SlideShare a Scribd company logo
1 of 4
Download to read offline
1/4
CURRICULUM VITAE
PERSONAL DATA
Family Name :HESHAM AHMED KAMAL
First Name : HESHAM
Middle Name : AHMED KAMAL
Sex : MALE
Marital status : MARRIED
Date and Place of birth : 20/12/1972
Nationality : EGYPTIAN
Languages : ENGLISH
Religion : ISLAM
Date of Employment : 27-3-1997
Graduated Date : 6/1995
Current job : Project manager
Departement / Branch : BRIDGES AND SPECIALIZED STRUCTURES DPT.
Address : 14 MOHAMMED HASSN ELSHOGAY-ABDEN-CAIRO
Telephone : 00966541414698-0020119582883
ACADEMIC QUALIFICATIONS:
BSC. FROM CAIRO UNIVERSITY
PROFISSIONAL AFFILIATIONS:
EGYPTIAN ENGINEERS SYNDICATE
2/4
POSITIONS HELD AND EXPERIENCES:
 FROM 3/2007 – UP TILL NOW
PROJECT TITLE : AL-MADINA BRIDGE (400 MILLION SR.)
OWNER NAME : AL MADINA CITY-COUNCIL.
DESCRIPTION : A REINFORCED CONCRETE FLYOVER TO CREATE A
RANG ROAD IN AL-MADINA- K.S.A
POSITION : PROJECT MANAGER.
 FROM 4/2006 – 3/2007
PROJECT TITLE : AL-HAWAMDYA BRIDGE-PHASE III (24 MILLION L.E.)
OWNER NAME : AL HAWMDYA CITY-COUNCIL.
DESCRIPTION : A REINFORCED CONCRETE FLYOVER TO CREATE A
FREE INTERSECTION BETWEEN CAIRO-UPPER EGYPT
ROAD AND AL-HAWAMDYA SUGAR FACTOR
RAULWAY.THE FLYOVER COMPRISES A STEEL BUY.
POSITION : PROJECT MANAGER.
 FROM 6/2004 - 4/2006
PROJECT TITLE : KING FAYSAL UNDERPASS-GIZA.
OWNER NAME : GIZA GOVERNORATE.
DECRIPTION : IT IS A BI-DRECTIONAL UNDERPASS UNDER KING
FAYSAL STREET. THE TOTAL LENGTH IS 325 m, 16
m WIDTH AND 5 m TRAFFIC CLEARANCE.
(22 MILLION L.E)
POSITION : PROJECT MANAGER.
 FROM 6/2003 – 6/2004
PROJECT TITLE: AL-HAWAMDYA BRIDGE-PHASE II(7MILLION L.E.)
OWNER NAME : AL- HAWAMDYA CITY-COUNCIL
DESCRIPTION : AN EXTENSION OF AL-HAWANDYA FLYOVER.IT
IS A BI-DIRECTIONAL RAMP CROSSING CAIRO-
UPPER EGYPT ROAD.
POSITION : PROJECT MANAGER.
3/4
 FROM 3/2002 – 6/2003
PROJECT TITLE: SOUTHERN DAHSHOUR BRIDGE.
OWNER NAME : MINISTRY OF RESIDENCE, UTILITIES & CONSTRUCTION.
DESCRIPTION : THE PROJECT IS A PART OF THE SECOND RING
ROAD AROUND GREATER CAIRO REGION,
CROSSING THE RIVER NILE, CAIRO-UPPER
EGYPT ROAD AND RAILWAY.
POSITION : CONSTRUCTION MANAGER.
 FROM 3/2001 – 3/2002
PROJECT TITLE: 10th
OF RANADAM CITY BOTABLE WATER PLANT
DESCRIPTION : FINISHING&REPAIR WORKS FOR THE PLANT.
(10MILLION L.E.)
POSITION : CONSTRUCTION MANAGER.
 FROM 8/1999 TO 3/2001:
PROJECT TITLE : EL MARYOTIA BRIDGES (9-D SECTOR)
PROJECT LOCATION : EL MARYOTIA GIZA
DESCREPTION : 3 BRIDGES ON EL MARYOTIA AXIS
VALUE : 5 MILLION L.E.
 FROM 7/1999 TO 8/1999:
PROJECT TITLE :2 PEDSTRIAN STELL FLYOVER
PROJECT LOCATION : G.CAIRO RING ROAD.
VALUE :2 MILLION L.E.
 FROM 3/1997 TO 7/1999:
PROJECT TITLE : EL MARYOTIA ELEVATED ROAD ( (9-D SECTOR)
DESCREPTION : BRIDGE 2.5Km FROM EL MARYOTIA TO EL
MANSORIA – GREATER CAIRO.
VALUE :75 MILLION L.E.
4/4
 FROM 2/1998 TO 8/1998:
PROJECT TITLE :2 REINFORCED CONCRETE BRIDGES
AS A PART OF 26th
JULY.AXIS.
PROJECT LOCATION : EL BRAGEEL – GIZA.
VALUE :2 MILLION L.E.
COURSES ATTENDED
o AUTOCAD
o SAP90
o EXCEL
o PRIMAVERA
‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬

