• A highly experienced result-oriented manager with over 21 years of illustrious service in planning, erection of
large power plants, huge e l e c t r o -mechanical structures, GIS sub-stations and maintenance field in India and abroad.
Well known in the profession for:
0 Leadership, Sincerity, Exemplary Honesty, unquestionable Integrity in actions and developing team
Spirit.
0 Excellent Organizing and timely execution capability.
0 Applying single minded devotion for completing any assignment satisfactorily.
0 Thorough about understanding of the fundamentals in the area of assigned responsibility.
• I was holding the key responsibility of Project manager in Alkaffaha Electrical Contracting Company-Dubai, an
organization well kno wn for its planning, engineering, quality of construction, execution of huge c o n t r a c t s in the
field of electrical power plants in Middle East and Asia.
• Expert in erection of large capacity transformers in the range of 300 MVA and above.
• Have established excellent creditability in the professional circle for:
 
� handling multiple Projects - keeping full control on multidisciplinary activities.
� Meticulous Project Planning, Implementation with respect to the stipulated parameters andstrict time
schedule adherence.
� typical o b j e c t i v e oriented style of preparation and presentation of progress reports and MIS to
management.
� Proven administrative capability to handle all t yp e s of personnel involved with any project of
sizable dimension.
• Proven track record of successful plan, erection and commissioning of multiple projects’ across various parts of
India and Middle East Asia in record time.
 
 
SALIENT CAPABILITIES AND ACHIEVEMENTS:
 
 
• Well proficient with latest erection methodologies, in compliance with the quality standards.
• Expertise in:
0 The development and implementation of Project Management systems, ISO-TQM System. Organization
Development, MIS – Uniform Reporting system, etc.
0 Swiftly ramping up projects with competent cross-functional skills and on time execution.
• Exemplary Relationship management, Effective Communication skills w i t h the ability to network with project
members, consultants, contractors, and statutory agencies with consummate ease.
2 | P a g e 
 
 
Work Experience
 
 
 
• To monitor all the Electrical Installation, MEP, LSP, CIVEL sub contractors and their progress, and
 
Drawing coordination.
 
• To attend the client weekly meeting, monthly meeting regularly.
 
• Daily, weekly progress reports to the project manager, civil project manager, civil,
testing commissioning manager, MEP coordinator, and the entire site Controls and etc..
• To prepare the ETC progress, and get the approval from the client and handover to
 
Project manager by monthly basic.
 
• Electrical, mechanical technical clarification for the client. And required site level
 
Modification, and to get the approval from the client and execution.
 
• To coordination with transformer supervisor like from German AREVA, TRUKEY AREVA, ABB.
 
For the installation and modification.
 
• To coordination with the 132 kv GIS supervisor and GIS installation manager for the
Installation of GIS, LCC, PJB Panel installation, cable pulling, and termination works
Execution
• Cable trays installation and modification according to the site condition and get the approval from client in the red mark
drawing...
 
• 110v, 48 v battery installation commissioning and coordination with the battery manufacture.
 
• LVAC, Control panels, protection panels, scada panels, fault recorder panels, telecom. FRP, installation, cable pulling
and termination,
 
• 132 kv GIS Installation, commissioning works. And 400 KVGIS installation and GIB installations, cable try, cabling
installations.
 
• 132 kv XLP copper cable pulling from 132 GIS to IDTS and Reactor to 132 GIS BAY and coordination with the approved
cable jointers to execute the 132 kv termination and link box installation and approval from the client as per the site
condition .
 
• 11 KV XLP copper cable pulling from IDT to 11 KV AIS Gears. And capacitor bank to 11 KV
 
AIS Gears. 11 kv cable pulling from Earting transformer to IDTS, all type of cable pulling, termination and etc...
 
• Coordination with commissioning team to get the client witness and complete the Testing activities in smooth manner.
 
