SlideShare a Scribd company logo
Curriculum vitae
SK IFTEKAR ALI email:sk.ifti@yahoo.com
Career Outlook:
Having experience of over 4 years in EPC projects, Capable of managing entire project operations with optimal
utilization of resources and cost control. Abilities in troubleshooting problems technically. Proficient with execution
methodology and completing activities in a given time frame with safety.
Career Objective
Seeking a challenging environment to work, where I could foster my knowledge, based on my skills, towards the
development of the organization.
Employment History:
1: July 2012 till Date – KEC International, Saudi Arab.
 380 KV OHTL (Double ckt) Project From Rabigh to Makkah .
 Position: Quality Assurance Engineer/Senior Engineer Projects.
• Managed all equipment and manpower involved in execution of electrical activities.
• Monitored all site activities and updated the client with the progress and attained to any kind of technical
and non technical problems.
• Assist in preparation of accurate project programs, clearly indicate the time frames and activities
involved in the project and monitor progress against the project plan taking the corrective action where
required through effective coordination with the client, various types of subcontractors, etc
• Involved in procurement of materials required for execution at site, by making prior list of
items/materials required and ensure its availability within the specific time frame.
• Responsible for maintaining quality of materials and work for related activities at site.
• Involved in activities like Tower grounding, Tower assembly, erection and passing.
• RMI and RFI Preparation.
• Maintaining checklist for tower grounding and Tower assembly, erection and passing.
• Handling project related documents.
• Ensure HSE policies at site during execution.
 132 KV (Double Ckt) Project Jamoom.
 Position : Project Officer.
• Managed GIS termination indoor and Outdoor and testing of 132 KV power cables.
• Monitoring the progress with the Plans prepared for the activity and coordinating with the client and sub
contractors for completing it in proposed time frame.
• Troubleshooting all technical and non technical problems during execution.
 132 KV(Double Ckt) Project from Duba Power plant to Duba-2 S/S.
 Position: Project Officer.
• Handled Foundation work (pad and chimney type) for the project.
• Monitored the progress as per the plan and attended to any kind of technical and non technical issues
related to execution.
• Reported the progress to the client regularly and attained their requirement for completion of particular
activity.
• Monitored Erection activity for entire route including testing of the overhead line.
• Installed 2.5 KM 132 KV Underground Cable, outdoor termination, GIS Termination and testing of
cables.
• RFI, RMI preparation and handling project related documents.
• Successfully completed Line diversion (Double Ckt) of existing Bida to Duba PP Line to Bida to Duba-2
S/S.
• Monitored ERS installation for doing line diversion.
• Monitored High voltage insulator coating and corrosion protective coating for tower materials for the
project.
• Punch list clearing and handing over the project.
 Position: Safety Officer.
• Worked as Safety officer for project and was responsible for maintaining safe and safety environment at
work.
• Maintained safety related checklist for all activity.
• Sending weekly and monthly safety report. Maintained all safety related documents.
 110 KV (Double Ckt) Project from Rabigh Power Plant to Rabigh S/S.
 Position: Graduate Engineer Trainee.
• Installed 110KV underground power cable for 5 Km.
• Handled Project related documentation. Compiling documents for submission to client for
approval( includes drawing), reported daily progress to client, assisted in preparing plans for site
execution and monitored it to completion within the specified time frame.
• Monitored High voltage insulator coating for the project.
Academic Qualification
COURSE YEAR University/Board Percentage
Operation &
Maintenance of
T&D(PG)
2012 NPTI 76.31%(With
Distinction)
B-Tech 2011 BPUT 7.82(CGPA)
12th
2006 CHSE 63%
10th
2004 ICSE 78%
Strengths/Interests
• Fast learner, Focused, Can cop up in adverse conditions, Have descent communication skill, optimistic in
approach.
• Looking forward for a career in Transmission system, distribution system, maintenance or installation
of substation.
Trainings and ON-Job Trainings
• Completed 26 weeks Training course on Operation And Maintenance Of Transmission And
Distribution System Under National Power Training Institute (Guwahati).
• Dispatch Training Simulator (DTS): This training provides a realistic environment for system operator
to practice operating tasks under both normal and abnormal conditions.(One week training,
Bangalore).Uses E-terra simulator database for real time operation.
• Hot Line Training: This training includes maintenance of overhead lines under live conditions.(i.e.
changing of insulators,dampers,repair of damaged parts in overhead lines and washings of insulators
during live conditions).(A week training, Bangalore).
• Successfully completed one week on-job training at 220/132/33 kV voltage level sub-station (Sarusajai,
Assam).
• Successfully completed one week on-job training at 132/33/11 kV voltage level sub-station (Kahalipara,
Assam).
• Successfully completed one week on-job training at SLDC (Kahalipara, Assam).
Skills:
• Well acquainted with usage of Softwares-MI Power, DTS (Habitat), MS Office/Excel/Power Point.
• 4 wheeler vehicle license holder for India and Saudi Arabia.
Personal Details:
Nationality: Indian
Marital Status: Single
Address:C/O- MuktarAlli, JobraRahamanChhack, Cuttack-753003 , Odisha
P.O- College Square
Gender: Male
Mobile no-+966 547518844, +91 7683858929
Declaration:
I hereby declare that the above mentioned information is valid and true as per my best knowledge
Signature Date:
(SkIftekar Ali)

