SlideShare a Scribd company logo
1 of 6
Download to read offline
Siva kumar P R prsivakumar87@gmail.com +919061281541
Career Growth Page 1
Covering letter
Having a total of 6 years experience in the construction field in which gulf experience is
about 4.9 years; I would like to apply for the position of Electrical Engineer in MEP
construction field.
As I have worked in Commercial/Industrial projects such as airport and car manufacturing
plant myself having good exposure in activities at MV and LV rooms such as substation,
electrical & UPS rooms. In India worked as a Project Coordinator Planning, I have
experience in administration related to site execution work too.
Lastly I worked for a 5 star hotel project in Qatar that gave me knowledge on various
customized requirements and sophisticated systems like home automation. I handled a
leading team of 200 men with the help of 1 engineer and 4 supervisors at the last project.
Further find my detailed development of career and works which I have done in various
projects for your perusal.
Career Graph in detail
1. MID LEVEL
M/S. ETA Star Engineering & Contracting W.L.L
P.O.Box – 23773, IBA Building 1st Floor Office No- 101 "C" Ring
Road
Near Al Emadi Building
Doha Qatar
Tel – 00 974 44666768,
Web: www.etamne.com
Duration: 2 years 7 months (from 10th November 2013 to 31st
May 2016)
I. Project Name: Falcon Tower Hotel Project – Pearl Qatar, Doha-Qatar
Owners Name: HH. Sheikh Joan Bin Hamad Al Thani
Consultant: M/S. South West Architecture
Main Contractor: M/S. SEG International Contracting
MEP Contractor: M/S. Eta Star Engineering & Contracting W.L.L
Project Structure
It’s a hotel project consisting of two basement levels, one ground, a mezzanine, two podium
levels and 24 upper floors, roof-1 with swimming pool, gym & roof-2 with juice bar. It will
be the first Mondrian-branded hotel in the Middle East and once completed, the tower will
become known as the Mondrian Doha Hotel, and will offer 270 rooms.
Role as an Electrical Engineer
On the mentioned above hotel project, my work was to monitor and execute all LV/ELV
related installation works including final fixtures. Apart from that,
Siva kumar P R prsivakumar87@gmail.com +919061281541
Career Growth Page 2
1. Representing Company as a Subcontractor in the project progress and technical meetings.
2. Officially raising request for information on any dispute in drawing/technical details or to
suggest our stand.
3. Voltage drop calculation to finalize the cable size.
4. Coordination with Qatar government authorities - Kharamaa - for Energization of
substation.
5. Subcontractors bill certification
6. Meeting with suppliers for various site related needs.
7. Meeting with other specialized contractors for coordinating work at site to avoid reworks
and to know their requirements.
8. Preparation of site completion plan by understanding the priority areas, material
availability, & manpower.
9. Arranging meeting with internal site team of engineers and supervisors for assigning tasks
and to comply completion targets
2. JUNIOR LEVEL
M/S. ETA - DUBAI
Emirates Trading Agency LLC
P.O. Box. 5239
Dubai - U.A.E.
Telephone: +971 4 3185111
Fax: +971 4 3386301
Web: www.etamne.com
Duration: 2 years 2 months (from 19th September 2011 to
04th October 2013)
II. Project Name: (AX-134) Dubai International Airport Terminal 3 Concourse 3
expansion phase II project
Owners Name: Government of Dubai - Department Civil Aviation
Consultant: M/S. Dar Al-Handasah
Main Contractor: M/S. ALEC
MEP Contractor: M/S. Eta Star - MNE
Project Structure
Concourse 3 is an extension and continued development of Concourse 1 and 2. It is a fully
airside structure and is connected to 2 major public levels of Terminal 3 via an Automated
People Mover (APM) in addition to Vehicular and Baggage Handling System utility