• Coordination with MEP coordinator to complete the MEP Equipment’s installation and testing activities. And
Modification works in the firefighting equipment’s, fire protection equipment and Programming.
3 | P a g e 
 
 
Current ASSIGNMENT
Now I am working as a SITE MANAGER in ABB, contract no REZD/E/2008/1 IN ARJAN
site in DUBAI. UAE
 
 
 
LATEST ASSIGNMENT
 
• I was worked as a Residential site manager in Iraq in 6x 250 KW GAS TURBINE power plants
in NINAWA. I was worked last 18 month Under Iraq ministry of electricity
 
• Installation and commissioning work was done in the distribution 400 kv substation through
by ALSTOM including all type of cable pulling and termination.
 
ALSTOM IRAQ
Resident Site manager (OCT- 2011 to NOV 2013)
Nainawa power plant
400 kv sub station
Responsibilities:
 
• Reporting to Project Manager. In charge of all erection and commissioning projects as a site
manager and ensuring compliance of all local statutory requirements.
• Liaison with clients and contractors in order to deliver the projects in time.
• To coordinate with the sub- contractor and testing team and the client at the time to time to salve
the technical problems.
• To attend the client weekly meeting and monthly meeting and review of project progress and to
find out the problems to avoid the delay to execute the project on time.
• Selection and ordering of materials required for execution of the projects.
• Organizing periodical review meetings with higher ups/subordinates for monitoring targets against
set budget.
4 | P a g e 
 
AREVA, DUBAI, UAE.
Site manager (22-Nov 2011 to Sep2011)
Bird site DEWA
Responsibilities:
 
• Reporting to Project Manager. In charge of all erection and commissioning projects as a site
manager and ensuring compliance of all local statutory requirements.
• Liaison with clients and contractors in order to deliver the projects in time.
• To coordinate with the sub- contractor and testing team and the client at the time to time to salve
the technical problems.
• To attend the client weekly meeting and monthly meeting and review of project progress and to
find out the problems to avoid the delay to execute the project on time.
• Selection and ordering of materials required for execution of the projects.
• Organizing periodical review meetings with higher ups/subordinates for monitoring targets against
set budget.
 
 
 
 
 
 
 
AL KAFAAHA ELECTRICAL COMPANY, DUBAI, UAE.
Project manager (15-Jan 2008 to Aug 2011)
Responsibilities:
• Reporting to Operations Manager. In charge of all erection and commissioning projects as a Project
Head and ensuring compliance of all local statutory requirements.
• Liaison with clients and contractors in order to deliver the projects in time.
• Tendering, selection and appointment of various contractors for the Projects’ taken up for execution.
• Planning, controlling and directing all operations required for proper execution of any project,
starting from Development to Administration to ultimate cash flow and allocation of fund according
to necessity.
• Optimizing best use of all available resources in the organization to achieve organizational
Objectives.
• Selection and ordering of materials required for execution of the projects.
• Organizing periodical review meetings with higher ups/subordinates for monitoring targets against
set budget.
 
 
PREVIOUS ASSIGNMENTS
 
 
• Worked as a Residential site manager from ALSTOM for Iraq electrical ministry Contract no SAS 880
6 x 250 KW GAS TURBINE power plants and 400 kv 8 diameters of GIS and 16 bay 132 kv
GIS installation and commissioning work was completed with 3 type of grid communication by
ABB Telecom panels in NINAWA. 300 MVA Transformers, 150 MVA 3 transformers, and ect…
 
• Worked as a Site manager from ALSTOM for DEWA 132/11 kv Substation Project electromechanical
equipment installation supervision PROJECT: CE 0716A/2008 BIRD SITE
 
• From alkafaah, as a Project manager for ALSTOM SITE, DUBAI INVESTMENT PARK (L&T SITE) 132/11
kv Substation Project electromechanical equipment installation supervision PROJECT: CE 448 B 2007
 
• From alkafaah Project manager for RC 1 JEBELALI AIRPORT (SIEMENS SITE) 132/11 kv Substation
Project electromechanical equipment installation supervision.PROJECT:JXB1/INF/0045 (DCA-045)
 
• From alkafaah Project manager for RC 2 JEBELALI AIRPORT (SIEMENS SITE) 132/11 kv Substation
Project electromechanical equipment installation supervision.PROJECT:JXB1/INF/0045 (DCA-045)
 
• From alkafaah Project manager for jumera village (AREVA SITE) PROJECT: CE 220 / 132/11 kv Substation
Project electromechanical equipment installation supervision.
5 | P a g e 
 
 
• From alkaffaha Project manager for Maritime City PROJECT: CE 228 (AREVA SITE) 132/11 kV Substation
Project electromechanical equipment installation supervision from July 2008 December 30, 2008.
 