More Related Content

What's hot

CV Update March 13 External final
CV Update March 13 External finalCV Update March 13 External final
CV Update March 13 External final
Lynsey Hunter
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
Keith DiMarco
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - Resume
Carlos Espino
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
sudhakar k
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
Greg Sleeper
 
CV - Rufino B.Cada
CV - Rufino B.CadaCV - Rufino B.Cada
CV - Rufino B.Cada
ruffy cada
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
Greg Sleeper
 
Narender Kumar resume1
Narender Kumar  resume1Narender Kumar  resume1
Narender Kumar resume1
Narender Kumar
 

What's hot (20)

Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
CV Update March 13 External final
CV Update March 13 External finalCV Update March 13 External final
CV Update March 13 External final
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Ashish k nair
Ashish k nairAshish k nair
Ashish k nair
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - Resume
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
JEEWAN KUMAR
JEEWAN KUMARJEEWAN KUMAR
JEEWAN KUMAR
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
CV - Rufino B.Cada
CV - Rufino B.CadaCV - Rufino B.Cada
CV - Rufino B.Cada
 
ResumeAug14
ResumeAug14ResumeAug14
ResumeAug14
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Narender Kumar resume1
Narender Kumar  resume1Narender Kumar  resume1
Narender Kumar resume1
 
Resume william bickford
Resume william bickford Resume william bickford
Resume william bickford
 
Veera raghavan current cv 10 august 2016
Veera  raghavan current  cv 10 august 2016Veera  raghavan current  cv 10 august 2016
Veera raghavan current cv 10 august 2016
 

Viewers also liked

Hkd2 london google_demystifying mobile_phil jones
Hkd2 london google_demystifying mobile_phil jonesHkd2 london google_demystifying mobile_phil jones
Hkd2 london google_demystifying mobile_phil jones
H&K Demystifying Digital
 
Complete Resume October 2014
Complete Resume October 2014Complete Resume October 2014
Complete Resume October 2014
Scamman Gloria
 
Edu614 session 8 ws 13 podcasts pinterest voicethread
Edu614 session 8 ws 13   podcasts pinterest voicethreadEdu614 session 8 ws 13   podcasts pinterest voicethread
Edu614 session 8 ws 13 podcasts pinterest voicethread
Kathy Favazza
 

Viewers also liked (13)

Hkd2 london google_demystifying mobile_phil jones
Hkd2 london google_demystifying mobile_phil jonesHkd2 london google_demystifying mobile_phil jones
Hkd2 london google_demystifying mobile_phil jones
 
Public Lecture Slide Presentation (4.1.2016) Haruka Adachi: The activities of...
Public Lecture Slide Presentation (4.1.2016) Haruka Adachi: The activities of...Public Lecture Slide Presentation (4.1.2016) Haruka Adachi: The activities of...
Public Lecture Slide Presentation (4.1.2016) Haruka Adachi: The activities of...
 
Summary of Services
Summary of ServicesSummary of Services
Summary of Services
 
Allysian sciences a holistic approach to life
Allysian sciences a holistic approach to lifeAllysian sciences a holistic approach to life
Allysian sciences a holistic approach to life
 
Complete Resume October 2014
Complete Resume October 2014Complete Resume October 2014
Complete Resume October 2014
 
Articulo
ArticuloArticulo
Articulo
 
pointless foods2
pointless foods2pointless foods2
pointless foods2
 
Edu614 session 8 ws 13 podcasts pinterest voicethread
Edu614 session 8 ws 13   podcasts pinterest voicethreadEdu614 session 8 ws 13   podcasts pinterest voicethread
Edu614 session 8 ws 13 podcasts pinterest voicethread
 
JT International, Jaipur
JT International, JaipurJT International, Jaipur
JT International, Jaipur
 
Iranian oil history
Iranian oil historyIranian oil history
Iranian oil history
 
Swabstapes
SwabstapesSwabstapes
Swabstapes
 
Aquaimago Aquarium Plant Substrate
Aquaimago Aquarium Plant SubstrateAquaimago Aquarium Plant Substrate
Aquaimago Aquarium Plant Substrate
 
Hệ thống mẹo trong bài thi toeic
Hệ thống mẹo trong bài thi toeicHệ thống mẹo trong bài thi toeic
Hệ thống mẹo trong bài thi toeic
 

Similar to Curriculum vitae 3.2

ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
Iyad Hassan
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
yogesh kumar
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
mathavan2008
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
Syed Asif Ali
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
Kiran Sasi
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
Umar Akbar
 

Similar to Curriculum vitae 3.2 (20)

ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
IGNATIOUS RESUME
IGNATIOUS RESUMEIGNATIOUS RESUME
IGNATIOUS RESUME
 
Pranav.Varshney
Pranav.VarshneyPranav.Varshney
Pranav.Varshney
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
PankajKPrajapati
PankajKPrajapatiPankajKPrajapati
PankajKPrajapati
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 

