CURRICULUM VITAE
Name: Ahmad Degheili
Designation: Project Manager / Contract Administrator/ Estimation
Nationality: Lebanese
Date of Birth: 30/12/1954
Education: AUB, BE-Civil Engineering 1977, Lebanon.
Professional Affiliation: Lebanese Order of Engineers.
Language: Arabic, English, Russian(little)
Contact: +9613-941676
Email: degheili@hotmail.com
SUMMARY:
More than thirty six years of experience in all fields of Civil Engineering; Oil and Gas ,
rotation camp, industrial base, taxi way, hotels, hospitals, bridges, buildings, marine works,
bomb shelters-etc mostly in Project Management/ contract administration / Estimation
Management of projects in Kazakhstan, Turkmenistan ,Kuwait, UAE, Iraq and Lebanon.
KPJV, Tengiz , Kazakhstan. Tengizchevroil Future Growth Project FGP/WPMP
Contract Engineer / Contract Administrator
[Jan 07, 2014- 2 March 2015 due to Low Oil Prices]
Joined KPJV, a JV of Fluor, Worley Parsons, KING and KGNT to work on Tengiz oil fields
as a Contract Engineer for the 5000 man camp / Orken Village(481 M$) and later as a
Contract Administrator for the Taxiway construction (10.5 M$)
Responsibilities include all Post Award Contract Administration activities such as
preparation of KOM presentation, preparation and review of out going correspondence ,
advising on potential change alerts of incoming letters, maintain letter logs, daily reports ,
Contract document transmittals, coordinating Contract submittals with various disciplines,
control of Contract Variations/ Changes, assessment of additional works claims , reviewing
Page 1 of 3
payment applications with Project Controls and Construction, issuing payment certificates
as per Company’s verification procedures etc.
Petrofac International Ltd. Construction Support Manager/ SC Manager-Turkmenistan
[May 2, 2011 – Sept 30, 2013] – Galkynysh Gas Field Processing Facility (3.5 Billion$)
Worked in Subcontracts Department as SubContracts Manager/ Construction Support
Manager at Galkynysh / South Yoluten Gas Field project- Turkmenistan, responsible for
contract administration of 3 packages; Rotation Camp (PK-5A), Substations (PK-11),
Industrial Base (PK-5B) and many other Earthworks/roads Pre-Awarding Tenders and
budget assessments.
- Preparation of ITB(Invitation to Bid) documents.
- Cost analysis of bids , Bid Tabulations and drafting/reviewing small SC agreements.
- Following the Subcontracts contractual issues, Invoices and Payments.
- Dealing with variations/ claims and settlements.
- Close Out of Subcontracts.
- Final account and final measurement.
IDEA s.a.l-Lebanon Technical Manager/ Consultant
[Feb 2010-March 2011]
One year Consultancy agreement with IDEA s.a.l Lebanon for the Zaytouni Bay water Font
project at ST. George Marina at Beirut Central District in charge of all Technical and
Contractual issues with the Contractors(Hourie and Moawad Eddeh) mainly:
- Correspondence and monthly payments.
- Review additional works requests(V.O).
- EOT claims requests.
M.A.Kharafi (MAK)- Lebanon branch. Technical Manager/ Estimation Mgr.
[Sept 1996-Feb 2010] Deputy PM.
In charge of all local and regional Tenders in addition to Contractual issues requested by
the Area Manager. For one and half years I have worked at Four Seasons Hotel-Beirut as
Contracts Manager/ Assistant Project Manager, dealing with Engineer/ Client-Kingdom and
Subcontractors in all Contractual issues including:
- Correspondence and monthly payments.
- Review additional works requests (V.O).
- EOT claims requests.
Some Tenders/Projects are:
- Litani Conveyor 800 water project (330M$)- Under construction.
- LattaKia- Ariha Highway-Syria (180M$)- Handed Over
- Beirut Air port Car Park (24M$)- BOT Investment of Kharafi Group.
- Four Seasons Hotel- Beirut(60M$)-Handed Over.
1993-1996 Turner Int’L / Projacs-Kuwait
Page 2 of 3
Amiri diwan Project (500M$)
Sheraton Hotel Renovation
Merill Lynch offices renovation -Bahrain
Project Management of Marine works and Bomb shelter packages in the Amiri Diwan
project, renovation of Sheraton Hotel after liberation of Kuwait and PM for Merrill Lynch
offices in Bahrain. Monitoring progress and follow up on payments, change orders, letters,
etc until handing over .
1990-1993 Bechtel-Kuwait
Kuwait oil fields Rehabilitation after Liberation
Working at Field Engineering Department and Supporting Construction in all matters.
1977-1990 Various Projects in IRAQ, UAE & KUWAIT.
Started as Site Engineer up to Project Manager for projects like buildings in UAE and Kuwait and
hospital mainly Medical Rehabilitation Center in Tikrit, Iraq (1980-1983).
References:
Mr. Robert Burton : FGP/ WPMP Future Growth Project, Well Head Pressure
Management
Tengiz, Kazakhstan
KPJV Contracts Supervisor
Robert.burton@fluor.com
Rbxx1@hotmail.com
Mr. Steve Brine FGP/ WPMP Future Growth Project, Well Head Pressure
Management
Tengiz, Kazakhstan
KPJV Contracts Manager
Steve.brine@fluor.com
Mr. Ali Ruhayel : South Yuloten Gas development project, Turkmenistan
Director of Subcontracts Department, Petrofac , UAE.
Ali.ruhayel@petrofac.com
Mr. Steve Worrell : Metro Project, Riyadh , KSA
Director of Infra structure Works, Bechtel , KSA
Skworrell229@gmail.com
Page 3 of 3

