This document provides a summary of Abdul Nasir's professional experience and qualifications. He has over 20 years of experience working as a civil engineer in Pakistan and Oman, holding positions such as Project Manager, Deputy Manager, and Construction Manager. His areas of responsibility have included infrastructure projects like road construction, bridges, and buildings. He has a DAE in Civil Engineering and is capable in English, Urdu, and Punjabi.
1. Muscat 096896504067
Abdul Nasir
Personal Profession : Civil Engineer
Nationality : Pakistani
C.N.I.C No : 36104-7359934-9
Religion : Islam
Home District : Khanewal
Date of Birth : 15-03-1974
Education DAE in Civil Engineering (1612 Marks) in 1993
Metric (571/850 Marks) in 1989
Language Capable English, Urdu, Punjabi
Professional Record
Position Project Manager
Name of Organization Arabian Supplies & Contracting LLC (Muscat).
Name of Project Construction of Road at Oman Munition
production Company (Lizugh)
Period January 2015 to till date
.
Responsibility To manage & execute all infrastructure works.
Including 7 Meters Roads, 125 ducts, 15 box
culverts & 6 Meters channels ( 40000 Sqm Rip
Rap work). Construction of schools (18 class
rooms,20class rooms,20class rooms &10class
rooms) in different cities of Oman.
Position Acting Project Manager
Name of Organization Desert Line Projects LLC (Muscat).
Name of Project Construction of Ring Road at Madinat Al Ilam
Period March 2011 to till date
.
Responsibility To manage all structure works including
1 No Bridge of 3Spans, 8 No ,s Box culverts
Construction of Dual Carriageway of Ring
Road & 3 Million cubic meter cutting, 3.5 million
Cubic meter cutting Support in Preparation of
IPC’s Escalation of work done,
Correspondence with Consultant NESPAK and
Client Royaaal office.
Position Deputy Manager
Name of Organization Habib Construction Services (Pvt) Ltd.
1 |3
2. Name of Project Improvement/Rehabilitation of Existing Multan
Road, Lahore
Period March 2010 to till date
Name of Project Construction of Lahore Ring Road Package-10
Period May 2009 to Feb 2010.
Responsibility To manage all structure works including
2 No.s Flyovers of 2 Spans, Underpasses,
Subway and Construction of Main Carriageway
of Ring Road & G.T Road & Approaches
Support in Preparation of IPC’s Escalation of
work done, Correspondence with Consultant
NESPAK and Client P.M.U.
Position Senior Engineer Structure
Name of Organization Qavi Engineers (pvt) Ltd.
Name of Project Construction of Nishat Power Plant 220 MW
(Combined Cycle) Pattoki.
Period July 2008 to May 2009.
Responsibility To manage all structure works including
Engine hall workshop, cooling tanks (Engine
foundations, Flooring of engine halls, Tank
foundations & switch yard), Correspondence
with ConsultantWartsila and Client Nishat
Power Plant Pattoki.
Position Construction Manager
Name of Organization Sh. Abdur Razzaq & Co. (Pvt) Ltd. Lahore
Name of Project Construction of Flyover for G. Magnolia
Park Housing Scheme at Gujranwala,
Period February, 2006 to June 2008.
Responsibility To manage all structure works including
Flyover of 20 Span, Retaining Walls, Main
Boulevard and approach roads.
Preparation of IPC’s Escalation of work done,
Correspondence with Consultant NESPAK and
Client Ghosia Builders Construction of Main
Boulevard & Approaches.
Position Sr. Structure Engineer
Name of Organization Izhar (Pvt) Ltd.
Name of Project Construction of Bulleha Shah Paper Mill at
kasur
Period September, 2005 to February, 2006
Responsibility Preparation and checking of
Structure Concreting of Heavy Raft
Foundation, Columns, Shells and Roof Slab
Position Project Engineer
2 |3
3. Name of Organization SKB Engineering & Construction (Pvt) Ltd.
Name of Project 1. Construction of Mall Road Underpass
2. Construction of F.C. College Underpass.
3. Construction of Doctor’s Hospital Underpass.
4. Construction of Dharam Pura Underpass.
Period October, 2003 to August, 2005
Responsibility To manage the work schedule
o Quantity Analysis of structure.
o Preparing of Bar-Bending Schedule for all
RCC.
Structure including 314 Nos Piles, and 12 Nos
CC Bridges, Retaining Walls & Approach
Roads
o Confirmatory boring and drilling of Piles.
o Pile load test.
Position Govt. Contractor
Name of Organization Tehsil Municipal Administration Mian Chanu
Name of Project Various Projects like Construction of Approach
Road T.M.A. Office Mian Chanu, Construction
of Metalloid Road & Laying of Sewerage Line
in Officers Colony Mian Chanu, Construction of
Metalloid Hanif Manna Road in Faisal Town
Mian Chanu, Construction of Sludge Carrier T.
Chowk Mian Chanu, Providing & Laying of 01
feet Sewerage Pipe Line Liaqat Road Mian
Chanu
Period January, 2001 to September, 2003.
Position Site Engineer (Structure)
Name of Organization M. Fahim haider (Pvt) Ltd.
Name of Project Provision & Laying of Ducts & Piped Services
at Jinnah Naval Base Ormara (Baluchistan)
Period July, 1995 to December, 2000
Responsibility Being a Site Engineer, having been involved in
the activities i.e.
o Excavation for ducts & piped lines.
o Laying of High & Medium Voltage Cables,
Laying of Fresh Water, Compressed Air, Fire
Water, JP4 & Fuel Pipe Lines. Construction of
Joint Pits, Values & Service Chambers
o Preparation of IPC’s.
Name of Project Construction of Baba Fareed Ghee Industries
(Pvt) Ltd. Okara
Name of Project Construction of Feroze Pur Road Underpass
Lahore.
Responsibilities To manage the work schedule
Quantity Analysis of structure
Preparing of Bar-Bending Schedule for all RCC
Structure including Piles, Deck Slab &Retaining
Walls & also supervised all the work.
Position Site Supervisor / Surveyor
3 |3
4. Name of Organization Deep Well Corp (Pvt) Ltd.
Name of Project Lahore – Islamabad Motorway (M2)
Period March, 1993 to June, 1995
Responsibility Layout of Piles, Supervise the drilling &
Concreting of Piles
Name of Project Piling of Bridges Raheem Yar Khan – Ubbaro
Dual Carriageway
4 |3