Experience:
______ SUMMARY:
Total 27 years experiences in Piping, pipeline, Structural and Equipment Erection in various
projects like Petrochemical, Power plant , Refinery and Maintenance .
06/2014 – 01/2016
Site Nord YANGA/SENDJI (TOTAL E&P Congo)
PNGF-North (YANGA/Sendji/Libondo/Likalala/Kombi), SUPERVISEUR TRAVAUX PIPING /
CAPACITES / ROBINETTERIE SIMOPS & ARRET Contract Metal in charge of 14 satellites ("mature"
field).
JOB DIMENSIONS
Oil installations of Total E & P Congo are many and varied, and the age of some platforms requires
significant rehabilitation work in often difficult conditions.
The limited development of the local industrial fabric imposes a number of constraints (lack of
technical expertise, under-qualification of labor, limited competition, etc ...) require a strong
involvement in preparing and carrying out the work .
Aggravating risks: H2S & industrial context
Guarantee the respect of construction rules and intervention procedures in the field of work on piping,
structures and facilities to maintain their integrity.
Supervise the activities of External Companies and receiving the work on behalf of the website
operator.
Health Safety Environment
 Ensure implementation of HSE regulations for the implementation of activities, that the work be
carried out by Total E & P Congo staff or contracted Foreign Companies,
 Participate in the preparation and drafting of records SIMOPS "Operations / Construction" when
necessary,
 Organize and participate in RLO ARO.
 Daily monitoring CMMS attached to the work
 Preparation / constitution of the work records.
2
 To intervene in all ARO, RLO and ROC.
 Ensure the control and validation of the technical part of procedures, plans and data sheets.
 Coordinate / Plan all work in conjunction with the SIM / Super Intendant Maintenance.
 Supervise metal contract team activities.
 Validate and receive completion in conjunction with the SIM.
Write the daily and weekly activity reports
 Ensure compliance and integrity of systems with as a goal the control of industrial risks.
 Ensure compliance of pressure vessels and lifting equipment.
n Skills NDT, metal / welding materials / corrosion paint.
n Ability to synthesize and analyze .and initiative
 business management capacity, methodical, organized.
 Interpretation of codes and TOTAL specification GS which are in English
12/2013-12/2013
Shutdown Manager-Weatherford Tunisia
Project: Waha Production Facility and Well Sites. Total Shutdown December 2013
OMV(Austria)-ETAP(Tunisia) SOUTH TUNISIA, Ltd E&P
 Maintain a strong relationship with the Shutdown Manager and adhere to contract reporting
requirements.
 Implement a Business Plan for the Shutdown Contract that identifies and delivers business
improvement initiatives.
 The incumbent has overall responsibility for coordination and execution of maintenance and
construction activities associated with the shutdown work list, and any emergent work that
arises. This includes all shutdownwn, shutdown and post shutdown activities.
 Preparation of a detailed shutdown execution plan that defines the organisation,
roles/responsibilities, scope, targets, contracting strategy and critical activities.
 Develop and implement cost effective sub-contracting strategies.
 Responsible for the preparation and compilation of tender documents, assessment of sub -
contractors, and the implementation of successful contracts prior to the commencement of
work.
 Analyse shutdown critical path activities and ensure that resources are allocated in the most
efficient manner.
 Ensure that planner(s) receive accurate and up to date information relating to work progress
on a daily basis.
 shutdown personnel on problems and critical changes that may affect resources, equipment
availability, cost and schedule in order to develop and implement solutions.
 Conduct a daily meeting with Shutdown Management Team, Superintendents and
Supervisors to monitor progress, facilitate coordination and communication to resolve
problems Promote and facilitate good communications among all groups –departments and
subcontractors
 Ensure progressive cost reports, forecast and progress reports are produced
 Control of execution plan ensuring all jobs are done in accordance with agreed plan Ensure
that a rigid extra work approval process is maintained. Ensure that variation instructions are
recorded and documented.
 Prepare Monitor and implement corrective actions for individual shutdown’s strategic plan.
 Optimizes resource plans /requirements, supplies and logistics for projects.
 Liase with management team on all matters related to assigned project and for the purpose to
ensure all information to develop cost.
 Degree.The incumbent has an obligation towards maintaining safe work practices & a safe &
healthy work environment for themselves as well as others in the workplace.
_____________________________________________________________
8/1/2012 UP to 8/31/2013
3
Piping & Pipeline Superintendant-Petrofac EPC
Project: Southern fields Development Project.
SONATRACH-BP-STATOIL Association In Salah Gas ALGERIA.
 Adhering to project drawings and specifications, maintaining good workmanship,
fulfilling all safety and quality requirements pertaining to the work, and targeting
zero punch list items associated with completed work activities. 1
 Developing the Project Piping Installation Plan and keeping it current throughout
the project life
 Directing and supervising craftsmen installing piping systems
 Arranging for all required work permits, tools, equipment, scaffolding and
consumable material required for piping installation activities
 Coordinating and scheduling piping installation activities based on project
schedule requirements.
 Providing regular and timely input for progress reporting
 A new CPF located close to the HMN field with two trains of dehydration.
 A number of gas producing wells in the 4 southern fields plus one water
re- injection well in the HMN field.
 12’’ infield 13% chrome pipelines in the HMN, GBF, IS and GMD fields.
 16’’ 13% chrome inter-field pipelines connecting HMN, GBF, IS and GMD fields
to the new IS CPF.
 An 8’’ plastic lined carbon steel water injection line from ISCPF to the injection
well in the HMN field.
 A 32’’ carbon steel line from the IS CPF TO Reg.
 An extension to the Reg facility to include an additional train of dehydration.
 A new 24’’ carbon steel pipeline between Reg and the ICP.
 Tie-ins, connections and interfaces with existing systems.
 A permanent operations camp (Base de Vie) located close to the new CPF.
 A permanent Military camp location approx 500m from the base de vie.
 Second Stage Compression at TEG, REG and KRECHBA.
 Other Associated infrastructure.
Notes :JV GAS Tiguentourine CPF( SONATRACH-BP-STATOIL) Joint Venture- TRAIN 3
INSPECTION after the terrorist attack on 16/01/2013.
11/2010 8/2012
Piping & Pipeline Superintendant-Petrofac EPC
Project: EL MERK Processing Facility and LNG Facility.
SONATRACH-ANADARKO Association HASSI MESSAOUD ALGERIA.
Duties:
• Makes technical decisions, ensuring coordination, quality and conformance with PMC-Client
contract requirements.
• Takes on Subcontractors staff supervision responsibilities.
• Reviews and understands the major project contract(s) basis including scope of work, scope of
facilities and applicable liability for the PMC contract and the individual contract.
4
• Reviews and is familiar with discipline scope of services and scope of facilities for each
contract. Is familiar with discipline contract deliverables, level of detail and drawing/document
acceptable quality levels according to client standards.
• Reviews and implements design criteria and specifications as per client requirements.
• Reviews projects to ensure compliance with basic design within the limits of defined EPC role
in managing major project contracts.