• With AlKafaah Electrical Contracting company. Completed ABB Switzerland project in Qatar Ras Abu Fonts
220KV GIS Substation project and IN Saudi. ABAHAH 400kv substation project, GIS assembling and
installation of 300 MVA transformers from January 2008 to July 2008 IN QUATAR AND SOUDI ARABIYA as a
Project manager
 
• As a Site manager with prime electrical contracting company, I was worked as a site manager in Al
Qusais snaya sub station, Barsha 1.
 
 
 
PRIME ELECTRICALS CONTRACTING COMPANY, DUBAI, UAE.
Project Engineer (21 Feb2006 to 9 Jan 2008)
Select Achievements
• Achieved great success in Power sub-station installation and commissioning including air bus-duct
Installation, and transformer up to 500 MVA range, all types of panels like bass bar protection,
MIMIC, 11KV switch gear, LVAC panels etc.
• Erected main control structures and housing for erection of four nos. of GE 4x180MW Gas turbines,
150 KM cable pulling, cable trays in 82 km trench in record time of 13 months.
• Identified critical activities for all project and gave top most attention towards them to resolve them
within scheduled time to avoid possible bottlenecks and delay in execution.
• Applied Quality Planning & Technology management criteria in all erection projects which led to
substantial improvement in quality of all works and client satisfaction.
Responsibilities:
• Reporting to General Manager. In charge of all erection and commissioning projects as a Project
Head and ensuring compliance of all local statutory requirements.
• Liaison with clients and contractors in order to deliver the projects in time.
• Tendering, selection and appointment of various contractors for the Projects’ taken up for execution.
• Planning, controlling and directing all operations required for proper execution of any project,
starting from Development to Administration to ultimate cash flow and allocation of fund according
to necessity.
• Optimizing best use of all available resources in the organization to achieve organizational
Objectives.
• Selection and ordering of materials required for execution of the projects.
• Organizing periodical review meetings with higher ups/subordinates for monitoring targets against
set budget.
6 | P a g e 
 
 
AREVA, DUBAI, UAE (EURO EMIRATES LLC)
 
Site in charge for GIS activities in 400 kV substations. (Sep 2003 to Jan 2005)
Responsibilities:
 
• Planned & scheduled erection of large GIS sub-stations projects at various places of UAE. (400 KV
SS,BUKATHRA, 400 KV SS and JAFZA II 400 kv substation)
 
 
SANGAM ALUMINIUM LTD., HOSUR/CHENNAI, INDIA
Mechanical Maintenance Supervisor/ Fitter (Aug 1990 to Feb 2001)
Responsibilities:
• Did planning & scheduling of plant preventive maintenance.
• Made shutdown planning of the plant and furnaces as a part of preventive maintenance.
• Prepared and planned layout plans for large machines shops to improve productivity.
• Attended to engineering and maintenance for most of the machines.
• Detailed planning and scheduling for completion of the jobs during any break-down situation.
• Ensured specs for erection of machineries so as to ensure quality of the jobs to be executed.
• Prepared and sent to the Management on regular basis Management Information System Reports
for man hour and machine hour lost due to break down on daily basis.
 
 
M/s Engineering Systems Ltd., Hosur, India
Mechanical trade Trainee (Aug 1989 to Aug 1990)
 
EDUCATION
• B.S. Engg (Mech), Washington American Global University, December 07, DUBAI, UAE.
• Undergone training in Fitter trade in National Industrial Training Institute, July 88, First Class.
 
DRIVING LICENSE
 
I have UAE/ INDIAN valued driving license and Indian driving license.
 
