2-Day Conference: 16-17 November 2015
Pre and Post-Conference Workshops:15 & 18 November 2015
Dusit Thani, Dubai, UAE
For more information or to register – +971 4 364 2975 enquiry@iqpc.ae
@iqpcmena www.undergrounduae.com
Paul Groves
Head of Tunnels &
Ground Engineering,
Middle East and India
Atkins
Rashid Al Mulla
Stakeholder
Manager
Etihad Rail
Reji John
Regional Director
NSCC international
Dr. Ali A. Mahdi
Associate Director,
Bridges and Tunnels
WSP|Parsons
Brinckerhoff
Salah Abdulatif Al
Dilim
Rail Infrastructure
Maintenance Manager
RTA
Qaiser Hayat
Geotechnical Design
Manager
CH2M
David Bulmer, Geotechnical Manager, Etihad Rail
Noha Abdou, Head of Structural Division, APG
Bart Leclerq, Senior Technical Director, Building
Structures, WSP|Parsons Brinckerhoff
Chris Magadia, Associate Principal Head of Structural
Department, Ted Jacob Engineering Group
Prof. Hesham El Shazly, Geotechnical Manager,
Municipality of Abu Dhabi City
Colin Crane, Managing Director, St. Johns Piling &
Foundation
Imraan Motara, Head of Ground Engineering,
WSP|Parsons Brinckerhoff
Nidhal Al-Alusi, Principal Geotechnical Engineer,
Mott MacDonald
Mamdouh Hamouda, Engineering Director, ARKAN
Architects Consultants
Mohamed AbouBakr (MIEAust), Senior Structural
Engineer, Architectural Consulting Group
Benoit Latapie, Technical Manager, Ground
Engineering, Atkins
Dr. Bashar Saadi Taha, Manager, NOC & Service
Coordination Section, Rail ROW Department, RTA
Scott Stewart, Chief Market Manager, Ground
Engineering, COWI
Oliver Higgins, Senior Hydrogeologist, Hyder
Consulting
Ioannis Saplamidis, Senior Project Engineer,
BESIX Group
Don’t miss your opportunity to:
Listen to industry experts from ATKINS, AECOM, ETIHAD
RAIL, HYDER, CH2M, MOTT MACDONALD, WSP and many
more allowing you to gain exclusive ideas about underground
infrastructure strategies for upcoming mega projects
Gain insights into the latest projects and case studies on
tried and tested methods to better understand strategies
that work
Discover the most innovative developments in piling
foundations and tunnelling techniques and technologies to
develop robust foundations
Attend interactive workshops where you can gain thorough
in-depth insight that walks you through the key steps to
executing winning underground infrastructure design and
development strategies
Media Partners:Construction Intelligence Partner: Researched & Developed by:
Book
and
pay
before
3
Septem
ber2015
to
save
up
to
US$600!
Foundations of the future: Discovering how to develop robust
foundations through innovative and sustainable techniques
Hear from key speakers including:
A great opportunity to meet and
discuss issues with the
stakeholders involved in the
major upcoming projects.
Contracts Manager, Ammico
Contracting Co
DON’T MISS OUR
WORKSHOPS ON:
Accurate geotechnical
investigations –15 NovChallenges of deep
foundations for high rise
buildings within the UAE –
18 Nov
DON’T MISS OUR
WORKSHOPS ON:
Accurate geotechnical
investigations –15 NovChallenges of deep
foundations for high-rise
buildings within the UAE –
18 Nov
Who will you meet?
Government and Project Owners
Geotechnical Consultants
Piling, Foundation and Tunnelling
Contractors
Main Contractors
Main Consultants
Developers
Event Overview
Dear Colleague,
After the success of the Underground Infrastructure and
Deep Foundations UAE conference in December 2014, we
are pleased to announce its return for November 2015!
With the UAE projected to spend US$329 billion on
construction projects by 2030, it is critical to put in place
the best piling and foundation structures to support these
projects, as well as have the most efficient methodologies
to create robust underground infrastructure.
This conference is the ideal learning opportunity to address
the challenging engineering and design issues relating to
underground infrastructure and deep foundations within the
UAE.
What can you expect from the 2015 event?
Etihad Rail’s stage 3 Hajar Mountain case study on
understanding the importance of geological engineering
assessments
Atkins’ historical case studies from the past decade of
tunnelling and lessons learnt since the construction of
the Dubai Metro
WSP|Parsons Brinkerhoff’s exclusive case study on deep
excavation from around the Middle East
AECOM uncover dewatering solutions to manage high
groundwater levels in construction
With huge opportunities for infrastructure projects across
the UAE, this conference is the ideal place for existing
players and new market entrants to access critical project
intelligence.
I look forward to seeing you in November.
Joanne Mount
Conference Director – 2nd
Annual Underground
Infrastructure and Deep Foundations UAE
IQPC Middle East
For more information or to register – +971 4 364 2975 enquiry@iqpc.ae
@iqpcmena www.undergrounduae.com
IQPC provides business executives around the
world with tailored practical conferences, large
scale events, topical seminars and training
programmes, keeping them up-to-date with
industry trends, technological developments
and the regulatory landscape. IQPC conferences
are market leading “must attend” events for
their respective industries. IQPC produces more
than 1,700 events annually around the world,
and continues to grow. Founded in 1973, IQPC
now has offices in major cities including:
Bengaluru, Berlin, Dubai, London, New York,
Singapore, Sydney, Tampa, and Toronto. IQPC
leverages a global research base of best
practices to produce an unrivalled portfolio of
conferences.