tunnels. Concourse 3 is partially an underground structure comprising the APM stations (both
arriving and departing) and extends above ground under a metal shell to accommodate 18
Nos. A380 & 2 Nos. other aircrafts. The built-up area is approximately 528,000 Square
meters and comprises EK lounges, 4 and 5 Star Hotels, Arrival and Departure levels
including the Duty Free Shops. The MEP services include provision of 30,000 TR Air
conditioning with associated works, Electrical works covering 50MVA electrical load and
Siva kumar P R prsivakumar87@gmail.com +919061281541
Career Growth Page 3
Power Distribution, Plumbing, Drainage, Building Management System, Fire fighting & Fire
Alarm System, lighting System, Central Emergency Lighting System etc.
As an Electrical Engineer of the project I was responsible for the below works as project
progressed at different stages and worked at site for a period of 1.7 years.
1. Arranging materials as per priority.
2. Study of drawings and technical details.
3. Planning the work force as per the areas/work
4. Monitoring work progress
5. Conducting weekly tool box talks to workers as per HSE team’s monthly plan and ensuring
safe work procedures.
6. Certification of subcontractors’ bill
7. Preparation of inspection request, site inspection along with consultant & QA/QC
engineer, compliance of comments if any and re inspection for approval
8. Handing over of areas through SOTO (Space Occupancy Taking Over) process.
During the peak time of construction activities I was appointed for the completion of
Electrical & UPS rooms at basement -3 & 4. During the final and hand over stage of the
project, I was in charge for the handing over of spaces at basement levels that was done
through SOTO(Space Occupancy Taking Over) process and was closely coordinating with
Cause & Affect Team.
III. Project Name: Al Sufouh Tram Project, Dubai – United Arab Emirates.
Owners Name: Government of Dubai – Road & Transport Authority
Consultant: M/S. Alstom
Main Contractor: M/S. Besix
MEP Contractor: M/S. Eta Star – MNE
Project Structure
The Dubai Tram (previously the Al Sufouh Tram) system was designed to be an integral part
of the Dubai transport network, linking the Dubai Metro and the Palm Monorail and running
along Al Sufouh Road and Jumeirah Beach Road from Mall of the Emirates at one end to the
Dubai Marina. Its first phase consists of 11 stations.
I was taking care/monitoring the first fix activities viz. Containment installations of cable
trays, ladders and GI pipes.
3. ENTRY LEVEL
M/S. STERLING AND WILSON LTD
SAI SREYAS KRISHNA, 72,
Poonamalle Rd, Ekkatuthangal,
Chennai, Tamil Nadu 600032
Phone:044 4295 6666
Web: http://sterlingandwilson.com/
Duration: 1 year 3 months (from 1st June 2010 to 15th
September 2011)
Siva kumar P R prsivakumar87@gmail.com +919061281541
Career Growth Page 4
IV. MFAR Hotel & Resorts Pvt. Ltd – Velachery, Tamil Nadu Legislative Assembly –
Chennai-Omandurar, Prime Electricals – Nellore – Andhra Pradesh.
I was mainly handling above mentioned 3 projects as a Project Coordinator-Planning
department. My work was to monitor the site works through site engineers comparing BOQ.
All material requests would be matched with BOQ for addition & variation. Apart from that
arranging meeting for updating the site progress with site team, consultant, main contractor,
sub contractors and suppliers was to be done.
Role as a planner
1. Study of Tax structure tender department considered on OH, Margin, and material cost, etc
for making rate analysis in case of rework, extra items, non tendered items, etc through
proper break up.
2. Getting clarification on any deviations in BOQ/SLD/Technical Details from
client/consultant.
3. Release of LOI for major items after getting work order.
4. Collecting GTP (Guaranteed Technical Particulars)/Technical details, test certificates from
supplier.