More Related Content

Similar to CVE-hesham ahmed kamal

Curriculum vita1
Curriculum vita1Curriculum vita1
Curriculum vita1ibrahim222
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017Moh Ask
 
ENG-MOSTAFA RAGAIEY ( C.V )
ENG-MOSTAFA RAGAIEY ( C.V )ENG-MOSTAFA RAGAIEY ( C.V )
ENG-MOSTAFA RAGAIEY ( C.V )mostafa ragaiey
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMostafa Hassan
 
PORTFOLIO.compressed
PORTFOLIO.compressedPORTFOLIO.compressed
PORTFOLIO.compressedJoseph Ahmadi
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015mahmoud gaber
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04Ahmed gemeiy
 
jamal zain c.v -
jamal zain c.v -jamal zain c.v -
jamal zain c.v -Jamal Zain
 
Mohammed ebrahim c.v. 12 2015
Mohammed ebrahim c.v. 12 2015Mohammed ebrahim c.v. 12 2015
Mohammed ebrahim c.v. 12 2015mohammed ebrahim
 
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012Mohammad Solaiman
 
April 2012 Photo Portfolio References Articles
April 2012   Photo Portfolio References ArticlesApril 2012   Photo Portfolio References Articles
April 2012 Photo Portfolio References Articlessalwa12
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)leslie Lavender
 

Similar to CVE-hesham ahmed kamal (20)

Curriculum vita1
Curriculum vita1Curriculum vita1
Curriculum vita1
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
AR - CV (1)
AR - CV (1)AR - CV (1)
AR - CV (1)
 
ENG-MOSTAFA RAGAIEY ( C.V )
ENG-MOSTAFA RAGAIEY ( C.V )ENG-MOSTAFA RAGAIEY ( C.V )
ENG-MOSTAFA RAGAIEY ( C.V )
 
Hosam - CV
Hosam - CV Hosam - CV
Hosam - CV
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
 
PORTFOLIO.compressed
PORTFOLIO.compressedPORTFOLIO.compressed
PORTFOLIO.compressed
 
mlindwa cv.docx1
mlindwa cv.docx1mlindwa cv.docx1
mlindwa cv.docx1
 
Khaled cv07
Khaled cv07Khaled cv07
Khaled cv07
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
Case Study - Palm Jumeirah
Case Study - Palm JumeirahCase Study - Palm Jumeirah
Case Study - Palm Jumeirah
 
CV_Tarek_Hassan_Dec 2015
CV_Tarek_Hassan_Dec 2015CV_Tarek_Hassan_Dec 2015
CV_Tarek_Hassan_Dec 2015
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04
 
jamal zain c.v -
jamal zain c.v -jamal zain c.v -
jamal zain c.v -
 
Mohammed ebrahim c.v. 12 2015
Mohammed ebrahim c.v. 12 2015Mohammed ebrahim c.v. 12 2015
Mohammed ebrahim c.v. 12 2015
 
tamer C.V
tamer C.Vtamer C.V
tamer C.V
 
CV samir02
CV samir02CV samir02
CV samir02
 
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
 
April 2012 Photo Portfolio References Articles
April 2012   Photo Portfolio References ArticlesApril 2012   Photo Portfolio References Articles
April 2012 Photo Portfolio References Articles
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)
 

