SlideShare a Scribd company logo
1 of 6
Sudhakar Krishnan B.E, M.B.A.
Contact No: +974 66904503 (Qatar) ~ E-mail: sudhakar.bcepl@gmail.com
I am:
 A person, with strong mental attitude, good communication skills and ability to perform
the best under challenging conditions
 Ascertaining the project requirements and be flexible to the varying and extreme
demands of job
 Utilizing the computer skills assimilated, can execute the responsibilities in a highly
professional way
 With the experience of leading team of people, can complete the project with precise
planning and perseverance
Objective:
 Work in a multi-lingual creative team environment to realise my true potential
 Seeking a challenging career in the environment that encourages creativity & continuous
learning
 Enhance the professional expertise gathered & development of personal growth along
with the growth of the organization
Academic Qualifications
 MBA (Marketing) – Master Degree
2011-Madras University, Chennai, Tamil Nadu, India
 B.E. (Electrical & Electronics Engineering) – Bachelor Degree
2009 – Anna University, Chennai, Tamil Nadu, India
 Diploma in Electrical & Electronics Engineering
2006 – St. Michaels Polytechnic College, Chennai, Tamil Nadu, India
Certifications
 Primavera P6
 Computer Hardware Networking
 Language C & C++
 Auto cad
Experience:
Present Organization: M/s National Contracting Company Ltd, Qatar
Period: September – 2012 to till date
Designation: Engineer – Projects (project Management, Tendering & Procurement)
Projects Handling:
• EPC Contract NO: GTC/488G/2012, Phase -11, 220/132/66/11kV, GIS Substations for
KAHRAMAA, Qatar general Electricity & Water Corporation, Qatar. (Contract Value :
QAR 852 Millions)
CV of Sudhakar Krishnan
• EPC Contract No: GTC/450I/2011, Phase -11, 220kV, 132kV, 66kV EHV underground
cables for KAHRAMAA, Qatar general Electricity & Water Corporation, Qatar
(Contract Value: QAR 320 Millions).
Projects Handled:
• EPC Contract No: GTC/372F/2010 & GTC/372B/2010, Phase – 10, Qatar Power
Transmission System Expansion, Package C6 &C7, EHV UG cables, 132kV &66kV for
KAHRAMAA (Qatar general Electricity & Water Corporation), Qatar. (Contract
Value : QAR 403 Millions)
• EPC Contract NO: HMC, CP403 Expansion 66/11kV, GIS Substations and 11kV/415V
distribution substations for KAHRAMAA, Qatar general Electricity & Water
Corporation, Qatar. (Contract Value : QAR 103 Millions)
Major Tenders Handled
• Qatar Power System Expansion, KAHRAMAA – GTC/735/2015 & GTC/736/2015
Phase-13, 220kV, 132kV, 66kV EHV substations & UG cables – Yet to be awarded.
• Qatar Power System Expansion, KAHRAMAA – Phase XII, GTC/643/2014 Phase-12,
220kV,132kV, 66kV EHV substations – Awarded Value QAR 2070Millions.
• Qatar Power System Expansion, KAHRAMAA – Phase XI – GTC/450/2011 &
GTC/488/2012, Phase-11, 220kV, 132kV, 66 kV EHV underground cables and
substations – Awarded Value QAR 1430Millions.
Previous Organization: M/s Best & Crompton Engineering Projects Ltd
Period: July -2009 to September – 2012
Designation: Electrical Engineer – Projects (project coordination, Tendering &
Procurement)
Projects Handled:
• 110/22KV Substation project at villianur, Pondichery for Power Grid Corparation Ltd -
INDIA.
• 132/25KV Traction Substation project at Mangaliagaon, Ujjain, Madyapradesh for
Railways - INDIA.
• Railway Electrification project between Lingampalli-Wadi for South Central Railway –
INDIA
• Railway Electrification project between Ujjain-Indore for West Central Railway-INDIA
Tenders Handled
• Tender quoted for EPC project (substation, transmission line and Railway Electrification
projects) for the client NTPC, TNEB, PGCIL, APTRANSCO, KPTCL, HVPNL, CPCL
& INDIAN RAILWAYS.
CV of Sudhakar Krishnan
Overall Responsibilities
Project Management:
• Project Management and Co-ordination with all concerned from taking over from Client
up to Commissioning, Handing over and receiving Taking over Certificate from client.