5. Arranging samples for approval for specified items through purchase department.
6. Follow up with purchase dept till the release of PO, necessary documents such as waybills,
SEZ documents, TIN/CST No.
8. Break up for Extra item/NT
9. Preparation of project schedule, maintaining SR/LOI/PO copy, record of test certificates,
and preparation of handing over documents, site visit, factory Inspection, and manufacturing
clearance/dispatch clearance will be given through planning department after the
conformation from site.
After graduation on Bachelor’s of Engineering in Electrical & Electronics during the year 1st
November 2009 I worked under M/S. Batliboi enXco Pvt.Ltd, for M/S. Ramco wind farms at
Poolavadi-Udumalaipettai - Tamil Nadu. As a fresher to the field of technical jobs my work
was to note KWHr generation of power generated by NEPC make wind turbines connected to
each transformer (generally 7 to 8 towers ranging from 36 to 55KW capacity were connected
to one transformer, a wind speed of minimum 7.2m/s was required for the operation of
turbines while it consumes utility power initially and cut-off to feed the utility once it’s
started operating) wind speed, terminal fuse, PCB and components, Capacitor banks, etc,.
Further, I worked as a Service Engineer with M/S. KB Power Care Pvt. Ltd, Chennai –
Tamil Nadu for the servicing and maintenance of Industrial servo stabilizers. Electronic
Servo Controlled Stabilizers were used to provide a steady output voltage ranging from 380V
to 415V for the input voltage ranging from 300V to 470V. Carbon brushes were to be
periodically replaced in oil cooled types since it’s prone to deterioration. PCB and
components were also to be changed in many cases.
Educational Qualifications
Institute Course Subject Percentage
of marks
gained
Siva kumar P R prsivakumar87@gmail.com +919061281541
Career Growth Page 5
Sri Subramanya College of
Engineering & Technology,
Palani-Tamilnadu. Anna
University
Bachelor of
Engineering
Electrical &
Electronics
66 with first
class
St. Joseph’s Higher Secondary
School – Kallody, Wayanad -
Kerala.
Higher Secondary
Examination (Class
XII)
Science Group –
Mathematics,
Physics,
Chemistry &
Computer Science
73 with first
class
Fr. GKM High School,
Kaniyaram, Wayand – Kerala.
Secondary School
Leaving Certificate
Examination
Language, Social
Science, Science
& Mathematics
75 with first
class
Languages Known
English To read To write To speak
Hindi To read To write To Speak
Malayalam To read To write To speak
Tamil To read ------------ To Speak
Co Curricular activities
1. Actively participated in Intra college sports, arts and personality development programs. I
was the committee in charge of Paper Presentation Team of EEE association for an Inter
college symposium held during 2009.
2. I was the team captain of NSS (National Service Scheme) team during the year 2003 at
Higher Secondary School. Attended leader ship training camp under NSS and had done
service of 240hrs.
3. I was a member of Junior Red Cross of Indian Red Cross Society during my upper primary
school level and had attended one day training camps and exam of it.
Bio-data
1. Name : SIVA KUMAR P R
2. Gender : Male
3. Date of Birth : 2nd
July 1987
4.Marital Status : Unmarried
5. Father’s name : RAJAGOPAL P P
6. Occupation : Retired government employee
7. Mother’s name : SHEELA
8. Occupation : Home maker
9. Sisters name : SRUTHI P R
10. Occupation : Student
11. Email – ID : prsivakumar87@gmail.com
12. Mobile number : +91 90612 81541
13. Contact address : Mangalady madam, Ellumannam.P.O, Edavaka,
Mananthavady, Wayand-Kerala, India - 670645
Siva kumar P R prsivakumar87@gmail.com +919061281541
Career Growth Page 6
Declaration
I hereby declare that the details furnished above by me are true to the best of my knowledge
and belief.
Place: Mananthavady yours faithfully
Date: 28.09.2016 Sivakumar P R