• Reviews and understands the project activity models for engineering and specific discipline
including the project requirement checklists and relevant sections of the Project execution
manual and of the project procedures manual.
• Checks and contributes to engineering man-hour estimates and schedules.
• Develops and/or amends scope of works, scope of services and any other documentation to
fulfill discipline project requirements.
• Prepares technical and contractual correspondence in accordance with project and client
requirements as formal letters and transmittals informing client and other parties of matters
pertaining to the discipline responsibility for various contracts.
• Possesses comprehensive knowledge of client, contractor and industry codes and standards
and applies that knowledge in accordance with the clients requirements to all activities executed
by contractors for which engineer has discipline EPC responsibility.
• Reviews inspection, examination and quality control requirements for each contract for which
Construction Piping Supervisor, has discipline responsibility. Monitors QC/QA activities on those
same projects.
• Understands and applies QC/QA requirements for discipline engineering as laid out in EPC
quality manual.
• Reviews designs and drawings in accordance with the scope of EPC activities for all contracts
for which the engineer has discipline responsibility.
• Demonstrates ability to conceive, plan, organize, coordinate and execute multiple assigned
tasks in a timely manner.
• Represents Client in a professional manner and is aware of Client’s best interest in dealing
with clients.
• Reviews and participates in the development of any project standards and specifications.
• Reviews and identifies deviations in job scope, reviews estimate magnitude of changes, and
advices client accordingly.
• Evaluates quotation summaries, material and component substitution, for technical
compliance.
• Reviews contractor’s recommendations for material inspection, identification, certification and
expediting to projects.
• Participates in project quality assurance reviews and implements corrective action
requirements.
• Travels to construction sites, shop sites, contractor sites or vendors works to provide technical
input as and when required. Makes records of visits with clear and concise reporting.
06/2010
10/2010:
Vice Manager QC-Piping & Pipeline ORASCOM-PETROFAC CONSTRUCTION INDUSTRIES.
Project: EL MERK Processing Facility and LNG Facility.
SONATRACH-ANADARKO HASSI MESSAOUD ALGERIA.
Duties:
Head of QC of piping HDPE-CS-SS-DSS; blasting and paint (4 welding engineers level 2)
Material receiving inspection.
Quality Management system audit on site Audit.
HDPE prefabrication and control quality.
Hydro testing U/G piping systems.
Inspection for under and above ground stainless and duplex steel piping installation.
Inspection for underground carbon steel piping installation.
Inspection for underground HDPE piping installation (Diameters 2” to 24”).
Visual and Dimensional control.
Installation of U/G piping system and trench work procedure.
The code compliance inspections of manufacturing. The design verification of equipments and
pressure vessels to verify Compliance with the code,
5
Verification of welding procedures in accordance with ASME Requirements. The manual review
of quality control to verify code compliance, the authorization and supervision of repairs and
modifications.
Equipments and pressure vessels in accordance with the code and standards.
Initiation and monitoring controls of outsourcing), ensures compliance.
With controlled products to customer requirements.
07/2009
04/2010
Mechanical supervisor Construction (Pipeline & Piping)
(OGEC RABI-GABON)
Duties: SHELL GABON (RABI-TOUCAN-KOULA FIELDS)
Supervision of operations on piping and pipelines of the existing
equipment and installations
Shut down central station PPF.
Hot water utility system/heat exchanger at toucan PPF
HOOK UP Toucan 31
Collaboration with the contractor’s workforce in terms of labour
safety
Supervision of activities performed onsite
Participation in piping/pipeline dismounting and mounting
activities
Supervision of activities within the relevant engineering
discipline
Reporting on the overall condition of process equipment with
regard to piping and vessels
11/2008
07/2009
Senior Piping , Pipeline and Vessel Supervisor (Dietsmann
Technologies, Russia)
Project: Samburgsky GTP Inspection, Reconditioning, Preservation and
Recertification (Novy Urengoy – Russia).
Duties: Supervision of operations on piping and vessels of the existing
equipment and installations
Inspection and reconditioning
Collaboration with the contractor’s workforce in terms of labour safety
Supervision of activities performed onsite
6
Participation in piping/vessel dismounting and mounting activities
Interpretation of results of visual inspection and NDT
Work with the tracking system, i.e. daily reporting, inspection reports
etc.
Supervision of activities within the relevant engineering discipline
Reporting on the overall condition of process equipment with regard
to piping and vessels
03/2008
07/2008
Site Inspector (TOTAL E & P, Congo)
Project: FPU-Alima Offshore platform
Duties: Implementation of inspection activities
Supervision of Inspection and NDT executed by contractors
Interpretation and development of specifications and procedures for
repair in accordance with TOTAL internal regulations.
Development of repair schedules for piping/boilers and vessels,
Analysis of welders` qualifications and audit of contracted companies.
Company representative in the Administration of the Inspectors of
Mines during recertification of pressure vessels,
Compilation and maintenance of technical documentation (databases,
inspection plans, inspection reports)
Participation in the qualification of Company`s pipe/boiler suppliers.
Planning, organization and supervision of loading/offloading
operations.
Interpretation of test results and consulting on the corrective action
plans.
Ensuring compliance and integrity of facilities with the ultimate control
of industrial risks.
Ensuring compliance with regulations for pressure vessels and lifting
appliances.
09/2003
02/2008
Senior Piping & Pipeline supervisor -workshop Assistance Sites
(TOTAL E&P Congo Sub-contractor Dietsmann-Congo)
Project: Maintenance contract for Total E&P Pointe Noire, Congo
Duties:
Head of the piping; Pipeline valves and vessel maintenance
workshop (25 employees)
The realization of all isometrics diameters of all sites offshore and
onshore of TOTAL
E & P Congo.
Work on the structural steel
Piping maintenance and repairs.
P& ID
Running the fabrication workshop
Production equipment operation and control.
Input quality control (procurement and control of products supplied by
7
the client), issuance of non-conformity certificates.
Technical supervision and training of local staff.
Ensuring the implementation and updating of the procedures
applicable to the workshop and storage facility.
Application of industrial codes and regulations (welding & piping).
Preparation of operating procedures specific to the construction
process.
Maintenance in static equipment-piping, valves, vessels, heat
exchanger, and boilers.
Safe Knowledge and maintenance experience in static equipments
such as columns, vessels, storage tanks, heat exchangers and gas
drier bed.
Knowledge and maintenance experience in Boilers, incinerators and
its refractory’s,
Knowledge and maintenance experience in piping specifications,
Mechanical isolation of piping and process equipment
Knowledge and experience in trouble shooting, repair and
overhauling of LNG Loading arms
Knowledge and maintenance experience of Sulphur granulation
plants
Knowledge and maintenance experience of Gas inlet and treatment
facilities inclusive of slug catcher and pig receiving.