2-Day Conference:
16-17 November 2015
Pre and Post-Conference Workshops:
15 & 18 November 2015
Dusit Thani, Dubai, UAE
The speakers are notably experts in
their field and this was evident in the
delivery of their papers during the
conference
Senior Planning and Design Engineer,
Qatar General Electricity and Water
Corporation
What our past delegates said:
One of the best conferences I have
attended in the Middle East. Well
balanced material and good speakers
Deputy Director, Roads and Transport
Authority
Conference Day One – Monday, 16 November 2015
For more information or to register – +971 4 364 2975 enquiry@iqpc.ae
@iqpcmena www.undergrounduae.com
Discussing the impact of test limitations on ground
improvement designs
Understanding the effective ways to enhance the gain
from zone load tests
Exclusive case study insights including the Fuel Storage
Tank Farm in Hamriyah Free Zone, Sharjah, UAE
Nidhal Al-Alusi, Principal Geotechnical Engineer, Mott
MacDonald
12:20 Discovering geotechnical challenges: The static earthquake
Discussing how settlement magnitude plays a crucial role
in understanding road damage
Effectively understanding what needs to be looked at when
examining soil strata
Analysing the advantages and disadvantages of geo-grids
An insight into forensic study strategies
Prof. Hesham El Shazly, Geotechnical Manager, Municipality
of Abu Dhabi City
12.50 Lunch and networking
Discovering effective water management and control
13.50 Assessing the efficient and sustainable control of ground
water through dewatering
Uncovering the challenges of dewatering and underground
infrastructure
Establishing suitable dewatering systems to manage the
high groundwater level in construction
Acknowledging dewatering subsidence and how to
eliminate it effectively
Exclusive case study insights including: ADNOC Car Park
Project, Abu Dhabi and the Al Hadeel Project, Abu Dhabi
Karim Roshdy, Resident Engineer, AECOM
14:20 Managing the effective disposal of groundwater
Discovering the variation of water level tables across the
UAE and the challenges this has on underground
infrastructure
Understanding how to effectively manage the impact of
rising water tables and mitigate risk
Evaluating environment friendly ways to dispose of
discharge water
Oliver Higgins, Senior Hydrogeologist, Hyder Consulting
Discovering how to effectively manage underground
infrastructure in urban areas
14:50 Exploring the challenges of developing underground
infrastructure in urban areas
Discover the challenges associated with deep foundations
and tunnel excavation on the foundations of adjacent
buildings in urban areas
Acknowledging the importance of examining an existing
building’s technical conditions in the project preparation
phase to prevent settlement problems and cracking in
adjacent buildings
Assessing techniques to manage noise control and traffic
disruption during underground construction in urban areas
Benoit Latapie, Technical Manager, Ground Engineering,
Atkins
15:20 Networking break and refreshments
15:50 PANEL DISCUSSION: Discussing the key requirements and
developments of high-rise foundations
Establishing the challenges and demands associated with
the foundations of high-rise buildings
Exploring innovative techniques and methods in foundation
design for high-rise buildings
Analysing the impact of the increasing number of high-rise
building projects on foundation guidelines
Mamdouh Hamouda, Engineering Director, ARKAN Architects
Consultants
Dr. Ali A. Mahdi, Associate Director, Bridges and Tunnels,
WSP|Parsons Brinckerhoff
Noha Abdou, Head of Structural Division, APG
Colin Crane, Managing Director, St. Johns Piling & Foundation
Prof. Hesham El Shazly, Geotechnical Manager, Municipality of
Abu Dhabi City
16:30 End of conference day one
08:00 Start of conference registration with welcome refreshments
08:45 Opening remarks from IQPC and introduction to Chair
08:50 Opening remarks from the conference Chair and start of
conference
Exploring the UAE landscape and its impact on
underground infrastructure and deep foundations
09.00 Managing geotechnical risks on underground infrastructure
projects in the UAE
Discussing typical geotechnical risks in the UAE and
highlighting the need to implement geotechnical risk
assessment and geotechnical certification processes on
projects
Recognising the importance of a detailed desk study
followed by geotechnical investigations and how they need
to be carefully tailored to the nature of the project and the
local UAE geology
Understanding the importance of continued input by the
geotechnical advisor during design and implementation
stages of the project to mitigate risks and to reduce costs
Case study insight
Qaiser Hayat, Geotechnical Design Manager, CH2M
09.30 CASE STUDY: Etihad Rail Stage 3 - Hajar Mountain Crossing -
geological engineering assessment
Understanding the geological challenges of the Hajar
Mountain corridor through preliminary studies and
geological field mapping
Exploring the evaluation of tunnel and alignment specific
geological conditions through specialist hard rock ground
investigations
An integrated geological engineering assessment and
interpretation
David Bulmer, Geotechnical Manager, Etihad Rail
Rashid Al Mulla, Stakeholder Manager, Etihad Rail
Uncovering problematic soil areas and their impact
on underground infrastructure within the UAE
10.00 PANEL DISCUSSION: Tackling the role of cavity management
in the development of underground infrastructure
Discussing how undetected cavities can result in cracks
and unwanted ground settlement which are detrimental
to the structure
Recognising the importance of soil investigation in order to
detect and monitor cavities
Discussing techniques such as grouting, stone columns
and vibro compaction in effectively managing cavities
Reji John, Regional Director, NSCC international
Mohamed AbouBakr (MIEAust), Senior Structural Engineer,
Architectural Consulting Group
Prof. Hesham El Shazly, Geotechnical Manager, Municipality
of Abu Dhabi City
10:40 Networking break and refreshments
11:10 PANEL DISCUSSION: Artificial islands - The challenge of
building foundations on reclaimed land
Discussing the issues that arise when building deep
foundations on reclaimed land
Investigating suitable methods of ground improvement
such as vibro compaction and stone columns to ensure
strong foundations can be built on reclaimed land
Acknowledging the importance of piles when building
foundations in reclaimed soil
Scott Stewart, Chief Market Manager, Ground Engineering,
COWI
Qaiser Hayat, Geotechnical Design Manager, CH2M
Oliver Higgins, Senior Hydrogeologist, Hyder Consulting
Noha Abdou, Head of Structural Division, APG
Prof. Hesham El Shazly, Geotechnical Manager, Municipality
of Abu Dhabi City
11:50 Acceptance criteria, control and interpretations of zone
load test on improved ground in the UAE
Acknowledging the importance of zone load tests
considering project specifications and geotechnical
characterisation
Presenting designs, acceptance criteria, control and
interpretations of selected zone load tests carried out
across UAE
Conference Day Two – Tuesday, 17 November 2015
For more information or to register – +971 4 364 2975 enquiry@iqpc.ae
@iqpcmena www.undergrounduae.com
12:00 The future of foundations: A sustainable approach
Understanding sustainability and the future of foundations
Discovering the social and ethical obligation to maintain
sustainability in the construction of foundations
Acknowledging cement use, using water sparingly,
recycled debris as aggregate, reducing energy and
restoring natural resources as the pillars of a sustainable
development
Mamdouh Hamouda, Engineering Director, ARKAN Architects
Consultants
12.30 Lunch and networking
13:30 Establishing the relationship between consultants and
designers in efficient project delivery
Discussing how close collaboration between contractors,
consultants and designers can reduce unforeseen
challenges
Acknowledging the importance of defining the roles and
responsibilities of the parties involved to reduce risk and
project delays
Establishing how to strengthen stakeholder relationship in
order to improve project efficiency of underground
infrastructure
Mohamed Aboubakr (MIEAust), Senior Structural Engineer,
Architectural Consulting Group
14.00 Precautions and control measures for excavation, piling &
dewatering (enabling works) within the protection zone of
railway infrastructure
Explaining authority requirements, current railway
legislations and Railway Protection Code of Practice
Understanding the precautions and control measures for
excavation, piling and dewatering (enabling works) within
the protection zone of railway infrastructure
Exploring best practice for risk mitigation and monitoring
requirements
Dr. Bashar Saadi Taha, Manager, NOC & Service Coordination
Section, Rail ROW Department, RTA
14:30 Let’s get technical – Roundtable discussions
The following session will provide delegates with an
opportunity to get more technical through dedicated discussion
tables led by industry experts. Delegates will have a few
minutes to choose a discussion table following which the table
leader will initiate the discussions.
Discussing the latest dewatering solutions to prevent
future problems when building on foundations
Examining innovative piling techniques to create robust
foundations
Delivering quality foundations through soil testing and
cavity management
Discovering geotechnical considerations in tunnel design
to enhance project efficiency
Why participate in this?