• Identifying and defining the deliverables and work to produce them. Identifying and
defining the scope must describe what the project will include and what it will not
include, i.e. what is in and out of scope.
• Served as a focal point of the contact from project initiation to project completion.
• Providing feasible and appropriate solutions for the contract & execution issues.
• Attending Factory acceptance test of goods at factory and verifying the technical
parameters as per client requirement.
• Attending weekly, monthly & annual internal meeting along with management members,
external clients, consultants, subcontractors & suppliers.
• Reporting the site issues to client through official letters to obtain the support.
• Execution coordination with subcontractors and other internal agencies, including civil
works.
• Conducting periodical meeting with client, consultants, contractors and suppliers to
review the progress of the project, project safety requirements, material, inspection,
quality requirements, etc. and to resolve the issues.
• Co-ordination with Engineering department and suppliers in submission of Drawings,
calculations, method statements, FAT procedures and other technical documents
submission work for consultant/client approval in line with contract specifications and
technical requirements/comments.
• Arranging the client witness for testing & commissioning for all relevant equipments.
• Co-ordination with Site Project Engineers for Electrical Equipment installation activities
• Invoicing, work progress statements and payment follow-up with Client. Assist Project
Manager in cost and financial monitoring.
• Billing and certifying for all subcontractors invoices as per site progress in co-ordination
with Site Engineers.
• Manage resource requirement by identifying all the required resources for the project and
the availability of resources.
• Critical Monitoring for all site execution and taking necessary actions to speed up the
Project.
• Coordination with client and project team such as Civil, QA/QC, Safety and technical
Crew to achieve good progress with quality of work and zero loss.
• Discuss various risk elements and mitigation strategies involved in the project during
Team Review Meetings.
• Coordinating with client to obtain required permits for the specific activity at right time
to avoid the delay.
• Coordinating with insurance agency/company.
Procurement:
.
• Preparation of Project Specific Vendor list for the approval of the client.
• Preparation of Project Specific Procurement and Subcontract Procedure for approval of
the client
• Analyze all suppliers in order to select the most suitable suppliers who are able to deliver
high quality products at competitive pricing.
CV of Sudhakar Krishnan
• Negotiate with suppliers on lead-time, cost and quality so as to obtain the maximum
benefit for the company..
• Create RFQ for the materials and services, projects, departments, project materials,
consumables, fixed assets, equipment’s and sub contracts
• Manage suppliers to meet objectives related to cost, delivery performance, schedule and
quality.
• Develop purchasing or sourcing strategies based on portfolio analyses and supplier
referencing study.
• Define and maintain documented category and supplier strategies using market and
competitive data.
• Conducting price and commercial negotiation to optimize the purchases within the
budgeted amount.
• Liaise with suppliers on delivery schedule so as to ensure on-time deliveries of final
product.
• Releasing the purchase and work orders to suitable vendors/sub-contractors.
• Develop, implement and drive the procurement strategies in order to meet cost savings
targets.
• Review and manage the supplier base to ensure consistency with the sourcing strategy.
• Perform regular performance review with suppliers to drive continuous improvements.
• Create monthly performance reviews and reports focusing on overall sourcing