Curriculum vitae 3.2

  • 1. Curriculum vitae SK IFTEKAR ALI email:sk.ifti@yahoo.com Career Outlook: Having experience of over 4 years in EPC projects, Capable of managing entire project operations with optimal utilization of resources and cost control. Abilities in troubleshooting problems technically. Proficient with execution methodology and completing activities in a given time frame with safety. Career Objective Seeking a challenging environment to work, where I could foster my knowledge, based on my skills, towards the development of the organization. Employment History: 1: July 2012 till Date – KEC International, Saudi Arab.  380 KV OHTL (Double ckt) Project From Rabigh to Makkah .  Position: Quality Assurance Engineer/Senior Engineer Projects. • Managed all equipment and manpower involved in execution of electrical activities. • Monitored all site activities and updated the client with the progress and attained to any kind of technical and non technical problems. • Assist in preparation of accurate project programs, clearly indicate the time frames and activities involved in the project and monitor progress against the project plan taking the corrective action where required through effective coordination with the client, various types of subcontractors, etc • Involved in procurement of materials required for execution at site, by making prior list of items/materials required and ensure its availability within the specific time frame. • Responsible for maintaining quality of materials and work for related activities at site. • Involved in activities like Tower grounding, Tower assembly, erection and passing. • RMI and RFI Preparation. • Maintaining checklist for tower grounding and Tower assembly, erection and passing. • Handling project related documents. • Ensure HSE policies at site during execution.  132 KV (Double Ckt) Project Jamoom.  Position : Project Officer. • Managed GIS termination indoor and Outdoor and testing of 132 KV power cables. • Monitoring the progress with the Plans prepared for the activity and coordinating with the client and sub contractors for completing it in proposed time frame. • Troubleshooting all technical and non technical problems during execution.  132 KV(Double Ckt) Project from Duba Power plant to Duba-2 S/S.  Position: Project Officer.
  • 2. • Handled Foundation work (pad and chimney type) for the project. • Monitored the progress as per the plan and attended to any kind of technical and non technical issues related to execution. • Reported the progress to the client regularly and attained their requirement for completion of particular activity. • Monitored Erection activity for entire route including testing of the overhead line. • Installed 2.5 KM 132 KV Underground Cable, outdoor termination, GIS Termination and testing of cables. • RFI, RMI preparation and handling project related documents. • Successfully completed Line diversion (Double Ckt) of existing Bida to Duba PP Line to Bida to Duba-2 S/S. • Monitored ERS installation for doing line diversion. • Monitored High voltage insulator coating and corrosion protective coating for tower materials for the project. • Punch list clearing and handing over the project.  Position: Safety Officer. • Worked as Safety officer for project and was responsible for maintaining safe and safety environment at work. • Maintained safety related checklist for all activity. • Sending weekly and monthly safety report. Maintained all safety related documents.  110 KV (Double Ckt) Project from Rabigh Power Plant to Rabigh S/S.  Position: Graduate Engineer Trainee. • Installed 110KV underground power cable for 5 Km. • Handled Project related documentation. Compiling documents for submission to client for approval( includes drawing), reported daily progress to client, assisted in preparing plans for site execution and monitored it to completion within the specified time frame. • Monitored High voltage insulator coating for the project. Academic Qualification COURSE YEAR University/Board Percentage Operation & Maintenance of T&D(PG) 2012 NPTI 76.31%(With Distinction) B-Tech 2011 BPUT 7.82(CGPA) 12th 2006 CHSE 63% 10th 2004 ICSE 78%
  • 3. Strengths/Interests • Fast learner, Focused, Can cop up in adverse conditions, Have descent communication skill, optimistic in approach. • Looking forward for a career in Transmission system, distribution system, maintenance or installation of substation. Trainings and ON-Job Trainings • Completed 26 weeks Training course on Operation And Maintenance Of Transmission And Distribution System Under National Power Training Institute (Guwahati). • Dispatch Training Simulator (DTS): This training provides a realistic environment for system operator to practice operating tasks under both normal and abnormal conditions.(One week training, Bangalore).Uses E-terra simulator database for real time operation. • Hot Line Training: This training includes maintenance of overhead lines under live conditions.(i.e. changing of insulators,dampers,repair of damaged parts in overhead lines and washings of insulators during live conditions).(A week training, Bangalore). • Successfully completed one week on-job training at 220/132/33 kV voltage level sub-station (Sarusajai, Assam). • Successfully completed one week on-job training at 132/33/11 kV voltage level sub-station (Kahalipara, Assam). • Successfully completed one week on-job training at SLDC (Kahalipara, Assam). Skills: • Well acquainted with usage of Softwares-MI Power, DTS (Habitat), MS Office/Excel/Power Point. • 4 wheeler vehicle license holder for India and Saudi Arabia. Personal Details: Nationality: Indian Marital Status: Single Address:C/O- MuktarAlli, JobraRahamanChhack, Cuttack-753003 , Odisha P.O- College Square Gender: Male Mobile no-+966 547518844, +91 7683858929 Declaration: I hereby declare that the above mentioned information is valid and true as per my best knowledge