Engaging with smaller groups of professionals experiencing
similar challenges means that you are more likely to walk
away with the right solutions. Focused group discussions also
mean that you will have more time to ask burning questions
and get the answers you need.
15:00 End of conference day two
The published programme is correct at time of printing. However, given the
seniority of our speakers and the nature of their roles, speakers may subsequently
substitute or remove themselves from the programme. This is always regrettable,
and we will always try to replace the speaker with a speaker with equivalent
insight. For the most up-to-date programme, please visit the event website.
08:00 Start of conference registration with welcome refreshments
08:45 Opening remarks from IQPC and introduction to Chair
08:50 Opening remarks from the conference Chair and start of
conference
Going down under: An insight into tunnelling techniques
and trends within the UAE
09.00 A decade of tunnelling in the GCC: Lessons learnt
An exclusive insight into historical case studies and
learning 10 years on from the construction of the Dubai
Metro
Uncovering the challenges of tunnel design in the past
decade and lessons learnt
Establishing innovative techniques and new developments
of tunnel design in the past decade to increase project
efficiency
Paul Groves, Head of Tunnels & Ground Engineering, Middle
East and India, Atkins
Addressing design considerations with piling structures
and construction foundations
09.30 An insight into alternative foundation methods for successful
construction
Evaluating the use of driven precast concrete piles for soil
improvement
Discovering the utilisation of a casing advancement
method for deep dewatering wells in areas known for
problematic collapsing
Exploring driven cast insitu applications
Colin Crane, Managing Director, St. Johns Piling & Foundation
10.00 CASE STUDY: Muller Verpress pile anchors in the Port of
Fujairah
Discovering the Muller Verpress pile as an effective
technique for underground construction
Exploring the Muller Verpress pile and grout container
design
Exclusive insight into the use of Muller Verpress pile
anchors in Port Fujairah
Ioannis Saplamidis, Senior Project Engineer, BESIX Group
10:30 Networking break and refreshments
Exploring design techniques to improve project efficiency
of underground infrastructure
11:00 CASE STUDY: WSP|Parsons Brinckerhoff’s deep excavation
case studies around the Middle East
Highlighting the challenges of deep excavation from
around the Middle East
Discovering innovative methodologies of deep excavation to
improve project efficiency
Exclusive case study insights from WSP|Parsons
Brinckerhoff
Bart Leclerq, Senior Technical Director, Building Structures,
WSP|Parsons Brinckerhoff
Imraan Motara, Head of Ground Engineering, WSP|Parsons
Brinckerhoff
11:30 Managing and delivering projects utilising building
information modelling
Understanding the road map to implementing building
information modelling in underground infrastructure
projects
Acknowledging the role of building information modelling
in the project life cycle
Discovering the benefits of implementing building
information modelling such as reduction in design time
and clash detection before the construction phase
Salah Abdulatif Al Dilim, Rail Infrastructure Maintenance
Manager, RTA
Pre-Conference Workshop – Sunday, 15 November 2015
For more information or to register – +971 4 364 2975 enquiry@iqpc.ae
@iqpcmena www.undergrounduae.com
Discovering how to effectively carry out accurate geotechnical investigations
Overview:
Geotechnical investigations are fundamental to the construction project cycle in order to investigate the geological conditions and
provide recommendations and design criteria for construction. Many firms in the UAE are not accurately completing geotechnical
investigations leading to unforeseen challenges, increased costs and delayed projects. With many big projects being announced in the
UAE, it is fundamental for companies to understand how to effectively carry out a geotechnical site investigation.
This exclusive workshop allows you to explore the challenges of developing an
accurate geotechnical site investigation and discover exclusive techniques and
methodologies to deliver an accurate geotechnical report.
08:00 Start of workshop registration with welcome refreshments
08:50 Opening remarks from workshop leader
09:00 Workshop
10:30 Morning refreshments and networking
10:00 Workshop
12:30 Lunch and networking
Analysing how to overcome challenges of deep foundations for high rise buildings within
the UAE
Overview:
The UAE has seen a drastic increase in the rate of construction of high-rise buildings. For example, Dubai is home to the tallest building
in the world, the Burj Khalifa. With many high rise projects being planned in the UAE is it essential that designers and contractors
understand how to effectively develop robust deep foundations to support high-rise structures.
This interactive workshop allows you to explore the challenges that arise when developing deep foundations and provides an exclusive
insight into innovative techniques and methodologies to develop sufficient deep foundations whilst at the same time reducing cost and
risk.
08:00 Start of workshop registration with welcome refreshments
08:50 Opening remarks from workshop leader
09:00 Workshop
10:30 Morning refreshments and networking
10:00 Workshop
12:30 Lunch and networking
Workshop Leader:
Chris Magadia, Associate Principal Head of Structural Department, Ted Jacob Engineering Group
Post-Conference Workshop – Wednesday, 18 November 2015
Sponsorship and Exhibition Opportunities
For more information or to sponsor – +971 4 360 2800 sponsorship@iqpc.ae
@iqpcmena www.undergrounduae.com
IQPC has been hosting events developed for senior executives for more than 40 years. We serve businesses representing over 15
sectors at more than 1,700 conferences around the globe. Our client list includes corporations such as IBM, Cisco, Microsoft,
Lockheed Martin, Boeing, Weatherford International, Halliburton, ABN AMRO, Deutsche Bank, GE, Siemens, BASF and Dow
Chemicals, just to name a select few. Senior executives travel from around the world to our events looking to garner best practices
and concrete solutions to assist them in improving their organisations. IQPC provides many different platforms for you to increase
your market share, stay ahead of your competition, increase awareness to your target audience and position yourself as a key
supplier to the construction industry.
Your platform – getting your message across:
Because we know that each sponsor has a different message, business development goal and branding objectives, each sponsorship
package is tailored to your corporate strategies. Though most sponsorship offers multiple levels and types of exposure, there are a
few main ways for you to highlight your corporate strengths:
Additionally IQPC offers a selection of sponsorship opportunities that enables our clients to increase their opportunity to develop new
relationships during our events, including one-to-one meetings with clients to understand their challenges, requirements and
opportunities.
1. Thought Leadership
As a sponsor at the 2nd
Annual
Underground Infrastructure and Deep
Foundations UAE conference, your
company will gain second-to-none
exposure to senior-level decision makers
at the point in time that they are seeking
solutions, information and systems for
improving their firm’s strategies. For a
select few sponsors, you can build your
reputation as a market leader through
subject-specific presentations, workshops
and focus days. This highly selective
sponsorship allows your firm to establish
tremendous capability and expertise in
your specialty as well as highlight
successful work completed with your
clients.
2. Premium Branding
We bring together buyers and suppliers
for collaboration, networking and knowledge
sharing. Branding is often a major initiative
for our clients who are seeking to get the
message out about their offerings. Build
your company’s brand and visibility in front
of senior decision-makers in order to get
shortlisted. As a sponsor, your company
branding will appear alongside the global
leaders associated with best practices in
this field. Our dedicated marketing team
will help you achieve your promotional aims
in the months leading up to the conference.
