SlideShare a Scribd company logo
1 of 4
Muscat 096896504067
Abdul Nasir
Personal Profession : Civil Engineer
Nationality : Pakistani
C.N.I.C No : 36104-7359934-9
Religion : Islam
Home District : Khanewal
Date of Birth : 15-03-1974
Education DAE in Civil Engineering (1612 Marks) in 1993
Metric (571/850 Marks) in 1989
Language Capable English, Urdu, Punjabi
Professional Record
 Position Project Manager
Name of Organization Arabian Supplies & Contracting LLC (Muscat).
Name of Project Construction of Road at Oman Munition
production Company (Lizugh)
Period January 2015 to till date
.
Responsibility To manage & execute all infrastructure works.
Including 7 Meters Roads, 125 ducts, 15 box
culverts & 6 Meters channels ( 40000 Sqm Rip
Rap work). Construction of schools (18 class
rooms,20class rooms,20class rooms &10class
rooms) in different cities of Oman.
 Position Acting Project Manager
Name of Organization Desert Line Projects LLC (Muscat).
Name of Project Construction of Ring Road at Madinat Al Ilam
Period March 2011 to till date
.
Responsibility To manage all structure works including
1 No Bridge of 3Spans, 8 No ,s Box culverts
Construction of Dual Carriageway of Ring
Road & 3 Million cubic meter cutting, 3.5 million
Cubic meter cutting Support in Preparation of
IPC’s Escalation of work done,
Correspondence with Consultant NESPAK and
Client Royaaal office.
 Position Deputy Manager
Name of Organization Habib Construction Services (Pvt) Ltd.
1 |3
Name of Project Improvement/Rehabilitation of Existing Multan
Road, Lahore
Period March 2010 to till date
Name of Project Construction of Lahore Ring Road Package-10
Period May 2009 to Feb 2010.
Responsibility To manage all structure works including
2 No.s Flyovers of 2 Spans, Underpasses,
Subway and Construction of Main Carriageway
of Ring Road & G.T Road & Approaches
Support in Preparation of IPC’s Escalation of
work done, Correspondence with Consultant
NESPAK and Client P.M.U.
 Position Senior Engineer Structure
Name of Organization Qavi Engineers (pvt) Ltd.
Name of Project Construction of Nishat Power Plant 220 MW
(Combined Cycle) Pattoki.
Period July 2008 to May 2009.
Responsibility To manage all structure works including
Engine hall workshop, cooling tanks (Engine
foundations, Flooring of engine halls, Tank
foundations & switch yard), Correspondence
with ConsultantWartsila and Client Nishat
Power Plant Pattoki.
 Position Construction Manager
Name of Organization Sh. Abdur Razzaq & Co. (Pvt) Ltd. Lahore
Name of Project Construction of Flyover for G. Magnolia
Park Housing Scheme at Gujranwala,
Period February, 2006 to June 2008.
Responsibility To manage all structure works including
Flyover of 20 Span, Retaining Walls, Main
Boulevard and approach roads.
Preparation of IPC’s Escalation of work done,
Correspondence with Consultant NESPAK and
Client Ghosia Builders Construction of Main
Boulevard & Approaches.
 Position Sr. Structure Engineer
Name of Organization Izhar (Pvt) Ltd.
Name of Project Construction of Bulleha Shah Paper Mill at
kasur
Period September, 2005 to February, 2006
Responsibility Preparation and checking of
Structure Concreting of Heavy Raft
Foundation, Columns, Shells and Roof Slab
 Position Project Engineer
2 |3
Name of Organization SKB Engineering & Construction (Pvt) Ltd.
Name of Project 1. Construction of Mall Road Underpass
2. Construction of F.C. College Underpass.
3. Construction of Doctor’s Hospital Underpass.
4. Construction of Dharam Pura Underpass.
Period October, 2003 to August, 2005
Responsibility To manage the work schedule
o Quantity Analysis of structure.
o Preparing of Bar-Bending Schedule for all
RCC.
Structure including 314 Nos Piles, and 12 Nos
CC Bridges, Retaining Walls & Approach
Roads
o Confirmatory boring and drilling of Piles.
o Pile load test.
 Position Govt. Contractor
Name of Organization Tehsil Municipal Administration Mian Chanu
Name of Project Various Projects like Construction of Approach
Road T.M.A. Office Mian Chanu, Construction
of Metalloid Road & Laying of Sewerage Line
in Officers Colony Mian Chanu, Construction of
Metalloid Hanif Manna Road in Faisal Town
Mian Chanu, Construction of Sludge Carrier T.
Chowk Mian Chanu, Providing & Laying of 01
feet Sewerage Pipe Line Liaqat Road Mian
Chanu
Period January, 2001 to September, 2003.
 Position Site Engineer (Structure)
Name of Organization M. Fahim haider (Pvt) Ltd.
Name of Project Provision & Laying of Ducts & Piped Services
at Jinnah Naval Base Ormara (Baluchistan)
Period July, 1995 to December, 2000
Responsibility Being a Site Engineer, having been involved in
the activities i.e.
o Excavation for ducts & piped lines.
o Laying of High & Medium Voltage Cables,
Laying of Fresh Water, Compressed Air, Fire
Water, JP4 & Fuel Pipe Lines. Construction of
Joint Pits, Values & Service Chambers
o Preparation of IPC’s.
Name of Project Construction of Baba Fareed Ghee Industries
(Pvt) Ltd. Okara
Name of Project Construction of Feroze Pur Road Underpass
Lahore.
Responsibilities To manage the work schedule
Quantity Analysis of structure
Preparing of Bar-Bending Schedule for all RCC
Structure including Piles, Deck Slab &Retaining
Walls & also supervised all the work.
 Position Site Supervisor / Surveyor
3 |3
Name of Organization Deep Well Corp (Pvt) Ltd.
Name of Project Lahore – Islamabad Motorway (M2)
Period March, 1993 to June, 1995
Responsibility Layout of Piles, Supervise the drilling &
Concreting of Piles
Name of Project Piling of Bridges Raheem Yar Khan – Ubbaro
Dual Carriageway
4 |3