requirements.
• Ensure commercial, legal and contractual compliances in all the procurement
transactions.
• Adopt appropriate supplier management methodologies and procurement strategies in
purchasing to secure better prices.
• Appointing Third Party Inspection and following till the approval of the inspection
report.
• Appointing shipper from the manufacturing end and clearance agency at receiving end.
• Taking the all responsibilities till materials reaches to site / stores.
• Handling all the insurance and shipping documents to ensure materials/equipment
healthiness.
• Train team on effective procurement processes and strategy.
• Coordinate with vendor on continuous quality improvement.
• Coordinating with client for the material inspection and preparation of invoices to collect
the payment from the client as early as possible to match the company cash flow.
• Preparation of damage claim to the insurance agency and following up to get the claim
within stipulated time period.
Tendering:
• The initial review and summarizing the ITT and assist Management to decide Bid or No
Bid.
• Understand and Compiling of the Tender Responsibility Matrix.
• Attending the Site Visits & Tender Kick of Meetings.
• Compiling and managing the tender inputs.
• Coordination with Equipment Vendors and all subcontractors and evaluating their offers.
• Compiling the pricing spreadsheet to build up the cost base.
• Evaluating of the project risks.
• Evaluating the competition / competitive position.
CV of Sudhakar Krishnan
• Interface with other departments as required.
• Presenting the costing to management.
• Compiling the commercial qualifications to ensure compliance with all commercial
principals.
• Compiling the final tender package in compliance with all processes, procedures and
principals.
• Submitted timely delivery of the tender documents.
• Dealing with Post Tender & Pre Tender clarifications and attend negotiation meeting
with Client.
• Close out of tenders negotiations.
• Handover the successful bid to the project team.
• Support on-going tendering initiatives.
Computer Expertise:
1. Experience in ACAD
2. Experience in MS Office related packages
3. Working knowledge in Primavera
Personal Details:
Father’s Name : E.R. Krishnan
Contact Details : +974 66904503 (Qatar) / +91 8608539889 (INDIA)
Permanent Address : #336, AV road, near bus stop, veerapuram, AVADI,
Chennai
– 600 055, Tamil Nadu, India
Date of Birth : 04-10-1987
Passport No. & Expiry Date : H2901993
Nationality : Indian
Visa Status : Qatar Residence Visa
Languages Known : English, Tamil and Telugu
Marital Status : Single
Nationality : Indian
Interests : Traveling, Meeting new people, Music & Sports
(Sudhakar Krishnan)
CV of Sudhakar Krishnan
• Interface with other departments as required.
• Presenting the costing to management.
• Compiling the commercial qualifications to ensure compliance with all commercial
principals.
• Compiling the final tender package in compliance with all processes, procedures and
principals.
• Submitted timely delivery of the tender documents.
• Dealing with Post Tender & Pre Tender clarifications and attend negotiation meeting
with Client.
• Close out of tenders negotiations.
• Handover the successful bid to the project team.
• Support on-going tendering initiatives.
Computer Expertise:
1. Experience in ACAD
2. Experience in MS Office related packages
3. Working knowledge in Primavera
Personal Details:
Father’s Name : E.R. Krishnan
Contact Details : +974 66904503 (Qatar) / +91 8608539889 (INDIA)
Permanent Address : #336, AV road, near bus stop, veerapuram, AVADI,
Chennai
– 600 055, Tamil Nadu, India
Date of Birth : 04-10-1987
Passport No. & Expiry Date : H2901993
Nationality : Indian
Visa Status : Qatar Residence Visa
Languages Known : English, Tamil and Telugu
Marital Status : Single
Nationality : Indian
Interests : Traveling, Meeting new people, Music & Sports
(Sudhakar Krishnan)
CV of Sudhakar Krishnan