IQPC leverages multiple marketing channels
including online, direct mail, email, press
releases, media partnerships and social
media to publicise the event and increase
awareness about your participation to our
extensive database, as well as through our
network of partners.
3. Featured Networking Events /
Face Time
Networking and information sharing are
two major aspects of our conferences and
IQPC builds in many opportunities for
sponsors to benefit from meeting
industry leaders. Focused and high-level,
our events will provide you with the
perfect environment to initiate new
business relationships, identify upcoming
opportunities and achieve face-to-face
contact that overcrowded tradeshows can
not deliver. The exhibition area is
designed to be the heart of the event – a
place to network and share strategies
with key decision makers. Sponsorship
opportunities range from exhibition
stands to sponsored lunches, cocktail
receptions, gala dinners and a host of
other branding opportunities.
Do you have a product or service that our senior decision-makers and influencers need?
The 2nd
Annual Underground Infrastructure and Deep Foundations UAE conference offers you the perfect platform to showcase
your solution to your target market and meet and network with senior-level decision makers who are leading the way in the
industry
We specialise in providing business development, marketing and sales solutions that are tailored to specifically deliver on your
business objectives. We pay patient attention to what our exhibition and sponsorship customers want, expect, need and value. Every
sponsor wants to create customers, develop qualified sales leads, convert leads into sales and retain customers. Our tailored
sponsorship packages help you to achieve these objectives.
If you would like more information on sponsorship and exhibition opportunities or to discuss which package will best help you
achieve your objectives, please contact Rathish Kumar on +971 4 360 2800 or email sponsorship@iqpc.ae.
Good event showing past experience of new technology on the
way to the Middle East
Head of Infrastructure, Meraas Holding
It was really a great pleasure to network with some of the
leading professionals from different backgrounds. The
conference organisation and content were both important
reasons for the success of the event
Manager UAE and Oman, Arab Centre for Engineering Studies
What our past delegates said:
Want to attend as a group?
Email us at enquiry@iqpc.ae for special
group booking discounts.
3 WAYS TO REGISTER
Book and pay before 3 September 2015 and save up to US$600!
REGISTRATION
Event Code: 24312.002
Please complete in BLOCK CAPITALS as information is used to produce delegate badges.
Please photocopy for multiple bookings.
Prices are stated net of any applicable local taxes.
DELEGATE DETAILS:
CREDIT CARD PAYMENTS
TEAM DISCOUNTS
Mr Mrs Ms Dr Other
First Name:..................................................................... Surname: ..........................................................
Email: ......................................................................... Telephone: ..........................................................
Job Title:.................................................................. Department: ..........................................................
Organisation: ................................................ Nature of business: ..........................................................
Address: ....................................................................................................................................................
Postcode:........................................................................ Country: ..........................................................
Telephone: ...................................................................... Fax: ..........................................................
Approving Manager: ........................................ Training Manager: ..........................................................
Name of person completing form if different from delegate: ....................................................................
Signature: .......................................................... Date: ..........................................................
I agree to IQPC’s payment terms
If you have not received an acknowledgement before the conference, please call us to confirm your
booking.
By Credit Card:
Please debit my credit card: Visa Master card American Express
Card No:
Valid from: Expiry date: Issue Number:
Cardholder’s name................................................................................... Signature..........................
Card billing address (if different from Co. address)..............................................................................
Country ..................................................................................................... Postcode ........................
/ /
VENUE & ACCOMMODATION
CONFERENCE DOCUMENTATION
If you cannot make the conference, you can still access all
presentations delivered throughout the conference days for just
US$450, post event. Contact us on +971 4 364 2975 for further
details.
IQPC STANDARD TERMS AND CONDITIONS
PAYMENT:
• Payment is due in full at the time of registration and includes
lunches, refreshments and detailed conference materials.
Payment prior to conference is mandatory for attendance.
• Your registration will not be confirmed until payment is
received and may be subject to cancellation.
• If a booking is received 10 working days before the
conference a credit card number will be required to confirm
your place, likewise if full payment has not been received
before the conference date.
• Any respective payment charges to be borne by the payer.
Please ensure that IQPC receives the full invoiced amount.
DISCOUNTS:
• All 'Early Bird' Discounts require payment at time of
registration and before the cut-off date in order to receive any
discount.
• Any other discounts offered by IQPC (including team
discounts) require payment at the time of registration.
• Discounts cannot be combined with any other offer.
CANCELLATION, POSTPONEMENT AND SUBSTITUTION
POLICY:
• You may substitute delegates at any time by providing
reasonable advance notice to IQPC.
• For any cancellations received in writing not less than eight
(8) days prior to the conference, you will receive a 90% credit
to be used at an other IQPC conference which must occur
within one year from the date of issuance of such credit. An
administration fee of 10% of the contract fee will be retained
by IQPC for all permitted cancellations. No credit will be
issued for any cancellations occurring within seven (7) days
(inclusive) of the conference.
• In the event that IQPC cancels an event for any reason, you
will receive a credit for 100% of the contract fee paid. You
may use this credit for another IQPC event to be mutually
agreed with IQPC, which must occur within one year from the
date of cancellation.
• In the event that IQPC postpones an event for any reason
and the delegate is unable or unwilling to attend on the
rescheduled date, you will receive a credit for 100% of the
contract fee paid. You may use this credit for another IQPC
event to be mutually agreed with IQPC, which must occur
within one year from the date of postponement.
• Except as specified above, no credits will be issued for
cancellations. There are no refunds given under any
circumstances.
• IQPC is not responsible for any loss or damage as a result of
a substitution, alteration or cancellation/postponement of an
event. IQPC shall assume no liability whatsoever in the event
this conference is cancelled, rescheduled or postponed due
to a fortuitous event, Act of God, unforeseen occurrence or
any other event that renders performance of this conference
impracticable, illegal or impossible. For purposes of this
clause, a fortuitous event shall include, but not be limited to:
war, fire, labour strike, extreme weather or other emergency.
PROGRAMME CHANGES:
• Please note that speakers and topics were confirmed at the
time of publishing; however, circumstances beyond the
control of the organisers may necessitate substitutions,
alterations or cancellations of the speakers and/or topics. As
such, IQPC reserves the right to alter or modify the advertised
speakers and/or topics if necessary. Any substitutions or
alterations will be updated on our web page as soon as
possible.
YOUR DETAILS:
• Please email our database manager at enquiry@iqpc.ae to
inform us of any incorrect details which will be amended
accordingly.
VENUE: Dusit Thani
133, Sheikh Zayed Road
Dubai
P.O. Box 23335
United Arab Emirates
Tel: +971 (4) 343 3333
Fax: +971 (4) 343 4222
Web: http://www.dusit.com/dusitthani/dubai/location-en.html
Hotel and travel costs are not included in the registration fee.
For assistance in your travel and accommodation requirements,
please refer to details below:
ROOM RESERVATION
Special / corporate rate for room accommodation is available in
the hotel. You may contact the hotel directly as per the details
above quoting IQPC Middle East or the name of the conference.
