 portable welding machines. e. Bringing the tools container and all the tools and devices for piping group. f. Bringing the site store container to store spools and site consumables EXPERIENCE: 1 JOB RESPONSIBILITIES
  • 5.
    JOB RESPONSIBILITIES EXPERIENCE:3 JOB RESPONSIBILITIES EXPERIENCE:2 EXPERIENCE: 3 JOB RESPONSIBILITIES POSITION : SITE PIPING ENGINEER COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY LOCATION : UAE – ABUDHABI PROJECT NAME : BAB TAMAMA G PROJECT (HABSHAN OIL FIELD) INDUSTRY : OIL AND GAS DURATION : AUGUST 2011 TO NOVEMBER 2012 Worked as a Field Piping Engineer in Remote Degassing Stations, Oil Production Wells, Remote De-Gassing Manifolds, Water Injection Clusters and Water Injection wells for crude oil production. POSITION : SITE PIPING ENGINEER COMPANY : M/S. BLACK CAT WLL LOCATION : QATER PROJECT NAME : EPIC OF SMOKELESS FLARE & AUTOMATIC BLOW DOWN YSTEM INDUSTRY : OIL AND GAS DURATION : DECEMBER 2009 TO JUNE 2011 1) Worked as a Site Piping Engineer - Smokeless Flare Project. Executed and completed the Seal Gas Drum Piping, High Pressure Compressor Piping, Vessels Piping, Main Pipe Racks Piping and Lube oil skid Piping. 2) Planning, Execution and co-ordination with Management, etc.
  • 6.
    PREVIOUS EXPERIENCE: 4 PREVIOUSEXPERIENCE: 5 JOB RESPONSIBILITIES JOB RESPONSIBILITIES POSITION : SITE PIPING ENGINEER COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY LOCATION : SAUDI ARABIA - JUBAIL PROJECT NAME : KHURSANIYAH GAS PROJECT INDUSTRY : OIL AND GAS DURATION : OCTOBER 2008 TO OCTOBER 2009 1) My responsibilities include Supervision of Fabrication and Erection of Spools of Utilities Service and Process Piping 2) Co-ordination with Pre-Commissioning Group 3) Planning and Scheduling, Progress Monitoring, Preparation of As-Built Drawing according to the site conditions 4) Working in line with the company’s HSE and Quality policy. POSITION : SR. MECHANICAL ENGINEER. COMPANY : TOYO ENGINEERING INDIA LTD., LOCATION : HALDIA, WEST BENGAL PROJECT NAME : HALDIA PETROCHEMICALS LTD., REVAMP SUPER MAX PROJECT INDUSTRY : OIL AND GAS DURATION : MAY 2007 TO SEPTEMBER 2008 1) Piping and Heater – Furnace and Piping of Naphtha Cracker Unit 2) Erection and Alignment of structure, module, radiant coil, TLE, Steam drum, ID fans, cross over, jump over, peep door burner works and 3) LTCS, CS and Alloy steel HP, MP, and LP Piping in Furnace and Naphtha Unit Piping. 4) Preparation of As Built Drawing 5) Material Reconciliation.
  • 7.
    PREVIOUS EXPERIENCE: 6 POSITION: SITE PIPING ENGINEER COMPANY : ENGINEERS INDIA LTD., LOCATION : DHABOL -PANVEL PIPE LINE MDPL MUNDRA-DELHI PIPE LINE DURATION : APRIL 01, 2006 TO APRIL 30, 2007. My responsibilities includes inspection forloweringcoating,tie-inwelding,trenching, back filling, of pipe lines & bill certification. Multipurpose Line and 30” Gas Line, As a Site Piping Engineer. POSITION : SITE PIPING ENGINEER COMPAN : S K CONSTRUCTION LOCATION : ESSAR OIL REFINERY PROJECT DURATION : MAY 2005 to MARCH 2006. My responsibilities include supervision of Project construction activities- Unit and Rack piping of CDU, VDU, SGU and FCCU. POSITION : PIPING ENGINEER COMPANY : RANDHAWA CONSTRUCTION COMPANY WORKING LOCATION: RELIANCE REFINERY PROJECT JAMNAGAR, GUJARAT INDUSTRY : OIL AND GAS DURATION OF WORK: AUGUST 2002 TO MARCH 2005. Grass root project as a Piping Engineer. My responsibilities include supervisionof ProjectConstruction, Piping, andEquipment Fabrication & Erection activities in FCCU. POSITION : PIPING ENGINEER COMPANY : NAWAZ CONSTRUCTION COMPANY LOCATION : RELIANCE REFINERY PROJECT JAMNAGAR, GUJARAT INDUSTRY : OIL AND GAS DURATION : FEBRUARY 2000 TO JUNE 2002 Grass root project as a Piping Engineer. PREVIOUS EXPERIENCE: 7 PREVIOUS EXPERIENCE: 8 PREVIOUS EXPERIENCE: 9
  • 8.
    My responsibilities includesupervision of Rack Piping, fabrication & Erection in CRUDE-1 SOFTWARE SKILLS: Piping Drafting: - Auto CAD Declaration: I hereby confirm that the information given above is true to best of my knowledge Place: JUBAIL SAUDI ARABIA Yours Faithfully, Manish Kumar Ray