More Related Content

What's hot

Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CVYousif Alanazi
 
Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16Ejaz Wagi
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed SabekEmad Ahmed Mohamed Sabek
 
CV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerCV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerAkbar Sadiq
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cvEnaia Kamel
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 

What's hot (20)

Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16
 
Electrical engineer cv
Electrical engineer cvElectrical engineer cv
Electrical engineer cv
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
CV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerCV - Electrical Estimation Engineer
CV - Electrical Estimation Engineer
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
BMS Engineer
BMS EngineerBMS Engineer
BMS Engineer
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 

Viewers also liked

Top 8 tendering engineer resume samples
Top 8 tendering engineer resume samplesTop 8 tendering engineer resume samples
Top 8 tendering engineer resume samplestonychoper2405
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathiFathi Alsunni
 
Jaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CLJaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CLJaz Morton
 
A Consideration of Medium Voltage Substation Primary Applications
A Consideration of Medium Voltage Substation Primary ApplicationsA Consideration of Medium Voltage Substation Primary Applications
A Consideration of Medium Voltage Substation Primary ApplicationsSchneider Electric
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
SNGPL Industrial Training Report Presentation
SNGPL Industrial Training Report PresentationSNGPL Industrial Training Report Presentation
SNGPL Industrial Training Report PresentationShams Ul Islam
 
Novel setting and design of relay for protection of 3 phase induction motor u...
Novel setting and design of relay for protection of 3 phase induction motor u...Novel setting and design of relay for protection of 3 phase induction motor u...
Novel setting and design of relay for protection of 3 phase induction motor u...eSAT Journals
 
Engineering symbology prints and drawings 1
Engineering symbology   prints and drawings 1Engineering symbology   prints and drawings 1
Engineering symbology prints and drawings 1adarshpushpan
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansLiving Online
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relaydavid roy
 
New base 815 special 24 march 2016
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016Khaled Al Awadi
 

Viewers also liked (14)

Top 8 tendering engineer resume samples
Top 8 tendering engineer resume samplesTop 8 tendering engineer resume samples
Top 8 tendering engineer resume samples
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathi
 
Jaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CLJaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CL
 
A Consideration of Medium Voltage Substation Primary Applications
A Consideration of Medium Voltage Substation Primary ApplicationsA Consideration of Medium Voltage Substation Primary Applications
A Consideration of Medium Voltage Substation Primary Applications
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
NEMA: U.S. Ecosystem for Smart Grid
NEMA: U.S. Ecosystem for Smart GridNEMA: U.S. Ecosystem for Smart Grid
NEMA: U.S. Ecosystem for Smart Grid
 
SNGPL Industrial Training Report Presentation
SNGPL Industrial Training Report PresentationSNGPL Industrial Training Report Presentation
SNGPL Industrial Training Report Presentation
 
Novel setting and design of relay for protection of 3 phase induction motor u...
Novel setting and design of relay for protection of 3 phase induction motor u...Novel setting and design of relay for protection of 3 phase induction motor u...
Novel setting and design of relay for protection of 3 phase induction motor u...
 
Engineering symbology prints and drawings 1
Engineering symbology   prints and drawings 1Engineering symbology   prints and drawings 1
Engineering symbology prints and drawings 1
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and Technicians
 
Read and Understand The Electrical Diagram
Read and Understand The Electrical DiagramRead and Understand The Electrical Diagram
Read and Understand The Electrical Diagram
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relay
 
New base 815 special 24 march 2016
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016
 
Aramco Question
Aramco Question Aramco Question
Aramco Question
 

Similar to CV of Electrical Engineer - Projects with 7+ years experience in Project management & tendering

Similar to CV of Electrical Engineer - Projects with 7+ years experience in Project management & tendering (20)

Resume_08_07_2015
Resume_08_07_2015Resume_08_07_2015
Resume_08_07_2015
 
CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender Sahrawat
 
Resume - Atul NaikDesai
Resume - Atul NaikDesaiResume - Atul NaikDesai
Resume - Atul NaikDesai
 
Ahmad Haddad
Ahmad HaddadAhmad Haddad
Ahmad Haddad
 
Resume New
Resume NewResume New
Resume New
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Gaurav Shukla_CV
Gaurav Shukla_CVGaurav Shukla_CV
Gaurav Shukla_CV
 