FLIGHT RESERVATION
Contact Bindu Babu at SNTTA Travel & Tours LLC Dubai.
E- mail: iqpc@snttadubai.com
Phone: + 971 4 2829000
Fax: + 971 4 2829988
Web: www.sntta.com
Please book at the earliest for your convenience.
Package Early Bird: Payment before
3 September 2015
ALL-ACCESS PLATINUM PACKAGE
Conference + 2 Workshop Days US$4,399 US$4,999
Standard price
Payment after 3 September 2015
CALL: +971 4 364 2975
EMAIL: enquiry@iqpc.ae
WEB: www.undergrounduae.com
SAVE US$600
GOLD PACKAGE
Conference + 1 Workshop Day US$3,699 US$4,199SAVE US$500
Please indicate your choice of workshop:
Pre-Conference Workshop Post-Conference Workshop
STANDARD PACKAGE
2-Day Conference Only US$2,639 US$2,999SAVE US$360
2-Day Conference: 16-17 November 2015
Pre and Post-Conference Workshops:15 & 18 November 2015
Dusit Thani, Dubai, UAE

2nd Annual Underground UAE - 13 July

  • 1.
    2-Day Conference: 16-17November 2015 Pre and Post-Conference Workshops:15 & 18 November 2015 Dusit Thani, Dubai, UAE For more information or to register – +971 4 364 2975 enquiry@iqpc.ae @iqpcmena www.undergrounduae.com Paul Groves Head of Tunnels & Ground Engineering, Middle East and India Atkins Rashid Al Mulla Stakeholder Manager Etihad Rail Reji John Regional Director NSCC international Dr. Ali A. Mahdi Associate Director, Bridges and Tunnels WSP|Parsons Brinckerhoff Salah Abdulatif Al Dilim Rail Infrastructure Maintenance Manager RTA Qaiser Hayat Geotechnical Design Manager CH2M David Bulmer, Geotechnical Manager, Etihad Rail Noha Abdou, Head of Structural Division, APG Bart Leclerq, Senior Technical Director, Building Structures, WSP|Parsons Brinckerhoff Chris Magadia, Associate Principal Head of Structural Department, Ted Jacob Engineering Group Prof. Hesham El Shazly, Geotechnical Manager, Municipality of Abu Dhabi City Colin Crane, Managing Director, St. Johns Piling & Foundation Imraan Motara, Head of Ground Engineering, WSP|Parsons Brinckerhoff Nidhal Al-Alusi, Principal Geotechnical Engineer, Mott MacDonald Mamdouh Hamouda, Engineering Director, ARKAN Architects Consultants Mohamed AbouBakr (MIEAust), Senior Structural Engineer, Architectural Consulting Group Benoit Latapie, Technical Manager, Ground Engineering, Atkins Dr. Bashar Saadi Taha, Manager, NOC & Service Coordination Section, Rail ROW Department, RTA Scott Stewart, Chief Market Manager, Ground Engineering, COWI Oliver Higgins, Senior Hydrogeologist, Hyder Consulting Ioannis Saplamidis, Senior Project Engineer, BESIX Group Don’t miss your opportunity to: Listen to industry experts from ATKINS, AECOM, ETIHAD RAIL, HYDER, CH2M, MOTT MACDONALD, WSP and many more allowing you to gain exclusive ideas about underground infrastructure strategies for upcoming mega projects Gain insights into the latest projects and case studies on tried and tested methods to better understand strategies that work Discover the most innovative developments in piling foundations and tunnelling techniques and technologies to develop robust foundations Attend interactive workshops where you can gain thorough in-depth insight that walks you through the key steps to executing winning underground infrastructure design and development strategies Media Partners:Construction Intelligence Partner: Researched & Developed by: Book and pay before 3 Septem ber2015 to save up to US$600! Foundations of the future: Discovering how to develop robust foundations through innovative and sustainable techniques Hear from key speakers including: A great opportunity to meet and discuss issues with the stakeholders involved in the major upcoming projects. Contracts Manager, Ammico Contracting Co DON’T MISS OUR WORKSHOPS ON: Accurate geotechnical investigations –15 NovChallenges of deep foundations for high rise buildings within the UAE – 18 Nov DON’T MISS OUR WORKSHOPS ON: Accurate geotechnical investigations –15 NovChallenges of deep foundations for high-rise buildings within the UAE – 18 Nov
  • 2.
    Who will youmeet? Government and Project Owners Geotechnical Consultants Piling, Foundation and Tunnelling Contractors Main Contractors Main Consultants Developers Event Overview Dear Colleague, After the success of the Underground Infrastructure and Deep Foundations UAE conference in December 2014, we are pleased to announce its return for November 2015! With the UAE projected to spend US$329 billion on construction projects by 2030, it is critical to put in place the best piling and foundation structures to support these projects, as well as have the most efficient methodologies to create robust underground infrastructure. This conference is the ideal learning opportunity to address the challenging engineering and design issues relating to underground infrastructure and deep foundations within the UAE. What can you expect from the 2015 event? Etihad Rail’s stage 3 Hajar Mountain case study on understanding the importance of geological engineering assessments Atkins’ historical case studies from the past decade of tunnelling and lessons learnt since the construction of the Dubai Metro WSP|Parsons Brinkerhoff’s exclusive case study on deep excavation from around the Middle East AECOM uncover dewatering solutions to manage high groundwater levels in construction With huge opportunities for infrastructure projects across the UAE, this conference is the ideal place for existing players and new market entrants to access critical project intelligence. I look forward to seeing you in November. Joanne Mount Conference Director – 2nd Annual Underground Infrastructure and Deep Foundations UAE IQPC Middle East For more information or to register – +971 4 364 2975 enquiry@iqpc.ae @iqpcmena www.undergrounduae.com IQPC provides business executives around the world with tailored practical conferences, large scale events, topical seminars and training programmes, keeping them up-to-date with industry trends, technological developments and the regulatory landscape. IQPC conferences are market leading “must attend” events for their respective industries. IQPC produces more than 1,700 events annually around the world, and continues to grow. Founded in 1973, IQPC now has offices in major cities including: Bengaluru, Berlin, Dubai, London, New York, Singapore, Sydney, Tampa, and Toronto. IQPC leverages a global research base of best practices to produce an unrivalled portfolio of conferences. 2-Day Conference: 16-17 November 2015 Pre and Post-Conference Workshops: 15 & 18 November 2015 Dusit Thani, Dubai, UAE The speakers are notably experts in their field and this was evident in the delivery of their papers during the conference Senior Planning and Design Engineer, Qatar General Electricity and Water Corporation What our past delegates said: One of the best conferences I have attended in the Middle East. Well balanced material and good speakers Deputy Director, Roads and Transport Authority
  • 3.