More Related Content

What's hot

What's hot (20)

CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
Eng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photoEng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photo
 
Alex CV Short Selection_email
Alex CV Short Selection_emailAlex CV Short Selection_email
Alex CV Short Selection_email
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Mahendran cv
Mahendran cvMahendran cv
Mahendran cv
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
 
hytham hashem sheta2
hytham hashem sheta2hytham hashem sheta2
hytham hashem sheta2
 
A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
CV - John Mckee Scott (2015)
CV - John Mckee Scott (2015)CV - John Mckee Scott (2015)
CV - John Mckee Scott (2015)
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
resume_5
resume_5resume_5
resume_5
 
Mohammed Adel CV
Mohammed Adel CVMohammed Adel CV
Mohammed Adel CV
 
Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14
 
CVRune.docx ENG
CVRune.docx ENGCVRune.docx ENG
CVRune.docx ENG
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
Cv msd 2019
Cv   msd 2019Cv   msd 2019
Cv msd 2019
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Construction m.emu master student project1
Construction m.emu master student project1Construction m.emu master student project1
Construction m.emu master student project1
 

Viewers also liked

PhotographyAwardsSlideshow
PhotographyAwardsSlideshowPhotographyAwardsSlideshow
PhotographyAwardsSlideshowLinda Morgan
 
แบบเสนอโครงร่างโครงงานคอม
แบบเสนอโครงร่างโครงงานคอมแบบเสนอโครงร่างโครงงานคอม
แบบเสนอโครงร่างโครงงานคอมBoyle606
 
College of Technology Pantnagar lecture- Jainendra
College of Technology Pantnagar lecture- Jainendra College of Technology Pantnagar lecture- Jainendra
College of Technology Pantnagar lecture- Jainendra Jainendra Kumar
 
Jože Plečnik - Slovenian History Icon
Jože Plečnik - Slovenian History IconJože Plečnik - Slovenian History Icon
Jože Plečnik - Slovenian History Iconinsvallbona
 
Presentación1
Presentación1Presentación1
Presentación1Albravo10
 
Homeless ppt (1)
Homeless ppt (1)Homeless ppt (1)
Homeless ppt (1)Ditra Comer
 
Slovenia španija - ECLIPSE Project
Slovenia španija - ECLIPSE ProjectSlovenia španija - ECLIPSE Project
Slovenia španija - ECLIPSE Projectinsvallbona
 
Personal goals essay
Personal goals essayPersonal goals essay
Personal goals essayEssayAcademy
 
Prueba de clase
Prueba de clasePrueba de clase
Prueba de clase94ncarmen
 
La prevención de la obesidad y el sobrepeso
La prevención de la obesidad y el sobrepesoLa prevención de la obesidad y el sobrepeso
La prevención de la obesidad y el sobrepesolozanillo98
 
Diapositivas turbomaquinas
Diapositivas turbomaquinasDiapositivas turbomaquinas
Diapositivas turbomaquinasedison ramos
 
Karina molina
Karina molinaKarina molina
Karina molinakarolai23
 

Viewers also liked (16)

TMK тема 4
TMK тема 4TMK тема 4
TMK тема 4
 
PhotographyAwardsSlideshow
PhotographyAwardsSlideshowPhotographyAwardsSlideshow
PhotographyAwardsSlideshow
 