Resume.Shahbaz
Resume.ShahbazResume.Shahbaz
Resume.Shahbaz
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
updated_resume
updated_resumeupdated_resume
updated_resume
 
CV
CVCV
CV
 
Kartik CV
Kartik CVKartik CV
Kartik CV
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Badrinath_Dash
Badrinath_DashBadrinath_Dash
Badrinath_Dash
 
Resume_3
Resume_3Resume_3
Resume_3
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
sounder
soundersounder
sounder
 
Professional with almost 4+ years of rich experience in Business Development ...
Professional with almost 4+ years of rich experience in Business Development ...Professional with almost 4+ years of rich experience in Business Development ...
Professional with almost 4+ years of rich experience in Business Development ...
 

CV of Electrical Engineer - Projects with 7+ years experience in Project management & tendering

  • 1. Sudhakar Krishnan B.E, M.B.A. Contact No: +974 66904503 (Qatar) ~ E-mail: sudhakar.bcepl@gmail.com I am:  A person, with strong mental attitude, good communication skills and ability to perform the best under challenging conditions  Ascertaining the project requirements and be flexible to the varying and extreme demands of job  Utilizing the computer skills assimilated, can execute the responsibilities in a highly professional way  With the experience of leading team of people, can complete the project with precise planning and perseverance Objective:  Work in a multi-lingual creative team environment to realise my true potential  Seeking a challenging career in the environment that encourages creativity & continuous learning  Enhance the professional expertise gathered & development of personal growth along with the growth of the organization Academic Qualifications  MBA (Marketing) – Master Degree 2011-Madras University, Chennai, Tamil Nadu, India  B.E. (Electrical & Electronics Engineering) – Bachelor Degree 2009 – Anna University, Chennai, Tamil Nadu, India  Diploma in Electrical & Electronics Engineering 2006 – St. Michaels Polytechnic College, Chennai, Tamil Nadu, India Certifications  Primavera P6  Computer Hardware Networking  Language C & C++  Auto cad Experience: Present Organization: M/s National Contracting Company Ltd, Qatar Period: September – 2012 to till date Designation: Engineer – Projects (project Management, Tendering & Procurement) Projects Handling: • EPC Contract NO: GTC/488G/2012, Phase -11, 220/132/66/11kV, GIS Substations for KAHRAMAA, Qatar general Electricity & Water Corporation, Qatar. (Contract Value : QAR 852 Millions) CV of Sudhakar Krishnan
  • 2. • EPC Contract No: GTC/450I/2011, Phase -11, 220kV, 132kV, 66kV EHV underground cables for KAHRAMAA, Qatar general Electricity & Water Corporation, Qatar (Contract Value: QAR 320 Millions). Projects Handled: • EPC Contract No: GTC/372F/2010 & GTC/372B/2010, Phase – 10, Qatar Power Transmission System Expansion, Package C6 &C7, EHV UG cables, 132kV &66kV for KAHRAMAA (Qatar general Electricity & Water Corporation), Qatar. (Contract Value : QAR 403 Millions) • EPC Contract NO: HMC, CP403 Expansion 66/11kV, GIS Substations and 11kV/415V distribution substations for KAHRAMAA, Qatar general Electricity & Water Corporation, Qatar. (Contract Value : QAR 103 Millions) Major Tenders Handled • Qatar Power System Expansion, KAHRAMAA – GTC/735/2015 & GTC/736/2015 Phase-13, 220kV, 132kV, 66kV EHV substations & UG cables – Yet to be awarded. • Qatar Power System Expansion, KAHRAMAA – Phase XII, GTC/643/2014 Phase-12, 220kV,132kV, 66kV EHV substations – Awarded Value QAR 2070Millions. • Qatar Power System Expansion, KAHRAMAA – Phase XI – GTC/450/2011 & GTC/488/2012, Phase-11, 220kV, 132kV, 66 kV EHV underground cables and substations – Awarded Value QAR 1430Millions. Previous Organization: M/s Best & Crompton Engineering Projects Ltd Period: July -2009 to September – 2012 Designation: Electrical Engineer – Projects (project coordination, Tendering & Procurement) Projects Handled: • 110/22KV Substation project at villianur, Pondichery for Power Grid Corparation Ltd - INDIA. • 132/25KV Traction Substation project at Mangaliagaon, Ujjain, Madyapradesh for Railways - INDIA. • Railway Electrification project between Lingampalli-Wadi for South Central Railway – INDIA • Railway Electrification project between Ujjain-Indore for West Central Railway-INDIA Tenders Handled • Tender quoted for EPC project (substation, transmission line and Railway Electrification projects) for the client NTPC, TNEB, PGCIL, APTRANSCO, KPTCL, HVPNL, CPCL & INDIAN RAILWAYS. CV of Sudhakar Krishnan