Knowledge and maintenance experience of Water treatment systems
and desalinations.
Intimate knowledge of reading and interpretation of schematic, logic,
P & I drawings,
Knowledge of torqing tools, rigging gear.
Good written and oral communication skills in English.
Good leadership and interpersonal skills.
Good adaptability to multinational environment, with wide exposure to
various cultures and customs.
Requests work permits as per company EHS policy
Should be conversant with the terms and specifications of Hazardous
locations as well as statutory inspections, maintenance and repairs of
such equipment.
Should understand the piping system specification, isometric drawing
Able to understand pipeline pig receiver and components
Complete knowledge of flange bolting and torqing procedure
Able to understand blinding, lock out and tag out process.
Actual experience of Blinding and Deblinding works
Basic knowledge of valve maintenance (Seat Flushing, Stem Seal
Flushing, Body Cavity Flushing)
Able to understand different types of Pressure vessels (Process
Filters, Process Strainers, Molecular Sieves, Catalyst vessels,
Columns, MCHE, Incinerator, Furnaces, Boilers & HRSG)
Vessel internals understanding
Able to understand different types of Heat Exchangers (Air Cooled
exchangers, Shell and Tube exchangers, Plate Exchangers, Brazed
fin exchangers)
Able to understand components of exchangers (Channel, Tube sheet,
Shell, Collar Bolts)
Basic understanding of different types of NDT (LP check, MPI check,
Eddy Current Check, Xray check, Pressure testing methods)
Basic understanding of temporary repairs (Clamp repairs, On-line
sealing injection, Composite wrap repairs)
Basic understanding of Steam trap monitoring
Basic understanding of Refractory lining
8
11/ 1990
09/ 2003
Piping, Pipeline Valve and Vessel Superintendent (ELF Congo)
Sub-Contractor (Oil Tools Services Congo)
Project: ELF Congo, Pointe Noire Congo
Duties:
Project: On-shore oil production facility (TERMINAL DJENO)
Duties: Ensuring the compliance of operations with the project specifications
for Piping, Valves and Vessels
Assistance and participation in the activities of the PVV Lead
Discipline Engineer
Ensuring the compliance with the FEED Engineering rules developed
in Congo.
Supervision, control and coordination of all Piping, Valve and Vessel
Engineering Design activities with respect to overall Project
Objectives (Schedule, Quality, Budget)
Supervision and development of work procedures from Contractors
and Sub-Contractors for all fields of PVV activities.
Monitoring of the operations performed by the Contractor and revision
of supporting documentation.
Review of the engineering documentation issued by the Contractors,
Sub-Contractors and/or its approval in accordance with the Project
procedures and requirements.
Monitoring of the application of project design standards defined by
AFNOR norms.
Meeting the requirements of the technical conditions developed in
line with COMPANY procedures and FEED Engineering, review of
contractor`s documentation as required per Lead Discipline
Engineering (LDE) in Congo.
Application of ASME design rules and project standards identify
potential gap remaining and participate in the finalization of the
project Standards
Definition of the requirements for the Factory Acceptance Tests (FAT)
of the facility.
Supervision of fabrication, installation and start-up of main equipment
up to commissioning
Fabrication & Erection of various materials like Copper Nickel.
Stainless Steel, Duplex and Super Duplex Stainless Steel spools.
Fit-up inspection of pipe spools, pipe support, platform, column and
all type of structural works as per ISO drawing.
9
Fit-up inspection of Review project specification, approved drawings
quality control plan, procedures, method statements and other
relevant documents.
Review material traceability reports against the actual heat number of
materials.
Able to control and monitor day to day Piping activities.
Able to carry out Site Safety Inspections, Safety Audits and prepare
subsequent reports.
Daily check for consumable storage and handling, baking and holding
oven temperature as per specification
Review hydro test package check the ISO drawings, plan drawings,
P&ID drawings, and limit of hydro test.
Check calibration certificate of pressure gauge and safety relief
valve, hydro tested manifold
Fabrication & Erection of Pipelines ranging form ½” to 84” Diameter
Heavy Structural Steel Fabrication & Erection up to the max. Of 50m
height using up to 40 mm thick materials.
Ducting Fabrication & Erection up to the maximum of 4.8 meter in
diameter.
Preparing & maintaining various Records & Documents
Being conversant with various codes viz., ASME, API, ANSI, BS, etc.,
Good sense of human relationships and good team spirit and able to
motivate team
Education:
1981-1986: National Institute of Hydrocarbons and Chemicals
Degree: Exploitation Engineer (oil & gas), major of promotion.
1986-1990: Institute Oil & Gas GOUBKINE Moscow
Degree: Ph& D in exploitation of Oil & Gas fields(hydraulic
fracturation Under a pulsatory pressure)
Skills:
Verification of isometrics
Technical Director
Shutdown manager
Piping fabrication and QC,
Quality Manager
External Auditor
Supervisor (Piping / Valves / Vessel/Painting)
Quality Inspector
Manager QA / QC
Project Manager.
Consultant
Language proficiency:
10
French -fluent
Arabic –native
English – good
Russian - good
Software:
GMAO (optimis)
S.A.P- TOTAL E & P Congo.
Microsoft Office
WELDERQUAL WELQSPEC.
WPSelect2005;
Portal;
COSTCOMP; WPS;
Turbo-FMC;
Turbo int;
Turbo IV;
WINCAD;
Piping. Auto-CAD 2007,
IntelliCAD,
CAD program 2006
Weld CAD
MICROSTATION stress
Autoplan Software Pipe-Autopipe-PLAN-4D (calculation of the pipe
by the finite element method).
RDM Software).
Esope 3.6.
Microsoft VISIO.MAXIMO.Advanced welding system 6.1.
Advanced pressure vessel 9.2
ASME Pro.Welding
PRO-FORM Write.ASME Welder.Weld-it-classic calcul.Assistant of
Welding,e-weld3.1ML.
ENG-PRO software, Top solid CATIA
CAM software CATIA.
CAM software, prelude
CAESARII, software Caesar (Pipe Stress Analysis) covering the
principles and applications of analysis of flexibility of piping (Static &
Dynamic Analysis).
COMPRESS (according to ASME VIII div1).
RDM6, SAP2000.
MS PROJECT.
NAVISWORKS FREEDOM Petrofac.
CONSTRUCTION MATERIALS
As per international standards & specifications (ASME/ASNT/AWS/API etc)
_________________________________________________________________
TRAINING
Protection Fire-TOTAL E&P Congo
11
Service H2S-TOTAL E&P Congo
Permit to work-TOTAL E&P Congo
Defensive driving-TOTAL E&P Congo
Permit to work & JHA-SHELL Gabon
Permit to Work &J.S.A(S.S.A)-PETROFAC El Merk ALGERIA
Corrosion- TOTAL E&P Congo
Hydraulic Test- TOTAL E&P Congo
Valves Masoneilan- TOTAL E&P Congo
Visual Inspection of the weldmet-APAVE-SUD France.
Flange Management-PETROC-EL MERK HASSI MESSAOUD ALGERIA.
Working at height.
Risk assessment.
Introd to Managing Safely.
Module Offshore(30) TOTAL E&P Congo
Module 7 TOTAL E&P Congo
Module 31 Scaffolding TOTAL E&P Congo
Module 57 Permit to Work TOTAL E&P Congo
____________________________________________________________________
CAREER OBJECTIVE
To use my talents to the service of my employer organization and become a self motivated and
goal oriented professional committed to pursing a long term carrier in the organization which
encourages creativity, innovation and provides opportunities to explore myself fully and realize
my potential and for mutual growth.
_________________________________________________________________________
DECLARATION
I hereby certify that the information supplied on this application for employment is true and correct to the
best of my knowledge, and agree to have any of the statements checked by the Employer, un less I have
indicated to the contrary.