แบบเสนอโครงร่างโครงงานคอม
แบบเสนอโครงร่างโครงงานคอมแบบเสนอโครงร่างโครงงานคอม
แบบเสนอโครงร่างโครงงานคอม
 
PowerPoint
PowerPointPowerPoint
PowerPoint
 
College of Technology Pantnagar lecture- Jainendra
College of Technology Pantnagar lecture- Jainendra College of Technology Pantnagar lecture- Jainendra
College of Technology Pantnagar lecture- Jainendra
 
Prueba ticc
Prueba ticcPrueba ticc
Prueba ticc
 
Jože Plečnik - Slovenian History Icon
Jože Plečnik - Slovenian History IconJože Plečnik - Slovenian History Icon
Jože Plečnik - Slovenian History Icon
 
Presentación1
Presentación1Presentación1
Presentación1
 
Homeless ppt (1)
Homeless ppt (1)Homeless ppt (1)
Homeless ppt (1)
 
Slovenia španija - ECLIPSE Project
Slovenia španija - ECLIPSE ProjectSlovenia španija - ECLIPSE Project
Slovenia španija - ECLIPSE Project
 
Personal goals essay
Personal goals essayPersonal goals essay
Personal goals essay
 
Prueba de clase
Prueba de clasePrueba de clase
Prueba de clase
 
La prevención de la obesidad y el sobrepeso
La prevención de la obesidad y el sobrepesoLa prevención de la obesidad y el sobrepeso
La prevención de la obesidad y el sobrepeso
 
Diapositivas turbomaquinas
Diapositivas turbomaquinasDiapositivas turbomaquinas
Diapositivas turbomaquinas
 
Karina molina
Karina molinaKarina molina
Karina molina
 
Ambarella company
Ambarella companyAmbarella company
Ambarella company
 

Similar to CV -AD

Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati∴
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah JEREIGE
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown
 
GBCV update Nov 2014
GBCV update Nov 2014GBCV update Nov 2014
GBCV update Nov 2014George Bell
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Toni AZAR
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CVmohamed ezz
 
Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015Maher Taha
 
Covering Letter
Covering LetterCovering Letter
Covering LetterSiva Kumar
 
Ayad Fakhery Karass2013
Ayad Fakhery Karass2013Ayad Fakhery Karass2013
Ayad Fakhery Karass2013aiad karas
 
CV Airat N Shakirov2015.R (3)
CV Airat N Shakirov2015.R (3)CV Airat N Shakirov2015.R (3)
CV Airat N Shakirov2015.R (3)Ayrat Shakirov
 

Similar to CV -AD (20)

Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016
 
MCV
MCVMCV
MCV
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
CV_June15
CV_June15CV_June15
CV_June15
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
GBCV update Nov 2014
GBCV update Nov 2014GBCV update Nov 2014
GBCV update Nov 2014
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
Covering Letter
Covering LetterCovering Letter
Covering Letter
 
Ayad Fakhery Karass2013
Ayad Fakhery Karass2013Ayad Fakhery Karass2013
Ayad Fakhery Karass2013
 
CV Airat N Shakirov2015.R (3)
CV Airat N Shakirov2015.R (3)CV Airat N Shakirov2015.R (3)
CV Airat N Shakirov2015.R (3)
 