  • 3. Overall Responsibilities Project Management: • Project Management and Co-ordination with all concerned from taking over from Client up to Commissioning, Handing over and receiving Taking over Certificate from client. • Identifying and defining the deliverables and work to produce them. Identifying and defining the scope must describe what the project will include and what it will not include, i.e. what is in and out of scope. • Served as a focal point of the contact from project initiation to project completion. • Providing feasible and appropriate solutions for the contract & execution issues. • Attending Factory acceptance test of goods at factory and verifying the technical parameters as per client requirement. • Attending weekly, monthly & annual internal meeting along with management members, external clients, consultants, subcontractors & suppliers. • Reporting the site issues to client through official letters to obtain the support. • Execution coordination with subcontractors and other internal agencies, including civil works. • Conducting periodical meeting with client, consultants, contractors and suppliers to review the progress of the project, project safety requirements, material, inspection, quality requirements, etc. and to resolve the issues. • Co-ordination with Engineering department and suppliers in submission of Drawings, calculations, method statements, FAT procedures and other technical documents submission work for consultant/client approval in line with contract specifications and technical requirements/comments. • Arranging the client witness for testing & commissioning for all relevant equipments. • Co-ordination with Site Project Engineers for Electrical Equipment installation activities • Invoicing, work progress statements and payment follow-up with Client. Assist Project Manager in cost and financial monitoring. • Billing and certifying for all subcontractors invoices as per site progress in co-ordination with Site Engineers. • Manage resource requirement by identifying all the required resources for the project and the availability of resources. • Critical Monitoring for all site execution and taking necessary actions to speed up the Project. • Coordination with client and project team such as Civil, QA/QC, Safety and technical Crew to achieve good progress with quality of work and zero loss. • Discuss various risk elements and mitigation strategies involved in the project during Team Review Meetings. • Coordinating with client to obtain required permits for the specific activity at right time to avoid the delay. • Coordinating with insurance agency/company. Procurement: . • Preparation of Project Specific Vendor list for the approval of the client. • Preparation of Project Specific Procurement and Subcontract Procedure for approval of the client • Analyze all suppliers in order to select the most suitable suppliers who are able to deliver high quality products at competitive pricing. CV of Sudhakar Krishnan
  • 4. • Negotiate with suppliers on lead-time, cost and quality so as to obtain the maximum benefit for the company.. • Create RFQ for the materials and services, projects, departments, project materials, consumables, fixed assets, equipment’s and sub contracts • Manage suppliers to meet objectives related to cost, delivery performance, schedule and quality. • Develop purchasing or sourcing strategies based on portfolio analyses and supplier referencing study. • Define and maintain documented category and supplier strategies using market and competitive data. • Conducting price and commercial negotiation to optimize the purchases within the budgeted amount. • Liaise with suppliers on delivery schedule so as to ensure on-time deliveries of final product. • Releasing the purchase and work orders to suitable vendors/sub-contractors. • Develop, implement and drive the procurement strategies in order