More Related Content

What's hot

LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)atiq amin
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_DarrDavid Darr
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
Pradeep Sundaresan
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
Mujahid Ali Akhtar
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
Khalid Alismail
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Hegab
 

What's hot (20)

CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
walid salah.CV
walid salah.CVwalid salah.CV
walid salah.CV
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_Darr
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 

Viewers also liked

Cost Saving Hotel
Cost Saving HotelCost Saving Hotel
Cost Saving HotelZW Yap
 
Nokia Competitive Intelligence, Strategy and Marketing analysis
Nokia Competitive Intelligence, Strategy and Marketing analysisNokia Competitive Intelligence, Strategy and Marketing analysis
Nokia Competitive Intelligence, Strategy and Marketing analysis
sylvain revuz
 
Competitive Intelligence using Social Media
Competitive Intelligence using Social MediaCompetitive Intelligence using Social Media
Competitive Intelligence using Social Media
Matt Siltala
 
Intelligence Trends 2017 - Snapshot of Market and Competitive Intelligence T...
Intelligence Trends 2017  - Snapshot of Market and Competitive Intelligence T...Intelligence Trends 2017  - Snapshot of Market and Competitive Intelligence T...
Intelligence Trends 2017 - Snapshot of Market and Competitive Intelligence T...ACRASIO
 
Competitive Intelligence
Competitive IntelligenceCompetitive Intelligence
Competitive Intelligence
Elijah Ezendu
 
What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013
What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013
What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013
Brian Groth
 
missed myocardial infarction among patients discharged with chest pain in the...
missed myocardial infarction among patients discharged with chest pain in the...missed myocardial infarction among patients discharged with chest pain in the...
missed myocardial infarction among patients discharged with chest pain in the...
guest75efe2
 
DHIFAF BAGHDAD company presenation
DHIFAF BAGHDAD company presenationDHIFAF BAGHDAD company presenation
DHIFAF BAGHDAD company presenationDHIFAF BAGDAH
 
Yamuna Lubricants
Yamuna LubricantsYamuna Lubricants
Yamuna Lubricants
Ganesh Khade
 
SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector Shivakumar Dhanabalan
 
UTSpeaks: Your Certain Death
UTSpeaks: Your Certain DeathUTSpeaks: Your Certain Death
UTSpeaks: Your Certain Death
University of Technology, Sydney
 
APDS Lecture 2005-10-18
APDS Lecture 2005-10-18APDS Lecture 2005-10-18
APDS Lecture 2005-10-18largess
 
Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011
Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011
Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011
Carolina Martínez Hansen
 
My Story of Transformation - RunIn United - 2013
My Story of Transformation - RunIn United - 2013My Story of Transformation - RunIn United - 2013
My Story of Transformation - RunIn United - 2013
Rachelle Diamond
 
Bopp carton packing tape
Bopp carton packing tapeBopp carton packing tape
Bopp carton packing tape
Layla electrical tape
 