CVE-hesham ahmed kamal

  • 1. 1/4 CURRICULUM VITAE PERSONAL DATA Family Name :HESHAM AHMED KAMAL First Name : HESHAM Middle Name : AHMED KAMAL Sex : MALE Marital status : MARRIED Date and Place of birth : 20/12/1972 Nationality : EGYPTIAN Languages : ENGLISH Religion : ISLAM Date of Employment : 27-3-1997 Graduated Date : 6/1995 Current job : Project manager Departement / Branch : BRIDGES AND SPECIALIZED STRUCTURES DPT. Address : 14 MOHAMMED HASSN ELSHOGAY-ABDEN-CAIRO Telephone : 00966541414698-0020119582883 ACADEMIC QUALIFICATIONS: BSC. FROM CAIRO UNIVERSITY PROFISSIONAL AFFILIATIONS: EGYPTIAN ENGINEERS SYNDICATE
  • 2. 2/4 POSITIONS HELD AND EXPERIENCES:  FROM 3/2007 – UP TILL NOW PROJECT TITLE : AL-MADINA BRIDGE (400 MILLION SR.) OWNER NAME : AL MADINA CITY-COUNCIL. DESCRIPTION : A REINFORCED CONCRETE FLYOVER TO CREATE A RANG ROAD IN AL-MADINA- K.S.A POSITION : PROJECT MANAGER.  FROM 4/2006 – 3/2007 PROJECT TITLE : AL-HAWAMDYA BRIDGE-PHASE III (24 MILLION L.E.) OWNER NAME : AL HAWMDYA CITY-COUNCIL. DESCRIPTION : A REINFORCED CONCRETE FLYOVER TO CREATE A FREE INTERSECTION BETWEEN CAIRO-UPPER EGYPT ROAD AND AL-HAWAMDYA SUGAR FACTOR RAULWAY.THE FLYOVER COMPRISES A STEEL BUY. POSITION : PROJECT MANAGER.  FROM 6/2004 - 4/2006 PROJECT TITLE : KING FAYSAL UNDERPASS-GIZA. OWNER NAME : GIZA GOVERNORATE. DECRIPTION : IT IS A BI-DRECTIONAL UNDERPASS UNDER KING FAYSAL STREET. THE TOTAL LENGTH IS 325 m, 16 m WIDTH AND 5 m TRAFFIC CLEARANCE. (22 MILLION L.E) POSITION : PROJECT MANAGER.  FROM 6/2003 – 6/2004 PROJECT TITLE: AL-HAWAMDYA BRIDGE-PHASE II(7MILLION L.E.) OWNER NAME : AL- HAWAMDYA CITY-COUNCIL DESCRIPTION : AN EXTENSION OF AL-HAWANDYA FLYOVER.IT IS A BI-DIRECTIONAL RAMP CROSSING CAIRO- UPPER EGYPT ROAD. POSITION : PROJECT MANAGER.
  • 3. 3/4  FROM 3/2002 – 6/2003 PROJECT TITLE: SOUTHERN DAHSHOUR BRIDGE. OWNER NAME : MINISTRY OF RESIDENCE, UTILITIES & CONSTRUCTION. DESCRIPTION : THE PROJECT IS A PART OF THE SECOND RING ROAD AROUND GREATER CAIRO REGION, CROSSING THE RIVER NILE, CAIRO-UPPER EGYPT ROAD AND RAILWAY. POSITION : CONSTRUCTION MANAGER.  FROM 3/2001 – 3/2002 PROJECT TITLE: 10th OF RANADAM CITY BOTABLE WATER PLANT DESCRIPTION : FINISHING&REPAIR WORKS FOR THE PLANT. (10MILLION L.E.) POSITION : CONSTRUCTION MANAGER.  FROM 8/1999 TO 3/2001: PROJECT TITLE : EL MARYOTIA BRIDGES (9-D SECTOR) PROJECT LOCATION : EL MARYOTIA GIZA DESCREPTION : 3 BRIDGES ON EL MARYOTIA AXIS VALUE : 5 MILLION L.E.  FROM 7/1999 TO 8/1999: PROJECT TITLE :2 PEDSTRIAN STELL FLYOVER PROJECT LOCATION : G.CAIRO RING ROAD. VALUE :2 MILLION L.E.  FROM 3/1997 TO 7/1999: PROJECT TITLE : EL MARYOTIA ELEVATED ROAD ( (9-D SECTOR) DESCREPTION : BRIDGE 2.5Km FROM EL MARYOTIA TO EL MANSORIA – GREATER CAIRO. VALUE :75 MILLION L.E.
  • 4. 4/4  FROM 2/1998 TO 8/1998: PROJECT TITLE :2 REINFORCED CONCRETE BRIDGES AS A PART OF 26th JULY.AXIS. PROJECT LOCATION : EL BRAGEEL – GIZA. VALUE :2 MILLION L.E. COURSES ATTENDED o AUTOCAD o SAP90 o EXCEL o PRIMAVERA ‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