    Conference Day One– Monday, 16 November 2015 For more information or to register – +971 4 364 2975 enquiry@iqpc.ae @iqpcmena www.undergrounduae.com Discussing the impact of test limitations on ground improvement designs Understanding the effective ways to enhance the gain from zone load tests Exclusive case study insights including the Fuel Storage Tank Farm in Hamriyah Free Zone, Sharjah, UAE Nidhal Al-Alusi, Principal Geotechnical Engineer, Mott MacDonald 12:20 Discovering geotechnical challenges: The static earthquake Discussing how settlement magnitude plays a crucial role in understanding road damage Effectively understanding what needs to be looked at when examining soil strata Analysing the advantages and disadvantages of geo-grids An insight into forensic study strategies Prof. Hesham El Shazly, Geotechnical Manager, Municipality of Abu Dhabi City 12.50 Lunch and networking Discovering effective water management and control 13.50 Assessing the efficient and sustainable control of ground water through dewatering Uncovering the challenges of dewatering and underground infrastructure Establishing suitable dewatering systems to manage the high groundwater level in construction Acknowledging dewatering subsidence and how to eliminate it effectively Exclusive case study insights including: ADNOC Car Park Project, Abu Dhabi and the Al Hadeel Project, Abu Dhabi Karim Roshdy, Resident Engineer, AECOM 14:20 Managing the effective disposal of groundwater Discovering the variation of water level tables across the UAE and the challenges this has on underground infrastructure Understanding how to effectively manage the impact of rising water tables and mitigate risk Evaluating environment friendly ways to dispose of discharge water Oliver Higgins, Senior Hydrogeologist, Hyder Consulting Discovering how to effectively manage underground infrastructure in urban areas 14:50 Exploring the challenges of developing underground infrastructure in urban areas Discover the challenges associated with deep foundations and tunnel excavation on the foundations of adjacent buildings in urban areas Acknowledging the importance of examining an existing building’s technical conditions in the project preparation phase to prevent settlement problems and cracking in adjacent buildings Assessing techniques to manage noise control and traffic disruption during underground construction in urban areas Benoit Latapie, Technical Manager, Ground Engineering, Atkins 15:20 Networking break and refreshments 15:50 PANEL DISCUSSION: Discussing the key requirements and developments of high-rise foundations Establishing the challenges and demands associated with the foundations of high-rise buildings Exploring innovative techniques and methods in foundation design for high-rise buildings Analysing the impact of the increasing number of high-rise building projects on foundation guidelines Mamdouh Hamouda, Engineering Director, ARKAN Architects Consultants Dr. Ali A. Mahdi, Associate Director, Bridges and Tunnels, WSP|Parsons Brinckerhoff Noha Abdou, Head of Structural Division, APG Colin Crane, Managing Director, St. Johns Piling & Foundation Prof. Hesham El Shazly, Geotechnical Manager, Municipality of Abu Dhabi City 16:30 End of conference day one 08:00 Start of conference registration with welcome refreshments 08:45 Opening remarks from IQPC and introduction to Chair 08:50 Opening remarks from the conference Chair and start of conference Exploring the UAE landscape and its impact on underground infrastructure and deep foundations 09.00 Managing geotechnical risks on underground infrastructure projects in the UAE Discussing typical geotechnical risks in the UAE and highlighting the need to implement geotechnical risk assessment and geotechnical certification processes on projects Recognising the importance of a detailed desk study followed by geotechnical investigations and how they need to be carefully tailored to the nature of the project and the local UAE geology Understanding the importance of continued input by the geotechnical advisor during design and implementation stages of the project to mitigate risks and to reduce costs Case study insight Qaiser Hayat, Geotechnical Design Manager, CH2M 09.30 CASE STUDY: Etihad Rail Stage 3 - Hajar Mountain Crossing - geological engineering assessment Understanding the geological challenges of the Hajar Mountain corridor through preliminary studies and geological field mapping Exploring the evaluation of tunnel and alignment specific geological conditions through specialist hard rock ground investigations An integrated geological engineering assessment and interpretation David Bulmer, Geotechnical Manager, Etihad Rail Rashid Al Mulla, Stakeholder Manager, Etihad Rail Uncovering problematic soil areas and their impact on underground infrastructure within the UAE 10.00 PANEL DISCUSSION: Tackling the role of cavity management in the development of underground infrastructure Discussing how undetected cavities can result in cracks and unwanted ground settlement which are detrimental to the structure Recognising the importance of soil investigation in order to detect and monitor cavities Discussing techniques such as grouting, stone columns and vibro compaction in effectively managing cavities Reji John, Regional Director, NSCC international Mohamed AbouBakr (MIEAust), Senior Structural Engineer, Architectural Consulting Group Prof. Hesham El Shazly, Geotechnical Manager, Municipality of Abu Dhabi City 10:40 Networking break and refreshments 11:10 PANEL DISCUSSION: Artificial islands - The challenge of building foundations on reclaimed land Discussing the issues that arise when building deep foundations on reclaimed land Investigating suitable methods of ground improvement such as vibro compaction and stone columns to ensure strong foundations can be built on reclaimed land Acknowledging the importance of piles when building foundations in reclaimed soil Scott Stewart, Chief Market Manager, Ground Engineering, COWI Qaiser Hayat, Geotechnical Design Manager, CH2M Oliver Higgins, Senior Hydrogeologist, Hyder Consulting Noha Abdou, Head of Structural Division, APG Prof. Hesham El Shazly, Geotechnical Manager, Municipality of Abu Dhabi City 11:50 Acceptance criteria, control and interpretations of zone load test on improved ground in the UAE Acknowledging the importance of zone load tests considering project specifications and geotechnical characterisation Presenting designs, acceptance criteria, control and interpretations of selected zone load tests carried out across UAE
  • 4.