More Related Content

What's hot (19)

Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
CV - K.D.S.Kumara
CV - K.D.S.KumaraCV - K.D.S.Kumara
CV - K.D.S.Kumara
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
CV Suresh44UIC
CV Suresh44UICCV Suresh44UIC
CV Suresh44UIC
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar Syed
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
Mechanical Engineer CV
Mechanical Engineer CVMechanical Engineer CV
Mechanical Engineer CV
 
Resume Paramjit Singh PM 1
Resume Paramjit Singh PM 1Resume Paramjit Singh PM 1
Resume Paramjit Singh PM 1
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 

Viewers also liked

Екскурсія початкова школа
Екскурсія початкова школаЕкскурсія початкова школа
Екскурсія початкова школаkzshn5
 
course certificatesocialmedia
course certificatesocialmediacourse certificatesocialmedia
course certificatesocialmediaCharlotta Lind
 
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINALChristina Soon
 
Babies and Toddlers October 2015
Babies and Toddlers October 2015Babies and Toddlers October 2015
Babies and Toddlers October 2015Linku2 North Shore
 
Mengurus perubahan
Mengurus perubahanMengurus perubahan
Mengurus perubahanElyza Elyzai
 

Viewers also liked (8)

Екскурсія початкова школа
Екскурсія початкова школаЕкскурсія початкова школа
Екскурсія початкова школа
 
course certificatesocialmedia
course certificatesocialmediacourse certificatesocialmedia
course certificatesocialmedia
 
กรรมการบริหาร ปอมท. 2551
กรรมการบริหาร ปอมท. 2551กรรมการบริหาร ปอมท. 2551
กรรมการบริหาร ปอมท. 2551
 
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
 
Babies and Toddlers October 2015
Babies and Toddlers October 2015Babies and Toddlers October 2015
Babies and Toddlers October 2015
 
PB1 AR MTBBE E
PB1 AR MTBBE EPB1 AR MTBBE E
PB1 AR MTBBE E
 
09 john Witnessing
09 john Witnessing09 john Witnessing
09 john Witnessing
 
Mengurus perubahan
Mengurus perubahanMengurus perubahan
Mengurus perubahan
 

Similar to Covering Letter (20)

new 5 tanmay_CV
new 5 tanmay_CV new 5 tanmay_CV
new 5 tanmay_CV
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
social profile.
social profile.social profile.
social profile.
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
SADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaiSADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubai
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 