More Related Content

What's hot

What's hot (19)

Resume(1)(1) - Copy
Resume(1)(1) - CopyResume(1)(1) - Copy
Resume(1)(1) - Copy
 
Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
Allan Dick - rigging foreman
Allan Dick - rigging foremanAllan Dick - rigging foreman
Allan Dick - rigging foreman
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016
 
cv abdul jaleel
cv abdul jaleelcv abdul jaleel
cv abdul jaleel
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
satih cv
satih cvsatih cv
satih cv
 
A resume FRES (1)
A resume FRES (1)A resume FRES (1)
A resume FRES (1)
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
CV OF KN GOPALAKRISHNAN
CV OF KN GOPALAKRISHNANCV OF KN GOPALAKRISHNAN
CV OF KN GOPALAKRISHNAN
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
New cv mobin 2
New cv mobin 2New cv mobin 2
New cv mobin 2
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 

Viewers also liked

Emotional competencies of teachers
Emotional competencies of teachersEmotional competencies of teachers
Emotional competencies of teachersdeshwal852
 
CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...
CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...
CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...Sabin Buraga
 
SEO Tips for Beginners
SEO Tips for Beginners SEO Tips for Beginners
SEO Tips for Beginners Furqan Arshad
 
Cv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhakaCv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhakafarrukh zaki
 
Understanding Underscores 〜「_s」テーマってなんだろう〜
Understanding Underscores 〜「_s」テーマってなんだろう〜Understanding Underscores 〜「_s」テーマってなんだろう〜
Understanding Underscores 〜「_s」テーマってなんだろう〜Naoko Takano
 
Why Civil Engineering is Best
Why Civil Engineering is BestWhy Civil Engineering is Best
Why Civil Engineering is BestRahul Chavda
 
My Professional cv
My Professional cvMy Professional cv
My Professional cvHumayun Khan
 
Engineering Geology (Civil Engineering Applications)
Engineering Geology (Civil Engineering Applications)Engineering Geology (Civil Engineering Applications)
Engineering Geology (Civil Engineering Applications)GAURAV. H .TANDON
 
A view to civil engineering in india by 2020
A view to civil engineering in india by 2020A view to civil engineering in india by 2020
A view to civil engineering in india by 2020ash09uce
 
Mekanisasi gps
Mekanisasi gpsMekanisasi gps
Mekanisasi gpszuesabri
 
Legal Foundation
Legal FoundationLegal Foundation
Legal FoundationUpGrad
 
учебник русский язык 2 класс зеленина2
учебник русский язык 2 класс зеленина2учебник русский язык 2 класс зеленина2
учебник русский язык 2 класс зеленина2YchebnikRU
 
ANZ Marketing Analytics Session 3
ANZ Marketing Analytics Session 3ANZ Marketing Analytics Session 3
ANZ Marketing Analytics Session 3Datalicious
 
In App Advertising from PlacePlay
In App Advertising from PlacePlayIn App Advertising from PlacePlay
In App Advertising from PlacePlayPlacePlay
 

Viewers also liked (20)

Emotional competencies of teachers
Emotional competencies of teachersEmotional competencies of teachers
Emotional competencies of teachers
 
CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...
CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...
CLIW 2015-2016 (3/13) Design Web. Interacțiune, utilizabilitate, metodologii ...
 