to meet cost savings targets. • Review and manage the supplier base to ensure consistency with the sourcing strategy. • Perform regular performance review with suppliers to drive continuous improvements. • Create monthly performance reviews and reports focusing on overall sourcing requirements. • Ensure commercial, legal and contractual compliances in all the procurement transactions. • Adopt appropriate supplier management methodologies and procurement strategies in purchasing to secure better prices. • Appointing Third Party Inspection and following till the approval of the inspection report. • Appointing shipper from the manufacturing end and clearance agency at receiving end. • Taking the all responsibilities till materials reaches to site / stores. • Handling all the insurance and shipping documents to ensure materials/equipment healthiness. • Train team on effective procurement processes and strategy. • Coordinate with vendor on continuous quality improvement. • Coordinating with client for the material inspection and preparation of invoices to collect the payment from the client as early as possible to match the company cash flow. • Preparation of damage claim to the insurance agency and following up to get the claim within stipulated time period. Tendering: • The initial review and summarizing the ITT and assist Management to decide Bid or No Bid. • Understand and Compiling of the Tender Responsibility Matrix. • Attending the Site Visits & Tender Kick of Meetings. • Compiling and managing the tender inputs. • Coordination with Equipment Vendors and all subcontractors and evaluating their offers. • Compiling the pricing spreadsheet to build up the cost base. • Evaluating of the project risks. • Evaluating the competition / competitive position. CV of Sudhakar Krishnan
  • 5. • Interface with other departments as required. • Presenting the costing to management. • Compiling the commercial qualifications to ensure compliance with all commercial principals. • Compiling the final tender package in compliance with all processes, procedures and principals. • Submitted timely delivery of the tender documents. • Dealing with Post Tender & Pre Tender clarifications and attend negotiation meeting with Client. • Close out of tenders negotiations. • Handover the successful bid to the project team. • Support on-going tendering initiatives. Computer Expertise: 1. Experience in ACAD 2. Experience in MS Office related packages 3. Working knowledge in Primavera Personal Details: Father’s Name : E.R. Krishnan Contact Details : +974 66904503 (Qatar) / +91 8608539889 (INDIA) Permanent Address : #336, AV road, near bus stop, veerapuram, AVADI, Chennai – 600 055, Tamil Nadu, India Date of Birth : 04-10-1987 Passport No. & Expiry Date : H2901993 Nationality : Indian Visa Status : Qatar Residence Visa Languages Known : English, Tamil and Telugu Marital Status : Single Nationality : Indian Interests : Traveling, Meeting new people, Music & Sports (Sudhakar Krishnan) CV of Sudhakar Krishnan
  • 6. • Interface with other departments as required. • Presenting the costing to management. • Compiling the commercial qualifications to ensure compliance with all commercial principals. • Compiling the final tender package in compliance with all processes, procedures and principals. • Submitted timely delivery of the tender documents. • Dealing with Post Tender & Pre Tender clarifications and attend negotiation meeting with Client. • Close out of tenders negotiations. • Handover the successful bid to the project team. • Support on-going tendering initiatives. Computer Expertise: 1. Experience in ACAD 2. Experience in MS Office related packages 3. Working knowledge in Primavera Personal Details: Father’s Name : E.R. Krishnan Contact Details : +974 66904503 (Qatar) / +91 8608539889 (INDIA) Permanent Address : #336, AV road, near bus stop, veerapuram, AVADI, Chennai – 600 055, Tamil Nadu, India Date of Birth : 04-10-1987 Passport No. & Expiry Date : H2901993 Nationality : Indian Visa Status : Qatar Residence Visa Languages Known : English, Tamil and Telugu Marital Status : Single Nationality : Indian Interests : Traveling, Meeting new people, Music & Sports (Sudhakar Krishnan) CV of Sudhakar Krishnan