Trica im nok
Trica im nokTrica im nok
Trica im nok
Peter Lüdorf
 
Fc k5 presentation
Fc k5 presentationFc k5 presentation
Fc k5 presentation
friulchemK5
 
OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...
OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...
OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...Fing
 
En avion
En avionEn avion
En avionlyago
 

Viewers also liked (20)

Cost Saving Hotel
Cost Saving HotelCost Saving Hotel
Cost Saving Hotel
 
Nokia Competitive Intelligence, Strategy and Marketing analysis
Nokia Competitive Intelligence, Strategy and Marketing analysisNokia Competitive Intelligence, Strategy and Marketing analysis
Nokia Competitive Intelligence, Strategy and Marketing analysis
 
Competitive Intelligence using Social Media
Competitive Intelligence using Social MediaCompetitive Intelligence using Social Media
Competitive Intelligence using Social Media
 
Intelligence Trends 2017 - Snapshot of Market and Competitive Intelligence T...
Intelligence Trends 2017  - Snapshot of Market and Competitive Intelligence T...Intelligence Trends 2017  - Snapshot of Market and Competitive Intelligence T...
Intelligence Trends 2017 - Snapshot of Market and Competitive Intelligence T...
 
Competitive Intelligence
Competitive IntelligenceCompetitive Intelligence
Competitive Intelligence
 
What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013
What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013
What makes up a good Competitive Intelligence program - Brian Groth - Feb 2013
 
missed myocardial infarction among patients discharged with chest pain in the...
missed myocardial infarction among patients discharged with chest pain in the...missed myocardial infarction among patients discharged with chest pain in the...
missed myocardial infarction among patients discharged with chest pain in the...
 
DHIFAF BAGHDAD company presenation
DHIFAF BAGHDAD company presenationDHIFAF BAGHDAD company presenation
DHIFAF BAGHDAD company presenation
 
Yamuna Lubricants
Yamuna LubricantsYamuna Lubricants
Yamuna Lubricants
 
SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector
 
UTSpeaks: Your Certain Death
UTSpeaks: Your Certain DeathUTSpeaks: Your Certain Death
UTSpeaks: Your Certain Death
 
APDS Lecture 2005-10-18
APDS Lecture 2005-10-18APDS Lecture 2005-10-18
APDS Lecture 2005-10-18
 
Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011
Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011
Curso Economic Guidelines for Mineral Exploration, Dr. M. Doggett 2011
 
My Story of Transformation - RunIn United - 2013
My Story of Transformation - RunIn United - 2013My Story of Transformation - RunIn United - 2013
My Story of Transformation - RunIn United - 2013
 
Bopp carton packing tape
Bopp carton packing tapeBopp carton packing tape
Bopp carton packing tape
 
Trica im nok
Trica im nokTrica im nok
Trica im nok
 
Fc k5 presentation
Fc k5 presentationFc k5 presentation
Fc k5 presentation
 
OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...
OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...
OpenDataWeek Marseille 2013 : Andrew Byrd -- The General Transit Feed Specifi...
 
En avion
En avionEn avion
En avion
 
Belleza Nocturna
Belleza NocturnaBelleza Nocturna
Belleza Nocturna
 

Similar to Mohamed El Hadi ADJABI 2016

Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
Rushi Pru Dhvi
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Mohamed Mustafa
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Dylan Gonsalves
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Ayman Issa
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
Mostafa Omar
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 

Similar to Mohamed El Hadi ADJABI 2016 (20)

Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Resume
ResumeResume
Resume
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
updated CV
updated CVupdated CV
updated CV
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
IssakakishC.V
IssakakishC.VIssakakishC.V
IssakakishC.V
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 