Covering Letter

  • 1. Siva kumar P R prsivakumar87@gmail.com +919061281541 Career Growth Page 1 Covering letter Having a total of 6 years experience in the construction field in which gulf experience is about 4.9 years; I would like to apply for the position of Electrical Engineer in MEP construction field. As I have worked in Commercial/Industrial projects such as airport and car manufacturing plant myself having good exposure in activities at MV and LV rooms such as substation, electrical & UPS rooms. In India worked as a Project Coordinator Planning, I have experience in administration related to site execution work too. Lastly I worked for a 5 star hotel project in Qatar that gave me knowledge on various customized requirements and sophisticated systems like home automation. I handled a leading team of 200 men with the help of 1 engineer and 4 supervisors at the last project. Further find my detailed development of career and works which I have done in various projects for your perusal. Career Graph in detail 1. MID LEVEL M/S. ETA Star Engineering & Contracting W.L.L P.O.Box – 23773, IBA Building 1st Floor Office No- 101 "C" Ring Road Near Al Emadi Building Doha Qatar Tel – 00 974 44666768, Web: www.etamne.com Duration: 2 years 7 months (from 10th November 2013 to 31st May 2016) I. Project Name: Falcon Tower Hotel Project – Pearl Qatar, Doha-Qatar Owners Name: HH. Sheikh Joan Bin Hamad Al Thani Consultant: M/S. South West Architecture Main Contractor: M/S. SEG International Contracting MEP Contractor: M/S. Eta Star Engineering & Contracting W.L.L Project Structure It’s a hotel project consisting of two basement levels, one ground, a mezzanine, two podium levels and 24 upper floors, roof-1 with swimming pool, gym & roof-2 with juice bar. It will be the first Mondrian-branded hotel in the Middle East and once completed, the tower will become known as the Mondrian Doha Hotel, and will offer 270 rooms. Role as an Electrical Engineer On the mentioned above hotel project, my work was to monitor and execute all LV/ELV related installation works including final fixtures. Apart from that,
  • 2. Siva kumar P R prsivakumar87@gmail.com +919061281541 Career Growth Page 2 1. Representing Company as a Subcontractor in the project progress and technical meetings. 2. Officially raising request for information on any dispute in drawing/technical details or to suggest our stand. 3. Voltage drop calculation to finalize the cable size. 4. Coordination with Qatar government authorities - Kharamaa - for Energization of substation. 5. Subcontractors bill certification 6. Meeting with suppliers for various site related needs. 7. Meeting with other specialized contractors for coordinating work at site to avoid reworks and to know their requirements. 8. Preparation of site completion plan by understanding the priority areas, material availability, & manpower. 9. Arranging meeting with internal site team of engineers and supervisors for assigning tasks and to comply completion targets 2. JUNIOR LEVEL M/S. ETA - DUBAI Emirates Trading Agency LLC P.O. Box. 5239 Dubai - U.A.E. Telephone: +971 4 3185111 Fax: +971 4 3386301 Web: www.etamne.com Duration: 2 years 2 months (from 19th September 2011 to 04th October 2013) II. Project Name: (AX-134) Dubai International Airport Terminal 3 Concourse 3 expansion phase II project Owners Name: Government of Dubai - Department Civil Aviation Consultant: M/S. Dar Al-Handasah Main Contractor: M/S. ALEC MEP Contractor: M/S. Eta Star - MNE Project Structure Concourse 3 is an extension and continued development of Concourse 1 and 2. It is a fully airside structure and is connected to 2 major public levels of Terminal 3 via an Automated People Mover (APM) in addition to Vehicular and Baggage Handling System utility tunnels. Concourse 3 is partially an underground structure comprising the APM stations (both arriving and departing) and extends above ground under a metal shell to accommodate 18 Nos. A380 & 2 Nos. other aircrafts. The built-up area is approximately 528,000 Square meters and comprises EK lounges, 4 and 5 Star Hotels, Arrival and Departure levels including the Duty Free Shops. The MEP services include provision of 30,000 TR Air conditioning with associated works, Electrical works covering 50MVA electrical load and
  • 3. Siva kumar P R prsivakumar87@gmail.com +919061281541 Career Growth Page 3 Power Distribution, Plumbing, Drainage, Building Management System, Fire fighting & Fire Alarm System, lighting System, Central Emergency Lighting System etc. As an Electrical Engineer of the project I was responsible for the below works as project progressed at different stages and worked at site for a period of 1.7 years. 1. Arranging materials as per priority. 2. Study of drawings and technical details. 3. Planning the work force as per the areas/work 4. Monitoring work progress 5. Conducting weekly tool box talks to workers as per HSE team’s monthly plan and ensuring safe work procedures. 6. Certification of subcontractors’ bill 7. Preparation of inspection request, site inspection along with consultant & QA/QC engineer, compliance of comments if any and re inspection for approval 8. Handing over of areas through SOTO (Space Occupancy Taking Over) process. During the peak time of construction activities I was appointed for the completion of Electrical & UPS rooms at basement -3 & 4. During the final and hand over stage of the project, I was in charge for the handing over of spaces at basement levels that was done through SOTO(Space Occupancy Taking Over) process and was closely coordinating with Cause & Affect Team. III. Project Name: Al Sufouh Tram Project, Dubai – United Arab Emirates. Owners Name: Government of Dubai – Road & Transport Authority Consultant: M/S. Alstom Main Contractor: M/S. Besix MEP Contractor: M/S. Eta Star – MNE Project Structure The Dubai Tram (previously the Al Sufouh Tram) system was designed to be an integral part of the Dubai transport network, linking the Dubai Metro and the Palm Monorail and running along Al Sufouh Road and Jumeirah Beach Road from Mall of the Emirates at one end to the Dubai Marina. Its first phase consists of 11 stations. I was taking care/monitoring the first fix activities viz. Containment installations of cable trays, ladders and GI pipes. 3. ENTRY LEVEL M/S. STERLING AND WILSON LTD SAI SREYAS KRISHNA, 72, Poonamalle Rd, Ekkatuthangal, Chennai, Tamil Nadu 600032 Phone:044 4295 6666 Web: http://sterlingandwilson.com/ Duration: 1 year 3 months (from 1st June 2010 to 15th September 2011)