    Conference Day Two– Tuesday, 17 November 2015 For more information or to register – +971 4 364 2975 enquiry@iqpc.ae @iqpcmena www.undergrounduae.com 12:00 The future of foundations: A sustainable approach Understanding sustainability and the future of foundations Discovering the social and ethical obligation to maintain sustainability in the construction of foundations Acknowledging cement use, using water sparingly, recycled debris as aggregate, reducing energy and restoring natural resources as the pillars of a sustainable development Mamdouh Hamouda, Engineering Director, ARKAN Architects Consultants 12.30 Lunch and networking 13:30 Establishing the relationship between consultants and designers in efficient project delivery Discussing how close collaboration between contractors, consultants and designers can reduce unforeseen challenges Acknowledging the importance of defining the roles and responsibilities of the parties involved to reduce risk and project delays Establishing how to strengthen stakeholder relationship in order to improve project efficiency of underground infrastructure Mohamed Aboubakr (MIEAust), Senior Structural Engineer, Architectural Consulting Group 14.00 Precautions and control measures for excavation, piling & dewatering (enabling works) within the protection zone of railway infrastructure Explaining authority requirements, current railway legislations and Railway Protection Code of Practice Understanding the precautions and control measures for excavation, piling and dewatering (enabling works) within the protection zone of railway infrastructure Exploring best practice for risk mitigation and monitoring requirements Dr. Bashar Saadi Taha, Manager, NOC & Service Coordination Section, Rail ROW Department, RTA 14:30 Let’s get technical – Roundtable discussions The following session will provide delegates with an opportunity to get more technical through dedicated discussion tables led by industry experts. Delegates will have a few minutes to choose a discussion table following which the table leader will initiate the discussions. Discussing the latest dewatering solutions to prevent future problems when building on foundations Examining innovative piling techniques to create robust foundations Delivering quality foundations through soil testing and cavity management Discovering geotechnical considerations in tunnel design to enhance project efficiency Why participate in this? Engaging with smaller groups of professionals experiencing similar challenges means that you are more likely to walk away with the right solutions. Focused group discussions also mean that you will have more time to ask burning questions and get the answers you need. 15:00 End of conference day two The published programme is correct at time of printing. However, given the seniority of our speakers and the nature of their roles, speakers may subsequently substitute or remove themselves from the programme. This is always regrettable, and we will always try to replace the speaker with a speaker with equivalent insight. For the most up-to-date programme, please visit the event website. 08:00 Start of conference registration with welcome refreshments 08:45 Opening remarks from IQPC and introduction to Chair 08:50 Opening remarks from the conference Chair and start of conference Going down under: An insight into tunnelling techniques and trends within the UAE 09.00 A decade of tunnelling in the GCC: Lessons learnt An exclusive insight into historical case studies and learning 10 years on from the construction of the Dubai Metro Uncovering the challenges of tunnel design in the past decade and lessons learnt Establishing innovative techniques and new developments of tunnel design in the past decade to increase project efficiency Paul Groves, Head of Tunnels & Ground Engineering, Middle East and India, Atkins Addressing design considerations with piling structures and construction foundations 09.30 An insight into alternative foundation methods for successful construction Evaluating the use of driven precast concrete piles for soil improvement Discovering the utilisation of a casing advancement method for deep dewatering wells in areas known for problematic collapsing Exploring driven cast insitu applications Colin Crane, Managing Director, St. Johns Piling & Foundation 10.00 CASE STUDY: Muller Verpress pile anchors in the Port of Fujairah Discovering the Muller Verpress pile as an effective technique for underground construction Exploring the Muller Verpress pile and grout container design Exclusive insight into the use of Muller Verpress pile anchors in Port Fujairah Ioannis Saplamidis, Senior Project Engineer, BESIX Group 10:30 Networking break and refreshments Exploring design techniques to improve project efficiency of underground infrastructure 11:00 CASE STUDY: WSP|Parsons Brinckerhoff’s deep excavation case studies around the Middle East Highlighting the challenges of deep excavation from around the Middle East Discovering innovative methodologies of deep excavation to improve project efficiency Exclusive case study insights from WSP|Parsons Brinckerhoff Bart Leclerq, Senior Technical Director, Building Structures, WSP|Parsons Brinckerhoff Imraan Motara, Head of Ground Engineering, WSP|Parsons Brinckerhoff 11:30 Managing and delivering projects utilising building information modelling Understanding the road map to implementing building information modelling in underground infrastructure projects Acknowledging the role of building information modelling in the project life cycle Discovering the benefits of implementing building information modelling such as reduction in design time and clash detection before the construction phase Salah Abdulatif Al Dilim, Rail Infrastructure Maintenance Manager, RTA
  • 5.
    Pre-Conference Workshop –Sunday, 15 November 2015 For more information or to register – +971 4 364 2975 enquiry@iqpc.ae @iqpcmena www.undergrounduae.com Discovering how to effectively carry out accurate geotechnical investigations Overview: Geotechnical investigations are fundamental to the construction project cycle in order to investigate the geological conditions and provide recommendations and design criteria for construction. Many firms in the UAE are not accurately completing geotechnical investigations leading to unforeseen challenges, increased costs and delayed projects. With many big projects being announced in the UAE, it is fundamental for companies to understand how to effectively carry out a geotechnical site investigation. This exclusive workshop allows you to explore the challenges of developing an accurate geotechnical site investigation and discover exclusive techniques and methodologies to deliver an accurate geotechnical report. 08:00 Start of workshop registration with welcome refreshments 08:50 Opening remarks from workshop leader 09:00 Workshop 10:30 Morning refreshments and networking 10:00 Workshop 12:30 Lunch and networking Analysing how to overcome challenges of deep foundations for high rise buildings within the UAE Overview: The UAE has seen a drastic increase in the rate of construction of high-rise buildings. For example, Dubai is home to the tallest building in the world, the Burj Khalifa. With many high rise projects being planned in the UAE is it essential that designers and contractors understand how to effectively develop robust deep foundations to support high-rise structures. This interactive workshop allows you to explore the challenges that arise when developing deep foundations and provides an exclusive insight into innovative techniques and methodologies to develop sufficient deep foundations whilst at the same time reducing cost and risk. 08:00 Start of workshop registration with welcome refreshments 08:50 Opening remarks from workshop leader 09:00 Workshop 10:30 Morning refreshments and networking 10:00 Workshop 12:30 Lunch and networking Workshop Leader: Chris Magadia, Associate Principal Head of Structural Department, Ted Jacob Engineering Group Post-Conference Workshop – Wednesday, 18 November 2015
  • 6.