 
 
TRAINING SKILLS
• Training in Fire Fighting Course from Fire Station in India
• GIS sub-station erection Trained by AREVA BHT in Dubai, UAE.
• GIS assembling and erection works trained 30 days by ABB in there factory Switzerland Europe
• IMS training from ALSTOM training10 days in France.
 
COUNTRY VISITS FOR EMPLOYMENTS
• United Arab Emirates (Dubai, Sharjah, Abu Dhabi and all emirates)
• Switzerland (ZURICK)
• Kingdom of Bahrain
• Qatar (DOHA)
• Kingdom of Saudi (ABHAHA, Jeddah, Riyadh)
• Iraq
 
PERSONAL DETAILS
• Date of Birth: 05-06-1967
• Languages Known: English, Tamil, Hindi, Malayalam, and Telugu
• EMAIL ADDRESS: mathavan2008@gmail.com

More Related Content

What's hot

shahid#2
shahid#2shahid#2
shahid#2
Shahid Hassan
 
Syed C.V
Syed C.VSyed C.V
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
Muhammad Rizwan
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
Lee Scholes
 
2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executed
Arun Das
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
saeed981
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
asterio bandoquillo
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
fady toma
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
Brijesh kumar
 
Resume Acc
Resume AccResume Acc
Resume Acc
mohammed yousuf
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
AEJAZ AFZAL NAKSHBANDI
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
Mohammed Irfan Parvaz
 
Manoj Subhash Patil AD H
Manoj Subhash Patil AD HManoj Subhash Patil AD H
Manoj Subhash Patil AD H
manoj patil
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
robinjacob0101
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
satya prasad
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
Arun Das
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
Baneshwar Pai
 
cv 2016
cv 2016cv 2016
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
Jai Kumar
 

What's hot (19)

shahid#2
shahid#2shahid#2
shahid#2
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executed
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
 
Manoj Subhash Patil AD H
Manoj Subhash Patil AD HManoj Subhash Patil AD H
Manoj Subhash Patil AD H
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
cv 2016
cv 2016cv 2016
cv 2016
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 

Similar to MATHAVAN LATEST CV ON AUG 2015

Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
mathavan2008
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
Teddy Fernando
 
Adil Mansoor
Adil MansoorAdil Mansoor
Adil Mansoor
Adil Mansoor
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
Kiran Sasi
 
Curriculum vitae 3.2
Curriculum vitae 3.2Curriculum vitae 3.2
Curriculum vitae 3.2
Sk Iftekar Ali
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
Ulysses Bustillo
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
yogesh kumar
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
MOHAMMED ABDUL JAMEEL
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
Richard Callueng
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
Paula Intra Lohit
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
JITENDRA CHAUDHARI
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
saeed981
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
IQBAL KHAN
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
Raghavendra Velayutharaja
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
Steven D'souza
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
Vishnu Vijayan
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
MUTHUKUMAR428109
 
resume design engineer
resume design engineerresume design engineer
resume design engineer
Arun Kumar
 
LI, GUANGYA
LI,  GUANGYALI,  GUANGYA
LI, GUANGYA
Guangya Li
 
KONI RESUME
KONI RESUMEKONI RESUME

Similar to MATHAVAN LATEST CV ON AUG 2015 (20)

Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Adil Mansoor
Adil MansoorAdil Mansoor
Adil Mansoor
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
Curriculum vitae 3.2
Curriculum vitae 3.2Curriculum vitae 3.2
Curriculum vitae 3.2
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
resume design engineer
resume design engineerresume design engineer
resume design engineer
 