  • 4. Siva kumar P R prsivakumar87@gmail.com +919061281541 Career Growth Page 4 IV. MFAR Hotel & Resorts Pvt. Ltd – Velachery, Tamil Nadu Legislative Assembly – Chennai-Omandurar, Prime Electricals – Nellore – Andhra Pradesh. I was mainly handling above mentioned 3 projects as a Project Coordinator-Planning department. My work was to monitor the site works through site engineers comparing BOQ. All material requests would be matched with BOQ for addition & variation. Apart from that arranging meeting for updating the site progress with site team, consultant, main contractor, sub contractors and suppliers was to be done. Role as a planner 1. Study of Tax structure tender department considered on OH, Margin, and material cost, etc for making rate analysis in case of rework, extra items, non tendered items, etc through proper break up. 2. Getting clarification on any deviations in BOQ/SLD/Technical Details from client/consultant. 3. Release of LOI for major items after getting work order. 4. Collecting GTP (Guaranteed Technical Particulars)/Technical details, test certificates from supplier. 5. Arranging samples for approval for specified items through purchase department. 6. Follow up with purchase dept till the release of PO, necessary documents such as waybills, SEZ documents, TIN/CST No. 8. Break up for Extra item/NT 9. Preparation of project schedule, maintaining SR/LOI/PO copy, record of test certificates, and preparation of handing over documents, site visit, factory Inspection, and manufacturing clearance/dispatch clearance will be given through planning department after the conformation from site. After graduation on Bachelor’s of Engineering in Electrical & Electronics during the year 1st November 2009 I worked under M/S. Batliboi enXco Pvt.Ltd, for M/S. Ramco wind farms at Poolavadi-Udumalaipettai - Tamil Nadu. As a fresher to the field of technical jobs my work was to note KWHr generation of power generated by NEPC make wind turbines connected to each transformer (generally 7 to 8 towers ranging from 36 to 55KW capacity were connected to one transformer, a wind speed of minimum 7.2m/s was required for the operation of turbines while it consumes utility power initially and cut-off to feed the utility once it’s started operating) wind speed, terminal fuse, PCB and components, Capacitor banks, etc,. Further, I worked as a Service Engineer with M/S. KB Power Care Pvt. Ltd, Chennai – Tamil Nadu for the servicing and maintenance of Industrial servo stabilizers. Electronic Servo Controlled Stabilizers were used to provide a steady output voltage ranging from 380V to 415V for the input voltage ranging from 300V to 470V. Carbon brushes were to be periodically replaced in oil cooled types since it’s prone to deterioration. PCB and components were also to be changed in many cases. Educational Qualifications Institute Course Subject Percentage of marks gained
  • 5. Siva kumar P R prsivakumar87@gmail.com +919061281541 Career Growth Page 5 Sri Subramanya College of Engineering & Technology, Palani-Tamilnadu. Anna University Bachelor of Engineering Electrical & Electronics 66 with first class St. Joseph’s Higher Secondary School – Kallody, Wayanad - Kerala. Higher Secondary Examination (Class XII) Science Group – Mathematics, Physics, Chemistry & Computer Science 73 with first class Fr. GKM High School, Kaniyaram, Wayand – Kerala. Secondary School Leaving Certificate Examination Language, Social Science, Science & Mathematics 75 with first class Languages Known English To read To write To speak Hindi To read To write To Speak Malayalam To read To write To speak Tamil To read ------------ To Speak Co Curricular activities 1. Actively participated in Intra college sports, arts and personality development programs. I was the committee in charge of Paper Presentation Team of EEE association for an Inter college symposium held during 2009. 2. I was the team captain of NSS (National Service Scheme) team during the year 2003 at Higher Secondary School. Attended leader ship training camp under NSS and had done service of 240hrs. 3. I was a member of Junior Red Cross of Indian Red Cross Society during my upper primary school level and had attended one day training camps and exam of it. Bio-data 1. Name : SIVA KUMAR P R 2. Gender : Male 3. Date of Birth : 2nd July 1987 4.Marital Status : Unmarried 5. Father’s name : RAJAGOPAL P P 6. Occupation : Retired government employee 7. Mother’s name : SHEELA 8. Occupation : Home maker 9. Sisters name : SRUTHI P R 10. Occupation : Student 11. Email – ID : prsivakumar87@gmail.com 12. Mobile number : +91 90612 81541 13. Contact address : Mangalady madam, Ellumannam.P.O, Edavaka, Mananthavady, Wayand-Kerala, India - 670645
  • 6. Siva kumar P R prsivakumar87@gmail.com +919061281541 Career Growth Page 6 Declaration I hereby declare that the details furnished above by me are true to the best of my knowledge and belief. Place: Mananthavady yours faithfully Date: 28.09.2016 Sivakumar P R