    Sponsorship and ExhibitionOpportunities For more information or to sponsor – +971 4 360 2800 sponsorship@iqpc.ae @iqpcmena www.undergrounduae.com IQPC has been hosting events developed for senior executives for more than 40 years. We serve businesses representing over 15 sectors at more than 1,700 conferences around the globe. Our client list includes corporations such as IBM, Cisco, Microsoft, Lockheed Martin, Boeing, Weatherford International, Halliburton, ABN AMRO, Deutsche Bank, GE, Siemens, BASF and Dow Chemicals, just to name a select few. Senior executives travel from around the world to our events looking to garner best practices and concrete solutions to assist them in improving their organisations. IQPC provides many different platforms for you to increase your market share, stay ahead of your competition, increase awareness to your target audience and position yourself as a key supplier to the construction industry. Your platform – getting your message across: Because we know that each sponsor has a different message, business development goal and branding objectives, each sponsorship package is tailored to your corporate strategies. Though most sponsorship offers multiple levels and types of exposure, there are a few main ways for you to highlight your corporate strengths: Additionally IQPC offers a selection of sponsorship opportunities that enables our clients to increase their opportunity to develop new relationships during our events, including one-to-one meetings with clients to understand their challenges, requirements and opportunities. 1. Thought Leadership As a sponsor at the 2nd Annual Underground Infrastructure and Deep Foundations UAE conference, your company will gain second-to-none exposure to senior-level decision makers at the point in time that they are seeking solutions, information and systems for improving their firm’s strategies. For a select few sponsors, you can build your reputation as a market leader through subject-specific presentations, workshops and focus days. This highly selective sponsorship allows your firm to establish tremendous capability and expertise in your specialty as well as highlight successful work completed with your clients. 2. Premium Branding We bring together buyers and suppliers for collaboration, networking and knowledge sharing. Branding is often a major initiative for our clients who are seeking to get the message out about their offerings. Build your company’s brand and visibility in front of senior decision-makers in order to get shortlisted. As a sponsor, your company branding will appear alongside the global leaders associated with best practices in this field. Our dedicated marketing team will help you achieve your promotional aims in the months leading up to the conference. IQPC leverages multiple marketing channels including online, direct mail, email, press releases, media partnerships and social media to publicise the event and increase awareness about your participation to our extensive database, as well as through our network of partners. 3. Featured Networking Events / Face Time Networking and information sharing are two major aspects of our conferences and IQPC builds in many opportunities for sponsors to benefit from meeting industry leaders. Focused and high-level, our events will provide you with the perfect environment to initiate new business relationships, identify upcoming opportunities and achieve face-to-face contact that overcrowded tradeshows can not deliver. The exhibition area is designed to be the heart of the event – a place to network and share strategies with key decision makers. Sponsorship opportunities range from exhibition stands to sponsored lunches, cocktail receptions, gala dinners and a host of other branding opportunities. Do you have a product or service that our senior decision-makers and influencers need? The 2nd Annual Underground Infrastructure and Deep Foundations UAE conference offers you the perfect platform to showcase your solution to your target market and meet and network with senior-level decision makers who are leading the way in the industry We specialise in providing business development, marketing and sales solutions that are tailored to specifically deliver on your business objectives. We pay patient attention to what our exhibition and sponsorship customers want, expect, need and value. Every sponsor wants to create customers, develop qualified sales leads, convert leads into sales and retain customers. Our tailored sponsorship packages help you to achieve these objectives. If you would like more information on sponsorship and exhibition opportunities or to discuss which package will best help you achieve your objectives, please contact Rathish Kumar on +971 4 360 2800 or email sponsorship@iqpc.ae. Good event showing past experience of new technology on the way to the Middle East Head of Infrastructure, Meraas Holding It was really a great pleasure to network with some of the leading professionals from different backgrounds. The conference organisation and content were both important reasons for the success of the event Manager UAE and Oman, Arab Centre for Engineering Studies What our past delegates said:
  • 7.
    Want to attendas a group? Email us at enquiry@iqpc.ae for special group booking discounts. 3 WAYS TO REGISTER Book and pay before 3 September 2015 and save up to US$600! REGISTRATION Event Code: 24312.002 Please complete in BLOCK CAPITALS as information is used to produce delegate badges. Please photocopy for multiple bookings. Prices are stated net of any applicable local taxes. DELEGATE DETAILS: CREDIT CARD PAYMENTS TEAM DISCOUNTS Mr Mrs Ms Dr Other First Name:..................................................................... Surname: .......................................................... Email: ......................................................................... Telephone: .......................................................... Job Title:.................................................................. Department: .......................................................... Organisation: ................................................ Nature of business: .......................................................... Address: .................................................................................................................................................... Postcode:........................................................................ Country: .......................................................... Telephone: ...................................................................... Fax: .......................................................... Approving Manager: ........................................ Training Manager: .......................................................... Name of person completing form if different from delegate: .................................................................... Signature: .......................................................... Date: .......................................................... I agree to IQPC’s payment terms If you have not received an acknowledgement before the conference, please call us to confirm your booking. By Credit Card: Please debit my credit card: Visa Master card American Express Card No: Valid from: Expiry date: Issue Number: Cardholder’s name................................................................................... Signature.......................... Card billing address (if different from Co. address).............................................................................. Country ..................................................................................................... Postcode ........................ / / VENUE & ACCOMMODATION CONFERENCE DOCUMENTATION If you cannot make the conference, you can still access all presentations delivered throughout the conference days for just US$450, post event. Contact us on +971 4 364 2975 for further details. IQPC STANDARD TERMS AND CONDITIONS PAYMENT: • Payment is due in full at the time of registration and includes lunches, refreshments and detailed conference materials. Payment prior to conference is mandatory for attendance. • Your registration will not be confirmed until payment is received and may be subject to cancellation. • If a booking is received 10 working days before the conference a credit card number will be required to confirm your place, likewise if full payment has not been received before the conference date. • Any respective payment charges to be borne by the payer. Please ensure that IQPC receives the full invoiced amount. DISCOUNTS: • All 'Early Bird' Discounts require payment at time of registration and before the cut-off date in order to receive any discount. • Any other discounts offered by IQPC (including team discounts) require payment at the time of registration. • Discounts cannot be combined with any other offer. CANCELLATION, POSTPONEMENT AND SUBSTITUTION POLICY: • You may substitute delegates at any time by providing reasonable advance notice to IQPC. • For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90% credit to be used at an other IQPC conference which must occur within one year from the date of issuance of such credit. An administration fee of 10% of the contract fee will be retained by IQPC for all permitted cancellations. No credit will be issued for any cancellations occurring within seven (7) days (inclusive) of the conference. • In the event that IQPC cancels an event for any reason, you will receive a credit for 100% of the contract fee paid. You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of cancellation. • In the event that IQPC postpones an event for any reason and the delegate is unable or unwilling to attend on the rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of postponement. • Except as specified above, no credits will be issued for cancellations. There are no refunds given under any circumstances. • IQPC is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. IQPC shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labour strike, extreme weather or other emergency. PROGRAMME CHANGES: • Please note that speakers and topics were confirmed at the time of publishing; however, circumstances beyond the control of the organisers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, IQPC reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any substitutions or alterations will be updated on our web page as soon as possible. YOUR DETAILS: • Please email our database manager at enquiry@iqpc.ae to inform us of any incorrect details which will be amended accordingly. VENUE: Dusit Thani 133, Sheikh Zayed Road Dubai P.O. Box 23335 United Arab Emirates Tel: +971 (4) 343 3333 Fax: +971 (4) 343 4222 Web: http://www.dusit.com/dusitthani/dubai/location-en.html Hotel and travel costs are not included in the registration fee. For assistance in your travel and accommodation requirements, please refer to details below: ROOM RESERVATION Special / corporate rate for room accommodation is available in the hotel. You may contact the hotel directly as per the details above quoting IQPC Middle East or the name of the conference. FLIGHT RESERVATION Contact Bindu Babu at SNTTA Travel & Tours LLC Dubai. E- mail: iqpc@snttadubai.com Phone: + 971 4 2829000 Fax: + 971 4 2829988 Web: www.sntta.com Please book at the earliest for your convenience. Package Early Bird: Payment before 3 September 2015 ALL-ACCESS PLATINUM PACKAGE Conference + 2 Workshop Days US$4,399 US$4,999 Standard price Payment after 3 September 2015 CALL: +971 4 364 2975 EMAIL: enquiry@iqpc.ae WEB: www.undergrounduae.com SAVE US$600 GOLD PACKAGE Conference + 1 Workshop Day US$3,699 US$4,199SAVE US$500 Please indicate your choice of workshop: Pre-Conference Workshop Post-Conference Workshop STANDARD PACKAGE 2-Day Conference Only US$2,639 US$2,999SAVE US$360 2-Day Conference: 16-17 November 2015 Pre and Post-Conference Workshops:15 & 18 November 2015 Dusit Thani, Dubai, UAE