Mohamed El Hadi ADJABI 2016

  • 1. 1 Mohamed El Hadi ADJABI Contacts: Tel(mobile):00213797392850 Home(mobile):00213672378614 E-mail: mohamedelhadi.adjabi@gmail.com Personal info: Age: 54 Marital Status: married Citizenship1: Algerian Citizenship2: Russian Experience: ______ SUMMARY: Total 27 years experiences in Piping, pipeline, Structural and Equipment Erection in various projects like Petrochemical, Power plant , Refinery and Maintenance . 06/2014 – 01/2016 Site Nord YANGA/SENDJI (TOTAL E&P Congo) PNGF-North (YANGA/Sendji/Libondo/Likalala/Kombi), SUPERVISEUR TRAVAUX PIPING / CAPACITES / ROBINETTERIE SIMOPS & ARRET Contract Metal in charge of 14 satellites ("mature" field). JOB DIMENSIONS Oil installations of Total E & P Congo are many and varied, and the age of some platforms requires significant rehabilitation work in often difficult conditions. The limited development of the local industrial fabric imposes a number of constraints (lack of technical expertise, under-qualification of labor, limited competition, etc ...) require a strong involvement in preparing and carrying out the work . Aggravating risks: H2S & industrial context Guarantee the respect of construction rules and intervention procedures in the field of work on piping, structures and facilities to maintain their integrity. Supervise the activities of External Companies and receiving the work on behalf of the website operator. Health Safety Environment  Ensure implementation of HSE regulations for the implementation of activities, that the work be carried out by Total E & P Congo staff or contracted Foreign Companies,  Participate in the preparation and drafting of records SIMOPS "Operations / Construction" when necessary,  Organize and participate in RLO ARO.  Daily monitoring CMMS attached to the work  Preparation / constitution of the work records.
  • 2. 2  To intervene in all ARO, RLO and ROC.  Ensure the control and validation of the technical part of procedures, plans and data sheets.  Coordinate / Plan all work in conjunction with the SIM / Super Intendant Maintenance.  Supervise metal contract team activities.  Validate and receive completion in conjunction with the SIM. Write the daily and weekly activity reports  Ensure compliance and integrity of systems with as a goal the control of industrial risks.  Ensure compliance of pressure vessels and lifting equipment. n Skills NDT, metal / welding materials / corrosion paint. n Ability to synthesize and analyze .and initiative  business management capacity, methodical, organized.  Interpretation of codes and TOTAL specification GS which are in English 12/2013-12/2013 Shutdown Manager-Weatherford Tunisia Project: Waha Production Facility and Well Sites. Total Shutdown December 2013 OMV(Austria)-ETAP(Tunisia) SOUTH TUNISIA, Ltd E&P  Maintain a strong relationship with the Shutdown Manager and adhere to contract reporting requirements.  Implement a Business Plan for the Shutdown Contract that identifies and delivers business improvement initiatives.  The incumbent has overall responsibility for coordination and execution of maintenance and construction activities associated with the shutdown work list, and any emergent work that arises. This includes all shutdownwn, shutdown and post shutdown activities.  Preparation of a detailed shutdown execution plan that defines the organisation, roles/responsibilities, scope, targets, contracting strategy and critical activities.  Develop and implement cost effective sub-contracting strategies.  Responsible for the preparation and compilation of tender documents, assessment of sub - contractors, and the implementation of successful contracts prior to the commencement of work.  Analyse shutdown critical path activities and ensure that resources are allocated in the most efficient manner.  Ensure that planner(s) receive accurate and up to date information relating to work progress on a daily basis.  shutdown personnel on problems and critical changes that may affect resources, equipment availability, cost and schedule in order to develop and implement solutions.  Conduct a daily meeting with Shutdown Management Team, Superintendents and Supervisors to monitor progress, facilitate coordination and communication to resolve problems Promote and facilitate good communications among all groups –departments and subcontractors  Ensure progressive cost reports, forecast and progress reports are produced  Control of execution plan ensuring all jobs are done in accordance with agreed plan Ensure that a rigid extra work approval process is maintained. Ensure that variation instructions are recorded and documented.  Prepare Monitor and implement corrective actions for individual shutdown’s strategic plan.  Optimizes resource plans /requirements, supplies and logistics for projects.  Liase with management team on all matters related to assigned project and for the purpose to ensure all information to develop cost.  Degree.The incumbent has an obligation towards maintaining safe work practices & a safe & healthy work environment for themselves as well as others in the workplace. _____________________________________________________________ 8/1/2012 UP to 8/31/2013
  • 3. 3 Piping & Pipeline Superintendant-Petrofac EPC Project: Southern fields Development Project. SONATRACH-BP-STATOIL Association In Salah Gas ALGERIA.  Adhering to project drawings and specifications, maintaining good workmanship, fulfilling all safety and quality requirements pertaining to the work, and targeting zero punch list items associated with completed work activities. 1  Developing the Project Piping Installation Plan and keeping it current throughout the project life  Directing and supervising craftsmen installing piping systems  Arranging for all required work permits, tools, equipment, scaffolding and consumable material required for piping installation activities  Coordinating and scheduling piping installation activities based on project schedule requirements.  Providing regular and timely input for progress reporting  A new CPF located close to the HMN field with two trains of dehydration.  A number of gas producing wells in the 4 southern fields plus one water re- injection well in the HMN field.  12’’ infield 13% chrome pipelines in the HMN, GBF, IS and GMD fields.  16’’ 13% chrome inter-field pipelines connecting HMN, GBF, IS and GMD fields to the new IS CPF.  An 8’’ plastic lined carbon steel water injection line from ISCPF to the injection well in the HMN field.  A 32’’ carbon steel line from the IS CPF TO Reg.  An extension to the Reg facility to include an additional train of dehydration.  A new 24’’ carbon steel pipeline between Reg and the ICP.  Tie-ins, connections and interfaces with existing systems.  A permanent operations camp (Base de Vie) located close to the new CPF.  A permanent Military camp location approx 500m from the base de vie.  Second Stage Compression at TEG, REG and KRECHBA.  Other Associated infrastructure. Notes :JV GAS Tiguentourine CPF( SONATRACH-BP-STATOIL) Joint Venture- TRAIN 3 INSPECTION after the terrorist attack on 16/01/2013. 11/2010 8/2012 Piping & Pipeline Superintendant-Petrofac EPC Project: EL MERK Processing Facility and LNG Facility. SONATRACH-ANADARKO Association HASSI MESSAOUD ALGERIA. Duties: • Makes technical decisions, ensuring coordination, quality and conformance with PMC-Client contract requirements. • Takes on Subcontractors staff supervision responsibilities. • Reviews and understands the major project contract(s) basis including scope of work, scope of facilities and applicable liability for the PMC contract and the individual contract.
