1. CURRICULUM VITAE
Name: Ahmad Degheili
Designation: Project Manager / Contract Administrator/ Estimation
Nationality: Lebanese
Date of Birth: 30/12/1954
Education: AUB, BE-Civil Engineering 1977, Lebanon.
Professional Affiliation: Lebanese Order of Engineers.
Language: Arabic, English, Russian(little)
Contact: +9613-941676
Email: degheili@hotmail.com
SUMMARY:
More than thirty six years of experience in all fields of Civil Engineering; Oil and Gas ,
rotation camp, industrial base, taxi way, hotels, hospitals, bridges, buildings, marine works,
bomb shelters-etc mostly in Project Management/ contract administration / Estimation
Management of projects in Kazakhstan, Turkmenistan ,Kuwait, UAE, Iraq and Lebanon.
KPJV, Tengiz , Kazakhstan. Tengizchevroil Future Growth Project FGP/WPMP
Contract Engineer / Contract Administrator
[Jan 07, 2014- 2 March 2015 due to Low Oil Prices]
Joined KPJV, a JV of Fluor, Worley Parsons, KING and KGNT to work on Tengiz oil fields
as a Contract Engineer for the 5000 man camp / Orken Village(481 M$) and later as a
Contract Administrator for the Taxiway construction (10.5 M$)
Responsibilities include all Post Award Contract Administration activities such as
preparation of KOM presentation, preparation and review of out going correspondence ,
advising on potential change alerts of incoming letters, maintain letter logs, daily reports ,
Contract document transmittals, coordinating Contract submittals with various disciplines,
control of Contract Variations/ Changes, assessment of additional works claims , reviewing
Page 1 of 3
2. payment applications with Project Controls and Construction, issuing payment certificates
as per Company’s verification procedures etc.
Petrofac International Ltd. Construction Support Manager/ SC Manager-Turkmenistan
[May 2, 2011 – Sept 30, 2013] – Galkynysh Gas Field Processing Facility (3.5 Billion$)
Worked in Subcontracts Department as SubContracts Manager/ Construction Support
Manager at Galkynysh / South Yoluten Gas Field project- Turkmenistan, responsible for
contract administration of 3 packages; Rotation Camp (PK-5A), Substations (PK-11),
Industrial Base (PK-5B) and many other Earthworks/roads Pre-Awarding Tenders and
budget assessments.
- Preparation of ITB(Invitation to Bid) documents.
- Cost analysis of bids , Bid Tabulations and drafting/reviewing small SC agreements.
- Following the Subcontracts contractual issues, Invoices and Payments.
- Dealing with variations/ claims and settlements.
- Close Out of Subcontracts.
- Final account and final measurement.
IDEA s.a.l-Lebanon Technical Manager/ Consultant
[Feb 2010-March 2011]
One year Consultancy agreement with IDEA s.a.l Lebanon for the Zaytouni Bay water Font
project at ST. George Marina at Beirut Central District in charge of all Technical and
Contractual issues with the Contractors(Hourie and Moawad Eddeh) mainly:
- Correspondence and monthly payments.
- Review additional works requests(V.O).
- EOT claims requests.
M.A.Kharafi (MAK)- Lebanon branch. Technical Manager/ Estimation Mgr.
[Sept 1996-Feb 2010] Deputy PM.
In charge of all local and regional Tenders in addition to Contractual issues requested by
the Area Manager. For one and half years I have worked at Four Seasons Hotel-Beirut as
Contracts Manager/ Assistant Project Manager, dealing with Engineer/ Client-Kingdom and
Subcontractors in all Contractual issues including:
- Correspondence and monthly payments.
- Review additional works requests (V.O).
- EOT claims requests.
Some Tenders/Projects are:
- Litani Conveyor 800 water project (330M$)- Under construction.
- LattaKia- Ariha Highway-Syria (180M$)- Handed Over
- Beirut Air port Car Park (24M$)- BOT Investment of Kharafi Group.
- Four Seasons Hotel- Beirut(60M$)-Handed Over.
1993-1996 Turner Int’L / Projacs-Kuwait
Page 2 of 3
3. Amiri diwan Project (500M$)
Sheraton Hotel Renovation
Merill Lynch offices renovation -Bahrain
Project Management of Marine works and Bomb shelter packages in the Amiri Diwan
project, renovation of Sheraton Hotel after liberation of Kuwait and PM for Merrill Lynch
offices in Bahrain. Monitoring progress and follow up on payments, change orders, letters,
etc until handing over .
1990-1993 Bechtel-Kuwait
Kuwait oil fields Rehabilitation after Liberation
Working at Field Engineering Department and Supporting Construction in all matters.
1977-1990 Various Projects in IRAQ, UAE & KUWAIT.
Started as Site Engineer up to Project Manager for projects like buildings in UAE and Kuwait and
hospital mainly Medical Rehabilitation Center in Tikrit, Iraq (1980-1983).
References:
Mr. Robert Burton : FGP/ WPMP Future Growth Project, Well Head Pressure
Management
Tengiz, Kazakhstan
KPJV Contracts Supervisor
Robert.burton@fluor.com
Rbxx1@hotmail.com
Mr. Steve Brine FGP/ WPMP Future Growth Project, Well Head Pressure
Management
Tengiz, Kazakhstan
KPJV Contracts Manager
Steve.brine@fluor.com
Mr. Ali Ruhayel : South Yuloten Gas development project, Turkmenistan
Director of Subcontracts Department, Petrofac , UAE.
Ali.ruhayel@petrofac.com
Mr. Steve Worrell : Metro Project, Riyadh , KSA
Director of Infra structure Works, Bechtel , KSA
Skworrell229@gmail.com
Page 3 of 3