LI, GUANGYA
LI,  GUANGYALI,  GUANGYA
LI, GUANGYA
 
KONI RESUME
KONI RESUMEKONI RESUME
KONI RESUME
 

MATHAVAN LATEST CV ON AUG 2015

  • 1. 1 | P a g e            S.MATHAVAN NO 21, VIVEAGANANDA STREET KANDANCHAVADI CHENNAI 600 096 mathavan2008@gmail.com Mobile no India: 0091 9176885000, 9176549008 UAE M. # 0097 52 7594880       SITE MANAGER   PROFESSIONAL ATTRIBUTES   • A highly experienced result-oriented manager with over 21 years of illustrious service in planning, erection of large power plants, huge e l e c t r o -mechanical structures, GIS sub-stations and maintenance field in India and abroad. Well known in the profession for: 0 Leadership, Sincerity, Exemplary Honesty, unquestionable Integrity in actions and developing team Spirit. 0 Excellent Organizing and timely execution capability. 0 Applying single minded devotion for completing any assignment satisfactorily. 0 Thorough about understanding of the fundamentals in the area of assigned responsibility. • I was holding the key responsibility of Project manager in Alkaffaha Electrical Contracting Company-Dubai, an organization well kno wn for its planning, engineering, quality of construction, execution of huge c o n t r a c t s in the field of electrical power plants in Middle East and Asia. • Expert in erection of large capacity transformers in the range of 300 MVA and above. • Have established excellent creditability in the professional circle for:   � handling multiple Projects - keeping full control on multidisciplinary activities. � Meticulous Project Planning, Implementation with respect to the stipulated parameters andstrict time schedule adherence. � typical o b j e c t i v e oriented style of preparation and presentation of progress reports and MIS to management. � Proven administrative capability to handle all t yp e s of personnel involved with any project of sizable dimension. • Proven track record of successful plan, erection and commissioning of multiple projects’ across various parts of India and Middle East Asia in record time.     SALIENT CAPABILITIES AND ACHIEVEMENTS:     • Well proficient with latest erection methodologies, in compliance with the quality standards. • Expertise in: 0 The development and implementation of Project Management systems, ISO-TQM System. Organization Development, MIS – Uniform Reporting system, etc. 0 Swiftly ramping up projects with competent cross-functional skills and on time execution. • Exemplary Relationship management, Effective Communication skills w i t h the ability to network with project members, consultants, contractors, and statutory agencies with consummate ease.
  • 2. 2 | P a g e      Work Experience       • To monitor all the Electrical Installation, MEP, LSP, CIVEL sub contractors and their progress, and   Drawing coordination.   • To attend the client weekly meeting, monthly meeting regularly.   • Daily, weekly progress reports to the project manager, civil project manager, civil, testing commissioning manager, MEP coordinator, and the entire site Controls and etc.. • To prepare the ETC progress, and get the approval from the client and handover to   Project manager by monthly basic.   • Electrical, mechanical technical clarification for the client. And required site level   Modification, and to get the approval from the client and execution.   • To coordination with transformer supervisor like from German AREVA, TRUKEY AREVA, ABB.   For the installation and modification.   • To coordination with the 132 kv GIS supervisor and GIS installation manager for the Installation of GIS, LCC, PJB Panel installation, cable pulling, and termination works Execution • Cable trays installation and modification according to the site condition and get the approval from client in the red mark drawing...   • 110v, 48 v battery installation commissioning and coordination with the battery manufacture.   • LVAC, Control panels, protection panels, scada panels, fault recorder panels, telecom. FRP, installation, cable pulling and termination,   • 132 kv GIS Installation, commissioning works. And 400 KVGIS installation and GIB installations, cable try, cabling installations.   • 132 kv XLP copper cable pulling from 132 GIS to IDTS and Reactor to 132 GIS BAY and coordination with the approved cable jointers to execute the 132 kv termination and link box installation and approval from the client as per the site condition .   • 11 KV XLP copper cable pulling from IDT to 11 KV AIS Gears. And capacitor bank to 11 KV   AIS Gears. 11 kv cable pulling from Earting transformer to IDTS, all type of cable pulling, termination and etc...   • Coordination with commissioning team to get the client witness and complete the Testing activities in smooth manner.   • Coordination with MEP coordinator to complete the MEP Equipment’s installation and testing activities. And Modification works in the firefighting equipment’s, fire protection equipment and Programming.