  • 4. 4 • Reviews and is familiar with discipline scope of services and scope of facilities for each contract. Is familiar with discipline contract deliverables, level of detail and drawing/document acceptable quality levels according to client standards. • Reviews and implements design criteria and specifications as per client requirements. • Reviews projects to ensure compliance with basic design within the limits of defined EPC role in managing major project contracts. • Reviews and understands the project activity models for engineering and specific discipline including the project requirement checklists and relevant sections of the Project execution manual and of the project procedures manual. • Checks and contributes to engineering man-hour estimates and schedules. • Develops and/or amends scope of works, scope of services and any other documentation to fulfill discipline project requirements. • Prepares technical and contractual correspondence in accordance with project and client requirements as formal letters and transmittals informing client and other parties of matters pertaining to the discipline responsibility for various contracts. • Possesses comprehensive knowledge of client, contractor and industry codes and standards and applies that knowledge in accordance with the clients requirements to all activities executed by contractors for which engineer has discipline EPC responsibility. • Reviews inspection, examination and quality control requirements for each contract for which Construction Piping Supervisor, has discipline responsibility. Monitors QC/QA activities on those same projects. • Understands and applies QC/QA requirements for discipline engineering as laid out in EPC quality manual. • Reviews designs and drawings in accordance with the scope of EPC activities for all contracts for which the engineer has discipline responsibility. • Demonstrates ability to conceive, plan, organize, coordinate and execute multiple assigned tasks in a timely manner. • Represents Client in a professional manner and is aware of Client’s best interest in dealing with clients. • Reviews and participates in the development of any project standards and specifications. • Reviews and identifies deviations in job scope, reviews estimate magnitude of changes, and advices client accordingly. • Evaluates quotation summaries, material and component substitution, for technical compliance. • Reviews contractor’s recommendations for material inspection, identification, certification and expediting to projects. • Participates in project quality assurance reviews and implements corrective action requirements. • Travels to construction sites, shop sites, contractor sites or vendors works to provide technical input as and when required. Makes records of visits with clear and concise reporting. 06/2010 10/2010: Vice Manager QC-Piping & Pipeline ORASCOM-PETROFAC CONSTRUCTION INDUSTRIES. Project: EL MERK Processing Facility and LNG Facility. SONATRACH-ANADARKO HASSI MESSAOUD ALGERIA. Duties: Head of QC of piping HDPE-CS-SS-DSS; blasting and paint (4 welding engineers level 2) Material receiving inspection. Quality Management system audit on site Audit. HDPE prefabrication and control quality. Hydro testing U/G piping systems. Inspection for under and above ground stainless and duplex steel piping installation. Inspection for underground carbon steel piping installation. Inspection for underground HDPE piping installation (Diameters 2” to 24”). Visual and Dimensional control. Installation of U/G piping system and trench work procedure. The code compliance inspections of manufacturing. The design verification of equipments and pressure vessels to verify Compliance with the code,
  • 5. 5 Verification of welding procedures in accordance with ASME Requirements. The manual review of quality control to verify code compliance, the authorization and supervision of repairs and modifications. Equipments and pressure vessels in accordance with the code and standards. Initiation and monitoring controls of outsourcing), ensures compliance. With controlled products to customer requirements. 07/2009 04/2010 Mechanical supervisor Construction (Pipeline & Piping) (OGEC RABI-GABON) Duties: SHELL GABON (RABI-TOUCAN-KOULA FIELDS) Supervision of operations on piping and pipelines of the existing equipment and installations Shut down central station PPF. Hot water utility system/heat exchanger at toucan PPF HOOK UP Toucan 31 Collaboration with the contractor’s workforce in terms of labour safety Supervision of activities performed onsite Participation in piping/pipeline dismounting and mounting activities Supervision of activities within the relevant engineering discipline Reporting on the overall condition of process equipment with regard to piping and vessels 11/2008 07/2009 Senior Piping , Pipeline and Vessel Supervisor (Dietsmann Technologies, Russia) Project: Samburgsky GTP Inspection, Reconditioning, Preservation and Recertification (Novy Urengoy – Russia). Duties: Supervision of operations on piping and vessels of the existing equipment and installations Inspection and reconditioning Collaboration with the contractor’s workforce in terms of labour safety Supervision of activities performed onsite
  • 6. 6 Participation in piping/vessel dismounting and mounting activities Interpretation of results of visual inspection and NDT Work with the tracking system, i.e. daily reporting, inspection reports etc. Supervision of activities within the relevant engineering discipline Reporting on the overall condition of process equipment with regard to piping and vessels 03/2008 07/2008 Site Inspector (TOTAL E & P, Congo) Project: FPU-Alima Offshore platform Duties: Implementation of inspection activities Supervision of Inspection and NDT executed by contractors Interpretation and development of specifications and procedures for repair in accordance with TOTAL internal regulations. Development of repair schedules for piping/boilers and vessels, Analysis of welders` qualifications and audit of contracted companies. Company representative in the Administration of the Inspectors of Mines during recertification of pressure vessels, Compilation and maintenance of technical documentation (databases, inspection plans, inspection reports) Participation in the qualification of Company`s pipe/boiler suppliers. Planning, organization and supervision of loading/offloading operations. Interpretation of test results and consulting on the corrective action plans. Ensuring compliance and integrity of facilities with the ultimate control of industrial risks. Ensuring compliance with regulations for pressure vessels and lifting appliances. 09/2003 02/2008 Senior Piping & Pipeline supervisor -workshop Assistance Sites (TOTAL E&P Congo Sub-contractor Dietsmann-Congo) Project: Maintenance contract for Total E&P Pointe Noire, Congo Duties: Head of the piping; Pipeline valves and vessel maintenance workshop (25 employees) The realization of all isometrics diameters of all sites offshore and onshore of TOTAL E & P Congo. Work on the structural steel Piping maintenance and repairs. P& ID Running the fabrication workshop Production equipment operation and control. Input quality control (procurement and control of products supplied by