CV -AD

  • 1. CURRICULUM VITAE Name: Ahmad Degheili Designation: Project Manager / Contract Administrator/ Estimation Nationality: Lebanese Date of Birth: 30/12/1954 Education: AUB, BE-Civil Engineering 1977, Lebanon. Professional Affiliation: Lebanese Order of Engineers. Language: Arabic, English, Russian(little) Contact: +9613-941676 Email: degheili@hotmail.com SUMMARY: More than thirty six years of experience in all fields of Civil Engineering; Oil and Gas , rotation camp, industrial base, taxi way, hotels, hospitals, bridges, buildings, marine works, bomb shelters-etc mostly in Project Management/ contract administration / Estimation Management of projects in Kazakhstan, Turkmenistan ,Kuwait, UAE, Iraq and Lebanon. KPJV, Tengiz , Kazakhstan. Tengizchevroil Future Growth Project FGP/WPMP Contract Engineer / Contract Administrator [Jan 07, 2014- 2 March 2015 due to Low Oil Prices] Joined KPJV, a JV of Fluor, Worley Parsons, KING and KGNT to work on Tengiz oil fields as a Contract Engineer for the 5000 man camp / Orken Village(481 M$) and later as a Contract Administrator for the Taxiway construction (10.5 M$) Responsibilities include all Post Award Contract Administration activities such as preparation of KOM presentation, preparation and review of out going correspondence , advising on potential change alerts of incoming letters, maintain letter logs, daily reports , Contract document transmittals, coordinating Contract submittals with various disciplines, control of Contract Variations/ Changes, assessment of additional works claims , reviewing Page 1 of 3
  • 2. payment applications with Project Controls and Construction, issuing payment certificates as per Company’s verification procedures etc. Petrofac International Ltd. Construction Support Manager/ SC Manager-Turkmenistan [May 2, 2011 – Sept 30, 2013] – Galkynysh Gas Field Processing Facility (3.5 Billion$) Worked in Subcontracts Department as SubContracts Manager/ Construction Support Manager at Galkynysh / South Yoluten Gas Field project- Turkmenistan, responsible for contract administration of 3 packages; Rotation Camp (PK-5A), Substations (PK-11), Industrial Base (PK-5B) and many other Earthworks/roads Pre-Awarding Tenders and budget assessments. - Preparation of ITB(Invitation to Bid) documents. - Cost analysis of bids , Bid Tabulations and drafting/reviewing small SC agreements. - Following the Subcontracts contractual issues, Invoices and Payments. - Dealing with variations/ claims and settlements. - Close Out of Subcontracts. - Final account and final measurement. IDEA s.a.l-Lebanon Technical Manager/ Consultant [Feb 2010-March 2011] One year Consultancy agreement with IDEA s.a.l Lebanon for the Zaytouni Bay water Font project at ST. George Marina at Beirut Central District in charge of all Technical and Contractual issues with the Contractors(Hourie and Moawad Eddeh) mainly: - Correspondence and monthly payments. - Review additional works requests(V.O). - EOT claims requests. M.A.Kharafi (MAK)- Lebanon branch. Technical Manager/ Estimation Mgr. [Sept 1996-Feb 2010] Deputy PM. In charge of all local and regional Tenders in addition to Contractual issues requested by the Area Manager. For one and half years I have worked at Four Seasons Hotel-Beirut as Contracts Manager/ Assistant Project Manager, dealing with Engineer/ Client-Kingdom and Subcontractors in all Contractual issues including: - Correspondence and monthly payments. - Review additional works requests (V.O). - EOT claims requests. Some Tenders/Projects are: - Litani Conveyor 800 water project (330M$)- Under construction. - LattaKia- Ariha Highway-Syria (180M$)- Handed Over - Beirut Air port Car Park (24M$)- BOT Investment of Kharafi Group. - Four Seasons Hotel- Beirut(60M$)-Handed Over. 1993-1996 Turner Int’L / Projacs-Kuwait Page 2 of 3
  • 3. Amiri diwan Project (500M$) Sheraton Hotel Renovation Merill Lynch offices renovation -Bahrain Project Management of Marine works and Bomb shelter packages in the Amiri Diwan project, renovation of Sheraton Hotel after liberation of Kuwait and PM for Merrill Lynch offices in Bahrain. Monitoring progress and follow up on payments, change orders, letters, etc until handing over . 1990-1993 Bechtel-Kuwait Kuwait oil fields Rehabilitation after Liberation Working at Field Engineering Department and Supporting Construction in all matters. 1977-1990 Various Projects in IRAQ, UAE & KUWAIT. Started as Site Engineer up to Project Manager for projects like buildings in UAE and Kuwait and hospital mainly Medical Rehabilitation Center in Tikrit, Iraq (1980-1983). References: Mr. Robert Burton : FGP/ WPMP Future Growth Project, Well Head Pressure Management Tengiz, Kazakhstan KPJV Contracts Supervisor Robert.burton@fluor.com Rbxx1@hotmail.com Mr. Steve Brine FGP/ WPMP Future Growth Project, Well Head Pressure Management Tengiz, Kazakhstan KPJV Contracts Manager Steve.brine@fluor.com Mr. Ali Ruhayel : South Yuloten Gas development project, Turkmenistan Director of Subcontracts Department, Petrofac , UAE. Ali.ruhayel@petrofac.com Mr. Steve Worrell : Metro Project, Riyadh , KSA Director of Infra structure Works, Bechtel , KSA Skworrell229@gmail.com Page 3 of 3