  • 3. 3 | P a g e      Current ASSIGNMENT Now I am working as a SITE MANAGER in ABB, contract no REZD/E/2008/1 IN ARJAN site in DUBAI. UAE       LATEST ASSIGNMENT   • I was worked as a Residential site manager in Iraq in 6x 250 KW GAS TURBINE power plants in NINAWA. I was worked last 18 month Under Iraq ministry of electricity   • Installation and commissioning work was done in the distribution 400 kv substation through by ALSTOM including all type of cable pulling and termination.   ALSTOM IRAQ Resident Site manager (OCT- 2011 to NOV 2013) Nainawa power plant 400 kv sub station Responsibilities:   • Reporting to Project Manager. In charge of all erection and commissioning projects as a site manager and ensuring compliance of all local statutory requirements. • Liaison with clients and contractors in order to deliver the projects in time. • To coordinate with the sub- contractor and testing team and the client at the time to time to salve the technical problems. • To attend the client weekly meeting and monthly meeting and review of project progress and to find out the problems to avoid the delay to execute the project on time. • Selection and ordering of materials required for execution of the projects. • Organizing periodical review meetings with higher ups/subordinates for monitoring targets against set budget.
  • 4. 4 | P a g e    AREVA, DUBAI, UAE. Site manager (22-Nov 2011 to Sep2011) Bird site DEWA Responsibilities:   • Reporting to Project Manager. In charge of all erection and commissioning projects as a site manager and ensuring compliance of all local statutory requirements. • Liaison with clients and contractors in order to deliver the projects in time. • To coordinate with the sub- contractor and testing team and the client at the time to time to salve the technical problems. • To attend the client weekly meeting and monthly meeting and review of project progress and to find out the problems to avoid the delay to execute the project on time. • Selection and ordering of materials required for execution of the projects. • Organizing periodical review meetings with higher ups/subordinates for monitoring targets against set budget.               AL KAFAAHA ELECTRICAL COMPANY, DUBAI, UAE. Project manager (15-Jan 2008 to Aug 2011) Responsibilities: • Reporting to Operations Manager. In charge of all erection and commissioning projects as a Project Head and ensuring compliance of all local statutory requirements. • Liaison with clients and contractors in order to deliver the projects in time. • Tendering, selection and appointment of various contractors for the Projects’ taken up for execution. • Planning, controlling and directing all operations required for proper execution of any project, starting from Development to Administration to ultimate cash flow and allocation of fund according to necessity. • Optimizing best use of all available resources in the organization to achieve organizational Objectives. • Selection and ordering of materials required for execution of the projects. • Organizing periodical review meetings with higher ups/subordinates for monitoring targets against set budget.     PREVIOUS ASSIGNMENTS     • Worked as a Residential site manager from ALSTOM for Iraq electrical ministry Contract no SAS 880 6 x 250 KW GAS TURBINE power plants and 400 kv 8 diameters of GIS and 16 bay 132 kv GIS installation and commissioning work was completed with 3 type of grid communication by ABB Telecom panels in NINAWA. 300 MVA Transformers, 150 MVA 3 transformers, and ect…   • Worked as a Site manager from ALSTOM for DEWA 132/11 kv Substation Project electromechanical equipment installation supervision PROJECT: CE 0716A/2008 BIRD SITE   • From alkafaah, as a Project manager for ALSTOM SITE, DUBAI INVESTMENT PARK (L&T SITE) 132/11 kv Substation Project electromechanical equipment installation supervision PROJECT: CE 448 B 2007   • From alkafaah Project manager for RC 1 JEBELALI AIRPORT (SIEMENS SITE) 132/11 kv Substation Project electromechanical equipment installation supervision.PROJECT:JXB1/INF/0045 (DCA-045)   • From alkafaah Project manager for RC 2 JEBELALI AIRPORT (SIEMENS SITE) 132/11 kv Substation Project electromechanical equipment installation supervision.PROJECT:JXB1/INF/0045 (DCA-045)   • From alkafaah Project manager for jumera village (AREVA SITE) PROJECT: CE 220 / 132/11 kv Substation Project electromechanical equipment installation supervision.