  • 7. 7 the client), issuance of non-conformity certificates. Technical supervision and training of local staff. Ensuring the implementation and updating of the procedures applicable to the workshop and storage facility. Application of industrial codes and regulations (welding & piping). Preparation of operating procedures specific to the construction process. Maintenance in static equipment-piping, valves, vessels, heat exchanger, and boilers. Safe Knowledge and maintenance experience in static equipments such as columns, vessels, storage tanks, heat exchangers and gas drier bed. Knowledge and maintenance experience in Boilers, incinerators and its refractory’s, Knowledge and maintenance experience in piping specifications, Mechanical isolation of piping and process equipment Knowledge and experience in trouble shooting, repair and overhauling of LNG Loading arms Knowledge and maintenance experience of Sulphur granulation plants Knowledge and maintenance experience of Gas inlet and treatment facilities inclusive of slug catcher and pig receiving. Knowledge and maintenance experience of Water treatment systems and desalinations. Intimate knowledge of reading and interpretation of schematic, logic, P & I drawings, Knowledge of torqing tools, rigging gear. Good written and oral communication skills in English. Good leadership and interpersonal skills. Good adaptability to multinational environment, with wide exposure to various cultures and customs. Requests work permits as per company EHS policy Should be conversant with the terms and specifications of Hazardous locations as well as statutory inspections, maintenance and repairs of such equipment. Should understand the piping system specification, isometric drawing Able to understand pipeline pig receiver and components Complete knowledge of flange bolting and torqing procedure Able to understand blinding, lock out and tag out process. Actual experience of Blinding and Deblinding works Basic knowledge of valve maintenance (Seat Flushing, Stem Seal Flushing, Body Cavity Flushing) Able to understand different types of Pressure vessels (Process Filters, Process Strainers, Molecular Sieves, Catalyst vessels, Columns, MCHE, Incinerator, Furnaces, Boilers & HRSG) Vessel internals understanding Able to understand different types of Heat Exchangers (Air Cooled exchangers, Shell and Tube exchangers, Plate Exchangers, Brazed fin exchangers) Able to understand components of exchangers (Channel, Tube sheet, Shell, Collar Bolts) Basic understanding of different types of NDT (LP check, MPI check, Eddy Current Check, Xray check, Pressure testing methods) Basic understanding of temporary repairs (Clamp repairs, On-line sealing injection, Composite wrap repairs) Basic understanding of Steam trap monitoring Basic understanding of Refractory lining
  • 8. 8 11/ 1990 09/ 2003 Piping, Pipeline Valve and Vessel Superintendent (ELF Congo) Sub-Contractor (Oil Tools Services Congo) Project: ELF Congo, Pointe Noire Congo Duties: Project: On-shore oil production facility (TERMINAL DJENO) Duties: Ensuring the compliance of operations with the project specifications for Piping, Valves and Vessels Assistance and participation in the activities of the PVV Lead Discipline Engineer Ensuring the compliance with the FEED Engineering rules developed in Congo. Supervision, control and coordination of all Piping, Valve and Vessel Engineering Design activities with respect to overall Project Objectives (Schedule, Quality, Budget) Supervision and development of work procedures from Contractors and Sub-Contractors for all fields of PVV activities. Monitoring of the operations performed by the Contractor and revision of supporting documentation. Review of the engineering documentation issued by the Contractors, Sub-Contractors and/or its approval in accordance with the Project procedures and requirements. Monitoring of the application of project design standards defined by AFNOR norms. Meeting the requirements of the technical conditions developed in line with COMPANY procedures and FEED Engineering, review of contractor`s documentation as required per Lead Discipline Engineering (LDE) in Congo. Application of ASME design rules and project standards identify potential gap remaining and participate in the finalization of the project Standards Definition of the requirements for the Factory Acceptance Tests (FAT) of the facility. Supervision of fabrication, installation and start-up of main equipment up to commissioning Fabrication & Erection of various materials like Copper Nickel. Stainless Steel, Duplex and Super Duplex Stainless Steel spools. Fit-up inspection of pipe spools, pipe support, platform, column and all type of structural works as per ISO drawing.
  • 9. 9 Fit-up inspection of Review project specification, approved drawings quality control plan, procedures, method statements and other relevant documents. Review material traceability reports against the actual heat number of materials. Able to control and monitor day to day Piping activities. Able to carry out Site Safety Inspections, Safety Audits and prepare subsequent reports. Daily check for consumable storage and handling, baking and holding oven temperature as per specification Review hydro test package check the ISO drawings, plan drawings, P&ID drawings, and limit of hydro test. Check calibration certificate of pressure gauge and safety relief valve, hydro tested manifold Fabrication & Erection of Pipelines ranging form ½” to 84” Diameter Heavy Structural Steel Fabrication & Erection up to the max. Of 50m height using up to 40 mm thick materials. Ducting Fabrication & Erection up to the maximum of 4.8 meter in diameter. Preparing & maintaining various Records & Documents Being conversant with various codes viz., ASME, API, ANSI, BS, etc., Good sense of human relationships and good team spirit and able to motivate team Education: 1981-1986: National Institute of Hydrocarbons and Chemicals Degree: Exploitation Engineer (oil & gas), major of promotion. 1986-1990: Institute Oil & Gas GOUBKINE Moscow Degree: Ph& D in exploitation of Oil & Gas fields(hydraulic fracturation Under a pulsatory pressure) Skills: Verification of isometrics Technical Director Shutdown manager Piping fabrication and QC, Quality Manager External Auditor Supervisor (Piping / Valves / Vessel/Painting) Quality Inspector Manager QA / QC Project Manager. Consultant Language proficiency:
  • 10. 10 French -fluent Arabic –native English – good Russian - good Software: GMAO (optimis) S.A.P- TOTAL E & P Congo. Microsoft Office WELDERQUAL WELQSPEC. WPSelect2005; Portal; COSTCOMP; WPS; Turbo-FMC; Turbo int; Turbo IV; WINCAD; Piping. Auto-CAD 2007, IntelliCAD, CAD program 2006 Weld CAD MICROSTATION stress Autoplan Software Pipe-Autopipe-PLAN-4D (calculation of the pipe by the finite element method). RDM Software). Esope 3.6. Microsoft VISIO.MAXIMO.Advanced welding system 6.1. Advanced pressure vessel 9.2 ASME Pro.Welding PRO-FORM Write.ASME Welder.Weld-it-classic calcul.Assistant of Welding,e-weld3.1ML. ENG-PRO software, Top solid CATIA CAM software CATIA. CAM software, prelude CAESARII, software Caesar (Pipe Stress Analysis) covering the principles and applications of analysis of flexibility of piping (Static & Dynamic Analysis). COMPRESS (according to ASME VIII div1). RDM6, SAP2000. MS PROJECT. NAVISWORKS FREEDOM Petrofac. CONSTRUCTION MATERIALS As per international standards & specifications (ASME/ASNT/AWS/API etc) _________________________________________________________________ TRAINING Protection Fire-TOTAL E&P Congo
  • 11. 11 Service H2S-TOTAL E&P Congo Permit to work-TOTAL E&P Congo Defensive driving-TOTAL E&P Congo Permit to work & JHA-SHELL Gabon Permit to Work &J.S.A(S.S.A)-PETROFAC El Merk ALGERIA Corrosion- TOTAL E&P Congo Hydraulic Test- TOTAL E&P Congo Valves Masoneilan- TOTAL E&P Congo Visual Inspection of the weldmet-APAVE-SUD France. Flange Management-PETROC-EL MERK HASSI MESSAOUD ALGERIA. Working at height. Risk assessment. Introd to Managing Safely. Module Offshore(30) TOTAL E&P Congo Module 7 TOTAL E&P Congo Module 31 Scaffolding TOTAL E&P Congo Module 57 Permit to Work TOTAL E&P Congo ____________________________________________________________________ CAREER OBJECTIVE To use my talents to the service of my employer organization and become a self motivated and goal oriented professional committed to pursing a long term carrier in the organization which encourages creativity, innovation and provides opportunities to explore myself fully and realize my potential and for mutual growth. _________________________________________________________________________ DECLARATION I hereby certify that the information supplied on this application for employment is true and correct to the best of my knowledge, and agree to have any of the statements checked by the Employer, un less I have indicated to the contrary.