SEO Tips for Beginners
SEO Tips for Beginners SEO Tips for Beginners
SEO Tips for Beginners
 
Cv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhakaCv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhaka
 
ASST.QUANTITY S
ASST.QUANTITY SASST.QUANTITY S
ASST.QUANTITY S
 
Understanding Underscores 〜「_s」テーマってなんだろう〜
Understanding Underscores 〜「_s」テーマってなんだろう〜Understanding Underscores 〜「_s」テーマってなんだろう〜
Understanding Underscores 〜「_s」テーマってなんだろう〜
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
 
Why Civil Engineering is Best
Why Civil Engineering is BestWhy Civil Engineering is Best
Why Civil Engineering is Best
 
My Professional cv
My Professional cvMy Professional cv
My Professional cv
 
Engineering Geology (Civil Engineering Applications)
Engineering Geology (Civil Engineering Applications)Engineering Geology (Civil Engineering Applications)
Engineering Geology (Civil Engineering Applications)
 
A view to civil engineering in india by 2020
A view to civil engineering in india by 2020A view to civil engineering in india by 2020
A view to civil engineering in india by 2020
 
Civil engineering
Civil engineeringCivil engineering
Civil engineering
 
Catalougue
CatalougueCatalougue
Catalougue
 
Mekanisasi gps
Mekanisasi gpsMekanisasi gps
Mekanisasi gps
 
Legal Foundation
Legal FoundationLegal Foundation
Legal Foundation
 
Photo Talk
Photo TalkPhoto Talk
Photo Talk
 
учебник русский язык 2 класс зеленина2
учебник русский язык 2 класс зеленина2учебник русский язык 2 класс зеленина2
учебник русский язык 2 класс зеленина2
 
ANZ Marketing Analytics Session 3
ANZ Marketing Analytics Session 3ANZ Marketing Analytics Session 3
ANZ Marketing Analytics Session 3
 
In App Advertising from PlacePlay
In App Advertising from PlacePlayIn App Advertising from PlacePlay
In App Advertising from PlacePlay
 
47 2012
47 201247 2012
47 2012
 

Similar to Civil Engineer resume

Similar to Civil Engineer resume (20)

CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
MCV
MCVMCV
MCV
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
CV GVN 2016
CV GVN 2016CV GVN 2016
CV GVN 2016
 
CV Engr Habib ur Rehman Babar August 26, 2016
CV Engr Habib ur Rehman Babar August 26, 2016CV Engr Habib ur Rehman Babar August 26, 2016
CV Engr Habib ur Rehman Babar August 26, 2016
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
BIODATA-CPE1
BIODATA-CPE1BIODATA-CPE1
BIODATA-CPE1
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
Psn app-1
Psn app-1Psn app-1
Psn app-1
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Farman Ali Rao
Farman Ali RaoFarman Ali Rao
Farman Ali Rao
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
SYED MUHAMMED ANWAR
SYED MUHAMMED ANWARSYED MUHAMMED ANWAR
SYED MUHAMMED ANWAR
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
CV - Midhun Mohan
CV - Midhun MohanCV - Midhun Mohan
CV - Midhun Mohan
 