  • 5. 5 | P a g e      • From alkaffaha Project manager for Maritime City PROJECT: CE 228 (AREVA SITE) 132/11 kV Substation Project electromechanical equipment installation supervision from July 2008 December 30, 2008.   • With AlKafaah Electrical Contracting company. Completed ABB Switzerland project in Qatar Ras Abu Fonts 220KV GIS Substation project and IN Saudi. ABAHAH 400kv substation project, GIS assembling and installation of 300 MVA transformers from January 2008 to July 2008 IN QUATAR AND SOUDI ARABIYA as a Project manager   • As a Site manager with prime electrical contracting company, I was worked as a site manager in Al Qusais snaya sub station, Barsha 1.       PRIME ELECTRICALS CONTRACTING COMPANY, DUBAI, UAE. Project Engineer (21 Feb2006 to 9 Jan 2008) Select Achievements • Achieved great success in Power sub-station installation and commissioning including air bus-duct Installation, and transformer up to 500 MVA range, all types of panels like bass bar protection, MIMIC, 11KV switch gear, LVAC panels etc. • Erected main control structures and housing for erection of four nos. of GE 4x180MW Gas turbines, 150 KM cable pulling, cable trays in 82 km trench in record time of 13 months. • Identified critical activities for all project and gave top most attention towards them to resolve them within scheduled time to avoid possible bottlenecks and delay in execution. • Applied Quality Planning & Technology management criteria in all erection projects which led to substantial improvement in quality of all works and client satisfaction. Responsibilities: • Reporting to General Manager. In charge of all erection and commissioning projects as a Project Head and ensuring compliance of all local statutory requirements. • Liaison with clients and contractors in order to deliver the projects in time. • Tendering, selection and appointment of various contractors for the Projects’ taken up for execution. • Planning, controlling and directing all operations required for proper execution of any project, starting from Development to Administration to ultimate cash flow and allocation of fund according to necessity. • Optimizing best use of all available resources in the organization to achieve organizational Objectives. • Selection and ordering of materials required for execution of the projects. • Organizing periodical review meetings with higher ups/subordinates for monitoring targets against set budget.
  • 6. 6 | P a g e      AREVA, DUBAI, UAE (EURO EMIRATES LLC)   Site in charge for GIS activities in 400 kV substations. (Sep 2003 to Jan 2005) Responsibilities:   • Planned & scheduled erection of large GIS sub-stations projects at various places of UAE. (400 KV SS,BUKATHRA, 400 KV SS and JAFZA II 400 kv substation)     SANGAM ALUMINIUM LTD., HOSUR/CHENNAI, INDIA Mechanical Maintenance Supervisor/ Fitter (Aug 1990 to Feb 2001) Responsibilities: • Did planning & scheduling of plant preventive maintenance. • Made shutdown planning of the plant and furnaces as a part of preventive maintenance. • Prepared and planned layout plans for large machines shops to improve productivity. • Attended to engineering and maintenance for most of the machines. • Detailed planning and scheduling for completion of the jobs during any break-down situation. • Ensured specs for erection of machineries so as to ensure quality of the jobs to be executed. • Prepared and sent to the Management on regular basis Management Information System Reports for man hour and machine hour lost due to break down on daily basis.     M/s Engineering Systems Ltd., Hosur, India Mechanical trade Trainee (Aug 1989 to Aug 1990)   EDUCATION • B.S. Engg (Mech), Washington American Global University, December 07, DUBAI, UAE. • Undergone training in Fitter trade in National Industrial Training Institute, July 88, First Class.   DRIVING LICENSE   I have UAE/ INDIAN valued driving license and Indian driving license.       TRAINING SKILLS • Training in Fire Fighting Course from Fire Station in India • GIS sub-station erection Trained by AREVA BHT in Dubai, UAE. • GIS assembling and erection works trained 30 days by ABB in there factory Switzerland Europe • IMS training from ALSTOM training10 days in France.   COUNTRY VISITS FOR EMPLOYMENTS • United Arab Emirates (Dubai, Sharjah, Abu Dhabi and all emirates) • Switzerland (ZURICK) • Kingdom of Bahrain • Qatar (DOHA) • Kingdom of Saudi (ABHAHA, Jeddah, Riyadh) • Iraq   PERSONAL DETAILS • Date of Birth: 05-06-1967 • Languages Known: English, Tamil, Hindi, Malayalam, and Telugu • EMAIL ADDRESS: mathavan2008@gmail.com