Civil Engineer resume

  • 1. Muscat 096896504067 Abdul Nasir Personal Profession : Civil Engineer Nationality : Pakistani C.N.I.C No : 36104-7359934-9 Religion : Islam Home District : Khanewal Date of Birth : 15-03-1974 Education DAE in Civil Engineering (1612 Marks) in 1993 Metric (571/850 Marks) in 1989 Language Capable English, Urdu, Punjabi Professional Record  Position Project Manager Name of Organization Arabian Supplies & Contracting LLC (Muscat). Name of Project Construction of Road at Oman Munition production Company (Lizugh) Period January 2015 to till date . Responsibility To manage & execute all infrastructure works. Including 7 Meters Roads, 125 ducts, 15 box culverts & 6 Meters channels ( 40000 Sqm Rip Rap work). Construction of schools (18 class rooms,20class rooms,20class rooms &10class rooms) in different cities of Oman.  Position Acting Project Manager Name of Organization Desert Line Projects LLC (Muscat). Name of Project Construction of Ring Road at Madinat Al Ilam Period March 2011 to till date . Responsibility To manage all structure works including 1 No Bridge of 3Spans, 8 No ,s Box culverts Construction of Dual Carriageway of Ring Road & 3 Million cubic meter cutting, 3.5 million Cubic meter cutting Support in Preparation of IPC’s Escalation of work done, Correspondence with Consultant NESPAK and Client Royaaal office.  Position Deputy Manager Name of Organization Habib Construction Services (Pvt) Ltd. 1 |3
  • 2. Name of Project Improvement/Rehabilitation of Existing Multan Road, Lahore Period March 2010 to till date Name of Project Construction of Lahore Ring Road Package-10 Period May 2009 to Feb 2010. Responsibility To manage all structure works including 2 No.s Flyovers of 2 Spans, Underpasses, Subway and Construction of Main Carriageway of Ring Road & G.T Road & Approaches Support in Preparation of IPC’s Escalation of work done, Correspondence with Consultant NESPAK and Client P.M.U.  Position Senior Engineer Structure Name of Organization Qavi Engineers (pvt) Ltd. Name of Project Construction of Nishat Power Plant 220 MW (Combined Cycle) Pattoki. Period July 2008 to May 2009. Responsibility To manage all structure works including Engine hall workshop, cooling tanks (Engine foundations, Flooring of engine halls, Tank foundations & switch yard), Correspondence with ConsultantWartsila and Client Nishat Power Plant Pattoki.  Position Construction Manager Name of Organization Sh. Abdur Razzaq & Co. (Pvt) Ltd. Lahore Name of Project Construction of Flyover for G. Magnolia Park Housing Scheme at Gujranwala, Period February, 2006 to June 2008. Responsibility To manage all structure works including Flyover of 20 Span, Retaining Walls, Main Boulevard and approach roads. Preparation of IPC’s Escalation of work done, Correspondence with Consultant NESPAK and Client Ghosia Builders Construction of Main Boulevard & Approaches.  Position Sr. Structure Engineer Name of Organization Izhar (Pvt) Ltd. Name of Project Construction of Bulleha Shah Paper Mill at kasur Period September, 2005 to February, 2006 Responsibility Preparation and checking of Structure Concreting of Heavy Raft Foundation, Columns, Shells and Roof Slab  Position Project Engineer 2 |3
  • 3. Name of Organization SKB Engineering & Construction (Pvt) Ltd. Name of Project 1. Construction of Mall Road Underpass 2. Construction of F.C. College Underpass. 3. Construction of Doctor’s Hospital Underpass. 4. Construction of Dharam Pura Underpass. Period October, 2003 to August, 2005 Responsibility To manage the work schedule o Quantity Analysis of structure. o Preparing of Bar-Bending Schedule for all RCC. Structure including 314 Nos Piles, and 12 Nos CC Bridges, Retaining Walls & Approach Roads o Confirmatory boring and drilling of Piles. o Pile load test.  Position Govt. Contractor Name of Organization Tehsil Municipal Administration Mian Chanu Name of Project Various Projects like Construction of Approach Road T.M.A. Office Mian Chanu, Construction of Metalloid Road & Laying of Sewerage Line in Officers Colony Mian Chanu, Construction of Metalloid Hanif Manna Road in Faisal Town Mian Chanu, Construction of Sludge Carrier T. Chowk Mian Chanu, Providing & Laying of 01 feet Sewerage Pipe Line Liaqat Road Mian Chanu Period January, 2001 to September, 2003.  Position Site Engineer (Structure) Name of Organization M. Fahim haider (Pvt) Ltd. Name of Project Provision & Laying of Ducts & Piped Services at Jinnah Naval Base Ormara (Baluchistan) Period July, 1995 to December, 2000 Responsibility Being a Site Engineer, having been involved in the activities i.e. o Excavation for ducts & piped lines. o Laying of High & Medium Voltage Cables, Laying of Fresh Water, Compressed Air, Fire Water, JP4 & Fuel Pipe Lines. Construction of Joint Pits, Values & Service Chambers o Preparation of IPC’s. Name of Project Construction of Baba Fareed Ghee Industries (Pvt) Ltd. Okara Name of Project Construction of Feroze Pur Road Underpass Lahore. Responsibilities To manage the work schedule Quantity Analysis of structure Preparing of Bar-Bending Schedule for all RCC Structure including Piles, Deck Slab &Retaining Walls & also supervised all the work.  Position Site Supervisor / Surveyor 3 |3
  • 4. Name of Organization Deep Well Corp (Pvt) Ltd. Name of Project Lahore – Islamabad Motorway (M2) Period March, 1993 to June, 1995 Responsibility Layout of Piles, Supervise the drilling & Concreting of Piles Name of Project Piling of Bridges Raheem Yar Khan – Ubbaro Dual Carriageway 4 |3